ൃROSSWALK TRAVEL DIRECTION04080402051st Ave ......51st Ave./Gateway Ave. from Crown Blvd. to Chambers Road and Crown Blvd. from Albrook Dr. to 56th Ave. High Comfort Bikeways MONTBELLO
EAST EXISTING: COMBINED PARKING/BIKE LANE SIGNED "NO STOPPING ANYTIME" PROPOSED: BUFFERED BIKE LANE, NO PARKING
AutoCAD SHX Text
EAST EXISTING: COMBINED PARKING/BIKE LANE PROPOSED: STRIPED BIKE LANE DESIGNATED PARKING LANE
AutoCAD SHX Text
WEST EXISTING: COMBINED PARKING/BIKE LANE PROPOSED: DESIGNATED BIKE LANE DESIGNATED PARKING LANE
AutoCAD SHX Text
WEST EXISTING: COMBINED PARKING/BIKE LANE SIGNED "NO PARKING ANYTIME" PROPOSED: STRIPED BIKE LANE DESIGNATED PARKING LANE
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
P
AutoCAD SHX Text
KEY MAP
AutoCAD SHX Text
CROWN BLVD
AutoCAD SHX Text
51ST AVE
AutoCAD SHX Text
PARKING BUFFER ZONE (PAINT & POSTS) PAINTED BUFFERED BIKEWAY PROTECTED BIKEWAY SINGLE STRIPED BIKEWAY ROADWAY GREEN BIKEWAY CROSSWALK TRAVEL DIRECTION
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
P
AutoCAD SHX Text
0
AutoCAD SHX Text
feet
AutoCAD SHX Text
scale
AutoCAD SHX Text
40
AutoCAD SHX Text
80
AutoCAD SHX Text
40
AutoCAD SHX Text
20
AutoCAD SHX Text
P:\AE\D\DENVC\149196\5-final-dsgn\51-drawings\10-Civil\cad\dwg\exhibit\Boards\Layout Exhibits.dwg 2/24/2020 10:48:28 AM 2/24/2020 10:48:28 AM2/24/2020 10:48:28 AM
AutoCAD SHX Text
51st Ave./Gateway Ave. from Crown Blvd. to Chambers Road and Crown Blvd. from Albrook Dr. to 56th Ave.