DD Analog Front-End (AFE) Board
Approximately 200 AFE boards are needed to readout CFT (&CPS/FPS)
512 channel (2/cassette) Analog output via SVX
IIe Discriminator output
every 396 ns for L1 trigger
MultiChip module (MCM) SIFT chip
– Analog buffer to SVX– Discriminator output
SVX IIe
DD AFE II
A Tremendous Effort has already gone into AFE II
PPD EE DepartmentJohn Anderson
Jim HoffAbder Mekkaoui
Paul Rubinov
D0 Alan Bross
Juan EstradaCarlos GarciaPeter Hasiakos
Bruce HoeneisenMarvin Johnson
Mike Utes
DD AFE II
AFE II Full New set of boards No SIFT No SVX – Much simpler architecture Will use instead
Trigger Pipeline Chip: TriP (or Tript - more in a bit)– Discriminators and analog pipeline– TriP chip submission was very successful – meets spec.
Commercial Flash ADCs + FPGA for analog information Integrates completely with existing system
Will Have No Front-end saturation problem
– Reset once per crossing– Also allows for data taking in abort gap (cannot do presently with
AFE I)• VERY useful for Calibration studies
Improved Ped dispersion and stability– Lower and tighter threshold setting capability
• Channel by Channel - analog Improved reliability Improved readout flexibility
– Decreased deadtime– Multi-buffering possible
• CFT Readout may dominate L1 readout rate without multi-buffering Added Functionality with new submission of TriP Chip - Tript
– z information from timing ( 2 ns rms)
DD AFE II –TriP Performance
Measurements on TriP very promising
Noise at 1/5 pe rms Threshold setting at 1.5
pe reliably Very high quality Analog
Data Plot at right was obtained
after 1 day of work on a TriP modified AFE board
To get this good, a plot with the AFE took about 1 month of dedicated work by the same people!
BLACK – DATA RED – FIT
All Discriminators Firing!
DD AFE II – TriP Discriminator Performance
Upper plot Red – all data Blue same data
with threshold and discriminator fires
Black – fit
Lower plot Ratio of analog
data with and without discriminator fires (threshold set)
47% occupancy
DD TriP-t: the new idea
About 1% additional components:(time to amplitude converter)
7 bits t-info offline: 120ns full scale=> 2ns time => ~30cm resolution in Z
DD AFE II - TriPt
With a rather simple modification to the TriP design – time stamp for hits can be obtained
Current TriP Electronics resolution
was determined to be 400 ps
For 8 pe signal expect about 2 ns sigma
Z measurement – 30 cm Has impact on reco time
and cluster splitting In Z +15 min bias MC
40-60% reduction in reco time
D0 Note 4497 Improvement in
clustering algorithm utilizing z info also a possibility
400 ps intrinsic resolution
DD TriP-t current status
The chip designers are chip designing. Ready for submission 23 Aug ’04 The new chip is the “critical path” item for
the project Some prep work going on now
We will need new packaging We had some concerns about features
used on the new chip, but not used on the old (current!) TriP chip, so we are retesting some things.
DD AFEII Prototype - current status
Schematic design is 100% complete. Internal review was held in early May. Layout of the board is about 95% complete. All parts are here. Req’s for boards are in the system. RFQs for stuffing are on the street. Firmware about 75% complete.
DD AFE II – Cost and Schedule
Cost M&S: Production cost M&S are based on quotes for parts and labor –
contingency estimate is grounds up: Manpower
Estimates from AFE experience Schedule critical path is the Tript chip Completion for the 05 Shutdown is not likely Planning for adiabatic Installation
AFE I and AFEII mixed running Will need to test compatibility once AFE II prototypes are ready
(9/04) Installation will have to be done at the crate level (16 boards)
because of difference in power requirements for AFE I and AFE II Credibility of installation plan is dependent on prototype
tests How quickly they come up Platform test and integration with trigger Software readiness Physical Installation can occur quickly (8 hour)
DD AFE II Milestones
AFE II Prototype under test 9/04 Tript MOSIS submission 9/04 D0 Internal Review 1/05
May be moved up to October Director’s Review 2/05
May be moved up to Novemeber Tript production submission 3/05
Possibility for “non-shared” submission in 12/04 AFE II pre-Production 7/05
Attempt to move up to 11/05 Boards available for KEK Test?
AFE II production 9/05 AFE II production complete 12/05 First Board Ready for installation 2/06
DD Conclusions – Improvements with AFE II
AFE II will Improve noise floor and pedestal stability which will allow for
consistent and reliable threshold setting with no discriminator feed-through or discriminator threshold shift
Will increase physics trigger efficiency Potential for better hit efficiency and point resolution Maintain capability of Preshower Detectors
No Front-End Saturation problem (reset once per crossing) Added functionality of the Tript (z information)
Large reduction in reco time Possible improvement in cluster finding
– Cluster splitting leading to additional improvement in track quality Readout architecture much more flexible
Less deadtime Multiple buffers can be added to greatly increase L1 capability
Board construction is simpler, more robust No MultiChip modules (MCM) Mostly commercial parts/standard mounting techniques Repairs/rework MUCH easier than in AFEI
AFEII will improve our capability to maintain high-quality and stable operation as the Tevatron Luminosity increases in RunII. This will allow D0 to maintain excellent tracking, trigger, and Preshower performance
DD New DAQ
Consists of (for 4 Board Readout) VIPA crate (10U)
Bit3 controller 1553 controller VRB (VME readout bus) VRBc (VRB controller) Serial command link receiver card (SCLr)
Sequencer crate Sequencer controler (SEQc) + SCLr Sequencer 2 fibers for connection of the VTM 2 grey cables for connection to the AFEs (2AFEs/cable)
AFE 4 (+2) Boards (minimum) Two backplanes for cyostat.
PC and custom cables Special trigger cards (2) (STDB) Hardware for downloads of firmware for AFE, SEQ, VRBc, and
SEQc
DD New DAQ
Cost (k$) VME 1 SEQ 1 1553 1 Power supplies 2 AFE BPs 2 Bit3 controller 1 SEQc 2 AFEIIs 4/each (X6) SCLr cards 2 Rack 1 Cables, misc. 4
TOTAL: $40-50K
DD New DAQ
We have started work on the DAQ. However there is a great deal of work to do to have a system ready for the KEK test
There is also a VERY steep learning curve on becoming an expert on this system and at least one will be needed for the beam test.
So Far I have not been able to get additional Fermi people interested or, at least, committed to it (there is interest).