Upload
nancy-warner
View
213
Download
0
Embed Size (px)
Citation preview
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE
© Copyright EDF Energy. All rights reserved.
METER READ REPLACEMENT
STEFAN LEEDHAM
29 December 2009
METER READ REPLACEMENTStefan Leedham 29 January 2009
© Copyright EDF Energy plc. All rights reserved. PAGE: 3
CURRENT ARRANGEMENTS
• UNC prevents Shippers from replacing a meter read if a subsequent read has been submitted (M 3.7.4)• For annual read sites this provides a window of at least 63 days
• For monthly read sites this provides a window of at least 7 days
• In electricity suppliers are able to replace meter reads even if a subsequent read submitted
• LSP sites can undertake a consumption adjustment
• Inaccurate meter readings can create issues when calculating AQs
METER READ REPLACEMENTStefan Leedham 29 January 2009
© Copyright EDF Energy plc. All rights reserved. PAGE: 4
OBJECTIVES
• Replace a meter read were a subsequent meter read has been submitted
• Should be a simple solution
• Mimics arrangements in electricity
• Ensure accurate AQ
• Probably User Pays
• Focus on SSP
METER READ REPLACEMENTStefan Leedham 29 January 2009
© Copyright EDF Energy plc. All rights reserved. PAGE: 5
ISSUES
• Project Nexus
• Appetite to incorporate LSP solution
• Requirement for a close out window
• Costs
ADD PRESENTATION TITLE HERE (GO TO: VIEW / MASTER / SLIDE MASTER TO AMEND)ADD PRESENTER’S NAME HERE / ADD DATE HERE
© Copyright EDF Energy. All rights reserved.
THANK YOU