African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process May 19, 2011 Jerimiah Luckett - LEED AP

African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process

Embed Size (px)

DESCRIPTION

African Elephant Crossing at the Cleveland MetroParks Zoo The LEED Process. May 19 , 2011 Jerimiah Luckett - LEED AP. Common Pre-Requisites. Inclusion of basic “green” practices into everyday standards. Construction Activity Pollution Prevention (Erosion Controls) - PowerPoint PPT Presentation

Citation preview

Page 1: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

African Elephant Crossing at the Cleveland MetroParks ZooThe LEED ProcessMay 19, 2011

Jerimiah Luckett - LEED AP

Page 2: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Common Pre-Requisites• Inclusion of basic “green” practices into everyday

standards. ▫ Construction Activity Pollution Prevention (Erosion

Controls)▫ Fundamental Commissioning▫ Minimum Energy Performance▫ Fundamental Refrigerant Management▫ Storage & Collection of Recyclables▫ Minimum IAQ Performance (ASHRAE 62.1)▫ Environmental Tobacco Smoke Control

Page 3: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Sustainable Site Development•Site Selection•Development Density & Community

Connectivity•Brownfield Redevelopment

Page 4: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Sustainable Site Development•Public Transportation Access•Bicycle Storage & Changing Rooms•Low Emitting & Fuel Efficient Vehicles•Parking Capacity

Page 5: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Sustainable Sites•Protect & Restore Habitat (50% excluding ftprnt

or 20% including ftprnt, whichever is greater)•Maximize Open Space (25%, equal, 20% -

depends on existing zoning code language)•Stormwater Management: Quantity

Control•Light Pollution Reduction

Page 6: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Water Efficiency•Water Use Reduction: 30%, 35%

Page 7: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Energy & Atmosphere• Optimize Energy Performance•Measurement & Verification•Green Power

▫35%, 70%, 100%

Page 8: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Materials & Resources•Construction Waste Management: 50% -

75%•Recycled Content: 10% - 20%•Regional Materials: 10% - 20%

Page 9: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Indoor Environmental Quality•Outdoor Air Delivery Monitoring•Increased Ventilation•Construction IAQ Mgmt. Plan

▫During Construction▫Before Occupancy

Page 10: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Indoor Environmental Quality•Low Emitting Materials:

▫Adhesives and Sealants▫Paints & Coatings▫Carpet▫Composite Wood & Agrifiber

Page 11: African Elephant Crossing at the Cleveland  MetroParks  Zoo The LEED Process

Indoor Environmental Quality•Lighting System Design & Controllability•Thermal Comfort: Controllability•Thermal Comfort: Design (ASHRAE 55)•Thermal Comfort: Verification