Upload
buinhan
View
215
Download
1
Embed Size (px)
Citation preview
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
2
.
3D VIEWS
22/09/2017
3D VIEWS
2
.AERIAL VIEW 11
2
.AERIAL VIEW 22
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
3
.
22/09/2017
CONTOUR AND DETAIL SURVEY
0 5000(millimetres)
BAR SCALE
N
DEMOLISH EXISTING BUILDINGS
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
1
8
1
8
MALBON STREET
BUTM
ARO
O S
TREE
T
LAN
EWAY
COMMERCIALUNIT 1
STAIR ACCESS TORESIDENTIAL UNITS ABOVE
COMMERCIALPARKING SPACES
RESIDEDENTIALVISITOR PARKING SPACES
PSU
COMM
1
PSU
COMM
2
PSU
COMM
3
PSU
COMM
4LOADING SPACE6500x3500
ENTRY EXIT
BINAREA
NEW DRIVEWAY
NEW
DRI
VEW
AY
LANDSCAPING(TYPICAL)
PATH
PSU
COMM
5
3500
3500
3500
DRIVEWAY DRIVEWAY
EXISTING CONCRETE FOOTPATH
CARPARKING PROVISIONS:COMMERCIAL 16 PSU'sCOMMERCIAL (DISABLED SPACE) 2 PSU'sRESIDENTIAL (GARAGES) 16 PSU'sVISITOR (RESIDENTIAL) 2 PSU'sTOTAL 36 PSU's
LOADING SPACE 1 PSU
94550
94550
2011
5
2011
580
00
16000 12380 1600 12380 16000 12380 1600 12380 8000
6000
DIS
PUS
SHAR
EDZO
NE
U1
DOUBLEGARAGE
PARKING DIMENSIONS2400X5400 90 DEGREE
COMMON STAIRUNITS 1-4
PSU
RES
VIS
2
PSU
RES
VIS
1
PSU
COMM
6
PSU
COMM
7
PSU
COMM
8
PSU
COMM
9
PSU
COMM
10
U2
DOUBLEGARAGE
COMMERCIALUNIT 2
COMMERCIALUNIT 3
SHAR
EDZO
NE
COMMON STAIRUNITS 5-8
1620
U3
DOUBLEGARAGE
U4
DOUBLEGARAGE
U5
DOUBLEGARAGE
U6
DOUBLEGARAGE
DRIVEWAY
U7
DOUBLEGARAGE
U8
DOUBLEGARAGE
6405
PSU
COMM
11
PSU
COMM
12
PSU
COMM
13
PSU
COMM
14
PSU
COMM
15
PSU
COMM
16
6380
920 920
PATH
6405
DIS
PUS
7
1
7
27 3
74
4000 LITREWATER TANK
4000 LITREWATER TANK
3
8
3
8
4
8
4
8
POSSIBLELOCATIONFUTURE LIFT
LOT 201901.8 SQ M
DISWCTE
A DISWCTE
A DISWC TE
A
FLOORS LEVELS:GROUND RL 693.5FIRST RL 697.30LOFT RL 700.00
K & G
MAILBOXES
MAILBOXES
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 300
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
4
.
22/09/2017
SITE AND GROUND FLOOR PLAN
1 : 3004
.FLOOR - G1
CONTRAST WALL CONTRAST WALL CONTRAST WALL CONTRAST WALL
SCHEDULE OF EXTERNAL MATERIALS & FINISHES:
GROUND FLOORBLOCK WALLSFACE OR RENDERED & PAINTEDAS SELECTED
FIRST FLOORBRICK VENEER WALLSFACE OR RENDERED & PAINTEDAS SELECTED
LOFT FLOORCLAD WALLSPAINTEDAS SELECTED
WINDOWS & DOORSALUMINIUM FRAMEDSINGLE GLAZEDAS SELECTED
ROOFCOLOURBOND ROOFAS SELECTED
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
As indicated
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
7
.
22/09/2017
ELEVATIONS
1 : 3007
N ELEVATION1
1 : 3007
S ELEVATION2
1 : 3007
E ELEVATION3
1 : 3007
W ELEVATION4
1 : 17
SCHEDULE OF EXTERNAL MATERIALS & FINISHES
128.0 m²COMMERCIAL UNIT 1
128.0 m²COMMERCIAL UNIT 2
64.0 m²COMMERCIAL UNIT 3
38.9 m²U1 GARAGE
40.1 m²U2 GARAGE
40.1 m²U3 GARAGE
38.9 m²U4 GARAGE
38.9 m²U5 GARAGE
40.1 m²U6 GARAGE
40.1 m²U7 GARAGE
38.9 m²U8 GARAGE
15.3 m²
GROUND - CIRCUALTION CORRIDORAND STAIRS
15.3 m²
GROUND - CIRCUALTION CORRIDORAND STAIRS
145.5 m²U1 LIVING FIRST
15.1 m²U1 BALCONY
105.0 m²U2 LIVING FIRST
14.6 m²U2 BALCONY
124.9 m²
FIRST - CIRCUALTION CORRIDOR ANDSTAIRS
105.6 m²U3 LIVING FIRST
105.6 m²U4 LIVING FIRST
105.6 m²U5 LIVING FIRST
105.6 m²U6 LIVING FIRST
105.0 m²U7 LIVING FIRST
14.6 m²U3 BALCONY
14.6 m²U4 BALCONY
14.6 m²U5 BALCONY
14.6 m²U6 BALCONY
14.6 m²U7 BALCONY
15.1 m²U8 BALCONY
145.5 m²U8 LIVING FIRST
66.1 m²U1 LIVING LOFT
54.6 m²U2 LIVING LOFT
55.2 m²U3 LIVING LOFT
55.2 m²U4 LIVING LOFT
55.2 m²U5 LIVING LOFT
55.2 m²U6 LIVING LOFT
54.6 m²U7 LIVING LOFT
66.1 m²U8 LIVING LOFT
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
1 : 750
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
9
.
FLOOR AREAS
22/09/2017
FLOOR AREAS
FLOOR AREASName Area (sq m)
COMMERCIAL UNIT 1 128.0 m²COMMERCIAL UNIT 2 128.0 m²COMMERCIAL UNIT 3 64.0 m²FIRST - CIRCUALTION CORRIDOR AND STAIRS 124.9 m²GROUND - CIRCUALTION CORRIDOR AND STAIRS 15.3 m²GROUND - CIRCUALTION CORRIDOR AND STAIRS 15.3 m²U1 BALCONY 15.1 m²U1 GARAGE 38.9 m²U1 LIVING FIRST 145.5 m²U1 LIVING LOFT 66.1 m²U2 BALCONY 14.6 m²U2 GARAGE 40.1 m²U2 LIVING FIRST 105.0 m²U2 LIVING LOFT 54.6 m²U3 BALCONY 14.6 m²U3 GARAGE 40.1 m²U3 LIVING FIRST 105.6 m²U3 LIVING LOFT 55.2 m²U4 BALCONY 14.6 m²U4 GARAGE 38.9 m²U4 LIVING FIRST 105.6 m²U4 LIVING LOFT 55.2 m²U5 BALCONY 14.6 m²U5 GARAGE 38.9 m²U5 LIVING FIRST 105.6 m²U5 LIVING LOFT 55.2 m²U6 BALCONY 14.6 m²U6 GARAGE 40.1 m²U6 LIVING FIRST 105.6 m²U6 LIVING LOFT 55.2 m²U7 BALCONY 14.6 m²U7 GARAGE 40.1 m²U7 LIVING FIRST 105.0 m²U7 LIVING LOFT 54.6 m²U8 BALCONY 15.1 m²U8 GARAGE 38.9 m²U8 LIVING FIRST 145.5 m²U8 LIVING LOFT 66.1 m²
2294.9 m²
1 : 7509
FLOOR - G1
1 : 7509
FLOOR - F2
1 : 7509
FLOOR - LOFT3
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
25
.
NOTES, ELECTRICALLEGEND
22/09/2017
NOTES, ELECTRICAL LEGEND
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
26
.
SPECIFICATION
22/09/2017
SPECIFICATION
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
1 : 500
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
27
.
DETAIL - RETAININGWALLS, EROSION &SEDIMENT CONRTROL
22/09/2017
DETAIL - RETAINING WALLS, EROSION & SEDIMENT CONRTROL
OPTION 3FOR LANDSCAPING
1 : 50027
..SOIL AND WATER MANAGEMENT DETAILS1
SCHEDULE OF BASIX COMMITMENTS:
LANDSCAPING OF INDIGENOUS OR LOW WATER USE SPECIES TOBE PLANTED THROUGH 10 SQ M PER UNIT SITE,TOTAL 80 SQ M OF THE SITE FOR ALL 8 UNITS
TO COMPLY AS FOLLOWS:SHOWERHEADS TO BE 4 STAR (>6 BUT <= 7.5 L/MIN)TOILET FLUSHING SYSTEM BE BE 4 STARKITCHEN TAPS TO BE 5 STARBATHROOM TAPS TO BE 5 STAR
WATER TANKS:1000 LITRES PER UNIT COLLECTED FROM 20 SQ M ROOF AREA,TAP FOR LANDSCAPE USE
THERMAL COMFORT BASED ON ABSA ASSESSOR CERTIFICATE- COLOURBOND ROOF WITH SISALATION UNDER (DARK COLOUR ROOF)- R3.5 TO CEILINGS UNDER ROOFING- SISALATION & R2.5 90mm BATTS TO EXTERNAL WALLS- STANDARD 3mm GLAZING THROUGHOUT WITH STANDARD ALUMINIUM WINDOWS
HOT WATER UNITS TO BE, ELECTRIC HEAT PUMP, AIR SOURCED 36-40 STCs
COOLING SYSTEMLIVING: 1 PHASE AIR CONDITIONING 5.5 STAR ZONEDBEDROOMS: 1 PHASE AIR CONDITIONING 5.5 STAR ZONED
HEATING SYSTEMLIVING: 1 PHASE AIR CONDITIONING 5.5 STAR ZONEDBEDROOMS: 1 PHASE AIR CONDITIONING 5.5 STAR ZONED
VENTILATION:BATHROOM: INDIVIDUAL FAN DUCTED TO FACADE, MANUAL SWITCH ON/OFFKITCHEN: INDIVIDUAL FAN DUCTED TO FACADE, MANUAL SWITCH ON/OFFLAUNDRY: INDIVIDUAL FAN DUCTED TO FACADE, MANUAL SWITCH ON/OFF
NATURAL LIGHTING TO BE BY PROVISION OF WINDOWS TO:NIL
ARTIFICIAL LIGHTING:ALL BEDRROMS, DEDICATEDALL LIVING & / OR DINING ROOMS, DEDICATEDKITCHEN, DEDICATEDBATHROOMS / TOILETS, DEDICATEDLAUNDRY, DEDICATEDALL HALLWAYS, DEDICATED
OTHER:INSTALL A ELECTRIC COOKTOP & ELECTRIC OVEN IN ALL THE KITCHENSALL REFRIGERATOR SPACES TO BE WELL VENTEDINSTALL FIXED INDOOR CLOTHES DRYING LINES TO ALL UNITS
DESIGN
Tru-line
ARCHITECTURAL &ENGINEERING
DESIGN & DRAFTING
ACT & NSW - URBAN & RURAL
DRAWING TITLE:
PROJECT:
BUILDER:
SCALE:
DATE:
LOCATION:
DESIGNED:
CAD FILE:
DRAWING STATUS:
SHEET:
AMENDED:
OF:
DWG No:
CLIENT:
Phone:
Phone:
SHT SIZE:REV:
A3
P.B.DRAWN: CHECKED:
P.B. P.B.
DATE PLOTTED:
(C) COPYRIGHT:THIS PLAN REMAINS THE PROPERTY OF"TRU-LINE DESIGN" AND MAY NOT BECOPIED IN WHOLE OR IN PART WITHOUTTHE WRITTEN PERMISSION OF "TRU-LINE"DESIGN. FAILURE TO DO SO WILL RESULT INLEGAL ACTION.
SERVICES:- NEW HOMES- DUAL OCCUPANCY- TOWNHOUSES- EXTENSIONS- COMMERCIAL- STRUCTURAL- CIVIL ENGINEERING- LANDSCAPE DESIGN- SURVEYING- COST ESTIMATING- CAD DESIGN- 3D PRESENTATIONS
- SHADOW DIGRAMS
- SITE ANALYSIS
- LICENCED BUILDER ACT & NSW
- ENERGY RATING SCHEME ACCREDITED ASSESSOR
PO BOX 780QUEANBEYAN NSW 2620
POSTAL ADDRESS:
PETER BLAZEVSKIMANAGER
MOBILE: 0418 627108PHONE: 02-62992352FAX: 02-62992923
EMAIL: [email protected]
.
1 : 1
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
28
.
SCHEDULE OF BASIXCOMMITMENTS
22/09/2017
SCHEDULE OF BASIX COMMITMENTS
1 : 128
SCHEDULE OF BASIX COMMITMENTS1
PROJECT UNIT 1 UNIT 2 UNIT 3 UNIT 4 UNIT 5 UNIT 6 UNIT 7 UNIT 8
0 5000(millimetres)
BAR SCALE
N
DEMOLISH EXISTING BUILDINGS
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
MALBON STREET
BUTM
ARO
O S
TREE
T
LAN
EWAY
COMMERCIALUNIT 1
STAIR ACCESS TORESIDENTIAL UNITS ABOVE
COMMERCIALPARKING SPACES
RESIDEDENTIALVISITOR PARKING SPACES
ENTRY EXIT
BINAREA
NEW DRIVEWAY
NEW
DRI
VEW
AY
LANDSCAPING(TYPICAL)
PATH
DRIVEWAY DRIVEWAY
EXISTING CONCRETE FOOTPATH
94550
94550
2011
5
2011
5
SHAR
EDZO
NE
U1
DOUBLEGARAGE
COMMON STAIRUNITS 1-4
U2
DOUBLEGARAGE
COMMERCIALUNIT 2
COMMERCIALUNIT 3
SHAR
EDZO
NE
COMMON STAIRUNITS 5-8
U3
DOUBLEGARAGE
U4
DOUBLEGARAGE
U5
DOUBLEGARAGE
U6
DOUBLEGARAGE
DRIVEWAY
U7
DOUBLEGARAGE
U8
DOUBLEGARAGE
920 920
PATH
4000 LITREWATER TANK
4000 LITREWATER TANK
POSSIBLELOCATIONFUTURE LIFT
LOT 201901.8 SQ M
DISWCTE
A DISWCTE
A DISWC TE
A
ALL EXISTING FOOTWAY SURFACES TO REMAIN
K & GFLOORS LEVELS:GROUND RL 693.5FIRST RL 697.30LOFT RL 700.00
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 300
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
L1
.
22/09/2017
LANSCAPE PLAN
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD1
.
22/09/2017
SHADOW DIAGRAM - 9AM 21 JUNE
1 : 400SD1
SHADOW DIAGRAMS - 9AM 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD2
.
22/09/2017
SHADOW DIAGRAM - 10AM 21 JUNE
1 : 400SD2
SHADOW DIAGRAMS - 10AM 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD3
.
22/09/2017
SHADOW DIAGRAM - 11AM 21 JUNE
1 : 400SD3
SHADOW DIAGRAMS - 11AM 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD4
.
22/09/2017
SHADOW DIAGRAM - 12 NOON 21 JUNE
1 : 400SD4
SHADOW DIAGRAMS - 12 NOON 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD5
.
22/09/2017
SHADOW DIAGRAM - 1PM 21 JUNE
1 : 400SD5
SHADOW DIAGRAMS - 1PM 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD6
.
22/09/2017
SHADOW DIAGRAM - 2PM 21 JUNE
1 : 400SD6
SHADOW DIAGRAMS - 2PM 21 JUNE1
MALBON STREET
BUTM
ARO
O S
TREE
T
PROPOSED SHOP TOP DEVELOPMENTGROUND FLOOR - COMMERCIAL & PARKINGFIRST FLOOR & LOFT FLOOR - RESIDENTIAL
LAN
EWAY
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
SD7
.
22/09/2017
SHADOW DIAGRAM - 3PM 21 JUNE
1 : 400SD7
SHADOW DIAGRAMS - 3PM 21 JUNE1
Lock to Lock T ime
WidthTrack
:::
m mB85
6.017701870
2800920
4910
Steering Angle 34.0:
180
150
120
90
OUTSIDE SWEPT PATH
INSIDE SWEPT PATH
60
30
STEERING LOCK ANGLE = 34.0 deg.
ACHIEVED STEERING ANGLE:
30 deg. SW EEP ANGLE: 19.6 deg. 60 deg. SW EEP ANGLE: 27.7 deg. 90 deg. SW EEP ANGLE: 31.2 deg.120 deg. SWEEP ANGLE: 32.8 deg.150 deg. SWEEP ANGLE: 33.5 deg.180 deg. SWEEP ANGLE: 33.9 deg.
B85STANDARDS (AU)[mm]Copyr ight (c ) 2011, Transof t So lut ions
0M 5M 10M
5 0 0 7 m m
6255 mm
9 2 0 m m
2 8 0 0 m m
1 1 9 0 m m
1 8 7 0 m m
UP UP
Lock to Lock T ime
SRVWidthTrack
Steering Angle
1050 3800
m m
::
23002300
:38.0:6.0
6400
(N.T.S.)
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
As indicated
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
VMP1
.
22/09/2017
VEHICLE MANOUVREING PLAN
1 : 200VMP1
....B85-14
1 : 200VMP1
....B85-25
1 : 400VMP1
.VEHICLE MANOUVREING1
1 : 200VMP1
....SRV2
PROJECT:
SCALE:
DATE:
LOCATION:
DRAWING STATUS:
SHEET: OF:
DWG No:
CLIENT:
SHT SIZE:REV:
A3
1 : 400
LOT 20 SEC 23 DP 75818331 MALBON STREET(CNR BUTMAROO STREET)BUNGENDORE NSW 2621
\\Asu
s1\d
\!!!!!
REV
IT F
ILES
IN P
RO
GR
ESS\
16 C
AR
NO
VALE
SH
OP
TOP
DEV
ELO
PM
ENT
BUN
GEN
DO
RE
\17
CA
RN
OVA
LE S
HO
P T
OP
DEV
ELO
PME
NT
BUN
GEN
DO
RE
- FIN
AL.
rvt
PROPOSED SHOP TOPDEVELOPMENT
PETER, TANYA, DAVID, &ADAM CARNOVALE
W.D.
VMP2
.
22/09/2017
VEHICLE TURNING PATHS - EXTRACT AS2890.1
1 : 400VMP2
.AS2890.11