47
KERALA STATE ELECTRICITY BOARD LIMITED (Incorporated under the Indian Companies Act, 1956) Registered Office: Vydyuthi Bhavanam, Pattom, Thiruvananthapuram – 695 004. Website: www.kseb.in CIN: U40100KL2011SGC027424 MB Nair: D:\My Documents\Documents\Disribution\Uniform Labor Data\Proposal 02.2015 - ULD 2015 - BO - R0.docx 26.08.2016 Abstract Revising Uniform Labour Data for various works under Distribution wing based on Delhi Schedule of Rate 2014 – Sanctioned- Orders issued. Corporate Office (SBU-D) BO (FTD) No. 2495/ 2016 (No D (D&S)/D6-AE 1/Proposal 02/2015) Dtd Tvpm, 25.08.2016 Read: 1 BO (FM) (Genl) No 741/2013(DPCII/AEE1/2013/M(Dist)) dated 01.04.2013. 2. Circular No CE/Admn/PLA/1014/2005 of Chief Engineer, PWD Roads & Bridges and Administration. Order The rates prescribed in BO 1 st cited is now followed for preparation of estimates for various works in Distribution Wing of KSEB. Subsequently Board, vide BO (FTD) No 2033/2014(DGC/AEE-II/Data & SoR/2014 dated 25.07.2014 adopted CPWD Data in KSEB for preparation of estimates for civil works where mechanized work is not possible, and to adopt CPWD SoR and National Building Code Guidelines for civil and electrical works in KSEB. CPWD has published latest cost indices for various places with effect from 01.08.2015 based on Delhi Plinth Area Rate (DPAR) 2012. Various representations have been received from representatives of petty contractors and casual line workers to adopt CPWD data and also to enhance the labour rates of certain specific items like stringing, re-conductoring, fabrication etc. Director (Distribution, Safety & Generation - Electrical) in his note dated 20.08.2016 pointed out that Board has been giving emphasis on standardization and quality of work considering the safety of installation, operating personnel and other users; the prescribed standards of performance and compulsion to complete the work within short time. For this contractors may have to employ additional manpower. The manpower requirement and rates worked out were scrutinised by team of experts in Distribution Wing. It was suggested that contractor are to be suitably compensated to ensure quality work. Based on the recommendation of team of experts, Director (Distribution, Safety & Generation - Electrical) recommended revising the Uniform Labour Data.

Abstract Corporate Office (SBU-D) - KSEB

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Abstract Corporate Office (SBU-D) - KSEB

KERALA STATE ELECTRICITY BOARD LIMITED (Incorporated under the Indian Companies Act, 1956)

Registered Office: Vydyuthi Bhavanam, Pattom, Thiruvananthapuram – 695 004. Website: www.kseb.in CIN: U40100KL2011SGC027424

MB Nair: D:\My Documents\Documents\Disribution\Uniform Labor Data\Proposal 02.2015 - ULD 2015 - BO - R0.docx 26.08.2016

Abstract Revising Uniform Labour Data for various works under Distribution wing based on Delhi Schedule of Rate 2014 – Sanctioned- Orders issued.

Corporate Office (SBU-D)

BO (FTD) No. 2495/ 2016 (No D (D&S)/D6-AE 1/Proposal 02/2015) Dtd Tvpm, 25.08.2016

Read: 1 BO (FM) (Genl) No 741/2013(DPCII/AEE1/2013/M(Dist)) dated 01.04.2013.

2. Circular No CE/Admn/PLA/1014/2005 of Chief Engineer, PWD Roads & Bridges and Administration.

Order The rates prescribed in BO 1st cited is now followed for preparation of estimates for various works in Distribution Wing of KSEB. Subsequently Board, vide BO (FTD) No 2033/2014(DGC/AEE-II/Data & SoR/2014 dated 25.07.2014 adopted CPWD Data in KSEB for preparation of estimates for civil works where mechanized work is not possible, and to adopt CPWD SoR and National Building Code Guidelines for civil and electrical works in KSEB. CPWD has published latest cost indices for various places with effect from 01.08.2015 based on Delhi Plinth Area Rate (DPAR) 2012. Various representations have been received from representatives of petty contractors and casual line workers to adopt CPWD data and also to enhance the labour rates of certain specific items like stringing, re-conductoring, fabrication etc.

Director (Distribution, Safety & Generation - Electrical) in his note dated 20.08.2016 pointed out that Board has been giving emphasis on standardization and quality of work considering the safety of installation, operating personnel and other users; the prescribed standards of performance and compulsion to complete the work within short time. For this contractors may have to employ additional manpower. The manpower requirement and rates worked out were scrutinised by team of experts in Distribution Wing. It was suggested that contractor are to be suitably compensated to ensure quality work. Based on the recommendation of team of experts, Director (Distribution, Safety & Generation - Electrical) recommended revising the Uniform Labour Data.

Page 2: Abstract Corporate Office (SBU-D) - KSEB

After considering the proposal in detail, the Full Time Directors of the Board, in the meeting held on 20.08.2016 decided the following:

1 To amend the Uniform Labour Data on the basis of Delhi Schedule of Rates, 2014 and revised labour / material requirement (wherever applicable) as given in Annexure. It is clarified that these rates will be made applicable for works for which quotations / tenders are invited in future only.

2 The rates for works which are not included in the uniform labour data at present shall be approved by the concerned Executive Engineer / Deputy Chief Engineer, as per the prevailing practice.

3 To authorised the Director (Distribution & Safety) to issue necessary Circulars for smooth implementation of the Uniform Labour Data.

4 To entrust Chief Engineer (IT & CR) to prepare a web-based application for simplifying the office works like preparation of work order, draft agreement, schedule to agreement, list of materials required (pole-var schedule), PC Bill etc associated with various Distribution Works.

5 To entrust Sri ET Murali Mohan, Assistant Executive Engineer, Electrical Sub Division, Alathiyur to develop a spreadsheet application to meet the above requirements till the time a full-fledged software is developed (A committee to be constituted by Director (Distribution & Safety) will scrutinise the spreadsheet template before implementation).

By Order of the Full Time Directors

Sd/-

Rajthilakan MG Secretary (Administration)

(Explanatory Note)

1 This labour data is for works carried out in the Distribution Wing of the Board, mostly covering electrical works. Even though the Board considered various Schedule of Rates and Data while revising the labour data, it is neither a replica of the any schedule of rates nor a mere adaptation. The reason for revising the Uniform Labour Data from time to time is for administrative convenience only. All contracted works in Distribution Wing is carried out through transparent competitive bidding (either by way of quotation or tender). The rates are guiding factors for the officers in preparation of various estimates; it does not have any bearing on the amount which an intending contractor can quote. When many persons participate in the tender and quote, KSEB chooses the lowest tender. Hence

Page 3: Abstract Corporate Office (SBU-D) - KSEB

the rates proposed in revised Uniform Labour Data will not be applicable for works for which quotations / tenders were already invited.

2 It was noted that the manpower requirement estimated earlier for some of the works were insufficient e.g. providing pipe earthing, stringing, installation & maintenance of streetlight etc. The man-power requirement estimate was reviewed and modified, wherever required. This affects the rate of all connected works also e.g. insufficiency in the rate provided for pipe earthing (as a task) also affects all tasks which has pipe earthing as sub-task.

3 The Distribution Advisory Committee pointed out that including pipe earthing as a sub-task as being done earlier often dilutes the importance of proper earthing (e.g. installation of Distribution Transformer may require 5 pipe earthing; in such cases there is tendency to overlook the importance of carrying out earthing in proper way). Hence earthling is now de-linked from other tasks (e.g. Key No 137, 138, 139, 140, 167, 176, 222). For such works, additional rates can be provided for carrying earthing as per specification.

4 In some cases the specification of task is changed and man-hour / material requirement is reworked accordingly (e.g. Key No 928, 929, 953, 954)

5 Rates for 46 items are included additionally in the Uniform Labour. Since field officers are familiar with the existing key numbers, it is attempted to maintain the old key numbers, wherever possible. However in some cases, it is required to change the existing key-numbers, so as to accommodate certain additional items.

To

Chief Engineers (Distribution Regions)

Chief Engineer (IT & CR) / Chief Engineer (CAPS)

Sri ET Muralimohan, AEE, ESD Alathiyur Copy to:

Chief Engineer (Commercial & Tariff) / Financial Advisor / Chief Internal Auditor

Deputy Chief Engineer (TRAC)

Executive Engineer (RITU Thiruvananthapuram)

Page 4: Abstract Corporate Office (SBU-D) - KSEB

TA to the Chairman & Managing Director / TA to Director (Distribution, Safety & Generation - Elec) / TA to Director (Transmission & System Operation)/ TA to Director (SCM & CP) / TA to Director (Generation – Civil & HRM) / PA to Director (Finance)

Resident Audit Officer, ECA, Vydyuthi Bhavanam/ Legal Liaison Officer, Kochi

Senior CA to Secretary/ The Fair Copy Superintendent / Library/ Stock File. Forwarded / By Order

Asst Exe Engineer

Page 5: Abstract Corporate Office (SBU-D) - KSEB

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

1 2 3 4 5HT LINE WORKS HT LINE WORKS

101 Surveying one km 11kV line using Theodolite. Surveying one km 11kV line using Theodolite. km 3297.00102 Surveying one km 11kV line using Ranging Rod. Surveying one km 11kV line using Ranging Rod. km 2216.00

103 Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site.

Loading HT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 270.00

104 Transporting one HT PSC pole by Hand cart (limited to 4km).

Transporting one HT PSC pole by Hand cart - normally limited to 4km (excluding loading and unloading). P/km 270.00

105 Loading HT 'A' type pole to Hand cart from the stacking place and unloading the same at work site.

Loading HT 'A' type pole of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 299.00

106 Transporting 'A' type pole by Hand cart (limited to 4km).

Transporting 'A' type pole of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading). P/km 335.00

107 Loading HT 4 legged pole to Hand cart from the stacking place and unloading the same at work site.

Loading HT Four legged lattice structure of all sizes to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 399.00

T i 4 l d l b H d (li i d T i F l d l i f ll i b H d ll li i d 4k

Kerala State Electricity Board LtdAnnexure to BO (FTD) No 2495/2016 (D(D&S))/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Uniform Labour Data for Distribution Works in KSEB - Based on DSoR 2014

108 Transporting 4 legged pole by Hand cart (limited to 4km).

Transporting Four legged lattice structure of all sizes by Hand cart - normally limited to 4km (excluding loading and unloading). P/km 470.00

109 Transporting one HT PSC pole by Head load (limited to 0.3km).

Transporting one HT PSC pole by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 1507.00

110 Transporting 'A' type pole by Head load (limited to 0.3km).

Transporting 'A' type pole of all sizes by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 1764.00

111 Transporting 4 legged pole by Head load (limited to 0.3km).

Transporting Four legged lattice structure of all sizes by Head load- for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 2446.00

112Fitting and erecting one HT PSC Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).

No 1934.00

113Fitting and erecting one HT 'A' type Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT 'A' type Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).

No 2448.00

Page 1 of 43

Page 6: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

114Fitting and erecting one HT 4 legged pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Four legged lattice structure in position including fitting cross arm, digging and back filling pit in ordinary soil (as per standards), drawing sufficient length of GI earthing leads from F clamp through V cross arm to the ground for earthing (excluding provision of earthing).

No 3529.00

115 Additional rate for providing one disc set on any type of HT pole for making cut point.

Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. No 94.00

116Fitting and erecting one HT DP using PSC pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

No 5159.00

117Fitting and erecting one HT DP using 'A' type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using 'A' type pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

No 6187.00

118Fitting and erecting one HT DP using 4 legged pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using Four legged lattice structure in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excluding provision of earthing).

No 8349.00

( g p g)

119 Fitting and providing one HT Stay for 11kV pole incl. digging & back filling pit.

Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. No 812.00

120 Fitting and providing one Strut using HT PSC pole incl. digging & back filling pit.

Fitting and providing one Strut using HT PSC pole including digging and back filling pit in ordinary soil. No 1805.00

121 Fitting and providing one Strut using 'A' type pole incl. digging & back filling pit.

Fitting and providing one Strut using 'A' type pole, including digging and back filling pit in ordinary soil. No 2319.00

122 Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole incl. digging & back filling pits.

Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2839.00

123 Fitting and providing one HT Fly stay for 11kV pole using 'A' type pole incl. digging & back filling pits.

Fitting and providing one HT Fly stay for 11kV pole using 'A' type pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 3353.00

124Insertion of one HT PSC pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT PSC pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2027.00

125Insertion of one HT 'A' type pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT 'A' type pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2541.00

Page 2 of 43

Page 7: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

126Insertion of one HT 4 legged pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT Four legged lattice structure in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 3812.00

127 Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. No 257.00

128 Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. No 514.00

129 Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. Additional rate for excavation of one Pit for HT Pole/HT Stay in Soft Rock. No 771.00

130 Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. Additional rate for excavation of one Pit for HT Pole/HT Stay in Rock. No 1542.00

131 Additional rate for excavation of Pit for 'A' type pole in Laterite. Additional rate for excavation of Pit for 'A' type pole in Laterite. No 386.00

132 Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. Additional rate for excavation of Pit for 'A' type pole in Hard Laterite. No 771.00

133 Additional rate for excavation of Pit for 'A' type pole in Soft Rock. Additional rate for excavation of Pit for 'A' type pole in Soft Rock. No 1157.00

134 Additional rate for excavation of Pit for 'A' type pole in Rock. Additional rate for excavation of Pit for 'A' type pole in Rock. No 2313.00

135Stringing of one km 11kV line with ACSR Raccoon (3 conductors) incl. cutting and removing tree branches wherever necessary.

Stringing of one km 11kV line with ACSR Raccoon (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.

km 20538.00

136Stringing of one km 11kV line with ACSR Rabbit (3 conductors) incl. cutting and removing tree branches wherever necessary.

Stringing of one km 11kV line with ACSR Rabbit (3 conductors) after fitting insulators and giving jumper connections including cutting and removing tree branches wherever necessary excluding cut point works.

km 17295.00

137

Fitting and erecting one HT PSC DP, fitting all accessories (2 stays, 8 cross arms, AB, DO, LA etc.), mounting of 100kVA Transformer, fixing DB, DTR box and giving all HT & LT connections.

Fitting and erecting one HT Double Pole Structure using PSC pole in position, providing 2 stays, fitting 8 channel cross arms, fitting AB switch, DO fuse, station class LA etc., drawing GI earthing leads (separate GI strip for LA through insulated conduit) to the ground, mounting of 100kVA Transformer on DP structure, clamping with Transformer belt, fixing 2way distribution box, DTR meter with box, giving all HT & LT connections upto OH lines, fixing/sign writing all statutory display boards etc. including digging & back filling pit in ordinary soil excluding provision of pipe earthing, yard fencing and metaling.

No 20634.00

Page 3 of 43

Page 8: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

138 Fitting 6 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

Fitting 6 channel cross arms, AB switch, DO fuse, Station class LA, HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles.

No 6779.00

139 Fitting 5 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, Fixing distribution box/provision for one set (3No.) of LT fuses, , drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on poles.

No 6445.00

140 Fitting 3 channel cross arms, AB switch, DO fuse, LA, HT & LT connections on existing DP, 3 LT fuses.

Fitting 3 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LT connections upto OH lines, etc. on existing DP structure, fixing distribution box/provision for one set (3No.) of LT fuses, drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing & mounting of Transformer on plinth.

No 5777.00

141Erecting one CT-PT unit to existing DP and giving connections, incl. loading & unloading, excluding transportation.

Erecting one CT-PT unit to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site, but excluding cost for transporting CT-PT. No 3002.00

142Erecting one 25kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 25kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 2860.00p

143Erecting one 63kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 63kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 3002.00

144Erecting one 100kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 100kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 4225.00

145Erecting one 160kVA Transformer to existing DP and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 160kVA Transformer to existing DP and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 4367.00

146Erecting one 100kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 100kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 3658.00

147Erecting one 160kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 160kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 3800.00

148Erecting one 250kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 250kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 4895.00

Page 4 of 43

Page 9: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

149Erecting one 315kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 315kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 5037.00

150Erecting one 500kVA Transformer to existing Plinth/Platform and giving connections, incl. loading & unloading, excluding transportation.

Erecting one 500kVA Transformer to existing Plinth/Platform and giving connections, including loading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer.

No 5179.00

151Installing one DTR Meter with box on existing poles and giving the complete connections incl. conveyance of materials.

Installing one DTR Meter with box (normal size 40x25x100cm) on existing poles including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, capacitors, control fuses and giving the complete connections including conveyance of materials.

No 2220.00

152Installing one Border Meter with box on existing poles and giving the complete connections incl. conveyance of materials.

Installing one Border Meter with box (normal size 40x25x100cm) on existing poles including laying and termination of control cable using proper lugs, fixing of meters, control fuses and giving the complete connections including conveyance of materials.

No 2220.00

153Erection of LT 2 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).

Erection of LT 2 way distribution box (normal size 130x40x90cm) on existing cross arm, giving connection including cable and earth connection (excluding earthing). No 2220.00

154Erection of LT 3 way distribution box on existing cross arm giving connection incl. cable and earth connection Erection of LT 3 way distribution box (normal size 160x40x90cm) on existing cross arm, giving

connection including cable and earth connection (excluding earthing) No 2376.00g g(excluding earthing). connection including cable and earth connection (excluding earthing).

155Erection of LT 4 way distribution box on existing cross arm giving connection incl. cable and earth connection (excluding earthing).

Erection of LT 4 way distribution box (normal size 190x40x90cm) on existing cross arm, giving connection including cable and earth connection (excluding earthing). No 2532.00

156 Fitting one additional Fuse unit and giving connection from Transformer to fuse and DB to LT OH line.

Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. No 207.00

157Providing one Earth using earth pipe incl. digging separate pit at standard distance away from the pole/structure & backfilling.

Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in ordinary soil & backfilling.

No 1340.00

158Providing one Driven Earth using GI earth pipe at standard distance away from the pole/structure in loose soil.

Providing one Driven Earth using GI earth pipe of size 38.1mm dia, 2.5m length at minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil.

No 351.00

159Providing one Driven Earth using Steel earth rod at standard distance away from the pole/structure in loose soil.

Providing one Driven Earth using Steel rod of size 19mm dia, 2.5m length at a minimum distance of 1.5m away from the pole/structure and maintaining standard distance between different earth pipes in loose soil.

No 351.00

160 Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. Additional rate for excavation of one Earth Pit (2.5m depth) in Laterite. No 514.00

Page 5 of 43

Page 10: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

161 Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. No 1028.00

162 Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock. No 1542.00

163Providing one Coil Earth using GI earth wire, digging separate pit at standard distance away from the pole/structure & backfilling.

Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns) including digging separate pit (0.45x0.45x1.5m) at standard distance away from the pole/structure in ordinary soil & backfilling.

No 643.00

164 Fitting one set (3No.) 11kV LA and giving connections excluding earthing. Fitting one set (3No.) 11kV LA and giving connections excluding earthing. No 284.00

165 Fitting one set (3No.) 11kV DO Fuse and giving connection. Fitting one set (3No.) 11kV DO Fuse and giving connection. No 284.00

166Fitting one set AB switch, DO fuse, LA, giving connections and drawing earth leads for earthing excluding provision of earth.

Fitting one set AB switch, DO fuse (3No.), LA (3No.), giving all connections from HT line to Transformer bush and drawing earth leads to the ground for earthing excluding provision of earthing and fixing channels.

No 2477.00

167 Fitting one set AB switch and giving connection Fitting one set AB switch on existing DP, giving connection and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing. No 1652.00

Conveyance of one km 11kV line materials from section Conveyance of one km 11kV line materials from section store/stacking place to the work site km/ 168 Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).

Conveyance of one km 11kV line materials from section store/stacking place to the work site (excluding poles).

km/ km 1028.00

169 Fitting one Additional V cross arm in existing single pole incl. conveyance of materials. Fitting one Additional V cross arm in existing single pole including conveyance of materials. No 284.00

170 Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole incl. conveyance of materials.

Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. No 284.00

171Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP incl. conveyance of materials.

Fitting one Additional 2.4m/3m Channel cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. No 334.00

172Fitting one Additional 2.4m/3m Channel cross arm (75x40x6mm), in existing 11kV DP incl. conveyance of materials.

Fitting one Additional 2.4/3m Channel cross arm (75x40x6mm), in existing 11kV DP including conveyance of materials. No 321.00

173Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP incl. conveyance of materials.

Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP including conveyance of materials. No 314.00

174Fitting one LT 2 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.

Fitting one LT 2 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. No 83.00

Page 6 of 43

Page 11: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

175Fitting one LT 4 line cross arm on HT or LT existing poles incl. fitting insulators and binding the same with LT Line.

Fitting one LT 4 line cross arm on HT or LT existing poles including fitting insulators and binding the same with LT Line. No 124.00

176 Providing Bucket type cradling for one span 11kV line.Providing Bucket type cradling for one span 11kV line using 8 SWG GI wire including provision of two stays and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing

No 7343.00

177 Providing barbed wire protection (2.5m height) for one 11kV pole. Providing barbed wire anti-climbing protection (2.5m height) for one 11kV pole. No 135.00

178 Providing special type anti-climbing protection 2.5m height for one 11kV pole. Providing special type anti-climbing protection (2.5m height) for one 11kV pole. No 83.00

179 Fitting one additional HT pin with insulator Additional rate for providing one HT Pin with insulator, complete on any type of HT pole. No 88.00

180 Fitting one additional F top bracket Additional rate for providing one F top bracket complete, on any type of HT pole. No 88.00

181 Additional rate for excavation of Pit for 4 legged pole in Laterite. Additional rate for excavation of Pit for 4 legged pole in Laterite. No 540.00

182 Additional rate for excavation of Pit for 4 legged pole in Hard Laterite. Additional rate for excavation of Pit for 4 legged pole in Hard Laterite. No 1079.00

183 Additional rate for excavation of Pit for 4 legged pole in Additional rate for excavation of Pit for 4 legged pole in Soft Rock No 1619 00183 gg pSoft Rock. Additional rate for excavation of Pit for 4 legged pole in Soft Rock. No 1619.00

184 Additional rate for excavation of Pit for 4 legged pole in Rock. Additional rate for excavation of Pit for 4 legged pole in Rock. No 3238.00

185 Fitting one Additional 2.4m Channel cross arm in existing single pole incl. conveyance of materials.

Fitting one Additional 2.4m Channel cross arm in existing single pole including conveyance of materials. No 341.00

186Insertion of one HT PSC pole in existing HT/LT line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

Insertion of one HT PSC pole in existing HT/LT line including digging & back filling of pit in ordinary soil, fitting cross arm, insulator, binding etc. , drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2415.00

187Installing one DTR meter with box on existing channel/angle cross-arm on DP structure and giving connections including conveyance

Installing one DTR Meter with box of suitable size at a minimum height of 1.25 m above the ground level, in the existing Channel/Angle cross arm on DP structure, including fixing of 3 CTs on bus bar, laying and termination of control cable using proper lugs, fixing of meters, control fuses and giving connections including cost of conveyance of materials

No 545.00

LT LINE WORKS LT LINE WORKS

201 Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site.

Loading LT PSC pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 222.00

202 Transporting one LT PSC pole by Hand cart - limited to 4km (excluding loading and unloading).

Transporting one LT PSC pole by Hand cart - (normally limited to 4km (excluding loading and unloading). P/km 222.00

Page 7 of 43

Page 12: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

203 Transporting one LT PSC pole by Head load for an average distance of one km (limited to 0.3km).

Transporting one LT PSC pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 824.00

204 Erecting one LT PSC Pole in position incl. digging & back filling pit. Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. No 1193.00

205 Providing Stay for LT poles incl. digging & back filling pit. Providing Stay for LT poles including digging & back filling pit in ordinary soil. No 555.00

206 Providing Strut using LT PSC pole incl. digging & back filling pit. Providing Strut using LT PSC pole including digging and back filling pit in ordinary soil. No 1116.00

207 Providing Fly stay for LT pole using LT PSC pole incl. digging & back filling pit.

Providing Fly stay for LT pole using LT PSC pole including digging and back filling pit in ordinary soil. No 1810.00

208 Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. No 129.00

209 Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. No 257.00

210 Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. Additional rate for excavation of one Pit for LT Pole/LT Stay in Soft Rock. No 386.00

211 Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. Additional rate for excavation of one Pit for LT Pole/LT Stay in Rock. No 771.00y

212Stringing one km LT Sph 2 wire line (Rabbit) incl. fitting cross arm etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and Neutral, for one km LT single phase 2 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 10015.00

213Stringing one km LT Sph 3 wire line (Rabbit for Ph&N, Weasel for St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase & Neutral and ACSR Weasel for street main, for one km LT single phase 3 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 14032.00

214Stringing one km LT 3ph 4 wire line (Rabbit for Ph, Weasel for N) incl. fitting cross arm etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral, for one km LT three phase 4 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 18874.00

215Stringing one km LT 3ph 5 wire line (Rabbit for Ph and Weasel for N&St.main) incl. fitting cross arm etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. using ACSR Rabbit for Phase and ACSR Weasel for Neutral & Street Main, for one km LT 3ph 5 wire line including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 22890.00

Page 8 of 43

Page 13: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

216

Stringing one km LT Addl conductor (Rabbit) after fitting crossarm, but without realigning existing conductor, incl. fitting cross arm, insulator etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 4530.00

217

Stringing one km LT Addl conductor (Weasel) after fitting crossarm, but without realigning existing conductor, incl. fitting cross arm, insulator etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 4016.00

218

Stringing one km LT Addl conductor (Rabbit) where fitting of crossarm or realigning existing conductoris not required, incl. fitting insulators, removing touchings and conveyance of materials.

Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conductor (ACSR Rabbit) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 3245.00

219

Stringing one km LT Addl conductor (Weasel) where fitting of crossarm or realigning existing conductoris not required incl fitting insulators removing touchings and

Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel) on existing LT line (where realignment of existing conductor is not required) including cutting and removing tree km 2474.00required, incl. fitting insulators, removing touchings and

conveyance of materials.

( g g q ) g g gbranches wherever necessary and conveyance of all materials (except poles) from stacking place.

220Conversion of one km LT Sph 2 wire to 3ph 4 wire line incl. dismantling existing 2 conductors, stringing 3 Rabbit & 1 Weasel incl. conveyance.

Conversion of one km LT single phase 2 wire line to LT three phase 4 wire line including dismantling the existing 2 conductors, stringing 3 ACSR Rabbit conductor for Phase & one Weasel for Neutral including conveyance of materials.

km 22593.00

221 Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt&nut etc.

Fitting one No. Section fuse on LT line with dropping cables, crimping sockets, connecting with bolt & nut etc. No 142.00

222 Providing Guarding for LT line one span for road crossing.

Providing Guarding for LT line using No.8 SWG GI wire one span for road crossing and drawing sufficient length of GI earthing leads to the ground for earthing, excluding provision of earthing.

No 2988.00

223 Fitting one No. LT lightning arrestor in LT OH line and giving connections excluding earthing. Fitting one No. LT lightning arrestor in LT OH line and giving connections excluding earthing. No 48.00

224Conversion of one km LT Sph 3 wire line to 3ph 5 wire line incl. dismantling existing 3 conductors, stringing 3 ACSR Rabbit & 2 waeasel including conveyance .

Conversion of one km LT single phase 3 wire line to LT three phase 5 wire line including dismantling the existing 3 conductors, stringing 3 ACSR Rabbit (for Phase) & two Weasel (for Neutral & Street Main) conductors including conveyance of materials.

km 26923.00

Page 9 of 43

Page 14: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

225

Stringing one km LT Addl conductor (Weasel) after fitting crossarm & realigning one of the existing conductors, incl. fitting cross arm, insulator etc. removing touchings and conveyance of materials.

Stringing, shackling, fitting cross arms, insulators and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel) on existing LT line after realignment of one of the existing conductor, including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 7464.00

Page 10 of 43

Page 15: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

SERVICE CONNECTION SERVICE CONNECTION

251 Giving one single phase WP service connection, as per standards, incl. conveyance of materials.

Giving one single phase WP service connection including conveyance of materials, fixing meter, drawing WP wire, with GI support wire etc. as per standards. No 952.00

252 Giving one three phase WP service connection (upto 10kW) as per standards, incl. conveyance of materials.

Giving one three phase WP service connection (upto 10kW) including conveyance of materials, fixing meter, drawing WP wire with GI support wire etc. as per standards. No 1459.00

253Giving one three phase WP service connection (above 10kW to 25kW) as per standards, incl. conveyance of materials.

Giving one three phase WP service connection (above 10kW to 25kW) including conveyance of materials, fixing meter, drawing WP wire with GI support wire etc. as per standards. No 1585.00

254 Giving one three phase WP service connection (above 25 kW) as per standards, incl. conveyance of materials.

Giving one three phase WP service connection using CT including conveyance of materials, fixing meter, CT, drawing WP wire etc. as per standards. No 2227.00

255 Converting single phase WP service connection to three phase service connection incl conveyance of materials

Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase meter, WP wire with GI support wire and other No 2034.00phase service connection, incl. conveyance of materials. g g p p ppaccessories including conveyance of all materials.

256 Converting three phase WP service connection to single phase service connection, incl. conveyance of materials.

Converting three phase WP service connection to single phase service connection by replacing existing three phase meter with single phase meter, WP wire with GI support wire and other accessories including conveyance of all materials.

No 1785.00

257Constructing one span Sph OH line for giving S/C using PSC pole with one stay incl. digging& back filling 2 pits, cutting tree branches .

Constructing one span single phase OH line for giving service connection using PSC pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 2148.00

258Constructing one span Sph OH line for giving S/C using PSC pole with PSC strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using PSC pole with PSC strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 2709.00

259Constructing one span Sph OH line for giving S/C using PSC pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span single phase OH line for giving service connection using PSC pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1593.00

260Constructing one span 3ph OH line for giving S/C using PSC pole with one stay incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using PSC pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 2502.00

Page 11 of 43

Page 16: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

261Constructing one span 3ph OH line for giving S/C using PSC pole with PSC strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using PSC pole with PSC strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 3063.00

262Constructing one span 3ph OH line for giving S/C using PSC pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span three phase OH line for giving service connection using PSC pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1948.00

263Conversion of one span Sph 2 wire OH line to 3ph 4 wire line, incl. dismantling existing line, stringing new Rabbit for phase and Weasel for neutral incl.conveyance.

Conversion of one span OH single phase 2 wire service line to three phase 4 wire service line including dismantling existing conductors, stringing new conductors (ACSR Rabbit for phase and Weasel for neutral) including conveyance of all materials.

No 904.00

264Insertion of one LT PSC pole in existing Sph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

Insertion of one LT PSC pole in existing single phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. No 1304.00

265Insertion of one LT PSC pole in existing 3ph OH line incl. digging & back filling pit, fitting cross arm, insulator, binding etc.

Insertion of one LT PSC pole in existing three phase OH line including digging & back filling pit in ordinary soil, fitting cross arm, insulator, binding etc. excluding transportation of poles. No 1402.00

266 Providing WP support with PSC pole incl. digging & back filling pit.

Providing WP support with PSC pole including digging & back filling pit in ordinary soil. excluding transportation of poles. No 1149.00g p g p p

267 Installing one pole top service connection box Sph 6way and giving connections. Installing one pole top service connection box single phase 6 way and giving connections. No 57.00

268 Installing one pole top service connection box 3ph 6way and giving connections. Installing one pole top service connection box three phase 6 way and giving connections. No 73.00

269 Giving one single phase service connection in panel board. Giving one single phase service connection in existing panel board. No 171.00

270 Giving one three phase service connection in panel board. Giving one three phase service connection in existing panel board. No 227.00

271Converting single phase WP service connection to three phase(5kW to 10kW) service connection, incl. conveyance of materials.

Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase meter, WP wire with GI support wire and other accessories including conveyance of all materials.

No 2570.00

272Converting single phase WP service connection to three phase(above 10kW ) service connection, incl. conveyance of materials.

Converting single phase WP service connection to three phase service connection by replacing existing single phase meter with three phase meter, WP wire with GI support wire and other accessories including conveyance of all materials.

No 2827.00

273Conversion of one span Sph 3 wire OH line to 3ph 5 wire line, incl. dismantling existing line, stringing new Rabbit for phase and Weasel for neutral incl.conveyance.

Conversion of one span OH single phase 2 wire line to three phase 5 wire line including dismantling existing conductors, stringing new conductors (ACSR Rabbit for phase and Weasel for neutral) including conveyance of all materials.

No 1077.00

Page 12 of 43

Page 17: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

HT MAINTENANCE WORK HT MAINTENANCE WORK

301Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 2686.00

302Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 'A' type pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 'A' type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 3268.00

303Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new 4 legged pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV TW/RSJ/Rail Pole with new Four legged lattice structure in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 4902.00

304Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV PSC/RCC Pole with new PSC pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 3098.00

305Renewal of existing damaged/old 11kV PSC/RCC Pole with new 'A' type pole in place and refitting of all items incl conveyance (except pole)

Renewal of existing damaged/old 11kV PSC/RCC Pole with new 'A' type pole in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole

No 3680.00incl. conveyance (except pole). conveyance of all materials except pole.

306Renewal of existing damaged/old 11kV PSC/RCC Pole with new 4 legged pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV PSC/RCC Pole with new Four legged lattice structure in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 5520.00

307Renewal of existing damaged/old 11kV 'A' type pole with new 'A' type pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV 'A' type pole with new 'A' type pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 3741.00

308Renewal of existing damaged/old 11kV 4 legged pole with new 4 legged pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV Four legged lattice structure with new Four legged lattice structure in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 5611.00

309Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new PSC DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP (2 channel cross arm) with new PSC DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 6998.00

310Renewal of existing damaged/old 11kV PSC DP with new PSC DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV PSC DP (2 channel cross arm) with new PSC DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 7822.00

311Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 'A' type DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 'A' type DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 8026.00

Page 13 of 43

Page 18: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

312Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new 4 legged pole DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV TW/RSJ/Rail DP with new Four legged lattice structure DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 12039.00

313Renewal of existing damaged/old 11kV PSC/RCC DP with new 'A' type DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV PSC/RCC DP with new 'A' type DP in place including excavation, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 8850.00

314Renewal of existing damaged/old 11kV PSC/RCC DP with new 4 legged pole DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV PSC/RCC DP with new Four legged lattice structure DP in place including excavation, erection of new pole, back filling pit and refitting of all items etc. and conveyance of all materials except poles.

No 13276.00

315Renewal of existing damaged/old 11kV 'A' type DP with new 'A' type DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV 'A' type DP with new 'A' type DP in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 9107.00

316Renewal of existing damaged/old 11kV 4 legged pole DP with new 4 legged pole DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV Four legged lattice structure DP with new Four legged lattice structure DP in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 13661.00

Renewing damaged TW/RSJ/Rail Transformer DP Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new PSC Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT

317

g gstructure with new PSC Transformer DP and re-erecting all accessories & Transformer. (excluding renewal of pipe earthing).

g gfuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 19811.00

318

Renewing damaged TW/RSJ/Rail Transformer DP structure with new 'A' type Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new 'A' type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 20325.00

319

Renewing damaged TW/RSJ/Rail Transformer DP structure with new 4 legged pole Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged/old TW/RSJ/Rail Transformer DP structure with a new Four legged lattice structure Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 22093.00

Page 14 of 43

Page 19: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

320Renewing damaged PSC/RCC Transformer DP structure with new PSC Transformer DP and re-erecting all accessories

Renewing one damaged PSC/RCC Transformer DP structure with a new PSC Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 20635.00

321

Renewing damaged PSC/RCC Transformer DP structure with new 'A' type Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged PSC/RCC Transformer DP structure with a new 'A' type Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 21149.00

322

Renewing damaged PSC/RCC Transformer DP structure with new 4 legged pole Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged PSC/RCC Transformer DP structure with a new Four legged lattice structure Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 23329.00

g p p g323 Renewal of one damaged HT Pin insulator. Renewal of one damaged HT Pin insulator. No 171.00

324 Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole Additional rate for refitting/redoing one Disc set while renewing any type of 11kV cut pole. No 426.00

325 Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines.

Additional rate for reinstalling LT line on the renewed 11kV pole having both HT and LT (HT/LT) lines. No 440.00

326Renewal of existing damaged/old 11kV Stay with new stay in place incl. excavation & backfilling of pit and conveyance.

Renewal of existing damaged/old 11kV Stay with new stay in place including excavation & backfilling of pit, dismantling, refitting of all items and conveyance of all materials. No 1089.00

327 Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. Renewal of existing damaged/broken old 11kV Stay to the existing stay rod. No 334.00

328 Replacing/inserting HT Stay insulator on the existing stay. Replacing/inserting HT Stay insulator on the existing stay. No 334.00

329Renewal of existing damaged/old 11kV Strut with new PSC strut in place incl. excavation & backfilling pit and conveyance (except pole).

Renewal of any type of existing damaged/old 11kV Strut with new PSC strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 2708.00

330Renewal of existing damaged/old 11kV Strut with new 'A' type strut in place incl. excavation & backfilling pit and conveyance (except pole).

Renewal of any type of existing damaged/old 11kV Strut with new 'A' type strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 2965.00

Page 15 of 43

Page 20: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

331

Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of PSC pole (used for fly stay) and refitting of all items and conveyance (except conveyance of pole).

Renewal of existing damaged/old 11kV Fly stay with new Fly stay including renewal of PSC pole (used for fly stay) in place, excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 4130.00

332Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of 'A' type pole and refitting of all items and conveyance (except pole).

Renewal of existing damaged/old 11kV Fly stay with new Fly stay including renewal of 'A' type pole in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 4515.00

333Re-Tensioning one span 11kV line incl. replacing insulators, tightening stay, cutting tree branches and conveyance.

Re-Tensioning one span 11kV line including replacing pin insulators, pin binding, jumpering, replacing insulators cross arms disc, tightening stay, cutting tree branches etc. wherever necessary, including conveyance of all materials complete.

No 429.00

334Re-joining one snapped HT conductor after removing damaged portion incl. re-tensioning and conveyance of all materials complete.

Re-joining one snapped HT conductor after removing damaged portion including re-tensioning and conveyance of all materials complete. No 981.00

335Repairing one limb of AB switch by replacing male and female contacts, damaged insulators etc. and reconnecting the same.

Repairing one limb of AB switch by replacing male and female contacts, damaged insulators, applying petroleum jelly, lubricants etc. and reconnecting the same, including reconditioning of the operating mechanism.

No 413.00

336 Replacing one set AB switch incl. dismantling existing AB, giving connections etc. Replacing one set AB switch including dismantling existing AB, giving connections etc. No 2477.00g g

337Renewal of one No. 11kV LA incl. conveyance, reconnecting and dismantling old LA (excluding earthing).

Renewal of one No. 11kV LA including conveyance, reconnecting and dismantling old LA (excluding earthing). No 142.00

338Renewal of one No. 11kV DO Fuse incl. conveyance, reconnecting and dismantling old DO Fuse (excluding earthing).

Renewal of one No. 11kV DO Fuse including conveyance, reconnecting and dismantling old DO Fuse (excluding earthing). No 142.00

339Renewing 11kV Jumper connection for one phase from OH line to Transformer through AB, DO and LA using Copper/ACSR conductor.

Renewing 11kV Jumper connection for one phase from OH line to Transformer through AB switch, DO Fuse and connection to LA using Copper/ACSR conductor as per standard specification including dismantling old jumpers.

No 440.00

340Renewing one 11kV Jumper using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).

Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line). No 256.00

341 Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification.

Renewing one 11kV Jumper connection using Copper/ACSR conductor as per standard specification. No 179.00

342 Renewing one V cross arm on the 11kV Pole incl. dismantling and conveyance. Renewing one V Cross arm on the 11kV Pole including dismantling and conveyance. No 480.00

343 Renewing one 1.8m Channel cross arm on the 11kV Pole incl. dismantling and conveyance.

Renewing one 1.8m Channel cross arm on the 11kV Pole including dismantling and conveyance. No 480.00

Page 16 of 43

Page 21: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

344Renewing one damaged cross arm with 100x50mm, 2.4m/3m Channel cross arm on the 11kV DP incl. dismantling and conveyance.

Renewing one damaged cross arm with 100x50mm, 2.4m/3m Channel cross arm on the 11kV DP including dismantling and conveyance. No 418.00

345Renewing one damaged cross arm with 35x35x5mm, 2.4m/3m Channel cross arm on the 11kV DP incl. dismantling and conveyance.

Renewing one damaged cross arm with 35x35x5mm, 2.4m/3m Channel cross arm on the 11kV DP including dismantling and conveyance. No 392.00

346 Providing stay (temporary nature) by piling Cut Ends in kole land incl. fabrication of cut ends and conveyance.

Providing stay (temporary nature) by piling Cut Ends in kole land providing insulator, including fabrication of cut ends and conveyance of materials. No 852.00

347 Straightening one slanted 11kV pole after unbinding the line and rebinding the line after work. Straightening one slanted 11kV pole after unbinding the line and binding the line after work. No 670.00

348 Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work.

Straightening one slanted 11kV Cut pole after lowering down the existing line and stringing the line after work. No 1109.00

349 Dismantling CT/PTunit, erecting new CT/PTunit in place incl. loading & unloading at site.

Dismantling existing CT/PT unit, erecting new CT/PT unit in place, giving connections etc. including loading/unloading of old and new CT/PT unit at site. No 4760.00

350 Dismantling 25kVA Tr., erecting new 25kVA Tr. in place incl loading & unloading at site

Dismantling existing 25kVA Transformer, erecting new 25kVA Transformer in place, giving connections etc including loading/unloading of old and new 25kVA Transformer at site No 4548.00incl. loading & unloading at site. connections etc. including loading/unloading of old and new 25kVA Transformer at site.

351 Dismantling 63kVA Tr., erecting new 63kVA Tr. in place incl. loading & unloading at site.

Dismantling existing 63kVA Transformer, erecting new 63kVA Transformer in place, giving connections etc. including loading/unloading of old and new 63kVA Transformer at site. No 4760.00

352Dismantling 100kVA Transformer, erecting new 100kVA Transformer, giving connections incl. loading & unloading at site.

Dismantling existing 100kVA Transformer, erecting new 100kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site. No 6878.00

353Dismantling 160kVA Transformer, erecting new 160kVA Transformer, giving connections incl. loading & unloading at site.

Dismantling existing 160kVA Transformer, erecting new 160kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site. No 7091.00

354Dismantling 250kVA Transformer, erecting new 250kVA Transformer, giving connections incl. loading & unloading at site.

Dismantling existing 250kVA Transformer, erecting new 250kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site. No 7883.00

355Dismantling 315kVA Transformer, erecting new 315kVA Transformer, giving connections incl. loading & unloading at site.

Dismantling existing 315kVA Transformer, erecting new 315kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site. No 8096.00

356Dismantling 500kVA Transformer, erecting new 500kVA Transformer, giving connections incl. loading & unloading at site.

Dismantling existing 500kVA Transformer, erecting new 500kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site. No 8309.00

Page 17 of 43

Page 22: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

357Enhancing 63kVA Transformer with new 100kVA Transformer, giving connections incl. loading & unloading at site.

Enhancing Transformer by dismantling existing 63kVA Transformer, erecting new 100kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site.

No 6010.00

358Enhancing 100kVA Transformer with 160kVA Transformer, giving connections etc. incl. loading & unloading at site.

Enhancing Transformer by dismantling existing 100kVA Transformer, erecting new 160kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site.

No 6480.00

359Enhancing 160kVA Transformer with 250kVA Transformer, giving connections etc. incl. loading & unloading at site.

Enhancing Transformer by dismantling existing 160kVA Transformer, erecting new 250kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site.

No 6795.00

360Enhancing 250kVA Transformer with 315kVA Transformer, giving connections etc. incl. loading & unloading at site.

Enhancing Transformer by dismantling existing 250kVA Transformer, erecting new 315kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site.

No 7485.00

361Enhancing 315kVA Transformer with 500kVA Transformer, giving connections etc. incl. loading & unloading at site.

Enhancing Transformer by dismantling existing 315kVA Transformer, erecting new 500kVA Transformer in place, giving connections etc. including loading/unloading of old and new Transformer at site.

No 7697.00

362Reconductoring one km 11kV old line of 3 conductors with new ACSR Raccoon incl. cutting of tree branches and conveyance.

Reconductoring one km 11kV Copper/old AAC/ACSR line of 3 conductors with new ACSR Raccoon including cutting of tree branches wherever necessary, conveyance of materials to and from the stacking place.

km 29367.00y g p

391Reconductoring one km 11kV old line of 3 conductors with new ACSR Rabbit incl. cutting of tree branches and conveyance.

Reconductoring one km 11kV Copper/old AAC/ACSR line of 3 conductors with new ACSR Rabbit including cutting of tree branches wherever necessary, conveyance of materials to and from the stacking place.

km 25938.00

392Renewal of existing damaged/old 11kV Fly stay with new Fly stay (excluding stay-pole & stay-rod) including conveyance.

Renewal of existing damaged/old 11kV Fly stay with new Fly stay (where replacement of stay-pole / stay-rod is not required) in place , dismantling, refitting of all items, including conveyance.

No 668.00

393 Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. refitting of all items and conveyance.

Renewal of existing damaged/old 11kV Fly stay with new Fly stay where renewal of PSC pole (used for fly stay), stay plate, stay rod etc is not required, including dismantling and refitting of all other items required for fly stay and conveyance of all materials.

No 668.00

FABRICATING WORKS FABRICATING WORKS

363 Drilling hole of various sizes on existing Channel/Cross Arm. Drilling hole of various sizes on existing Channel/Cross Arm. No 10.00

364 Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. Drilling oval shaped hole of various sizes on existing Channel/Cross Arm/GI/MS cleat etc. No 25.00

365 Cutting Channel/Cross Arm/Angle Iron into two pieces. Cutting Channel/Cross Arm/Angle Iron into two pieces. No 43.00

Page 18 of 43

Page 23: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

LT MAINTENANCE WORK LT MAINTENANCE WORK

401Renewal of existing damaged/old LT TW/RSJ/Rail (Sph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT TW/RSJ/Rail (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1812.00

402Renewal of existing damaged/old LT PSC/RCC (Sph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT PSC/RCC (single phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 2069.00

403Renewal of existing damaged/old LT TW/RSJ/Rail (3ph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT TW/RSJ/Rail (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 2050.00

404Renewal of existing damaged/old LT PSC/RCC (3ph line) pole with new PSC pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT PSC/RCC (three phase line) pole with new PSC pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 2307.00

405 Additional rate for refitting/redoing one Shackle set and reshackling one span while renewing any type of pole.

Additional rate for refitting/redoing one Shackle Set, including reshacling one span, while renewing any type of LT pole. No 202.00

406Renewal of existing damaged/old LT stay with new stay in place and refitting of all items and conveyance of all materials.

Renewal of existing damaged/old LT stay with new stay in place including excavation of stay pit, erection of new stay, backfilling pit and refitting of all items and conveyance of all materials.

No 703.00

407 Renewal of existing damaged/broken old LT stay with existing stay rod. Renewal of existing damaged/broken old LT stay in existing stay rod. No 257.00

408 Replacing/inserting LT stay insulator on the existing stay. Replacing/inserting LT stay insulator on the existing stay. No 257.00

409Renewal of existing damaged/old LT Strut with new PSC strut in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT Strut of any type with new PSC strut in place including excavation of pit, erection of new strut, backfilling, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 1545.00

410Renewal of damaged LT Fly stay with new Fly stay incl. renewal of new PSC pole (used for fly stay) and refitting of all items, conveyance (except conveyance of pole).

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including renewal of PSC pole (used for fly stay) in place, excavation of pit, erection of new Fly stay, backfilling, dismantling & refitting of all items and conveyance of all materials except pole.

No 2586.00

411Reshackling one span LT Sph 2 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.

Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials.

No 155.00

Page 19 of 43

Page 24: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

412Reshackling one span LT 3ph 4 wire OH line, replacing insulators, tightening stay, cutting tree branches incl. conveyance.

Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials.

No 291.00

413Reshackling one span LT OH Addl conductor, replacing insulators, tightening stay, cutting tree branches incl. conveyance.

Reshackling one span LT OH Additional conductor including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc. wherever necessary including conveyance of all materials complete.

No 68.00

414Re-joining snapped one LT conductor after removing damaged portion incl. Reshackling and conveyance of all materials complete.

Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete. No 415.00

415Renewing one LT Jumper using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line).

Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification (in loop formation for tapping from line). No 85.00

416 Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification.

Renewing one LT Jumper connection using Copper/ACSR conductor as per standard specification. No 60.00

417 Providing/Inserting 2 line spacer on the existing LT OH line. Providing/Inserting 2 line spacer on the existing LT OH line. No 52.00

418 Providing/Inserting 3 line spacer on the existing LT OH Providing/Inserting 3 line spacer on the existing LT OH line No 62 00418 g g p gline. Providing/Inserting 3 line spacer on the existing LT OH line. No 62.00

419 Transferring LT Sph 2/3 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

Transferring LT single phase 2/3 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.

No 519.00

420 Transferring LT 3ph 4/5 wire OH line to newly erected HT/LT pole and refitting all items to the new pole.

Transferring LT three phase 4/5 wire OH line to newly erected HT/LT pole including dismantling existing cross arm and insulators, refitting the same on the new pole, binding etc. complete.

No 1051.00

421 Straightening one Slanted LT pole after unbinding the line and rebinding the line after work. Straightening one slanted LT pole after unbinding the line and binding the line after work. No 608.00

422 Straightening one Slanted LT Cut pole after unbinding the line and rebinding the line after work.

Straightening one slanted LT Cut Pole after lowering down the existing line and stringing the line after work. No 824.00

423Reconductoring one km LT Sph 2 wire OH old line with new ACSR Rabbit conductor incl. conveyance of materials.

Reconductoring (changing) one km LT single phase 2 wire OH Copper/old AAC/ACSR conductor line with new ACSR Rabbit conductor including conveyance of materials to and from the stacking place.

km 11785.00

Page 20 of 43

Page 25: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

424Reconductoring one km LT 3ph 4 wire OH old line with new 3 ACSR Rabbit and one Weasel conductor incl. conveyance of materials.

Reconductoring (changing) one km LT three phase 4 wire OH Copper/old AAC/ACSR conductor line with new 3 ACSR Rabbit and one ACSR Weasel conductor including conveyance of materials to and from the stacking place.

km 24926.00

425Reconductoring one km LT OH one old conductor with New ACSR Rabbit conductor incl. conveyance of materials.

Reconductoring (changing) one km LT OH Copper/old AAC/ACSR one conductor with new ACSR Rabbit conductor including conveyance of materials to and from the stacking place. km 5893.00

426Reconductoring one km LT OH one old conductor with New ACSR Weasel conductor incl. conveyance of materials.

Reconductoring (changing) one km LT OH Copper/old AAC/ACSR one conductor with new ACSR Weasel conductor including conveyance of materials to and from the stacking place. km 5303.00

427Reconductoring one km LT single ph 3 wire OH old line with new 2 ACSR Rabbit and one weasel condutor incl conveyance of materials

Reconductoring (changing) one km LT single phase 3 wire OH Copper/old AAC/ACSR conductor line with new 2 ACSR Rabbit and one ACSR Weasel conductor including conveyance of materials to and from the stacking place.

km 17088.00

428

Stringing one km LT Addl conductor (Weasel) after relocating one of the existing conductor, incl. fitting insulators, removing touchings and conveyance of materials.

Stringing, shackling, fitting insulators (excluding fitting of cross arm) and binding, giving jumper connection etc. for one km additional conductor (ACSR Weasel) on existing LT line (where relocation of one existing conductor is also required) including cutting and removing tree branches wherever necessary and conveyance of all materials (except poles) from stacking place.

km 4330.00

p

429 Renewal of damaged LT Fly stay with new Fly stay incl. refitting of all items, conveyance .

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay where renewal of PSC pole (used for fly stay), stay plate, stay rod etc is not required, including dismantling & refitting of all items and conveyance of all materials.

No 514.00

MAINTENANCE OF SERVICE CONNECTION MAINTENANCE OF SERVICE CONNECTION

451 Dismantling and reconnecting Sph service connection from the OH line incl. lowering down the WP portion.

Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. No 57.00

452 Dismantling and reconnecting 3ph service connection from the OH line incl. lowering down the WP portion.

Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work. No 88.00

453Redoing Sph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material.

Redoing single phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire, Fuse unit etc., changing Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at various location.

No 514.00

454Redoing 3ph WP S/C complete incl. changing WP, E/Meter, cut-out, neutral link etc, and conveyance of material.

Redoing three phase WP service connection complete including lowering down the guy wire portion, repairing or changing WP wire, GI wire, Fuse unit etc., changing Energy Meter cutout, neutral link etc., if necessary and reconnecting the same including conveyance of material to site from Section office at various location.

No 648.00

Page 21 of 43

Page 26: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

455 Shifting one Sph metering equipment with all fittings at new location and redoing the WP service wire.

Shifting one No. single phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantling Meter Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings.

No 488.00

456 Shifting one 3ph metering equipment with all fittings at new location and redoing the WP service wire.

Shifting one No. three phase service connection metering equipment with all fittings including lowering down the WP service wire, dismantling Meter Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings.

No 643.00

457 Shifting one 3ph metering equipment (with CT) with all fittings at new location and redoing the WP service wire.

Shifting one No. three phase service connection metering equipment (CT connected) with all fittings including lowering down the WP service wire, dismantling Meter Board without making damage and refitting the same at new location and redoing the WP service wire with all fittings.

No 964.00

METER CHANGING METER CHANGING

476Changing faulty Sph Energy meter with new meter, giving connection incl. conveyance of meter to the site and back to store.

Changing Faulty single phase energy meter including Dismantling of old meter, connecting of new meter/giving electric connection including conveyance of new meter to the site and returning old meters to section store.

No 67.00

477Changing faulty 3ph Energy meter with new meter,

i i i i l f h i Changing Faulty three phase energy meter including Dismantling of old meter, connecting of

/ i i l i i i l di f h i d N 124 00477 giving connection incl. conveyance of meter to the site and back to store.

new meter/giving electric connection including conveyance of new meter to the site and returning old meters to section store.

No 124.00

478Changing faulty 3ph CT meter with new meter & CT, giving connection incl. conveyance of meter to the site and back to store.

Changing Faulty three phase CT energy meter including Dismantling of old meter, replacing CTs, renewing PT connection, connecting new meter/giving electric connection including conveyance of new meter to the site and returning old meters to section store.

No 697.00

DISMANTLING – HT DISMANTLING – HT

501 Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 648.00

502Dismantling (without damage) one No. 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one No. 11kV TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1066.00

503 Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1060.00

504Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one 11kV PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1847.00

Page 22 of 43

Page 27: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

505 Dismantling one damaged 11kV 'A' type pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged 11kV 'A' type pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1317.00

506Dismantling (without damage) one 11kV 'A' type pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one 11kV 'A' type pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1849.00

507 Dismantling one damaged 11kV 4 legged pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged 11kV Four legged lattice structure after disconnecting stays, strut etc. attached thereon and stacking the same. No 1976.00

508Dismantling (without damage) one 11kV 4 legged pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one 11kV Four legged lattice structure after disconnecting stays, strut etc. attached thereon and stacking the same. No 2773.00

509 Dismantling one damaged HT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.

Dismantling one damaged HT TW/RSJ/Rail Strut pole including removal of clamps and stacking. No 490.00

510 Dismantling (without damage) one HT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.

Dismantling (without damage) one HT TW/RSJ/Rail Strut pole including removal of clamps and stacking. No 917.00

511 Dismantling one damaged HT PSC/RCC Strut pole incl. removal of clamps and stacking. Dismantling one damaged HT PSC/RCC Strut pole including removal of clamps and stacking. No 903.00

512 Dismantling (without damage) one HT PSC/RCC Strut Dismantling (without damage) one HT PSC/RCC Strut pole including removal of clamps and No 1692 00512 g ( g )pole incl. removal of clamps and stacking.

g ( g ) p g pstacking. No 1692.00

513Dismantling (without damage) one km 11kV line (3 conductors), cross arm, insulators, disc, rolling the conductor and stacking.

Dismantling (without damage) one km 11kV line (three conductors) including dismantling cross arm, insulators, disc, disconnecting jumper connection, rolling the conductor and stacking the materials.

km 8168.00

514 Dismantling (without damage) one HT stay incl. back filling, and bringing back to section store.

Dismantling (without damage) one HT stay including digging pit in all classes of soil and backfilling, and bringing back to section store. No 534.00

515 Dismantling one V cross arm/Channel cross arm from existing Pole, and bringing back to section store.

Dismantling (without damage) one V cross arm/Channel cross arm from existing Pole and bringing back to section store. No 114.00

516 Dismantling one Channel cross arm from existing DP structure, and bringing back to section store.

Dismantling (without damage) one Channel cross arm from existing DP structure and bringing back to section store. No 167.00

517 Dismantling (without damage) one AB switch from existing structure and bringing back to section store.

Dismantling (without damage) one AB switch from existing structure and bringing back to section store. No 991.00

518 Dismantling one HT pin insulator with pin and bring back to section store. Dismantling one HT pin insulator with pin and bring back to section store. No 114.00

519 Dismantling one damaged AB switch from existing structure.

Dismantling one damaged AB switch from existing structure and bringing back to section store. No 697.00

Page 23 of 43

Page 28: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

520 Dismantling transformer station in DP structure excluding the rate of dismantling earthing

Dismantling transformer station with transformer erected in DP structure by dismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 10 channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box with metering equipments, CTs, Distribution Box, statutory display boards etc. but excluding the rate of dismantling transformer, earthing, stay sets & fencing.

No 8825.00

521 Dismanling transformer station with transformer erected in plinth excluding the rate of dismantling transformer

Dismanling plinth mounted transformer station by dismantling HT Double Pole Structure using PSC pole after disconnecting stay wires, 8 channel cross arms,AB switch, DO fuse, LA, GI earthing leads, DTR meter with box, Distribution Box, statutory display boards etc. but excluding the rate of dismantling transformer, civil structures, earthing, stay sets & fencing.

No 8424.00

DISMANTLING – LT DISMANTLING – LT

551 Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 339.00

552Dismantling (without damage) one LT TW/RSJ/Rail pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one LT TW/RSJ/Rail pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 610.00

553 Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 596.00

554Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. and stacking the same.

Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. No 1137.00

555 Dismantling (without damage) LT stay incl. digging pit in all classes of soil and backfilling

Dismantling (without damage) LT stay including digging pit in all classes of soil and backfilling. No 277.00

556 Dismantling one damaged LT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.

Dismantling one damaged LT TW/RSJ/Rail Strut pole including removal of clamps and stacking. No 301.00

557 Dismantling (without damage) one LT TW/RSJ/Rail Strut pole incl. removal of clamps and stacking.

Dismantling (without damage) one LT TW/RSJ/Rail Strut pole including removal of clamps and stacking. No 555.00

558 Dismantling one damaged LT PSC/RCC Strut pole incl. removal of clamps and stacking. Dismantling one damaged LT PSC/RCC Strut pole including removal of clamps and stacking. No 558.00

559 Dismantling (without damage) one LT PSC/RCC Strut pole incl. removal of clamps and stacking.

Dismantling (without damage) one LT PSC/RCC Strut pole including removal of clamps and stacking. No 939.00

560 Dismantling one LT 2 line cross arm from existing pole. Dismantling one LT 2 line cross arm with clamp from existing pole and stacking. No 41.00

561 Dismantling one LT 4 line cross arm from existing pole. Dismantling one LT 4 line cross arm with clamp from existing pole and stacking. No 62.00

Page 24 of 43

Page 29: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

562Dismantling single phase WP service connection with meter & all accessories and bringing back to section store.

Dismantling single phase WP service connection with meter & all accessories and bringing back to section store. No 512.00

563Dismantling three phase WP service connection with meter & all accessories and bringing back to section store.

Dismantling three phase WP service connection with meter & all accessories and bringing back to section store. No 761.00

564Dismantling (without damage) one span of HT or LT cradling and stacking the same neatly and in good condition for re-use.

Dismantling (without damage) one span of HT or LT cradling and stacking the same neatly and in good condition for re-use. No 723.00

565Dismantling (without damage) one km LT Sph 2 wire OH line, cross arms, insulators and stacking the conductors in rolls.

Dismantling (without damage) one km LT single phase 2 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. km 4400.00

566Dismantling (without damage) one km LT 3ph 4 wire OH line, cross arms, insulators and stacking the conductors in rolls.

Dismantling (without damage) one km LT three phase 4 wire OH line conductor by dismantling cross arms, insulators and stacking the conductors in rolls properly. km 8353.00

567Dismantling (without damage) one km LT additional conductor line, cross arms, insulators and stacking the conductors in rolls.

Dismantling (without damage) one km LT additional conductor line by dismantling cross arms, insulators and stacking the conductors in rolls properly. km 1982.00

568 Dismantling one section fuse Dismantling one section fuse from structure and bringing back to section store. 114.00569 Dismantling one section fuse from distribution box Dismantling one section fuse from distribution box and bringing back to section store. 192.00

570 Dismantling three phase CT Connected WP service connection

Dismantling three phase CT connected WP service connection with metering equipmets & all other accessories and bringing back to section store. No 991.00

STREET LIGHT STREET LIGHT

601 Wiring and installing one new ordinary street light fitting on existing pole and giving connections.

Wiring and installing one new ordinary street light fitting on existing pole and giving connections. No 185.00

602 Wiring and installing one new CFL street light fitting on existing pole and giving connections. Wiring and installing one new CFL street light fitting on existing pole and giving connections. No 185.00

603 Wiring and installing one new LED street light fitting on existing pole and giving connections. Wiring and installing one new LED street light fitting on existing pole and giving connections No 185.00

604 Dismantling (without damage) one ordinary street light/CFL/LED fitting from the pole and stacking.

Dismantling (without damage) one ordinary street light/CFL/LED fitting from the pole and stacking. No 93.00

605Dismantling one ordinary street light/CFL/LED fitting from pole, repairing and refitting the same in position and giving connection.

Dismantling one ordinary street light/CFL/LED fitting from existing pole cleaning, rewiring, repairing/replacing the holder, changing bulbs and refitting the same in position and giving connection.

No 278.00

Page 25 of 43

Page 30: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

606 Wiring and installing new set 2x40W fluorescent tube fitting on existing poles incl. giving connection.

Wiring and installing new set 2x40W fluorescent tube fitting on existing poles including giving connection. No 297.00

607Dismantling one set 2x40 W fluorescent tube fitting from pole, repairing and refitting the same in position and giving connection.

Dismantling one set 2x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitting the same in position and giving connection.

No 445.00

608 Replacing bulb on existing street light. Replacing bulb on existing street light. No 45.50609 Replacing CFL/LED on existing street light. Replacing CFL/LED on existing street light. No 45.50

610Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole and reconnecting.

Dismantling one ordinary street light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. No 291.00

611Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting.

Dismantling one 2x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. No 445.00

612Wiring and installing new set SV lamp fitting on existing poles incl. giving connection (without using aerial lift).

Wiring and installing new set Sodium Vapour lamp fitting on existing poles including giving connection (without using aerial lift). No 927.00

Wiring and installing new set MV lamp fitting on Wiring and installing new set Mercury Vapour lamp fitting on existing poles including giving 613g g p g

existing poles incl. giving connection (without using aerial lift).

Wiring and installing new set Mercury Vapour lamp fitting on existing poles including giving connection (without using aerial lift). No 927.00

614Wiring and installing new set Metal halide lamp fitting on existing poles incl. giving connection (without using aerial lift).

Wiring and installing new set Metal Halide lamp fitting on existing poles including giving connection (without using aerial lift). No 927.00

615 Wiring and installing new set SV lamp fitting on existing poles incl. giving connection (using aerial lift).

Wiring and installing new set Sodium Vapour lamp fitting on existing poles including giving connection (using aerial lift). No 463.00

616 Wiring and installing new set MV lamp fitting on existing poles incl. giving connection (using aerial lift).

Wiring and installing new set Mercury Vapour lamp fitting on existing poles including giving connection (using aerial lift). No 463.00

617Wiring and installing new set Metal halide lamp fitting on existing poles incl. giving connection (using aerial lift).

Wiring and installing new set Metal Halide lamp fitting on existing poles including giving connection (using aerial lift). No 463.00

618Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting the same in position and giving connection (without using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from existing pole, cleaning, rewiring, repairing/replacing holder, tube, bulb, igniter, choke, capacitor etc. and refitting the same in position and giving connection (without using aerial lift).

No 1390.00

Page 26 of 43

Page 31: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

619Dismantling SV/MV/Metal halide lamp fitting, repairing & refitting the same in position and giving connection (using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from existing pole, cleaning, rewiring, repairing/replacing holder, tube, bulb, igniter, choke, capacitor etc. and refitting the same in position and giving connection (using aerial lift).

No 695.00

620Dismantling SV/MV/Metal halide lamp fitting from the existing pole and refitting the same on newly erected pole and reconnecting (without using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires (without using aerial lift).

No 1390.00

621Dismantling SV/MV/Metal halide lamp fitting from the existing pole and refitting the same on newly erected pole and reconnecting (using aerial lift).

Dismantling one Sodium Vapour/Mercury Vapour/Metal Halide lamp fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires (using aerial lift).

No 695.00

622Replacing holder, fused bulb/CFL, changing wires, giving connection etc. of street light incl. conveyance of all materials.

Replacing holder, fused bulb/CFL, changing wires, giving connection etc. of street light including conveyance of all materials. No 93.00

623 Wiring and installing new set 1x40W fluorescent tube fitting on existing poles incl. giving connection.

Wiring and installing new set 1x40W fluorescent tube fitting on existing poles including giving connection. No 241.00

624Dismantling one set 1x40 W fluorescent tube fitting from pole, repairing and refitting the same in position and giving connection.

Dismantling one set 1x40 W fluorescent tube fitting from existing pole cleaning, rewiring, repairing/replacing holder, changing tubes and refitting the same in position and giving connection.

No 361.00g g

625Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole and reconnecting.

Dismantling one 1x40W fluorescent tube fitting from the existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires. No 361.00

CLEARING TOUCHING (HT) CLEARING TOUCHING (HT)

651Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Urban/Town).

Clearing touchings on 11kV HT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified by dept. (Urban/Town).

km 1184.00

652Clearing touchings on HT lines 11kV, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).

Clearing touchings on 11kV HT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified by dept. (Rural/Remote).

km 1586.00

653Clearing touchings on HT/LT lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Urban/Town).

Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified by dept. (Urban/Town).

km 1421.00

654Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).

Clearing touchings on HT/LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified by dept. (Rural/Remote).

km 1903.00

655Clearing touchings on 33kV lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Urban/Town).

Clearing touchings on 33kV lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0m from the outer conductor as specified by dept. (Urban/Town).

km 1777.00

Page 27 of 43

Page 32: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

656Clearing touchings on 33kV lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified by dept. (Rural/Remote).

Clearing touchings on 33kV lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 2.0m from the outer conductor as specified by dept. (Rural/Remote).

km 2378.00

Page 28 of 43

Page 33: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

CLEARING TOUCHINGS (LT) CLEARING TOUCHINGS (LT)

657Clearing touchings on LT lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified. (Urban/Town).

Clearing touchings on LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified. (Urban/Town).

km 1100.00

658Clearing touchings on LT lines, cutting tree branches, bamboo clusters, coconut cudjans etc. as specified. (Rural/Remote).

Clearing touchings on LT lines, cutting branches of trees, bamboo clusters, coconut cudjans etc. from above the lines for a distance of 1.8m from the outer conductor as specified. (Rural/Remote).

km 1339.00

TREE CUTTING TREE CUTTING

676Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting of trunks/branches, removing the root completely and stacking.

Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. No 280.00

677Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting of trunks/branches, removing the root completely and stacking.

Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. No 477.00

678Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting of trunks/branches, removing the root completely and stacking

Cutting trees having girth beyond 120cm but upto and including 180cm (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No. No 732.00

completely and stacking.

679Cutting trees beyond 30cm but upto and incl. 60cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough).

Cutting trees having girth beyond 30cm but upto and including 60cm, in between the line and Buildings where space for falling trees is not available/enough (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

No 422.00

680Cutting trees beyond 60cm but upto and incl. 120cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough).

Cutting trees having girth beyond 60cm but upto and including 120cm, in between the line and Buildings where space for falling trees is not available/enough (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

No 760.00

681Cutting trees beyond 120cm but upto and incl. 180cm girth, cutting branches, removing root completely and stacking (where space for falling trees is not enough).

Cutting trees having girth beyond 120cm but upto and including 180cm in between the line and Buildings where space for falling trees is not available/enough (felling trees including cutting of trunks and branches) and removing the root completely and stacking etc. 1 No.

No 1072.00

LOADING AND UNLOADING LOADING AND UNLOADING

701Loading HT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading HT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle). No 206.00

Page 29 of 43

Page 34: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

702 Loading HT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). No 450.00

703 Loading HT 'A' type pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading HT 'A' type pole from the stacking place and unloading the same at work site (transportation by any vehicle). No 535.00

704 Loading HT 4 legged pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading HT Four legged lattice structure from the stacking place and unloading the same at work site (transportation by any vehicle). No 752.00

705Loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading LT TW/RSJ/Rail pole from the stacking place and unloading the same at work site (transportation by any vehicle). No 149.00

706 Loading LT PSC pole from the stacking place and unloading the same at work site (transport by vehicle).

Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). No 283.00

707 Unloading one Transformer (upto and incl. 160kVA) from vehicle to ground incl. conveyance upto 25m.

Unloading one Transformer (upto and including 160kVA) from any vehicle to ground including conveyance upto 25m at site. No 798.00

708 Unloading one Transformer (above 160kVA) from Unloading one Transformer (above 160kVA) from any vehicle to ground including conveyance No 1338 00708 g ( )vehicle to ground incl. conveyance upto 25m.

g ( ) y g g yupto 25m at site. No 1338.00

709 Loading one Transformer (upto and incl. 160kVA) from ground to vehicle incl. conveyance upto 25m.

Loading one Transformer (upto and including 160kVA) from ground to any vehicle including conveyance upto 25m at site. No 1055.00

710 Loading one Transformer (above 160kVA) from ground to vehicle incl. conveyance upto 25m.

Loading one Transformer (above 160kVA) from ground to any vehicle including conveyance upto 25m at site. No 1595.00

711Dismantling one Transformer upto 160kVA from structure and loading to vehicle incl. disconnecting HT/LT/Earth connections.

Dismantling one Transformer (upto and including 160kVA) from existing structure and loading to any vehicle directly, including disconnecting HT/LT/Earth connections. No 1164.00

712Dismantling one Transformer above 160kVA from plinth and loading to vehicle incl. disconnecting HT/LT/Earth connections.

Dismantling one Transformer (above 160kVA) from existing plinth and loading to any vehicle directly, including disconnecting HT/LT/Earth connections. No 1434.00

713 Dismantling one Transformer (upto and incl. 160kVA) from existing structure to ground.

Dismantling one Transformer (upto and including 160kVA) from existing structure to ground, including disconnecting HT/LT/Earth connections. No 1434.00

714 Dismantling one Transformer (above 160kVA) from existing plinth to ground.

Dismantling one Transformer (above 160kVA) from existing plinth to ground, including disconnecting HT/LT/Earth connections. No 1705.00

Page 30 of 43

Page 35: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

TRANSPORTATION OF TRANSFORMER/POLE BY LORRY TRANSPORTATION OF TRANSFORMER/POLE BY LORRY

726Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading.

Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading& unloading charges. Trip 1207.35

727 Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 poles. (Running km).

Transporting poles by hired vehicle to a distance beyond 5km and carrying upto 4 numbers of poles. (Running km) km 40.00

728Transporting Transformers by hired vehicle upto 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs excluding loading & unloading.

Transporting Transformers by hired vehicle to a distance upto 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units excluding loading& unloading charges.

Trip 1207.35

729Transporting Transformers by hired vehicle to a distance beyond 5km and upto 2 No. of 63 to 250kVA Transformers / RMUs (Running km).

Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of 63/100/160/250kVA Transformers / Ring Main Units (Running km). km 40.00

TRANSPORTATION OF TRANSFORMER/POLE BY COUNTRY BOAT/VALLAM TRANSPORTATION OF TRANSFORMER/POLE BY COUNTRY BOAT/VALLAM

751 Engaging one boat man with Boat/Country B /V ll Engaging one boat man with Boat/Country Boat/Vallam. day 586.005 Boat/Vallam. gag g o e boat a t oat/Cou t y oat/ a a . day 586.00

752Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 292.00

753 Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. Transporting HT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. km 51.40

754 Transporting HT PSC Poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting HT PSC Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 667.00

755 Transporting HT PSC Poles by Country boat/Vallam beyond 6km. Transporting HT PSC Poles by Country boat/Vallam beyond 6km. km 77.00

756 Transporting 'A' type Poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting 'A' type Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 786.00

757 Transporting 'A' type Poles by Country boat/Vallam beyond 6km. Transporting 'A' type Poles by Country boat/Vallam beyond 6km. km 103.00

758 Transporting 4 legged poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting Four legged lattice structures by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 1179.00

759 Transporting 4 legged poles by Country boat/Vallam beyond 6km. Transporting Four legged lattice structures by Country boat/Vallam beyond 6km. km 154.00

Page 31 of 43

Page 36: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

760Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 235.00

761 Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. Transporting LT TW/RSJ/Rail Poles by Country boat/Vallam beyond 6km. km 30.80

762 Transporting LT PSC Poles by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting LT PSC Poles by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 559.00

763 Transporting LT PSC Poles by Country boat/Vallam beyond 6km. Transporting LT PSC Poles by Country boat/Vallam beyond 6km. km 62.00

764Transporting 63/100/160kVA Transformer by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting 63/100/160kVA Transformer by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 1127.00

765 Transporting 63/100/160kVA Transformer by Country boat/Vallam beyond 6km. Transporting 63/100/160kVA Transformer by Country boat/Vallam beyond 6km. km 154.00

766Transporting 250/315/500kVA Transformer by Country boat/Vallam upto 6km incl. loading, unloading and hire charges.

Transporting 250/315/500kVA Transformer by Country boat/Vallam upto 6km including loading and unloading charges and hire charge of Country boat/Vallam. No 1345.00

767 Transporting 250/315/500kVA Transformer by Country Transporting 250/315/500kVA Transformer by Country boat/Vallam beyond 6km km 154 00767 p g y yboat/Vallam beyond 6km. Transporting 250/315/500kVA Transformer by Country boat/Vallam beyond 6km. km 154.00

PAINTING PAINTING

776

Pole numbering using printed Aluminium sheets / Painting the surface of pole with anti algal yellow paint and painting Letters with black paint as specified incl. cost of paint.

Pole numbering using printed Aluminium sheets of 22 SWG having size 20 x 12 cm or Painting the surface of line supports where numbers are to be inscribed, Pole numbers shall be painted in circular / rectangular background, using approved quality anti algal yellow paint in two coat after scraping and cleaning the surface at a height of 2.5 metre above ground level. The number and letters should be in black synthetic enamel paint. The size of the number should be at least 2cm in height x 1.5cm in width. including cost of paint.

No 54.00

777Preparing index register (book & soft copy) showing name of Transformer, post numbers, consumer numbers as specified.

Preparing index register (book & soft copy) showing name of Transformer, post numbers, consumer numbers (in separate column of excel sheet) etc. No 5.00

778Traffic signal painting of pole 1.5m height using black and white paints in alternate rings of 25cm width incl. cost of paint as specified.

Object Marking (traffic signal painting) in one LT, HT, HT/LT pole for a height of 1.5m from ground level using approved quality primer one coat and two coats anti algal black and fluorescent white paint in alternate rings of 25cm width including cost of paints.

No 228.00

779Supplying and fixing permanently, screen printed consumer premises identification number card of size 10x7cm using screw/adhesives as specified.

Supplying and fixing permanently, screen printed consumer premises identification number card of size 10x7cm using screw/adhesives. (Con.No. of digit 2cm height, 1.5cm width & 0.5cm thickness, Name of section of character 1cm height, 1cm width & 0.25cm thickness).

No 21.50

Page 32 of 43

Page 37: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

780Painting 'A' pole structure with one coat Synchromate primer and two coat grey enamel/aluminium paint incl. cost of paint.

Painting 'A' pole structure with one coat Synchromate primer and two coat grey enamel paint/aluminium paint including cost of paint. No 1646.00

781 Numbering of Tree (marking for cutting the tree) using yellow enamel paint as specified incl. cost of paint.

Numbering of Tree (marking for cutting the tree) using yellow enamel paint as specified including cost of paint. No 11.00

782 Repainting 25 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 25 transformer installed at site (DP or plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 1717.00

783 Repainting 50/63 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 50/63 kVA transformer installed at site (DP or plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 2016.00

784 Repainting 100 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 100 kVA transformer installed at site (DP or plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 2530.00

g y p

785 Repainting 160 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 160 kVA transformer installed at site (DP or plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 3381.00

786 Repainting 250 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 250 kVA transformer installed at site (plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 5097.00

787 Repainting 500 kVA transformers at site

Scrapping and cleaning of old paint,rust,oil etc. over the old 500 kVA transformer installed at site (plinth) and applying one or more coat of synthetic enamel paint (over a coat of iron primer, wherever required) of approved quality and colour as per standard specification including cost of materials, conveyance etc, complete.

No 6776.00

Page 33 of 43

Page 38: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

TW/RSJ/RAIL - HT TW/RSJ/RAIL - HT

801 Loading HT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site.

Loading HT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 199.00

802 Transporting one HT TW/RSJ/Rail pole by Hand cart - limited to 4km (excluding loading and unloading)

Transporting one HT TW/RSJ/Rail pole by Hand cart - normally limited to 4km (excluding loading and unloading) P/km 199.00

803 Transporting one HT TW/RSJ/Rail pole by Head load for an average distance of one km (limited to 0.3km).

Transporting one HT TW/RSJ/Rail pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 811.00

804Fitting and erecting one HT TW Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT TW Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 1109.00

805Fitting and erecting one HT RSJ Pole in position incl. fitting cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT RSJ Single Pole in position, including fitting cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 1109.00

806Fitting and erecting one HT Rail Pole in position incl. fi i di i & b k filli i d i

Fitting and erecting one HT Rail Single Pole in position, including fitting cross arm, digging d b k filli i i di il d i ffi i l h f GI hi l d h N 1109 00806 fitting cross arm, digging & back filling pit, drawing

earth leads.and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 1109.00

807Fitting and erecting one HT DP using TW pole in position incl. fitting 2 channel cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using TW pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 3510.00

808Fitting and erecting one HT DP using RSJ pole in position incl. fitting 2 channel cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using RSJ pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 3510.00

809Fitting and erecting one HT DP using Rail pole in position incl. fitting 2 channel cross arm, digging & back filling pit, drawing earth leads.

Fitting and erecting one HT Double Pole Structure using Rail pole in position including fitting 2 No. channel cross arm, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads to the ground for earthing (excluding provision of earthing).

No 3510.00

810 Fitting and providing one Strut using HT TW pole incl. digging & back filling pit.

Fitting and providing one Strut using HT TW pole, including digging and back filling pit in ordinary soil. No 981.00

811 Fitting and providing one Strut using HT RSJ pole incl. digging & back filling pit.

Fitting and providing one Strut using HT RSJ pole, including digging and back filling pit in ordinary soil. No 981.00

812 Fitting and providing one Strut using HT Rail pole incl. digging & back filling pit.

Fitting and providing one Strut using HT Rail pole, including digging and back filling pit in ordinary soil. No 981.00

Page 34 of 43

Page 39: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

813Fitting and providing one HT Fly stay for 11kV pole using HT TW pole incl. digging & back filling pits, drawing earth leads.

Fitting and providing one HT Fly stay for 11kV pole using HT TW pole, including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2015.00

814Fitting and providing one HT Fly stay for 11kV pole using HT RSJ pole incl. digging & back filling pits, drawing earth leads.

Fitting and providing one HT Fly stay for 11kV pole using HT RSJ pole, including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2015.00

815Fitting and providing one HT Fly stay for 11kV pole using HT Rail pole incl. digging & back filling pits, drawing earth leads.

Fitting and providing one HT Fly stay for 11kV pole using HT Rail pole, including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 2015.00

816Insertion of one HT TW pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT TW pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 1203.00

817Insertion of one HT RSJ pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT RSJ pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 1203.00

818Insertion of one HT Rail pole in existing line incl. digging & backfilling pit, fitting cross arm, insulators, binding etc.

Insertion of one HT Rail pole in existing OH line including digging & backfilling pit in ordinary soil, fitting cross arm, insulators, binding etc., drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing).

No 1203.00g g g ( g p g)

TW/RSJ/RAIL - LT TW/RSJ/RAIL - LT

826 Loading LT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site.

Loading LT TW/RSJ/Rail pole to Hand cart from the stacking place and unloading the same at work site (excluding transportation). No 93.00

827 Transporting one LT TW/RSJ/Rail pole by Hand cart - limited to 4km (excluding loading and unloading).

Transporting one LT TW/RSJ/Rail pole by Hand cart - normally limited to 4km (excluding loading and unloading). P/km 93.00

828 Transporting one LT TW/RSJ/Rail pole by Head load - for an average distance of one km (limited to 0.3km).

Transporting one LT TW/RSJ/Rail pole by Head load - for an average distance of one km where transportation by hand cart is not possible. (normally limited to 0.3km). P/km 412.00

829 Erecting one LT TW Pole in position incl. digging & back filling pit. Erecting one LT TW Pole in position including digging & back filling pit in ordinary soil. No 679.00

830 Erecting one LT RSJ Pole in position incl. digging & back filling pit. Erecting one LT RSJ Pole in position including digging & back filling pit in ordinary soil. No 679.00

831 Erecting one LT Rail Pole in position incl. digging & back filling pit. Erecting one LT Rail Pole in position including digging & back filling pit in ordinary soil. No 679.00

832 Providing Strut using LT TW pole incl. digging and back filling pit. Providing Strut using LT TW pole including digging and back filling pit in ordinary soil. No 602.00

Page 35 of 43

Page 40: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

833 Providing Strut using LT RSJ pole incl. digging and back filling pit. Providing Strut using LT RSJ pole including digging and back filling pit in ordinary soil. No 602.00

834 Providing Strut using LT Rail pole incl. digging and back filling pit. Providing Strut using LT Rail pole including digging and back filling pit in ordinary soil. No 602.00

835 Providing Fly stay for LT pole using LT TW pole incl. digging and back filling pit.

Providing Fly stay for LT pole using LT TW pole including digging and back filling pit in ordinary soil. No 1296.00

836 Providing Fly stay for LT pole using LT RSJ pole incl. digging and back filling pit.

Providing Fly stay for LT pole using LT RSJ pole including digging and back filling pit in ordinary soil. No 1296.00

837 Providing Fly stay for LT pole using LT Rail pole incl. digging and back filling pit.

Providing Fly stay for LT pole using LT Rail pole including digging and back filling pit in ordinary soil. No 1296.00

838Constructing one span Sph OH line for giving S/C using TW pole with one stay incl. digging & back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using TW pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1634.00

839Constructing one span Sph OH line for giving S/C using RSJ pole with one stay incl. digging & back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using RSJ pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1634.00

840Constructing one span Sph OH line for giving S/C using Rail pole with one stay incl. digging & back filling 2 pits,

Constructing one span single phase OH line for giving service connection using Rail pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree No 1634.00p y gg g g p

cutting tree branches.y g gg g g p y g g

branches, excluding WP portion and transportation of pole.

841Constructing one span Sph OH line for giving S/C using TW pole with TW strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using TW pole with TW strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1681.00

842Constructing one span Sph OH line for giving S/C using RSJ pole with RSJ strut incl. digging & back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using RSJ pole with RSJ strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1681.00

843Constructing one span Sph OH line for giving S/C using Rail pole with Rail strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span single phase OH line for giving service connection using Rail pole with Rail strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1681.00

844Constructing one span Sph OH line for giving S/C using TW pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span single phase OH line for giving service connection using TW pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1079.00

845Constructing one span Sph OH line for giving S/C using RSJ pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span single phase OH line for giving service connection using RSJ pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1079.00

846Constructing one span Sph OH line for giving S/C using Rail pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span single phase OH line for giving service connection using Rail pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 1079.00

Page 36 of 43

Page 41: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

847Constructing one span 3ph OH line for giving S/C using TW pole with one stay incl. digging & back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using TW pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1988.00

848Constructing one span 3ph OH line for giving S/C using RSJ pole with one stay incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using RSJ pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1988.00

849Constructing one span 3ph OH line for giving S/C using Rail pole with one stay incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using Rail pole with one stay including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1988.00

850Constructing one span 3ph OH line for giving S/C using TW pole with TW strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using TW pole with TW strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 2035.00

851Constructing one span 3ph OH line for giving S/C using RSJ pole with RSJ strut incl. digging& back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using RSJ pole with RSJ strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 2035.00

852Constructing one span 3ph OH line for giving S/C using Rail pole with Rail strut incl. digging & back filling 2 pits, cutting tree branches.

Constructing one span three phase OH line for giving service connection using Rail pole with Rail strut (without stay) including digging & back filling 2 pits in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of poles.

No 2035.00p g g g p p p

853Constructing one span 3ph OH line for giving S/C using TW pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span three phase OH line for giving service connection using TW pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1434.00

854Constructing one span 3ph OH line for giving S/C using RSJ pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span three phase OH line for giving service connection using RSJ pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1434.00

855Constructing one span 3ph OH line for giving S/C using Rail pole without stay/strut incl. digging& back filling pit, cutting tree branches.

Constructing one span three phase OH line for giving service connection using Rail pole without stay/strut including digging & back filling pit in ordinary soil, cutting and removing tree branches, excluding WP portion and transportation of pole.

No 1434.00

856 Providing WP support with TW pole incl. digging & back filling pit.

Providing WP support with TW pole including digging & back filling pit in ordinary soil. excluding transportation of poles. No 635.00

Page 37 of 43

Page 42: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

TW/RSJ/RAIL HT MAINTENANCE TW/RSJ/RAIL HT MAINTENANCE

857Renewal of existing damaged/old 11kV pole with new TW pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV pole (any type) with new TW pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 1862.00

858Renewal of existing damaged/old 11kV pole with new RSJ pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV pole (any type) with new RSJ pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 1862.00

859Renewal of existing damaged/old 11kV pole with new Rail pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old 11kV pole (any type) with new Rail pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except pole.

No 1862.00

860Renewal of existing damaged/old 11kV DP with new TW DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new TW DP in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 5350.00

861Renewal of existing damaged/old 11kV DP with new RSJ DP in place and refitting of all items incl. conveyance (except poles).

Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new RSJ DP in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 5350.00

862Renewal of existing damaged/old 11kV DP with new R il DP i l d fi i f ll i i l

Renewal of existing damaged/old 11kV DP (any type) (2 channel cross arm) with new Rail DP i l i l di i f l i i f l b kfilli i d fi i f ll N 5350 00862 Rail DP in place and refitting of all items incl.

conveyance (except poles).in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items etc. and conveyance of all materials except poles.

No 5350.00

863Renewing damaged Transformer DP structure with new TW Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged Transformer DP (any type) structure with a new TW Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 18162.00

864Renewing damaged Transformer DP structure with new RSJ Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing).

Renewing one damaged Transformer DP (any type) structure with a new RSJ Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 18162.00

865Renewing damaged Transformer DP structure with new Rail Transformer DP and re-erecting all accessories & Transformer (excluding renewal of pipe earthing) .

Renewing one damaged Transformer DP (any type) structure with a new Rail Transformer DP including excavation, dismantling accessories like AB switch, DO fuse, LA, LT fuses, HT, LT and earth connections, dismantling existing Transformer, keeping it in safe custody and re erecting all accessories including Transformer on the new DP as per standards and drawing sufficient length of GI earthing leads to the ground for earthing, excluding renewal of pipe earthing.

No 18162.00

Page 38 of 43

Page 43: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

866Renewal of existing damaged/old 11kV Strut with new TW strut in place incl. excavation & backfilling of pit and conveyance (except pole).

Renewal of any type of existing damaged/old 11kV Strut (any type) with new TW strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 1471.00

867Renewal of existing damaged/old 11kV Strut with new RSJ strut in place incl. excavation & backfilling of pit and conveyance (except pole).

Renewal of any type of existing damaged/old 11kV Strut (any type) with new RSJ strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 1471.00

868Renewal of existing damaged/old 11kV Strut with new Rail strut in place incl. excavation & backfilling of pit and conveyance (except pole).

Renewal of any type of existing damaged/old 11kV Strut (any type) with new Rail strut in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 1471.00

869Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of HT TW pole and refitting of all items and conveyance (except pole).

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT TW pole in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 3022.00

870Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of HT RSJ pole and refitting of all items and conveyance (except pole).

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT RSJ pole in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 3022.00

871Renewal of existing damaged/old 11kV Fly stay with new Fly stay incl. renewal of HT Rail pole and refitting of all items and conveyance (except pole).

Renewal of existing damaged/old 11kV Fly stay (any type) with new Fly stay including renewal of HT Rail pole in place including excavation & backfilling of pit, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 3022.00y ( p p ) g g y p p

TW/RSJ/RAIL LT MAINTENANCE TW/RSJ/RAIL LT MAINTENANCE

872Renewal of existing damaged/old LT (Sph line) pole with new TW pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (single phase line) pole (any type) with new TW pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1298.00

873Renewal of existing damaged/old LT (Sph line) pole with new RSJ pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (single phase line) pole (any type) with new RSJ pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1298.00

874Renewal of existing damaged/old LT (Sph line) pole with new Rail pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (single phase line) pole (any type) with new Rail pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1298.00

875Renewal of existing damaged/old LT (3ph line) pole with new TW pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (three phase line) pole (any type) with new TW pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1536.00

Page 39 of 43

Page 44: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

876Renewal of existing damaged/old LT (3ph line) pole with new RSJ pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (three phase line) pole (any type) with new RSJ pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1536.00

877Renewal of existing damaged/old LT (3ph line) pole with new Rail pole in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT (three phase line) pole (any type) with new Rail pole in place including excavation of pole pit, erection of new pole, backfilling pit and refitting of all items except street light fitting etc. and conveyance of all materials except pole.

No 1536.00

878Renewal of existing damaged/old LT Strut with new TW strut in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT Strut of any type with new TW strut in place including excavation of pit, erection of new strut, backfilling, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 774.00

879Renewal of existing damaged/old LT Strut with new RSJ strut in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT Strut of any type with new RSJ strut in place including excavation of pit, erection of new strut, backfilling, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 774.00

880Renewal of existing damaged/old LT Strut with new Rail strut in place and refitting of all items incl. conveyance (except pole).

Renewal of existing damaged/old LT Strut of any type with new Rail strut in place including excavation of pit, erection of new strut, backfilling, consolidating, dismantling and refitting of all items and conveyance of all materials except pole.

No 774.00

Renewal of damaged LT Fly stay with new Fly stay incl Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including 881

Renewal of damaged LT Fly stay with new Fly stay incl. new LT TW pole in place and refitting of all items, conveyance (except pole).

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT TW pole in place including excavation of pit, erection of new Fly stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

No 1815.00

882Renewal of damaged LT Fly stay with new Fly stay incl. new LT RSJ pole in place and refitting of all items, conveyance (except pole).

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT RSJ pole in place including excavation of pit, erection of new Fly stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

No 1815.00

883Renewal of damaged LT Fly stay with new Fly stay incl. new LT Rail pole in place and refitting of all items, conveyance (except pole).

Renewal of existing damaged/old LT Fly stay of any type of pole with new Fly stay including new LT Rail pole in place including excavation of pit, erection of new Fly stay, backfilling and dismantling and refitting of all items and conveyance of all materials except pole.

No 1815.00

Page 40 of 43

Page 45: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

UG CABLE UG CABLE

926Excavation of cable trench in all classes of soil and backfilling after laying of cable (excluding laying of cable).

Excavation of cable trench of appropriate size ( normally 1.2m deep and 0.35m /0.5m wide for single/double run) in all classes of soil including breaking clods, watering, ramming and sectioning of soil bank etc. and back filling the soil after cable laying and consolidating the soil in layers of 75cm (excluding laying of cable).

m 181.00

927Additional rate for excavation of cable trench in exceptionally hard conditions ( like in *ordinary rock).

Additional rate for excavation of cable trench of appropriate size (normally 1.2m deep and 0.35m /0.5m wide for single/double run) in exceptionally hard conditions (like in ordinary rock).* (As per the PWD Standard Data book ,'ordinary rock' is defined as any material which can be quarried or split with crowbars or wedges).

m 106.00

928Laying HT XLPE UG cable (of sizes upto and incl. 3x185 sqmm) as per specification excl. excavation and backfilling.

Laying HT XLPE UG cable of sizes upto and including 3x185 sq mm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling

m 259.00

transport including crane charges excluding excavation and backfilling.

929Laying HT XLPE UG cable (of sizes beyond 3x185 sqmm and upto and incl. 3x300 sqmm) as per specification excl. excavation and backfilling.

Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.

m 304.00

930Doing straight joint on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally as per specification.

Doing straight joint on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site.

No 1857.00

931Doing straight joint on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally as per specification.

Doing straight joint on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally as per specification after providing proper traffic signalling and caution board fencing etc. wherever necessary, including charges for cable jointer and other sundries etc. as per the direction of departmental officers at site.

No 1909.00

Page 41 of 43

Page 46: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

932Doing one cable end termination on cables of sizes upto and incl. 3x185 sqmm using the cable jointing kit supplied departmentally.

Doing one cable end termination on HT XLPE UG cables of sizes upto and including 3x185 sqmm using the cable jointing kit supplied departmentally after making fencing, caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers.

No 1086.00

933Doing one cable end termination on cables of sizes beyond 3x185 sqmm and upto and incl. 3x300 sq mm using the cable jointing kit supplied departmentally.

Doing one cable end termination on HT XLPE UG cables of sizes beyond 3x185 sqmm and upto and including 3x300 sq mm using the cable jointing kit supplied departmentally after making fencing,caution board and all other safety measures including charges for cable jointer etc. complete as per the direction of the departmental officers.

No 1137.00

934Mounting the cable ends of all sizes upto and incl. 3x300 sq mm with special type cable clamps incl. cost of extra materials if needed and giving necessary connections.

Mounting and connecting HT XLPE UG cable ends of all sizes upto and including 3x300 sq mm with special type cable clamps, bolts, nuts, terminal protectors etc.including cost of extra materials if needed and giving necessary jumper connections.

No 691.00

935Excavation of cable trench (soil surface) and digging out the faulty cable from the trench and refilling after work. (excluding joining).

Excavation of cable trench (soil surface) and digging out the faulty portion of the cable from the trench for redoing straight through joint, re-laying the cable after jointing, refilling and consolidating the trench as per standard specification. (excluding joining).

m 161.00

936 Additional rate for excavating trench on tarred/concrete surface of specified size. Additional rate for excavating trench on tarred/concrete surface of specified size. m 161.00p

937Dismantling faulty cable end from the structure/pole and mounting the same after redoing End termination and giving connections. (excluding end termination).

Dismantling the faulty cable end from the structure/pole after disconnecting 11kV jumper connections and mounting the same after redoing End termination and giving jumper connections. (excluding end termination).

No 448.00

CIVIL WORKS CIVIL WORKS

951 Constructing Transformer plinth inclusive of cost of all materials (as per specification).

Constructing Transformer plinth of size 1.5x1.5x1.5m on 1.8x1.8x0.75m basement inclusive of cost of all materials. [Excavation 1.8x1.8x0.75m, Random Rubble in CM(1:6) 1.8x1.8x0.75m + 1.5x1.5x1.5m, concrete (1:2:4, 20mm) 1.5x1.5x0.10 m, plaster CM (1:3) 12mm, 1.5x1.5m, Pointing CM (1:3) 1.5x1.5mx 4 sides].

No 36650.00

952 Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification).

Providing concrete muffing of size 0.45x0. 45x1.5m (0.5m above GL and 1m below GL). Excavation 0.45x0.45x1m, concrete (1:3:6, 20mm) 0.45x0.45x1.5m, Plastering (1:3) 12mm 0.45x0.45mx5sides.

No 3717.00

953Providing Transformer fencing , using 50x50x6mm Angle iron, 40 x 6 mm MS flat and 8 mm MS rod as specified, incl cost of transportation & foundation

Providing Transformer fencing to a height of 1.8 m above ground level using MS Angle frames of size ISA 50x50x6mm for outer frame, 2 runs of 40 x 6 MS flat for horizondal brasing and grills with MS rods 8 mm Dia @ 10cm c/c for verticals, providing gate with locking arrangements, providing danger board & name board, embeding the legs in cement concrete 1:2:4, footing of size 30cmx30cmx50cm, painting with synthetic enamel paint two coats over one coat of iron primer etc complete, incl cost of transportation

m2 1713.00

Page 42 of 43

Page 47: Abstract Corporate Office (SBU-D) - KSEB

Kerala State Electricity Board Ltd Annexure to BO (FTD) No 2495/2016 (D(D.S)/D6-AE 1/Proposal 02/2015) dtd 25.08.2016

Short Description of work Detailed description of work UnitAmount

incl. 10 % CP

954 Providing yard metalling with 6mm & 40mm thick blue metal as specified after constructing a curb wall.

Cleaning and levelling of transformer yard/RMU, spreading 40 mm broken stone in yard for a thickness of 10 cm above bed of 10 cm thick 6 mm broken stone, after constructing a curb wall of height 20cm above ground and 10cm below level including cost of all materials and charges for conveying, spreading, consolidating etc.

m2 649.00

956 Providing Transformer fencing using GI chain link.

Providing Transformer fencing using steel work using 40 mm Dia GI pipes for verticals & outer frame of gate, providing gate with locking arrangements, with two horizondal brasings using 40 x 6 mm MS flat & grills with MS rods 8 mm Dia @ 10cm c/c for verticals for the gate, providing danger board & name board, fixing in position, concreting the base with 1:2:4 CC, applying one coat of zinc chromate primer and two coats of aluminium paint for fencing post and gate frame, providing fencing with 4 mm GI chain link fixed to GI post, as per detailed specifications including all charges.

m2 1422.00

957 Brick work in cement mortar for superstructure as per the direction of departmental staff.

Brick work in cement mortar 1:4 with country burnt bricks for superstructure as per the direction of departmental staff m3 8855.00

Earthing Earthing

955 Providing one Earth using earth pipe incl. digging & backfilling pit and supply of charcoal, salt, sand etc.

Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length including digging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom including the cost of 20kg salt, 25kg charcoal, excluding supply of earth

No 2965.0090cm from the bottom. including the cost of 20kg salt, 25kg charcoal, excluding supply of earth pipe.

Installation of RMU Installation of RMU

Cost of installation & commissioning including transportation of materials of Data Aquisition compatible Extensible type Ring Main Unit without of different specifications

Cost of construction of foundation, base plates, fixing anchor bots, loading & unloading, handling, erection, allignment and allied works for the installation of Data Aquisition compatible Extensible type Ring Main Units with terminal protector boots & extension modules, actuators for remote operatios, communicable FPIs, CTs, PTs & relay contacts for SCADA, giving power & control wiring and connections, providing terminal protector, interconnecting RMU bus bar and control cables, providing metered LT supply from nearest LT pole, providing 2 nos pipe earthing, cable mounting & terminations, giving connections after ascertaing proper phase sequence, providing location name & warning boards, burying cables & refilling, conducting all precommissioning tests as required, complete, except cost of conveyance

991 RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch RMU Bus Couplers / Add-On units with Load Break switch(s) & Earth switch No 27065.00

992 RMUs with two nos load break switches & one VCB RMUs with two nos load break switches & one VCB No 40376.00

993 Additional rate for RMUs with one additional Load Break switch / VCB Additional rate for RMUs with one additional Load Break switch / VCB No 8689.00

994 Coupling of Busbars Coupling of Busbars Set 2811.00

Page 43 of 43