6

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

Embed Size (px)

Citation preview

Page 1: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights
Page 2: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE

© Copyright EDF Energy. All rights reserved.

METER READ REPLACEMENT

STEFAN LEEDHAM

29 December 2009

Page 3: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

METER READ REPLACEMENTStefan Leedham 29 January 2009

© Copyright EDF Energy plc. All rights reserved. PAGE: 3

CURRENT ARRANGEMENTS

• UNC prevents Shippers from replacing a meter read if a subsequent read has been submitted (M 3.7.4)• For annual read sites this provides a window of at least 63 days

• For monthly read sites this provides a window of at least 7 days

• In electricity suppliers are able to replace meter reads even if a subsequent read submitted

• LSP sites can undertake a consumption adjustment

• Inaccurate meter readings can create issues when calculating AQs

Page 4: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

METER READ REPLACEMENTStefan Leedham 29 January 2009

© Copyright EDF Energy plc. All rights reserved. PAGE: 4

OBJECTIVES

• Replace a meter read were a subsequent meter read has been submitted

• Should be a simple solution

• Mimics arrangements in electricity

• Ensure accurate AQ

• Probably User Pays

• Focus on SSP

Page 5: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

METER READ REPLACEMENTStefan Leedham 29 January 2009

© Copyright EDF Energy plc. All rights reserved. PAGE: 5

ISSUES

• Project Nexus

• Appetite to incorporate LSP solution

• Requirement for a close out window

• Costs

Page 6: ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND) ADD PRESENTER’S NAME HERE / ADD DATE HERE © Copyright EDF Energy. All rights

ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE

© Copyright EDF Energy. All rights reserved.

THANK YOU