16
dynamics in engineering www.abmeurope.com [email protected] 1

ABM Bridge Systems Presentation

Embed Size (px)

Citation preview

Page 1: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

1

Page 2: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

2

•Established in 1994

•Experience in Ireland, UK and Mainland Europe

•Design & Build

•Value Engineering

•Project Management

•Excellent Reputation and Track Record

About Us

Page 3: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

3

Company Structure

Page 4: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

4

•tunnel portals

•railway overbridges/underbridges

•river crossings

•motorway underbridges

•attenuation tanks and tidal structures

Bridge Systems Project References

Page 5: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

5

Technological Advance

•Investment in advanced structural analysis design technology.

•Highly qualified in-house design professionals.

•Innovative, effective design and construction solutions.

Accreditation

•ISO 9001:2008

•Safe-T Certificate

Page 6: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

6

ABM Bridge Systems - WHAT DO WE DO?

• Rapid design and construction of bridges & culverts

• Using innovative modular components

• To provide a high-quality and dependable delivery

Page 7: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

7

ABM Bridge Systems – Products:

•Precast concrete buried modular arches & portals

•Specialist proven technology worldwide – Matiere ®

•Open/ closed cell configurations

•End treatment solutions – Wing walls/ Edge Beams

•Special customisation for bespoke applications

ABM Bridge Systems – Services:•Specialist sub-contracting service

•Full in-house design capability

•Chartered Engineers to certify designs

•Manufacturing expertise

•Project management of delivery & installation

Page 8: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

8

Manufacturing Capacity:

• Permanent Factory in Tuxford, United Kingdom

• Mobile Casting Facility in Banska, Slovakia

• Highly mobile and adaptable work-force

• In-house concrete batching expertise

• Extensive QA systems & procedures

• Moulds custom built for bespoke applications

Page 9: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

9

Features & Benefits:

• Up to 20m span in single cell or multi-

cell profiles - flexible

• Ball & socket technology – maintenance

free

• Soil-structure interaction – efficient

design to reduce weight

• Rapid installation up to 25m per day

• Simple self-stabilising construction

• Full frame precast option

• Customisation to suit specific projects

Soil Block for Soil-Structure Interaction:

Ball – Socket “maintenance free” Bearing Joint:

Page 10: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

10

Who do ABM Bridge Systems work for?

•Sub-contractors to large international Main Contractors

•Specialist designers for global Consulting Engineering firms

•Approved and certified suppliers to infrastructure authorities

Where do ABM Bridge Systems operate?

• Ireland, UK, Czech Republic, Slovakia, Poland, Romania

• Infrastructure applications

• Public Private Partnerships/ Design and Build

•Fast-track projects

Page 11: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

11

Case Study 1 (Czech Rep.) – Prague Ring Road:

Contractor: Alpine (Ph 613); Metrostav (Ph 612)

Consultant: Pragoprojekt

Scope: Design, manufacture & install 5 no. twin-

span arches 19m in span over a dual carriageway

line to form environmental “green” bridges.

Construction Period: The structures were

delivered on a phased basis over 7 months with

a total work-time on-site of 10 weeks.

Page 12: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

12

Case Study 2 (Slovakia)Jasna Ski Resort:

Contractor: J & T

Consultant: Sudop

Scope: Design, manufacture & install CM4 arch

arches on horizontal curve and vertical grade.

Construction Period: 7 days.

Page 13: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

13

Case Study 3 (Ireland) – M3 PPP Clonee to Kells:

Contractor: JV Ferrovial-Agroman & SIAC

Consultant: White Young Green

Scope: Design, manufacture & install 14 no.

Opti Cadre Underbridges including Wingwalls.

Construction Period: The structures were

delivered on a phased basis over 9 months with

a total work-time on-site of 16 weeks.

Page 14: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

14

Case Study 4 (UK) – Renault F1 CFD Centre:

Contractor: SDC

Consultant: Scott Wilson

Scope: Design, manufacture & install CM4

precast arch to form buried building to house

“supercomputer” and aerodynamics designers.

Construction Period: The structure was

delivered from order to installation in 3 months

with a total work-time on-site of 6 days.

Page 15: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

15

ABM Bridge Systems – WHAT CAN WE DO FOR YOU NOW?

• We offer a free conceptual design service with budgets

• We would be delighted to collaborate on a confidential basis for projects you are tendering for

•We will deal promptly with tender enquiries

• We can attend a further meeting to brainstorm technical solutions

Page 16: ABM Bridge Systems Presentation

dynamics in engineering

[email protected]

16

THANK YOU FOR YOUR TIME