Agenda Item No-6 Monthly Review Meeting held on 27/08/2010 Progress & Talk on R & D Set up and its
Guidelines
By
Shri. N.K Sharma Principal Consultant (R &D) at SPMCIL- Nashik
Activities Proposed
1. Concept Paper on what Constitute R & D for SPMCIL- (Annexure-I)
2. Concept paper on main Objectives of Corporate R&D Centre -(Annexure-II)
3. In-House R & D Recoganisation of DSIR - (Annexure-III)
4. Details of expenditure Incurred on R & D Centre / Activities/ - (Annexure-IV)
5. Proposed R & D Projects / Activities/ Illustrative list - (Annexure-V)
6. General Information needed for R&D Activities- (Annexure-VI)
7. Training Programmers / Inter-actions - (Annexure-VII)
Proposed R & D Projects / Activities/ Illustrative list - (Annexure-V)
1.Environmental protection / waste recycling:- Waste reduction / treatment, such as effluents, air-
pollution reduction metallurgical waste, packaging waste, etc.
Shredded notes utilization for making laminated blocks etc.
You may also consider any specific R & D requirements that would needed for ISO Certifications, more specifically for ISO:1400:ISO:18000,ISO:22000, etc.
2. Energy auditing / Power reduction.
3. Recycling / re- use of packaging materials for currency, security, coins security paper including semi knock – down boxes, shrink plastic packaging.
4. New Materials like: Paper Composite paper New alloys
5. Indelible ink for election purpose.
6. New Currency notes of higher denominations (Rs.5,000- etc.)
General Information needed for R & D Activities- (Annexure-VI
Details of existing R & D Project / R & D studies / R & D collaboration projects.
HRD Policy wrt R & D Personnel recruitment / Promotion / training / awards, etc.
IPR Policy if any Expansion Plans / New Plants. Major suppliers / Sub- contractors / (their R & D set up). Transportation / Logistics- Special requirement/
considerations.
Training Programs / Inter- actions – (Annexure-VII)
Module 1 – Idea Generation / Identification of New R & D Projects.
Module 2 – Analysis / Selection of R & D Projects. Module 3 – Basics of Intellectual Property Rights (IPR)
Patent / Design / Copy right / Trade Marks / Electronic circuit Design registration.
Module 4 – Preparation of R & D proposal for external funding, Joint R& D Project with other R & D Institutions/ Organizations.
Note:- Each session would be for a duration of approx. 3 hours followed by Discussions / Interactions.