Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
saM: Paxaoivas
saovaamaoM,
saUcaIkoAnau
ivaYaya :p
mahaodya
piMScama xao~haonaovaalaI 4
Qanyavaad.
saMlagna : ]
dUrBaaYa Phon
sa.p`caa. Pa`sa
ausaar
.xao.iva.saimai
~Iya ivaVut sai459vaIM baOzk
]Parao@tanausaar
C
Westef-3,
F-3, MIDC A
ne: 022‐ 2820Website : ww
asa.kaya-saUcaI
it, mauMba[- kI Pa`
imait, mauMba[- kI kI kaya--saUcaI
BaartsGovernme
kond`IyaivaVuCentral Electr
piScamaxao~Iytern Regional emaAayaDIsaIxao~,AM
Area, Andher
00194, 28200ww.wrpc.gov.
.2014.15
Pa`caalana evaM sam
Pa`caalana eva MAapkI saUcana
sarkarent of IndiaVutp`aiQakrNaricity AuthorityaivaVutsaimait Power Comm
AMQaorI(pUva-),mauMba[- - 40ri (East), Mum
0195, 282216in E‐ma
4014
amanvaya saimait
Msamanvaya saimaitaaqa- vaAagao kI
a
ty
mittee 00 093
mbai - 400 093
636 fO@sa Fax ail : opc‐wrpc@
id
kI 459vaIM baO
it kI idnaaMkI kaya-vaahI ko
3
Aa[- e
IS/
: 022 – [email protected]
idnaaMk : 8.0
azk kI kaya-s
12.05.201ilea p`stut hO
AQaIxaN
esa/Aa[- esa Aao : 9
/ISO : 9001
0193
05.2014
saUcaI
14 kao mauMba[- m oohO .
Ba
(emaemaQaNaAiBayaMta(p`c
9001‐2008
1-2008
maoMoM
BavadIya,
Qakato) caalana)
List of OCC Members Fax No.
1. Chief Engineer (L D), GETCO, Gotri 0265‐2352019 2. Chief Engineer (Generation), GSECL, Vadodara 0265‐2344734/2338847 3. Superintendent Engineer (CP & SS), GETCO, Vadodara 0265‐2337918, 2338164 4. Chief Engineer (L D), MPPTCL, Jabalpur 0761‐2664343 5. Chief Engineer (O&M:Gen), MPPGCL, Jabalpur 0761‐2664572/2668050 6. Chief Engineer (L D), MSETCL, Kalwa 022–27601769 7. Chief Engineer (Works),MSPGCL, Mumbai 022‐26473896 8. Superintending Engineer (LD), MSETCL Ambazari 07104‐220275 9. Chief Engineer (L D), CSPTCL /Raipur 0771‐2574174 10. Chief Engineer (O&M:GEN), CSPGCL, Raipur 0771‐2574425 11. General Manager, POSOCO, Mumbai 022‐28202630 12. General Manager (WRTS‐I), Powergrid, Nagpur 0712‐2641366 13. General Manager (O & M),WRTS‐II, PGCIL,Vadodara 0265‐2487542 14. Chief Engineer (Transmission), NPCIL, Mumbai 25580741/25563350 15. Operation Superintendent, TAPS, Tarapur 1 & 2 02525‐282125/244125 16. Operation Superintendent, TAPS, Tarapur 3 & 4 02525‐244021/244169 17. Operation Superintendent, KAPP, Kakrapar 02626‐231231 18. General Manager (OS), NTPC, Mumbai 022‐28216692 19. General Manager, NTPC, Korba 07759‐ 237462/237552 20. General Manager (OS), NTPC, HQ‐II Raipur 0771‐2544550 21. General Manager, NTPC, Vindhyachal, M.P. 07805 –247711 22. General Manager, NTPC, SIPAT, CG 07752‐246504 23. General Manager, NTPC, Kawas, Surat 0261‐2860290 24. General Manager, NTPC, Gandhar 02642‐287402 25. General Manager, NTPC, Mouda 07115‐281221/281219 26. CLD TPC, Mumbai 022‐25541908/67175385 27. Chief Engineer (O), Dahanu TPS, Dahanu 02528‐222039 28. Sr V P Reliance Transmission, Pune 0124‐3917982/020‐30471555 29. Vice President (Generation), Torrent Power Ltd, Ahmedabad 079‐27506679 30. Executive Director, Sugen CCPP, Torrent Power Ltd, Surat. 02621‐661151 31. Vice President (O &M), APL Mundra , Gujarat 02838‐266364 32. Vice President (Opn), Jindal Power Ltd.,Raigarh 07767‐281993/281995 33. AGM(OS), NSPCL Delhi 011‐26717363,26717366 34. GENERAL MANAGER ( POWER), RGPPL, Ratnagiri 02359‐241071/ 241011 35. Member (Power), NCA, Indore 0731‐2559888 36. Chief Engineer (PM & C), NHDC, Bhopal 0755 4030188/4030130 37. E. E. Elect. (Ponda), Goa 0832‐2313780 38. Executive Engineer DD (UT), Daman 0260‐/2230771/2250889/2230550 39. Executive Engineer DNH (UT), Silvassa 0260‐2642338 40. Secretary, CERC, New Delhi 011‐24360010/23753923 41. Director, JSW Energy ltd. 011‐46032343/26183546 42. VP‐Power Infra‐EssarHaziraSurat 0261‐6688498/022‐67082198 43. Chief Electrical Distribution Engineer, CR 022‐22621060 44. Dy Chief Elect. Engineer, WR 45. Vice President EPTCL HaziraSurat 0261‐6682747 46. GM (O&M), PGCIL, Raipur 0771-29704
AGENDA NOTES FOR 459th MEETING OF OPERATION & COORDINATION
SUB-COMMITTEE OF WRPC
TO BE HELD ON 12TH MAY 2014 AT MUMBAI
ITEM No. 1: CONFIRMATION OF THE MINUTES
Minutes of 458TH meeting of Operation & Coordination Sub-Committee of WRPC
held on 16th April 2014 at Mumbai, were forwarded vide letter No. WRPC/OPN/OCC-
Minutes/2014-15/3653 dated 30.04.2014.
EE, Daman & Diu vide letter dated have submitted their comments on item No. 8.3 and requested to include their statement in the minutes of 458th meeting as below : “In 456th OCC meeting at Vadodara, it was discussed that 66KV Vapi Dabhel line will be ready to be shifted to powergrid network after commissionig of 400KV Magarwada in May 2014. In 458th OCC, the Powergrid representative informed that the commisioning of 400KV Magarwada is scheduled by June 2014”
OCC may like to discuss and confirm the same.
ITEM NO.2: REVIEW OF SYSTEM OPERATION DURING THE MONTH OF APRIL
2014.
2.1 Frequency Particulars
The average frequency during the month of April 2014 was 49.95 Hz. The
maximum instantaneous frequency was 50.56 Hz on 20th April 2014 while
minimum instantaneous frequency was 49.49 Hz on 26th April 2014. The
frequency profile during April 2014 was as under:
01-Apr 2014 to 30-Apr- 2014 % time
IEGC band (49.9 < f < 50.05 Hz) 52.33
< 49.9 Hz 30.64
> 50.05 Hz 17.03
The detailed frequency particulars are enclosed at Annex- 2.1.
The Sub-Committee may like to note.
2.2 Operational Discipline
There was a net inter-regional export of 3153 MUs by WR.
2.3 Voltage Profile
Voltage profile at some of 765/400 kV sub-stations during the month of April
2014 furnished by WRLDC is enclosed at Annex-2.3.
2
459th OCCM AGENDA
The Sub-Committee may like to discuss as above.
2.4 U/F Relay Operations
As per WRLDC records during April 2014 the system frequency didn’t touch 49.2
Hz. The details of UFR operation received from constituents for the month of April 2014
is enclosed at Annexure 2.4.
The Sub-Committee may like to discuss.
2.5 Power Cuts / Load Restrictions
Details of Power Cuts and Regulatory measures during April 2014 as furnished by the state utilities are given in Annex. 2.5.
The Sub-Committee may note.
2.6 Details of Generating Units under Forced outages
Details of generating units under forced outages during April 2014 are given in Annex-2.6.
The Sub-Committee may discuss.
2.7 Details of Generating Units under Planned outages
The details of generating units under Planned Outages during April 2014 are given in Annex-2.7
The Sub-Committee may discuss.
ITEM NO.3: OPERATIONAL PLANNING
3.1 Proposed Planned maintenance programme of generating units.
The proposed maintenance programme of generating units for May 2014 & June 2014 is given in Annex 3.1.
The Sub-Committee may discuss and finalize the outage schedule of
generating units for the above period.
3.2 A. Outage Programme of Transmission Lines/elements
Maintenance programme for transmission lines during the months of May 2014 & June 2014 is given in Annex 3.2 A & B.
3
459th OCCM AGENDA
The Sub-Committee may discuss and finalise the maintenance
programme proposed above.
B. Line outages planned vs. implemented:
In 453rd OCC meeting it was decided that WRLDC shall submit the list of
planned transmission element outages vs. actual availed or emergency outages
during the April 2014. WRLDC had submitted the list of emergency outages(Attached
at Annexure-3.2-C1).
WRLDC submitted the status of planned transmission element outages vs.
actual availed or emergency outages during the April 2014(Attached at Annexure-3.2-
C2).
As agreed during the 453rd OCC meeting the respective utilities may apprise the sub-
committee regarding reason for failing to avail approved outages.
WRLDC furnished the statistics for planned vs availed outage during April 2014 is
summarized below:
S No. Particulars of OCC approved Outage Number
1 Number of transmission element outage
approved in OCC meeting
216
2 Number of transmission elements for which
reliability consent was available
208
3 Number of outage availed 93
4 Availed Outage as a % of Approved Outage 44.7%
There were 8 cases where the outages were advised by Reliability Coordinators for
rescheduling due to system constraints. Respective utilities may apprise the OCC-
members on the reason for not availing the planned outages approved by the OCC.
The complete Break up Agency wise will be shown during the OCC.
The Sub-Committee may discuss.
3.3 Anticipated Power Supply Position for the months – June 2014 & July 2014 Details of anticipated restricted & un-restricted demands for the months of June 2014 & July 2014 are given in Annex 3.3 (A).
Constituents may furnish the anticipated station wise Availability & Energy for the months of June 2014 & July 2014 in case of any change.
ITEM NO. 4: OPERATIONAL STATISTICS FOR THE MONTH OF APRIL 2014
The details of actual generation, demand, drawl of power from grid; exchanges etc. are given in the following Annexures:
4
459th OCCM AGENDA
Annex 4.1 - Actual Generation and Requirement for April 2014
Annex 4.2 - Peak Demand: Schedule Vs Actual for April 2014
Annex 4.3 - Integrated Operation of the System and Operation of Inter State Tie lines
for April 2014
Annex 4.7 – Details of level of Major Reservoirs in Western Region for April 2014
The Sub-Committee may like to note.
ITEM NO. 5: SYSTEM DISTURBANCES IN WESTERN REGION
There was no major grid disturbance in the Western Region during the month. The
tripping details during the month received from WRLDC is enclosed at Annexure-5.
The Sub-Committee may like to discuss.
ITEM NO. 6 Healthiness status of SERs/DRs of equipment in the system.
Constituents have furnished the status of healthiness of SER/DRs in their systems on the dates below :
Sl No. Name of
constituents
Date of Receipt
1 PGCIL,WRTS-I 2 PGCIL,WRTS-II 3 MPPTCL 4 NTPC 5 CSPTCL 6 GETCO 7 MSETCL
Constituents of WR are requested to ensure healthiness and send the information to
this office regularly as per the recommendation of enquiry committee of Grid
disturbances on 25.02.2007 and 28.02.2007.
The sub-Committee may like to note.
ITEM NO. 7: STATUS OF COMPLETION OF ONGOING SCHEMES FOR
COMMISSIONING OF REACTORS, TRANSMISSION LINES AND
GENERATING UNITS IN WR.
7.1 Status of completion of ongoing Schemes for Commissioning of reactors.
The present status regarding schedule and commissioning of reactors is as below:
S. No.
400 kV Sub/stn.
Size (MVAR)
Implementing agency
Expected commissioning date
1 Ranchodpura 125 MVAR GETCO Commd. On 8th July 2013
5
459th OCCM AGENDA
2 Varsana 125 MVAR GETCO Commd. On 25th July 2013
3 Rajkot 125 MVAR GETCO Commd. On 5th August 2013
4 Amreli 125 MVAR GETCO Commd. On 12.07.2013
5 Jetpur 63 MVAR GETCO Commd. on 11.07.2013
6 Zerda 125 MVAR GETCO Commd. in July 2013
7 Kosmba 80 MVAR GETCO Commissioned on 29.11.2013
8 Limbdi (Chornia) 125 MVAR GETCO 25th July 2013
9 Jabalpur 125 MVAR PGCIL Commissioned on 26.03.2014
10 Khandwa 125 MVAR PGCIL Commissioned on 28.03.2014
11 India bulls 80 MVAR BR
MSETCL Commissioned 26.11.2013
12 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014
13 Sasan Line reactor-1
240 MVAR RELIANCE Commissioned on 16.02.2014
14 Shujalpur 125 MVAR PGCIL June 2014
15 Bhatapara 125 MVAR PGCIL June 2014
16 Raigarh 125 MVAR PGCIL June 2014
17 Aurangabad 125 MVAR PGCIL June 2014
18 Nanded 125 MVAR MSETCL 2015
19 Sholapur 125 MVAR MSETCL Sept-2014
20 Kolhapur 125 MVAR MSETCL Sept-2014
21 Akola 125 MVAR MSETCL Sept-2014
22 Nagda 125 MVAR MPPTCL September 2014
23 Bhopal 80 MVAR MPPTCL June 2014
24 Damoh 125 MVAR PGCIL August 2014
25 Bachau 125 MVAR PGCIL August 2014
26 Pirana 125 MVAR PGCIL August 2014
27 Itarsi 2X125 MVAR
PGCIL August 2014
28 Seoni 125 MVAR PGCIL August 2014
29 Parli 125 MVAR PGCIL August 2014
30 Raipur 125 MVAR PGCIL August 2014
31 Gwalior 125 MVAR PGCIL August 2014
32 ISP 125 MVAR NHDC 2015
33 Satpura 50 MVAR MPPGCL March-2015
34 Sasan Line reactor-2
240 MVAR RELIANCE June -2014
35 Sasan Bus reactor
240 MVAR RELIANCE June-2014
Respective utilities may update the status of commissioning of reactors.
7.2 Status of completion of 765/400 kV and above on going Transmission Schemes
being executed/implemented by Transmission Agencies.
6
459th OCCM AGENDA
The updated status on various ongoing transmission schemes for the current year as per the current information available is as follows: - S. No.
Name of the Line Target Completion Date
Remarks
POWERGRID 1 400 kV Vapi(PG)-Navsari Commissioned on
16.03.2013 2 400 kV Navsari - Navi Mumbai D/C
Line June- 2014 ROW problem
3 765kV S/C Satna-Gwalior line (Ckt.-I) Commissioned on 1.02.2014
4 765kV S/C Satna-Gwalior line (359Km + 60Km D/C Portion) Ckt.-II
May.- 2014
5 765 kV Sasan-Satna-II Commissioned on 01.06.13
GUJARAT 1 400 kV D/C Kosamba-Chorania line
(Package I)(From Chorania S/S to AP-54)
May -2014
2 400 kV D/C Kosamba-Chorania line (Package II)(From Kosamba S/S to AP-54)
May -2014
3 400 kV D/C Mundra-Zerda line No. 1 August -2014 4 400 kV D/C Mundra-Zerda line No. 2 August -2014 5 400 kV D/C Vadinar-Amreli line August -2014 6 400kV Mundra-Hadala LILO to
Halvad August -2014
7 400 kV D/C Amreli-Kasor line(Part-1) August -2014 8 315 MVA IInd ICT at Kosamba S/S Charged on 15.11.2013 9 ICT at 400/220kV Jetpur Charged on
27.02.2014 loaded on 05.03.2014
MADHYA PRADESH 1 Malwa-TPH-Pithampur 400KV
DCDS Line 23,24.10.2013
2 Malwa TPH-Chhegaon 400 KV DCDS Line
Ckt –I on 22.03.2013 Ckt-II on 11.07.2013
3 Chhegaon-Julwania 400 KV DCDS Line
June - 2014
4 Pithampur- Indore 400KV DCDS Line
June - 2014
5 Satpura TPH-Ashta 400KV DCDS Line
December – 2014
CSPTCL
1 400 kV Korba (W)-Khedamara
DCDS Ckt II LILOed at Marwa
August 2013 Test charged on 20.08.2013
2 400 kV Khedamara- Raita -II Commissioned on
20.02.2014
7
459th OCCM AGENDA
3 400kV DCDS Marwa-Raipur(Raita) Commissioned on
24.03.2014
4 LILOof 400kV K(W)-Khedamara line
at Marwa (one ckt.)
April -2014
5 50MVAR LR at Khedamara Charged on 28.02.2014
6 400 kV Khedamara-Raita ckt-I Commissioned on
02.04.2014
MAHARASHTRA(STU)
1 400KV D/C line from Koradi-II to Wardha S/S(PG) D/C
June - 2014
2 400 kV Chandrapur-II-Warora-II
Commissioned on 16.01.2014
3 400 kV Bableshwar-Sinner Ckt-II
Commissioned on 27.12.2013
4 400 kV Chandrapur-Parli-II LILO at Chandrapur-II S/S
Commissioned on 16.01.2014
5 765kV Tiroda – Akola(Adani)
Commissioned on 23.02.2014
MAHARASHTRA
(IPTC route) by WR Transmission (Mah) Pvt. Ltd
1 400 kV Parli(PG)-Pune D/C Commissioned Ckt - 1 on 08.11.2013 Commissioned Ckt - 2 on 10.11.2013
2 400 kV Pune (PG)-Aurangabad (MSETCL) D/C
Commissioned Ckt - 1 on 05.12.2013 Commissioned Ckt - 2 on 04.12.2013
3 LILO Lonikhand –Kalwa at Pune(PG) Lonikhand-Pune charged on 21:30 on 09.07.2013 and Kalwa –Pune at 21:45 on 09.07.2013.
GUJARAT (IPTC route) by WR Transmission (Guj) Pvt. Ltd
1 400 kV Rajgarh(PG)-Karamsad (GETCO) D/C
June -2014
Commissioning of new and important lines to be monitored during the year 2014-15
may be identified to be monitored on monthly basis.
The Sub-Committee may note/discuss.
7.3 Commissioning of new Generating units in Western Region and the
capacity expected to be commissioned during the current year 2014-15.
The status regarding Generating units, commissioned during 2013-14/expected to be
commissioned during the current year 2014-15 is as below:
Name of the Power Projects Unit No. Capacity
(MW)
Date of Commissioning
/Schedule Date
8
459th OCCM AGENDA
GUJARAT
Ukai 6 500 COD on 08.06.2013
Pipavav CCPP- GPCL & GSPC joint venture Block-1 350
March- 2014 Made in synchronized on 10.10.2013.
Bhavnagar Lignite TPP-JV I 250 August 2014
II 250 August 2014
UNO SUGEN 1 382.5 COD on 04.04.2013
CHHATTISGARH
Marwa TPS I 500 20.12.2013
Korba (w) Ext-5 500 COD on 05.09.2013
KSK Mahanadi 3 600 COD on 14.08.2013
VEDANTA VIDYUT 1 135 Synchronized on 11.08.2013
MAHARASHTRA
INDIABULLS (Amaravati) 1 270
Synchronized on 03.06.2013 COD on 01.02.2014
INDIABULLS (Amaravati) 2 270 Synchronized on 1.02.2014
INDIABULLS (Sinnar) 1 270 Synchronized on 24.02.2014
VIPL(Butibori) 1 300 COD on 05.04.2013
VIPL (Butibori) 2 300
First synchronized on 02.01.2013 Full load on 19.03.2013
GMR EMCO 2 300 COD on 27.08.2013
Dhariwal 1 300 Synd. On 2.9.13 COD on 11.02.2014
Bhusawal 5 500/400 COD on 03.01.2014
MADHYA PRADESH
SINGAJI TPP 1 600
Synchronized on 31.08.2013 Coal fired on 30.09.2013 COD on 01.02.2014
2 600 June-2014
M/s Jhabua Power, Seoni 1 300 JANUARY – 2014
MB Power, Anuppur 1 300 JANUARY – 2014
Satpura 11 250 Synchronized on 02.10.2013
SATPURA 10 250 COD on 18.08.2013
CENTRAL SECTOR
Vindhyachal TPP IV 12 500 27th March-14
MAUDA 2 500 30th March -14
9
459th OCCM AGENDA
The WR utilities may identify the units to be commissioned during 2014-15
and intimate the schedule of commissioning to be monitored in monthly OCC
meetings. ITEM NO. 8: MISCELLANEOUS OPERATIONAL ITEMS
(A) FOLLOW-UP
8.1 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN
All the constituents are requested to submit the CMP report for the Third quarter
(January 2014 to March 2014) for the year 2013-14.
The Sub-Committee members may like to note and furnish details in respect of
above.
8.2 STATUS OF PHYSICAL & CYBER SECURITY IN POWER SECTOR REGARDING
Status of physical & cyber security in Power Sector for the Third quarter (January
2014 to March 2014) have not been received from some of the constituents.
The constituents/utilities may like to furnish the status.
The Sub-Committee may like to note and furnish details in respect of above.
8.3 COLLECTION OF DATA REGARDING POWER SUPPLY IN
RGGVY VILLAGES ON MONTHLY BASIS
CE(GM), CEA vide letter No. 1/A1/MRP/GM-14/ dated 31.01.2-2014 intimated the
decision by MoP to monitor the supply of power for minimum 6 – 8 hours to the
villages electrified under RGGVY Scheme or any other rural electrification scheme.
Members were requested to furnish the data in enclosed format to CEA/WRPC
Secretariat at the following email addresses:
[email protected] [email protected] [email protected] The above data may please be sent by 1st working day of each month in respect of
previous month as it needs to be communicated by this office to CEA along with
Provisional Power Supply Position which is being sent by 2nd working day each month.
It has been observed that data upto March 2014 except Maharashtra has been
received. Nomination of coordinating officers were received but the data is
awaited for April-2014.
Gujarat and Maharashtra may submit the details.
10
459th OCCM AGENDA
8.4 SHIFTING OF FEEDERS FROM GETCO TO DD & DNH
During last meeting, DNH representative informed that regarding power evacuation
from 400 KV Kala PGCIL S/s to DNH, due to High Court STAY for one location work
held up, balance 220 KV line work will be completed by April 2014 end and request
was made to GETCO to consider the above situation before disconnecting DNH
power.
The copy of the high court stay order was sent to GETCO/WRPC/WRLDC/others
by DNH. DNH may intimate if any update is available in the matter.
Executive Engineer, DD vide letter dated 6.05.2014 (copy enclosed at Annexure-8.4) have intimated that the decision of OCC for shifting of load from 66 kV Vapi-Dabhel feeder (May-2014) after commissioning of 400 kV Magarwada (GIS) s/s. However, PGCIL vide letter dated 16.4.2014 addressed to Secretary, UT of DD and DNH have intimated that the work is delayed due to local protests and PGCIL is making all efforts to complete the Magarwada s/s by June 2014. The Sub-Committee may like to discuss.
8.5 Rescheduling of SIPAT unit No. 5 for boiler license renewal:
SLDC, GETCO have intimated that AGM (OS), NTPC, WR-II, vide his letter No. WR-II/OS/2014 dated 22.04.14, had requested for rescheduling of outage of Sipat unit No. 5 (500 MW of which share of GUVNL is 137 MW) for boiler license renewal from 27.04.14 to 01.05.14 instead of earlier approved period from 27.10.14 to 31.10.14 citing the reason of acute coal shortage and subsequent review of their present plant condition. Accordingly, WRPC has concurred the above outage subject to real time condition. GETCO further intimated that granting approval for such unplanned large sized unit outage especially when the system is catering its peak summer demand is not at all desirable and also, NTPC should have made all out efforts to resolve the issue of acute coal shortage and ensure full availability of coal for running their units to their full capacity at such times. GETCO requested that WRPC shall take cognizance of the constituent States in writing prior to granting such outage which is likely to create scarcity of power in the State. Constituents may discuss.
8.6 Not availing the approved outage of 400 KV APL-Sami line No. 2 by M/s.
APL
SLDC, GETCO have intimated that M/s. APL had requested on 26.04.14 for availing outage of 400 KV APL-Sami line No. 2 for attending hot spot at Loc. No. 79 top phase and 159 bottom phase on 27.04.14 and they were permitted to avail the same.
11
459th OCCM AGENDA
Accordingly, code was issued by WRLDC for taking out the FSC of the said line. After the FSC was taken out, SLDC-Gujarat requested M/s. APL to reduce their generation in view of possible overloading of 220 KV D/C Hadala-Nyara line (which was already carrying around 220 MW on each line) as line loading of 400 KV APL-Hadala would increase due to outage of 400 KV APL-Sami line No. 2. Despite repeated instructions, M/s. APL didn’t follow our advice and the FSC was taken back in service after about 40 minutes without availing the approved outage of 400 KV APL-Sami line No. 2. Such indolent attitude of M/s. APL shows that they were neither interested in availing the approved outage nor serious about the instructions given to them by the system operator. Whenever any agency wishes to avail outage of any transmission element, they should strictly adhere to the instructions of the load despatcher who is entrusted the job of maintaining the system security, safety and reliability. The instructions of the system operator should be scrupulously followed. OCC may like to note.
8.7 Frequent tripping of 400 KV CGPL-Jetpur lines
SLDC, GETCO have intimated that on 27.04.14, the 400 KV CGPL-Jetpur line No. 1 tripped on Jetpur: Z-I, R-E, 60.17 Kms. Mundra: Z-I, R-E, 271.1 Kms. at 06:08 Hrs and was restored at 06:25 Hrs and later Auto Reclosure of the said line operated repeatedly thrice during 06:44 Hrs to 06:50 Hrs. Subsequently, 400 KV CGPL-Jetpur line No. 2 also tripped on Jetpur: Z-I, B-E, 53.14 Kms. Mundra: Z-II, B-E, 279 Kms at 06:50 Hrs and was restored at 07:44 Hrs. Also, 400 KV CGPL-Jetpur line No. 2 tripped on 28.04.14 too on Mundra: R-E, Z-1, 162.2 Kms Jetpur: R-E, Z-1, 164.3 Kms at 17:15 Hrs and was restored at 17:37 Hrs. Fortunately, during the above trippings, the CGPL unit No. 10 was under AOH and the total generation from CGPL-Mundra complex was reasonably less and hence, there was no system disturbance. Had the same kind of incident happened when all the five units of CGPL-Mundra complex were running with full generation of around 3750 MW, it would have certainly caused a severe grid disturbance. It’s been quite a long time since the evacuation lines of CGPL-Mundra complex have been commissioned and the system cannot afford to have such frequent trippings of important power evacuation lines. It is highly essential that M/s. PGCIL shall do the needful in order to avoid the recurrence of such incidents at least in future so that the system is not jeopardized.
8.8 Strengthening evacuation facility of UMPP Mundra SLDC, GETCO have intimated that a meeting was convened by the Chief Engineer (SP&PA), CEA on 06.05.2014 at CEA, New Delhi to examine the feasibility of utilizing the upcoming 400 KV D/C Essar Salaya (Stage-II) - Bhachau (Bhimasar) Triple Snowbird transmission line. There is uncertainty of Essar Salaya Stage-II project and hence, now the transmission network created needs to be utilized for enhancing reliability of power system. Therefore, it was preliminarily concluded to terminate this line at Essar Vadinar Stage-
12
459th OCCM AGENDA
I project. Simultaneously, PGCIL is also doing additional 400 KV D/C CGPL Mundra - Bhachau transmission lines and hence, it is proposed to utilize this 400 KV D/C Essar Vadinar - Bhachau CTU line as additional evacuation facility of Mundra UMPP as all of us are aware that there is acute need of enhancing the evacuation facility of Mundra UMPP.
OCC may like to discuss.
ITEM No. 9 : ITEMS FROM WRLDC:
9.1 Preparedness for the ensuing monsoon season:
The following situations are anticipated based on previous experience during the monsoon.
• Reduction in agricultural load • Sudden reduction of load due to tripping of 11kV/lower kV lines due to stormy
and inclement weather conditions leading to high frequency. Less requisition at all ISGS units during all the day except for 2-3 hours during peak where the requisitions are maximum.
• Sudden rise in demand during dry spells leading to low frequency during peak hours.
• High voltages and network depletion due to manual opening of EHV lines on high voltage or due to tripping of trunk lines on tower collapse
• Violation of flow gates limits and TTC/ATC limits of inter-regional corridors
Suggestion to tackle the above expected scenarios:
• Ensuring that all L/Rs and B/Rs are healthy and kept in service.
• MVAR absorption by generating units to the machine’s reactive capability limit
• Coordination of taps of GTs, UATs and STs at power stations
• Review of ICT taps at load centers
• Review Voltage grading and time grading adopted in O/V relays.
• Shunt capacitor bank switching at distribution level
• Availing Reserve Shutdown and controlling of under drawal / over injection.
• Weather forecast to be duly considered during operation planning.
9.2 Controlling high voltage scenario in Monsoon
Controlling high voltage situation in WR grid was a challenge during the last monsoon
season. The nodes where high voltage was observed during last year monsoon are
given under.
13
459th OCCM AGENDA
Name of the State
where voltage was
above IEGC
specified limit
(>420 kV / >800 kV)
for more than 50%
of time
June 2013 July 2013 August 2013
Maharashtra Bhusawal, Dhule, Bhadrawati, Akola, Karad, Kolhapur, Chandrapur, Sholapur,
Bhudsawal,Dhule, Bhadrawati, Karad, Akola
Dhule, Karad, Akola. Bhadrawati.
Madhya Pradesh Satna, Jabalpur, Birsinghpur, Damoh,Khandwa, Nagda
Jabalpur, Birsinghpur, Damoh, Khandwa
Itarsi, Birsinghpur, Damoh
Gujarat - - -
Chhattisgarh Raipur, Raigarh, Bhilai Raipur, Raigarh, Bhilai
Bhilai, Raipur, Raigarh
The envisaged Bus reactors that are yet to commissioned are as under:
Madhya Pradesh: Commissioning of Bus Reactors envisaged at Sujalpur, Bhopal,
Damoh, Gwalior, Nagda (50 MVAR), Indirasagar, Satpura, Sasan (Line Reactor-2),
Sasan (Bus Reactor), Itarsi, Seoni to be expedited.
Maharashtra: Bus Reactors envisaged at Aurangabad, Nanded, Sholapur, Kolhapur,
Akola, Parli are yet to be commissioned. Status of Dhule CSR may be apprised.
Chhattisgarh: Bus Reactors envisaged at Bhatapara, Raipur, Raigarh to be
expedited.
Gujarat: Reactors envisaged at Pirana & Bachau are yet to be commissioned.
The implementing agencies may apprise the progress of commissioning of the
envisaged shunt reactors to contain expected high voltage condition in the ensuing
monsoon season.
9.3 Updating List of Important Grid elements of Western Region:
The Draft list of Important Grid elements of Western Regional Grid for 2014 – 15 is
available on website of WRLDC. Members are requested to review the list.
14
459th OCCM AGENDA
Corrections received upto 20th May 2014 shall be incorporated and final list shall be
uploaded on 23rd May 2014.
The criteria used for including elements in the above list are as under
a. All 400 kV and higher kV lines, EHV AC and HVDC links/poles irrespective of
ownership
b. All ICTs connected at 400 kV level and above.
c. All 220 kV lines emanating from ISTS / ISGS substations
d. All Inter Regional transmission lines irrespective of voltage level/ownership
e. All Inter-state transmission lines irrespective of voltage level and ownership
f. All shunt reactive elements connected at 400 kV and higher level of voltage
g. All FACT devices in the WR grid
h. All generating units mandated for FGMO/RGMO under sec 5.2(f) of IEGC.
As per the outage coordination procedure, proposal from planned outage of the above
elements for construction / maintenance related activities scheduled in a month have
to be submitted in OCC meeting of the preceding month. After concurrence in OCC
meeting preparedness to avail the outage shall be sent to WRLDC in D-3 for reliability
consent.
In line with IEGC section 5.2 (c) and (d), switching of elements included in the above
list to be done only after prior concurrence / operation code from WRLDC control room
in real time. Manual / Automatic tripping of the above elements to be reported to
WRLDC and concerned SLDC as per the IEGC reporting format.
Section 5.2. (c) and (d) of IEGC are reproduced under for reference.
Section 5.2.c:
“No important element of the National/Regional grid shall be deliberately opened or removed from service at any time, except when specifically instructed by RLDC or with specific and prior clearance of RLDC. The list of such important grid elements on which the above stipulations apply shall be prepared by the RLDC in consultation with the concerned Users, CTU and STUs, and be available at the websites of NLDC/RLDC/SLDCs. In case of opening/removal of any important element of the grid under an emergency situation, the same shall be communicated to RLDC at the earliest possible time after the event. RLDC shall inform the opening/removal of the important elements of the regional grid, to NLDC, and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.”
Section 5.2.d:
15
459th OCCM AGENDA
“Any tripping, whether manual or automatic, of any of the above elements of Regional grid shall be precisely intimated by the concerned SLDC/CTU/User to RLDC as soon as possible, say within ten minutes of the event. The reason (to the extent determined) and the likely time of restoration shall also be intimated. All reasonable attempts shall be made for the elements’ restoration as soon as possible. RLDC shall inform the tripping of the important elements of the regional grid, to NLDC and to the concerned Regional Entities (whose grid would be affected by it) as specified in the detailed operating procedure by NLDC.” The OCC sub-Committee may discuss.
9.4 Status of telemetry in Western Region
CERC vide its suo motu order in petition SM/007/2014 dated 25-April-2014 has
directed as under:
“The Commission vide order dated 19.12.2013 in Petition No. 56/SM/2013 had
directed as under:
We are at pains to observe that despite the Commission’s sustained initiative for the
implementation of the statutory mandate, the progress achieved is far from
satisfactory. We are constrained to place on record that the overall scenario is very
precarious. Accordingly, we issue the following directions:
(a) POWERGRID shall complete the telemetry on all its sub-stations within six months
of the issue of order failing which action under Section
142 of the Act may be initiated. After six months, NLDC/ RLDC shall submit status
report in this regard.
(b) Notice under section 142 of the Electricity Act, 2003 be issued against utilities
which have not responded to NLDC as contained in the Annexure to this order.”
Non availability of telemetry from substations within Maharashtra was discussed in the
457th and 458th OCC meeting wherein it was committed that the data would be made
available from 88 stations by 30th April 2014.
As per last updated status on 30th April 2014, integration of the only the following 17
out of 88 locations has been completed and data are reporting to MSETCL through
Tata Teleservices (TTSL) links and to WRLDC on ICCP.
Sr.No.
Date of receipt of
data on TTL RTU Location
1 14/3/2014
400 KV Kalwa2
2
14/3/2014
400 KV Khargar
3
27/3/2014
220 KV Ambazari
16
459th OCCM AGENDA
4 04/1/2014
220 KV Khaperkheda
5
04/3/2014
400 KV Akola
6
04/3/2014
400 KV Aurangabad3
7
04/8/2014
220 KV Mulund
8
04/8/2014
220 KV Warora
9
04/9/2014
220 KV Aurangabad2
10
14/4/2014
400 KV Chakan
11
17/4/2014
220 KV Badnera
12
17/4/2014
220 KV Amravati
13
21/4/2014
400 KV Padge2
14
21/4/2014
220 KV Boisar
15
22/4/2014
220 KV Uran
16
25/4/2014
400 KV Karad2
17
26/4/2014
220 KV Akola1
MSETCL apprise the status of availability of telemetry from the remaining stations of Maharashtra. During the 457th OCC meeting it was confirmed by Chhattisgarh that the issues
pertaining to Korba (W) extn, 220 kV Saraipalli and 400 kV Raita would be resolved
within 45 days. Likewise DD informed that the telemetry issues of Magarwada
substation would be attended within two months. Representatives from Madhya
Pradesh, Goa, and DNH informed that they would revert back regarding the progress
of pending telemetry issues. POWERGRID had assured that the communication link
for availability of PMU Data from Satna, Dehgam, and Boisar would be made available
within one month at WRLDC. However the same is yet to be established.
POWERGRID had also assured that the telemetry issues with 765 kV Gwalior, Durg,
Kotra and Tamnar would be resolved on priority.
MPPTCL vide letter dated 29.04.2014 have intimated that telemetry discrepancies for
following PGCIL lines are persisting since long time :
1. 400 kV SGTPS-Balco (from SGTPS end)
2. 400 kV Indore(MPPTCL)-Indore(PGCIL)-1 (at 400 kV Indore MPPTCL s/s)
3. 400 kV Indore(MPPTCL)-Indore(PGCIL)-2 (at 400 kV Indore MPPTCL s/s)
Members are requested to expedite resolution of pending issues related with telemetry
and communication.
9.5 Mock Black start Exercise
a) Black start at SSP (by NCA /Gujarat)
During the 456th OCCM and the 54th PSC meeting of NCA it was decided that NCA
would coordinate to organize a separate meeting of SLDC-GETCO along with other
17
459th OCCM AGENDA
stakeholders (preferably at SSP, Khevadia, Gujarat) to finalize the procedure for
mock black start drill of RBPH unit. NCA / SLDC GETCO may kindly apprise the
progress in this regard.
b) Healthiness of black start facilities in hydro stations in Madhya Pradesh
During the last OCC-M, SLDC-Madhya Pradesh had reported non-availability of DG
set at Pench and Bargi. Likewise Governor problem was reported at Tons,
Birsinghpur and Medikheda, Rajghat. Representative from Madhya Pradesh may
update the status. SLDC Jabalpur may also apprise the tentative date for conducting
black start exercise at Indira Sagar Hydro power station.
All the utilities may confirm healthiness of their black start DG sets through weeky
tests and send the test reports to WRPC/WRLDC as mandated by sec 5.8(b) of
IEGC.
9.6 Commissioning of SPS at 400/220 kV Vapi
During the special WRPC meeting on 18.03.2013 at DNH, an SPS for automatic load
shedding subsequent to tripping of 400/220 kV ICT at Vapi was approved as under. It
was decided that POWERGRID would extend trip signal from Vapi ICTs to the
requisite feeders.
Contingency Envisaged SPS action
Identified Feeders
Tripping of any one ICT at 400/200 Vapi Sub-Station
Automatic Load Shedding of 100MW.
DNH :
1) 66 kV-Kharadpara-Rakholi-I: 50 MW 2) 66 kV Khadoli-Khadoli-3: 30 MW DD:
1) 66 kV Magarwada-Kachigam: 60 MW In this regard communication were sent from WRLDC on 22nd Oct 2013 as well on
02nd May 2014. POWERGRID also has been raising the issue vide its letter dated 31st
Oct 2013 and 23rd April 2014. It is a matter of concern that even after one year, the
scheme approved by WRPC is yet to be commissioned by UT-DNH. The MVA loading
of one of the three ICTs at Vapi in April 2014 is illustrated below:
18
459th OCCM AGENDA
UT-DNH may apprise the status of commissioning of the envisaged SPS.
9.7 SPS at Sipat
WRLDC vide letter No. WRLDC/MO-I/1719/2013 dt 21.6.13 requested to take up this matter with the concerned for early implementation of the SPS. Status of the SPS at NTPC Sipat is as under:
1 449th OCC SPS was proposed by WRLDC. It was decided to have a
separate meeting to finalize the scheme
2 450th OCC Member Secretary, WRPC intimated that the matter will be discussed in 119th PCM on 3rd & 4th September 2013 at Tarapur.
3 451st OCC It was intimated that the issue of SPS of Sipat was discussed in 119th PCM held on 3rd & 4th September 2013 at TARAPUR. The tentative scheme were formulated which needed finer tuning.
4 452nd OCC Matter not discussed
5 453rd OCC NTPC representative intimated proposal sent to their corporate office for engineering approval.
6 454th OCC Approval from our corporate office is yet to be obtained
7 455th OCC Approval from our corporate office is yet to be obtained
8 456th OCC Approval from corporate office has been obtained and would be forwarded to WRPC for approval
9 457th OCC It was suggested by the sub-committee that the scheme be discussed among WRPC, WRLDC and NTPC and suggest for early implementation with requisite modification (if necessary).
10 458th OCC NTPC intimated that fresh approval from its corporate centre in view of revised suggestions from WRPC & WRLDC and it shall be implemented by 30.05.14. ICT shut down was sought by NTPC for implementation of SPS and the same was approved also.
9.8 Modification of SPS at CGPL Mundra for tripping of evacuation feeders.
19
459th OCCM AGENDA
A blackout occurred at CGPL Mundra on 12.03.2014. During discussion in the
meeting at Mumbai on 19.03.2014 it was agreed to review the existing SPS at CGPL
Mundra for tripping of one or more evacuation lines. WRPC vide its letter dated 25th
March 2014 sent a revised SPS proposal with two alternate options (Option-A and
Option-B) was to CGPL for their comments. CGPL vide its letter dated 29th March
2014 proposed a third option (Option-C). Thereafter SLDC GETCO vide its letter
suggested to include tripping of 400 kV Bachau-Vadavi (Ranchodpura) in the SPS
logic. WRLDC vide its letter dated 11th April 2014 suggested that the envisaged SPS
for N-2 contingencies that were already agreed by CTU, SLDC GETCO and CGPL,
were inadvertently missed in the revised scheme. The matter was therefore
discussed again in 458th OCCM. After due deliberations in the 458th OCC, the
following revised scheme was agreed.
CGPL representatives may apprise the status of implementation of the above.
9.9 SPS at 4x300 MW Balco IPP
The SPS at 2010 MW Balco (4x67.5MW + 4x135 MW + 4x300 MW) was to be
commissioned by Nov 2013 before commissioning of first unit of 4x300 MW Balco
IPP. For the new SPS scheme envisaged for the Balco CTU connection, namely the
Grid Islanding and Load Management Scheme (GILMS), Balco had reported to have
placed an order with M/s SEL. As discussed earlier, the scheme suggested by
WRLDC may be implemented before commissioning of first unit of 300 MW. It was
intimated during the 456th OCCM by the Balco representatives that the SPS shall be
commissioned by March 2014.
The present status may be apprised by Balco representative to the sub-
committee.
9.10 Taking 220 kV Kolhapur-Mudsinghi-Chikodi- Belgam line in service for
exchange of power
20
459th OCCM AGENDA
The matter was discussed in the 458th OCC meeting wherein, MSETCL
representative stated that the matter is sub-judice in MERC and hearing was
scheduled on 16.4.2014.
MSETCL may update the status.
9.11 RGMO / FGMO of mandated generators in Western Region
The list of state/utility wise RGMO/FGMO mandated units in WR is as under as per
the information available with WRLDC. As recommended by the WRPC report [item
4.0(v)] on the black out at CGPL dated 17.04.14 all these units were to give their MW
vs. frequency plot showing their compliance to sec 5.2(f) of IEGC by 22.04.2014. The
status as on 8.5.2014 is also given in the table in the last column.
Name of Entity No of
Eligible units
RGMO/FGMO available at
RGMO/FGMO Not available
at
Data Recived Status (wrt WRPC Report dt
17.04.14) Maharashtra 90 37 53 Not Received
Madhya Pradesh*
58* 36* 22* Not Received
Gujarat 35 19 16 SCADA Snap shot
received only for a few units
Chhattisgarh 10 3 7 Not Received CGPL 5 5 0 Not Received NCA 11 6 5 Not Received
SASAN 2 1 1 Received
NTPC 24 16 8
Only VSTPS report format is OK. Other
stations data ambiguous. No data for
Mouda ESSAR_Mahan 1 1 0 Not Received
NSPCL 2 2 0 Not Received KSK 1 1 0 Not Received
KWPCL 1 0 1 Not Received DB POWER 1 1 0 Not Received
JPL 5 4 1 Ambiguous data LANCO 2 2 0 Not Received
IEPL 1 0 1 Not Received EMCO 2 0 2 Not Received
WR_Total 251 134 117
All the utilities may submit the details as recommended by the WRPC at the
earliest.
21
459th OCCM AGENDA
*SLDC MPPTCL, intimated in 458th OCCM that in Madhya Pradesh total
FGMO/RGMO mandated units are 52 out of which FGMO/RGMO is available at 12
units and not available at 40 units. MPPTCL was requested to furnish the exact unit
wise break-up for the above statistics, to WRLDC and WRPC. That data is yet to be
submitted by MPPTCL. SLDC MPPTCL may kindly submit the same as soon as
possible for updating and further reporting to the CEA and the CERC.
Governor Response on 12.03.2014
MPPTCL vide letter dated 30.04.14 have furnished governor response on 12.03.2014.
Sub-Committee may like to discuss.
9.12 Revival of transmission elements under Long outage
As per the information available at WRLDC following elements are out for a long
period.
Sl.
No
Element Date of
outage
Reason
ISTS/IPP
1 50 MVAR L/R OF BIRSINGPUR-I @ DAMOH
23-Nov-13 REF & Buchholtz operated
2 50 MVAR B/R @ GWALIOR
1-Mar-14 Up-gradation work of bus reactor to 125 MVAR
3 240 MVAR L/R OF DURG-1@KOTRA
2-Apr-14 DGA violation at Kotra end
4 50 MVAR B/R @ ITARSI-I
20-Apr-14 Up-gradation work of bus reactor to 125 MVAR
5 63 MVAR LR of CGPL-JETPUR-II @ CGPL
21-Apr-14 Oil temparature high
765 kV DURG-KOTRA-I 25-Apr-14 L/R problem @ kotra end
400/220kV ICT-III @ PUNE
25-Apr-14 System constraint
MSETCL
1 765 kV Tiroda-Akola-I 23.03.2014 To control line loading
2 400 kV RGPPL-New
Koyna
29.04.2014 Insulator Washing
MPPTCL
22
459th OCCM AGENDA
Sl.
No
Element Date of
outage
Reason
1 400 kV DAMOH-KATNI-S/C
25-Apr-14 B ph to earth fault
2 400 kV BIRSINGPUR-KATNI - I
2-Apr-14 High voltage
3 400 kV SINGHAJI-PITAMPURA-II
15-Apr-14 No generation @ Singaji
4 400 kV SINGHAJI-CHHEGAON S/C
17-Apr-14 No generation @ Singaji
5 400 kv INDORE (MP)-INDORE-S/C
27-Apr-14 Y PH CT of 220 KV Indore-Indore line burst.
CSPTCL
1 50 MVAR L/R OF SEONI-BHIAI @ BHILAI
05.03.2014 DGA violation
OCC may like to be apprised of the actions being taken for expediting
revival of the above elements.
9.13 Implementation of the revised AUFLS in Goa, DD and DNH
It was decided during the 455th and 456th OCC meeting as well as during 25th
WRPC meeting that Goa, DD and DNH shall complete the implementation of the
revised AUFLS in Goa, DD and DNH at the earliest. Goa has intimated in the 458th
meeting that the AUFLS has been implemented.
Representatives from the DD and DNH may apprise the status of the
progress.
9.14 Crisis Management Plan for Railways
Pursuant to the Grid Disturbance in July 2012, a meeting to review the Crisis
Management Plan (CMP) in respect of back-up arrangement of Indian Railways
was convened by Director (OM), Ministry of Power on 5th June 2013, in New
Delhi wherein Director Electrical Engineering (PS), Ministry of Railways and Chief
Electrical Distribution Engineer, Northern Railways attended. The minutes of the
meeting is enclosed. Few decisions taken in the meeting that were to be
implemented at SLDCs and RLDCs are briefly listed below:
a. Feeders supplying to Railways to be clearly displayed in SLDCs so that
these can be monitored easily
b. In case of grid events power supply to Railways to be restored on priority.
SLDCs/RLDCs shall coordinate with the Nodal officers nominated by
Railways for this purpose.
23
459th OCCM AGENDA
c. The procedure for restoration of traction supply to be prepared in
coordination with Indian Railways and included in the Operating manual of
SLDCs and RLDCs
d. Railways shall be invited for participation in the Operation Coordination
Meeting of all RPCs so that issues of Railways are properly addressed
Members may like to deliberate so as to implement the Crisis Management Plan
as above.
ITEM NO. 10: DATE AND VENUE OF NEXT OCC MEETING
As per meeting roaster for OCCM in item 8.6 of 452nd OCC meeting, the 460th OCC
Meeting is missing. However, PGCIL WRTS-I will host 460th meeting and 461st OCC
will be hosted by NTPC, HQ-II Raipur.
OCC Members may like to note. OCC may like to fix up date of next meeting.
*****************
Anaulagnak 2.1
maah ApOla 2014
1. INTEGRATED OVER AN-HOUR
ek GaMTo maoM samaakilat
1.1 MAXIMUM FREQUENCY 50.29 Hz. BETWEEN 1700 Hrs & 1800 Hrs Hrs. ON 20.04.2014
AiQaktma AavaRi%t
1.2 MINIMUM FREQUENCY 49.71 Hz. BETWEEN 2200 Hrs & 2300 Hrs Hrs. ON 26.04.2014
nyaUnatma AavaRi%t
1.3 AVERAGE FREQUENCY 49.98 Hz.
AaOsat AavaRi%t
2. INSTANTANEOUS ta%kailak
2.1 MAXIMUM FREQUENCY 50.56 Hz. AT 18:02:47 Hrs. ON 20.04.2014
AiQaktma AavaRi%t
2.2 MINIMUM FREQUENCY 49.49 Hz. AT 21:05:59 Hrs. ON 26.04.2014
nyaUnatma AavaRi%t
3. %AGE OF TIME WHEN FREQUENCY WAS APRIL 2014 MARCH 2014 FEBRUARY 2014
AavaRi%t ka samaya p`itSat maoM
3.1 BELOW 48.5 Hz. 0.00 0.00 0.00
48.5 hT\ja ko naIcao3.2 BETWEEN 48.5 Hz. AND 48.8 Hz. 0.00 0.00 0.00
48.5 hT\ja AaOr 48.8 hT\ja ko baIca3.3 BETWEEN 48.8 Hz. AND 49.2 Hz. 0.00 0.00 0.00
48.8 hT\ja AaOr 49.2 hT\ja ko baIca3.4 BETWEEN 49.2 Hz. AND 49.5 Hz. 0.00 0.00 0.01
49.2 hT\ja AaOr 49.5 hT\ja ko baIca3.5 BETWEEN 49.5 Hz. AND 49.7 Hz. 1.23 0.25 0.41
49.5 hT\ja AaOr 49.7 hT\ja ko baIca3.6 BETWEEN 49.7 Hz. AND 49.9 Hz. 29.41 12.65 10.69
49.7 hT\ja AaOr 50.2 hT\ja ko baIca3.7 BETWEEN 49.9 Hz. AND 50.05 Hz. 52.33 47.83 40.14
49.9 hT\ja AaOr 50.05 hT\ja ko baIca3.8 BETWEEN 50.05 Hz. AND 51.5 Hz. 17.03 39.27 48.76
50.05 hT\ja AaOr 51.5 hT\ja ko baIca3.9 ABOVE 51.5 Hz. 0.00 0.00 0.00
51.5 hT\ja ko }pr
4.1 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.80 Hz. AavaRi%t 48.80 hT\ja kao CUhI
4.2 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 48.60 Hz. AavaRi%t 48.60 hT\ja kao CUhI
4.3 NO. OF TIMES FREQUENCY 0 0 0
TOUCHED 51.00 Hz. AavaRi%t 51.00 hT\ja kao CUhI
maoM AavaRi%t ko AaMkD,aoM ka ivavarNa
FREQUENCY PARTICULARS DURING APRIL 2014
(AS PER FREQUENCY REPORT OF WRLDC)
(piScama xao~ Baar poYaNa kond` kI AavaRi%t irpaoT- ko AaQaar pr)
Voltage Profile during the month of Apr. 2014
�दनाकDate
अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम
Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv
1 411 394 413 400 429 407 420 399 416 404 417 405 418 410 416 401
2 411 394 413 400 429 411 420 400 416 404 417 405 418 410 416 401
3 411 393 415 397 428 400 426 400 414 410 420 402 414 406 418 401
4 411 394 414 399 429 403 425 401 416 402 417 407 412 404 415 398
5 413 394 416 400 409 409 408 408 414 401 415 403 411 405 415 401
6 420 403 423 408 429 402 434 400 415 402 422 406 419 419 424 407
7 412 397 417 403 409 409 408 408 413 400 415 404 412 401 414 401
8 413 400 418 406 409 409 408 408 414 401 415 404 415 407 415 400
9 412 394 417 401 409 409 408 408 413 399 416 405 419 407 413 40010 409 393 413 397 428 409 419 394 412 399 416 405 416 408 417 40111 410 394 415 399 409 409 408 408 415 402 418 406 418 411 418 40312 409 390 411 397 409 409 408 408 417 400 415 404 416 406 416 40313 411 394 417 400 425 400 430 411 414 402 412 404 417 407 414 40114 411 389 415 396 428 402 425 400 414 400 420 407 417 407 418 39915 410 395 414 399 428 402 424 400 413 401 418 405 420 414 418 40216 409 393 413 394 409 409 408 408 414 398 416 405 416 407 414 40317 414 396 417 399 409 409 408 408 413 397 417 401 420 409 414 40218 416 397 419 401 426 403 418 398 414 400 414 403 419 411 413 40319 416 400 418 403 429 406 419 405 414 400 415 403 417 411 415 398
20 420 402 423 404 409 409 408 408 420 404 417 405 420 411 420 40321 416 396 417 399 427 402 415 395 418 399 416 403 416 409 414 40222 416 396 417 399 428 402 424 401 414 404 421 410 419 413 414 402
23 415 401 421 407 433 402 426 400 415 403 421 406 422 414 416 404
24 416 405 420 410 409 409 408 408 416 404 416 407 417 411 415 402
25 415 396 419 402 429 404 408 408 416 400 416 407 416 409 413 402
26 416 397 417 400 433 405 417 401 417 400 416 405 416 409 415 401
27 414 401 424 406 435 412 421 405 414 402 413 404 418 410 415 395
28 414 399 418 402 432 402 408 408 413 400 414 405 417 410 413 402
29 409 397 423 402 424 405 424 409 421 406 422 401 420 408 419 406
30 417 400 426 410 433 403 426 401 413 406 415 409 420 413 412 400
420 389 426 394 435 400 434 394 421 397 422 401 422 401 424 395
�दनाकDate
अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम अ�धकतम �यनतम
Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv Max. Kv Min. Kv
1 413 403 407 390 419 404 420 396 754 735 775 743 760 748 775 7592 419 406 412 397 419 404 420 405 754 735 779 750 787 765 797 7663 415 401 408 392 419 398 421 398 758 734 777 743 781 748 780 7594 415 402 408 394 419 403 421 405 750 738 770 745 782 756 783 7585 416 404 409 397 419 402 421 403 751 734 774 753 785 760 788 7646 419 405 414 389 423 406 428 406 746 733 772 749 785 754 780 750
7 417 408 414 402 419 403 423 405 756 741 770 755 796 773 789 7738 419 411 410 406 419 406 421 406 758 739 769 749 787 773 792 7789 417 405 411 398 418 401 423 402 751 736 771 744 788 761 788 766
10 413 402 409 397 415 398 420 400 749 736 759 743 783 762 779 76111 413 402 409 397 417 400 424 402 755 739 766 749 781 758 781 76612 409 399 402 383 417 399 420 402 757 745 767 747 771 755 774 755
13 415 402 406 396 418 400 424 403 760 746 777 751 779 760 786 765
14 414 399 405 395 417 396 423 398 757 741 775 741 775 757 780 755
15 411 403 400 394 416 400 421 401 756 743 776 755 767 754 780 765
16 411 400 404 389 414 396 421 396 758 736 773 751 777 746 775 760
17 411 400 404 389 419 399 426 401 756 740 773 751 777 746 775 760
18 417 407 410 399 420 402 424 404 760 747 784 765 781 762 788 771
19 419 407 409 392 420 404 422 406 756 743 779 751 781 750 788 76320 422 407 406 397 425 407 426 407 758 746 777 755 776 757 790 76721 417 401 404 394 419 405 419 397 754 742 769 746 770 753 781 75822 414 405 410 391 419 405 419 397 754 742 780 733 782 747 788 75223 421 410 410 399 421 407 430 411 757 743 789 758 784 761 794 77524 420 412 410 399 421 410 427 413 757 746 782 759 782 762 792 77525 418 409 407 400 421 402 424 405 756 738 770 765 779 763 785 76826 418 406 409 399 420 402 423 403 755 744 771 752 780 760 787 76827 423 406 418 395 420 407 427 411 755 744 783 760 800 755 805 76728 416 404 409 397 419 403 424 405 760 748 782 759 783 760 792 76929 416 406 407 397 416 405 418 403 759 740 781 764 781 761 789 77330 421 413 410 400 423 409 432 411 767 754 796 764 789 765 801 779
423 399 418 383 425 396 432 396 767 733 796 733 800 746 805 750
�व�यतदाब �परखा अ�ल 2014
स��नक Annex-2.3
इदौर इटारसी कराड धल असोज कासोर $भलाई जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur
'वा$लयर (बना
Bina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina
(बना 'वा$लयर नागदा खडवा $सपत $सव*न
No.of
Occasion
MAX LOAD
RELIEF IN MW
No.of
Occasion
MAX LOAD RELIEF
IN MW
1-Apr-14 0 0.0 0 0.02-Apr-14 2 45.4 0 0.03-Apr-14 0 0.0 0 0.04-Apr-14 0 0.0 0 0.05-Apr-14 0 0.0 0 0.06-Apr-14 0 0.0 0 0.07-Apr-14 0 0.0 0 0.08-Apr-14 0 0.0 0 0.09-Apr-14 0 0.0 0 0.0
10-Apr-14 0 0.0 0 0.011-Apr-14 0 0.0 0 0.012-Apr-14 0 0.0 0 0.013-Apr-14 0 0.0 0 0.014-Apr-14 0 0.0 0 0.015-Apr-14 0 0.0 0 0.016-Apr-14 0 0.0 0 0.017-Apr-14 0 0.0 0 0.018-Apr-14 0 0.0 0 0.019-Apr-14 0 0.0 0 0.020-Apr-14 1 47.5 0 0.021-Apr-14 0 0.0 0 0.022-Apr-14 0 0.0 0 0.023-Apr-14 0 0.0 0 0.024-Apr-14 0 0.0 0 0.025-Apr-14 0 0.0 0 0.026-Apr-14 0 0.0 0 0.027-Apr-14 0 0.0 0 0.028-Apr-14 0 0.0 0 0.029-Apr-14 0 0.0 0 0.030-Apr-14 1 104.8 0 0.0
Datewise Under Frequnecy Operation
Annex-2.4
GUJARAT:FOR THE MONTH APRIL-2014
Date
U/F 49.2Hz U/F 49.0 Hz
Annexure-2.5
Power Cut/Restrictions in Western Region for the month of April-2014
k k k k : gauja ra tgauja ra tgauja ra tgauja ra t Gujarat
1 ]Vaoog aaoM ko ila yao iv aVu t kT aO ityaaM 1 Power Cut/ Restriction on Industries
a) All industries are allowed to run their units on all days of week & if they want to avail staggered holiday,
then they will have to staggered on notified day only & cannot avail as per their choice.
b) All industries are required to keep their recess timings staggered.
2 kRiY a va g aa maINa xao ~aoM kao iv a Vu t Aa pUit- 2. Power supply to Agricultural & Rural Sectors
a) Only 8 Hrs. Power supply in staggered form in rotation of day & night is given to Ag. Single Phase
supply during rest of 16 Hrs by providing LSTC.
b) Jyotigram Yojana 24 hrs. 3 Anya jaa na ka rI 3. Any other information: NIL.
K K K K : ma Qya p` doSa ma Qya p` doSa ma Qya p` doSa ma Qya p` doSa Madhya Pradesh
1 ]Vaoog aaoM ko ila yao iv aVu t kT aO ityaaM / pab MaidyaaM , ra jya maoM Baar ina yama na Aaid 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
i va va rNa Details i va Vu t k Ta O tI k I maa ~a Quantum of
power cut (MW)
p a ba ndI k a s a ma ya Restriction Timing
p ` i t i dna k u la }j a a- k T aO tI Total Energy Cut
(MUs /day s a o From tk To (a) Power Restrictions(Evening
peak Hour) on non continuous
process HT/LT IndustriesM (b) Baar inaya ma na Load Shedding
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
(c) Anya ja a nak a rI Other information
1.Weekly Off
2.Staggering of power supply
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
2 kRiY a xao ~ kao iv aVu t Aa pUit- 2. Power supply to Agricultural Sector: -
i va va rNa Details s a o From
i dna a Mk Date
tk To
i dna a Mk Date
p ` i t i dna Aa pU i t- Ga M To Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase
Supply(DLF) 01.04.2014 31.04.2014 23:54 23:13 23:38
2.1 Three-Phase
Supply(Irrigation) 01.04.2014 31.04.2014 09:55 09:43 09:51
2.1 Three-Phase
Supply(Mixed) 01.04.2014 31.04.2014 23:53 23:13 23:35
3 Anya jaa na ka rI 3. Any other information
Sa hrI xa o ~ao M ma oM i na ya ma na i vaVu t k Ta O i ty aa M Scheduled Power cuts in Urban Areas
i va va rNa Details s a o From
i dna a Mk Date
tk To i dnaa Mk
Date
Aa o sa t p `i ti dna Average Supply
Aa p Ui t- GaM To Hours per day
Max.
(Hrs)
Min. (Hrs) Average (Hrs)
3.1 Commissionary H. Qtrs. 01.04.2014 30.04.2014 23:58 23:31 23:50 3.2 District Head Qtrs. 01.04.2014 30.04.2014 23:59 23:35 23:50
3.3 Tehsil Head Qtrs. 01.04.2014 30.04.2014 23:55 23:29 23:44
g a g a g a g a : ma ha ra YT/ma ha ra YT/ma ha ra YT/ma ha ra YT/ Maharashtra
1 ]Qyaaog aaoM ko ila yao iv aVu t k TaO ityaaM / pab MaidyaaM , ra jya maoM Baar ina ya ma na Aa id 1. Power Cut/ Restriction on Industries, Load Shedding in the state etc
i va va rNa Details i va Vu t k Ta O tI k I maa ~a Quantum of
power cut (MW)
p a ba ndI k a s a ma ya Restriction Timing
p`it id na ku la }ja a- kT a Ot I Total Energy Cut
(MUs /day From To
(a) Power Cuts/Restriction on HT/
LT Industries
(b) Load Shedding
From 01.04.14 to 30.04.14
Sa U ny a Nil
@ 0-970MW
Sa U ny a Nil
00.00
Sa U ny a Nil
24.00
Sa U ny a Nil
@ 6 MUs/day
(c) Any other information
1.Weekly Off
2. Staggering of power supply
Industrial Staggering LS
withdrawn from 03/02/2012
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
Sa U ny a Nil
2 kRiY a xao ~ kao iv aVu t Aa pUit- 2. Power supply to Agricultural Sector
i va va rNa Details s a o From
i dna a Mk Date
tk To
i dna a Mk Date
p ` i t i dna Aa pU i t- Ga M To Supply Hours per day
Max. (Hrs) Min. (Hrs) Average (Hrs) 2.1 Three-Phase Supply 01.04.2014 30.04.2014 10:00 08:00 09:00
2.2 Single-Phase Supply 01.04.2014 30.04.2014 18:00 18:00 18:00
3333 Anya jaa na ka rIAnya jaa na ka rIAnya jaa na ka rIAnya jaa na ka rI Any other information:
There is no load shedding on industrial feeders in Maharashtra
G a G a G a G a : C% tI sa g a Z,C% tI sa g a Z,C% tI sa g a Z,C% tI sa g a Z, Chhattisgarh:
1 ]Qyaaog aaoM ko ila yao iv aVu t k TaO ityaaM / pab MaidyaaM , ra jya maoM Baar ina ya ma na Aa id 1 Power Cut/ Restriction on Industries, Load Shedding in the state etc
i va va rNa Details i va Vu t k Ta O tI k I maa ~a Quantum of power cut (MW)
p a ba ndI k a s a ma ya Restriction Time
p ` i t i dna k u la }j a a - k Ta O tI
s a o From tk To
Total
Energy Cut
(MUs /day) (A) Scheduled
(a) (i) Power Cuts/
Restriction on HT Industries
(ii) Power Cuts/Restriction
on LT Industries
(iii) Power Cuts/Restriction
on Rural
(iv) Agriculture pump*
(v)Urban/ Sub-Urban
(iv)Town feeders(C-1to C-6)
(B) Un-Scheduled (a) Load Shedding
00.00(Av)
00.00(Av)
00.00 (Av)
45.67 (Av) of 28 days
00.00(Av)
00.00 (Av)
1.Rural 73.28 (Av)
2.Town Feeders (C-1to C-6 & X) : 0.00(Av)
-
-
-
17.00
-
-
-
-
-
-
23.00
-
-
-
-
-
-
-
0.274
-
-
0.130
-
3. HT Industries 82.50 (Av) 0.018 Total Energy Cut/day ( b) Any other information
1.Weekly Off/staggering of
power supply
1day (In a week as per
consumer’s option) 50MW(Av.)
-
-
0.422
2 kRiY a xao ~ kao iv aVu t Aa pUit- 2. Power supply to Agricultural Sector
i va va rNa Details s a o From
i dna a Mk Date
tk To
i dna a Mk Date
p ` i t i dna Aa pU i t- Ga M To Supply Hours per day Max. (Hrs) Min. (Hrs) Average (Hrs)
2.1 Three-Phase Supply 01.04.2014- 30.04.2014, 6.00
Hrs
(Power cut)
18.00
2.2 Single-Phase Supply - - - - - 2.3 Remarks/Note/ - - - - -
*-up till 30/3/2014, as conveyed to SLDC, CSPTCL for power cut under Atal Jyoti scheme by Raipur & Durg region, CSPDCL
3 A nya jaa naA nya jaa naA nya jaa naA nya jaa na ka rI ka rI ka rI ka rI / Any other information: Sa U ny a Nil
ca ca ca ca : gaaovaa gaaovaa gaaovaa gaaovaa Goa: Sa U ny a Nil
Annex- 2.6
k`maaMk yauinaT saM xamata karNaidnaaMk samaya idnaaMk samaya
S. No. Unit No. Capacity Reason
(MW) Date Time Date Time
1.0 Gujarat
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2.0 Madhya
2.1
2.2
3.0 Chhattisgarh
3.1
3.2
4.0 Maharashtra
4.1 Dabhol 1B 230 28-May-13 22.02 Continued. Gas shortage.
4.2 Dabhol 2A 230 6-Jun-13 09.10 Continued. Gas Shortage
4.3 Dabhol 3A 230 6-Jun-13 08.28 Continued. Gas Shortage
4.4 Dabhol 1A 230 27-Jun-13 21.47 Continued. Gas Shortage
4.5 Dabhol 1X 290 27-Jun-13 21.46 Continued. Gas Shortage
4.6 Dabhol 2X 290 15-Jul-13 15.09 Continued. Gas Shortage
4.7 Tata Trombay 6 500 19-Jul-13 23.54 7-Apr-14 11.25 Economic shut down.
4.8 Dabhol 2B 230 8-Aug-13 15.03 Continued. Gas Shortage
4.9 CPP VIPL 300 2-Oct-13 00.45 1-Apr-14 12.49 Turbine bearing vibration high.
4.10 Dabhol 3X 290 29-Dec-13 05.47 Continued. Gas Shortage
4.11 Dabhol 3B 230 29-Dec-13 06.14 Continued. Gas Shortage
4.12 Uran Unit 8 108 3-Jan-14 14.06 1-Apr-14 12.07 Gas Shortage
4.13 Tata Trombay 8 250 9-Jan-14 22.54 Continued. Emergency H/T,Fire at turbine track.
4.14 CPP WPCL U-1 135 30-Jan-14 12.45 Continued. turbine vibration
4.15 CPP WPCL U-2 135 18-Feb-14 00.02 Continued. Ash Conveying problem
4.16 CPP INDIABULLS 270 20-Feb-14 19.43 28-Apr-14 17.41 BFP and Turbine Problem of U-2
4.17 Koradi Unit 5 200 23-Feb-14 04.04 10-Apr-14 12.12 ID Fan Problem.
4.18 CPP JSW (J) U2 300 28-Feb-14 17.52 Continued. No Schedule.
4.19 CPP JSW (J) U1 300 12-Mar-14 12:00 1-Apr-14 21.23 Condensor Tube Leakage.
4.20 Uran Unit 6 108 16-Mar-14 08.03 10-Apr-14 10.02 gas shortage
4.21 CPP Adani U-2 660 20-Mar-14 11.32 14-Apr-14 02.03 BTL.
4.22 Parli Unit 5 210 25-Mar-14 12.18 10-Apr-14 17.32 Stator Earth Fault
4.23 Bhusawal Unit 3 210 29-Mar-14 22.25 1-Apr-14 08.43 CD Path Flne Gas Duct Internal Inspection.
4.24 Chandrapur Unit 2 210 1-Apr-14 05.18 1-Apr-14 14.33 Excitation Problem.
4.25 Uran Unit 8 108 1-Apr-14 12.42 14-Apr-14 11.54 Gas Shortage
4.26 Chandrapur Unit 3 210 1-Apr-14 14.47 4-Apr-14 10.25 BLR T/L.
4.27 CPP WPCL U-3 135 1-Apr-14 00.07 30-Apr-14 21.41 No Schedule
4.28 CPP VIPL 300 1-Apr-14 23.13 8-Apr-14 10.47 BLR T/L.(U-2)
4.29 Koyna Unit 5 80 2-Apr-14 21.30 3-Apr-14 01.50 P.M.Work
Anaulagnak Anaulagnak Anaulagnak Anaulagnak 2.6
DETAILS OF GENERATING UNITS UNDER FORCED OUTAGE DURING
baMd ikyaa caalaU ikyaa/caalaU haonao kI saMBaavanaa
Taken out on Sync. on /Exp. by
4.30 Parli Unit 6 250 3-Apr-14 00.05 3-Apr-14 03.15 Furnace Pressure High
4.31 Parli Unit 6 250 3-Apr-14 03.28 3-Apr-14 05.07 Furnace pressure High
4.32 CPP WPCL U-4 135 3-Apr-14 00.01 Continued. No Schedule
4.33 Parli Unit 7 250 4-Apr-14 18.30 4-Apr-14 21.15 flame failure
4.34 Chandrapur Unit 2 210 4-Apr-14 22.24 6-Apr-14 4.50 BTL
4.35 Nasik Unit 3 210 5-Apr-14 17:15 9-Apr-14 12.25 Boiler Tube Leakage.
4.36 Chandrapur Unit 2 210 6-Apr-14 06.53 6-Apr-14 11.12 Drum Level low.
4.37 Bhusawal Unit 4 500 7-Apr-14 13.07 7-Apr-14 15.37 Class A Prot.Optd.
4.38 CPP Dhariwal 300 7-Apr-14 10.47 7-Apr-14 13.50 Generator Prot Optd.
4.39 Paras Unit 4 250 7-Apr-14 22.54 8-Apr-14 18.28 Furnace Pressure High.
4.40 Koradi Unit 6 210 9-Apr-14 01.01 13-Apr-14 14.03 ID Fan Problem.
4.41 Nasik Unit 3 210 9-Apr-14 23.00 10-Apr-14 05.25 Drum Level Very Low
4.42 Paras Unit 4 250 11-Apr-14 11.58 14-Apr-14 08.41 coal balt problem.furnace pressure high
4.43 Paras Unit 3 250 12-Apr-14 2.28 14-Apr-14 16.33 bunkering prob.
4.44 Bhusawal Unit 2 210 12-Apr-14 16.15 15-Apr-14 08.02 Id fan tem.high
4.45 Hydro GhatgharU1 125 12-Apr-14 15.40 14-Apr-14 04.00 Water walve leakege
4.46 Koyna ST - IV 4 250 13-Apr-14 09.44 13-Apr-14 11.40 Sperical Valve Problem.
4.47 CPP JSW (J) U1 300 13-Apr-14 11.05 13-Apr-14 13.22 Low Vacoum Pressure.
4.48 Bhusawal Unit 5 500 13-Apr-14 10.50 13-Apr-14 18.49 Class A Protection Operated.
4.49 Parli Unit 7 250 13-Apr-14 13.11 13-Apr-14 16.17 Low Drum Level.
4.50 CPP Adani U-4 660 14-Apr-14 04:35 28-Apr-14 06.24 Withdrawn
4.51 Koyna ST - IV 4 250 14-Apr-14 12.36 14-Apr-14 19.05 Numerical Prot Optd.
4.52 Bhusawal Unit 4 500 14-Apr-14 23.07 17-Apr-14 23.32 BLR T/L.
4.53 Paras Unit 4 250 15-Apr-14 22.54 16-Apr-14 01.21 Flame Failure.
4.54 CPP Dhariwal 300 16-Apr-14 15.28 16-Apr-14 17.55 Genretor Prot. Operation.
4.55 Bhusawal Unit 5 500 16-Apr-14 22.44 17-Apr-14 01.53 While shifting salven load UAT.
4.56 Uran Unit 5 108 16-Apr-14 03.31 1-May-14 12.28 Gas Shortage.
4.57 Chandrapur Unit 1 210 17-Apr-14 22.29 21-Apr-14 07.05 Boiler validity extension
4.58 CPP Dhariwal 300 17-Apr-14 10.07 17-Apr-14 17.05 UT Winding Temp High
4.59 Bhusawal Unit 5 500 17-Apr-14 14.59 22-Apr-14 19.10 Boiler Tube Leakage
4.60 CPP INDIABULLS 270 19-Apr-14 19.50 Continued. Coal Shortage of U-1
4.61 Chandrapur Unit 4 210 20-Apr-14 02.58 23-Apr-14 03.29 Boiler Tube Leakage.
4.62 Bhusawal Unit 2 210 20-Apr-14 04.10 24-Apr-14 06.03 Bearing Temp.High.
4.63 Koyna Unit 8 80 20-Apr-14 11.05 21-Apr-14 23.10 Boiler Bearing Temp.High.
4.64 Parli Unit 5 210 21-Apr-14 20.56 23-Apr-14 12.10 Gen.Protection.
4.65 Chandrapur Unit 1 210 21-Apr-14 07.26 21-Apr-14 09.25 Low Vaccume.
4.66 Chandrapur Unit 4 210 23-Apr-14 08.37 25-Apr-14 01.15 PA Fan problem4.67 Koradi Unit 7 210 24-Apr-14 14.51 26-Apr-14 02.38 ID Fan Bearing Temp High
4.68 CPP Dhariwal 300 24-Apr-14 15.00 24-Apr-14 19.09 Station Board Supply tripped4.69 Uran Unit 7 108 24-Apr-14 08.20 25-Apr-14 22:32 Gas Shortage.
4.70 Uran Unit 8 108 24-Apr-14 09.16 25-Apr-14 17.26 Gas Shortage
4.71 Uran Unit B0 120 24-Apr-14 09.16 25-Apr-14 22.13 Gas Shortage.
4.72 Parli Unit 4 210 25-Apr-14 17.52 Continued. Flame Failure.
4.73 Uran Unit 6 108 25-Apr-14 12.35 26-Apr-14 19.37 Gas Shortage.
4.74 Uran Unit A0 120 25-Apr-14 12.35 26-Apr-14 18.42 Gas Shortage.
4.75 CPP Adani U-3 660 26-Apr-14 00.33 1-May-14 06.37 Boiler Tube Leakage.
4.76 Koyna ST - IV 3 250 27-Apr-14 19.25 27-Apr-14 20.18 Trip.
4.77 Uran Unit A0 120 27-Apr-14 18.42 27-Apr-14 19.37 Trip.
4.78 Nasik Unit 4 210 27-Apr-14 11.15 29-Apr-14 21.12 Boiler Tube Leakage.
4.79 Koyna Unit 9 80 28-Apr-14 22.25 29-Apr-14 05.25 R.M.Work
4.80 Koyna ST-IV 1 250 29-Apr-14 12.15 30-Apr-14 04.00 Butterfly valve problem
4.81 Koyna ST - IV 4 250 29-Apr-14 12.05 29-Apr-14 19.10 Governor safety valve problem
4.82 CPP INDIABULLS 270 29-Apr-14 09.34 Continued. PA Fan Problem of U-2
4.83 CPP Adani U1 660 30-Apr-14 12.11 Continued. BTL.
4.84 Paras Unit 4 250 2-May-14 17.36 Continued. Boiler Tube Leakage
Annex- 2.7
maah ApOla 2014 maah ApOla 2014 maah ApOla 2014 maah ApOla 2014 maoM yaaojanaabaQd Aa]Toja ko AMtga-t ]%padk yauinaTaoM ka ivavarNa maoM yaaojanaabaQd Aa]Toja ko AMtga-t ]%padk yauinaTaoM ka ivavarNa maoM yaaojanaabaQd Aa]Toja ko AMtga-t ]%padk yauinaTaoM ka ivavarNa maoM yaaojanaabaQd Aa]Toja ko AMtga-t ]%padk yauinaTaoM ka ivavarNa
k`maaMk yauinaT saM xamata karNaidnaaMk samaya idnaaMk samaya
S. No. Unit No. Capacity Reason
(MW) Date Time Date Time
1.0gau}ivainaila gau}ivainaila gau}ivainaila gau}ivainaila GUVNL
1.1
1.2
1.3
1.4
1.5
1.6
1.7
2.0 map`iva]kMila map`iva]kMila map`iva]kMila map`iva]kMila MPPGCL
2.1
2.2
3.0 Craivabaao Craivabaao Craivabaao Craivabaao CSEB
3.1
3.2
4.0 maraiva]kMila maraiva]kMila maraiva]kMila maraiva]kMila MSPGCL
4.1 Parli Unit 3 210 13-Feb-13 23.50 Continued. Water Shortage
4.2 Khaparkheda Unit 3 210 1-Apr-14 05.14 Continued. A.O.H.
4.3 Koradi Unit 5 200 10-Apr-14 19.21 Continued. Coal conservation
4.4 CPP JSW (J) U3 300 14-Apr-14 23.51 29-Apr-14 02.30 Annual Shutdown.
caalaU ikyaa/caalaU haonao kI saMBaavanaa
Sync. on /Exp. by
baMd ikyaa
Taken out on
Anaulagnak Anaulagnak Anaulagnak Anaulagnak 2.7
DETAILS OF GENERATING UNITS UNDER PLANNED OUTAGE DURING APRIL 2014
ma[- 2014ma[- 2014ma[- 2014ma[- 2014 AaOr AaOr AaOr AaOr jaUna 2014jaUna 2014jaUna 2014jaUna 2014 maoM ]%padk yauinaTaoM ko p`staivat AnaurxaNa kaya-k`ma ka ivavarNa maoM ]%padk yauinaTaoM ko p`staivat AnaurxaNa kaya-k`ma ka ivavarNa maoM ]%padk yauinaTaoM ko p`staivat AnaurxaNa kaya-k`ma ka ivavarNa maoM ]%padk yauinaTaoM ko p`staivat AnaurxaNa kaya-k`ma ka ivavarNa
k`maaMk yauinaT saM xamata karNa
(maogaavaaT)
(MW) sao From tk To sao From tk To
1 gau}ivainaila gau}ivainaila gau}ivainaila gau}ivainaila GUVNL
1.1 EPGL 1 500 15-May-14 8-Jun-14 AOH
1.2 STPS 1 120 29-May-14 18-Jun-14 AOH
1.3 DGB 2 112 13-Jun-14 27-Jun-14 HGPI
1.4 UTPS 4 200 15-Jun-14 19-Jul-14 COH
1.5 SLPP 2 125 15-Jun-14 4-Jul-14 COH
1.6 GTPS 4 210 20-Jun-14 10-Jul-14 AOH
1.7 WTPS 5 210 20-Jun-14 29-Jul-14 COH
1.8
1.9
1.10
1.11
1.12
1.13
1.14
2 map`iva]kMila map`iva]kMila map`iva]kMila map`iva]kMila MPPGCL
2.1
2.2
2.3
2.4
2.5
3 Craiva]kMila Craiva]kMila Craiva]kMila Craiva]kMila CSPGCL
3.1
3.2
3.3
4 maraiva]kMila maraiva]kMila maraiva]kMila maraiva]kMila MSPGCL
4.1
4.2
4.3
4.4
4.5
5 koMd``Iya xao~ koMd``Iya xao~ koMd``Iya xao~ koMd``Iya xao~ Central Sector
5.1 KSTPS 5 500 15-Apr-14 9-May-14 AOH
5.2 KSTPS 4 500 13-Jun-14 11-Aug-14 AOH
5.3 VSTPS 3 210 22-May-14 28-May-14 AOH
5.4 VSTPS 1 210 28-Apr-14 18-May-14 AOH
5.5 VSTPS 8 500 1-Jun-14 15-Jul-14 AOH
5.6 SSTPS 2 500 3-May-14 18-Jun-14 COH5.7 KGPP 2A 106 17-Jun-14 16-Aug-14 R&M
5.8 JGPP GT2 144 6-May-14 12-May-14
5.9 VSTPS GT1 144 15-May-14 28-Jun-14
ReasonCapacity Outage as per Annual
Maintenance Plan
vaaiYa-k AnaurxaNa yaaojanaa
ko Anausaar Aa]Toja
Aa]Toja p`staivat / vaastivak
Outage Proposed/Availed
DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING MAY 2014 AND JUNE 2014
S. No. Unit No.
Anaulagnak Anaulagnak Anaulagnak Anaulagnak 3.1
Annex- 3.1
5.10 CGPL 50 800 1-Jun-14 30-Jun-14 COH
5.11 KGPP 2C 116 28-Jun-14 11-Aug-14 R&M
SN KV Line Basis Reason System Agency Type
Date Time Date Time1 220 Kawas-Vav 2+ bus 2 @ Kawas 1-May-14 9:00 1-May-14 19:00 daily Maintenance NTPC NTPC R
2 220 KV Kawas-Navsari 1 12-May-14 9:00 12-May-14 19:00 daily distance relay testing. NTPC NTPC R
3 400 Kasor-SSP Line 13-May-14 8:00 15-May-14 18:00 Daily PMM GETCO GETCO R
4 220 KV Kawas-Navsari 2 13-May-14 9:00 13-May-14 19:00 daily distance relay testing. NTPC NTPC R
5 765 Bus-II ,Dharamjaygarh 14-May-14 8:00 15-May-14 18:00 Continous For line dropper , Bus connection and testing of
equipment of 765kV Champa bay at
Dharamjaygarh due to high induction of
Adjoining line
WRTS-I POWERGRID C
6 765 Dharamjaygarh-Bilspur line 14-May-14 8:00 15-May-14 18:00 Continous WRTS-I POWERGRID C
7 765 Bus-I ,Dharamjaygarh 14-May-14 8:00 15-May-14 18:00 Continous For line dropper , Bus connection and testing of
equipment of 765kV Jharsugda -2 bay at
Dharamjaygarh due to high induction
WRTS-I POWERGRID C
8 220 KV Kawas-vav 1 14-May-14 9:00 14-May-14 19:00 daily distance relay testing. NTPC NTPC R
9 400 Amreli-Chorania 15-May-14 0.33 15-May-14 18:00 Daily PMM GETCO GETCO R
10 400KV Korba 400 KV bus coupler 1 15-May-14 9:00 16-May-14 19:00 Continuous Bay Maint. and testing. NTPC NTPC R
11 765 765kV D/C Raigarh (Kotra) – Raigarh (Tamnar) 15-May-14 8:00 23-May-14 18:00 Continous diversion of certain portion of the line near
Monnet Expansion area
WRTS-I POWERGRID C
12 765 765kV D/C Raigarh (Kotra) – Raigarh (Tamnar) 15-May-14 8:00 23-May-14 18:00 Continuous For diversion of certain portion of the line near
Monnet Expansion area
WRTS-I POWERGRID c
13 220 KV Kawas-vav 2 15-May-14 9:00 15-May-14 19:00 daily distance relay testing. NTPC NTPC R
14 400 Hadala-Amreli 16-May-14 8:00 16-May-14 18:00 Daily PMM GETCO GETCO R
15 400 Raipur- Bhadrawati Ckt #2 16-May-14 8:00 16-May-14 18:00 Daily For attending oil leakage and Repalcement of
B Phase L/R bushing.
WRTS-I POWERGRID R
16 765 Dharamjaygarh-Ranchi-2 line 16-May-14 8:00 17-May-14 18:00 Continous WRTS-I POWERGRID C
17 765 765KV Bay no.-, 705 (Seoni-1 Tie) at Bilaspur S/s 16-May-14 8:00 17-May-14 18:00 Daily CSD (Control switching)Commissioning work WRTS-I POWERGRID C
18 400 Raipur-Bhadrawati ckt-II 16-May-14 10 16-May-14 18 daily bushing replacement of LR WRTS-I POWERGRID R
19 220 KV Kawas-Hal1 16-May-14 9:00 16-May-14 19:00 daily distance relay testing. NTPC NTPC R
20 400 Amreli-Jetpur-1 17-May-14 8:00 17-May-14 18:00 Daily PMM GETCO GETCO R
21 765 1500 ICT-1, Durg PS 17-May-14 8:00 17-May-14 18:00 Daily for commissioing RTCC WRTS-I POWERGRID C
22 765 BUS -1 , Kotra PS 17-May-14 8:00 20-May-14 18:00 Daily Rectification of construction defects of Bus WRTS-I POWERGRID C
23 220 D/C Korba - Raigarh & Korba-Budipadar 17-May-14 8:00 18-May-14 18:00 Conti. Crossing works of 765KVJarsugda-
Dharmjaygarh
CSPTCL POWERGRID C
24 220 S/C Korba - Budipadar # 3 17-May-14 8:00 18-May-14 18:00 Conti. Crossing works of 765KVJarsugda-
Dharmjaygarh
WRTS-I POWERGRID C
25 220 KV Kawas-Hal 2 17-May-14 9:00 17-May-14 19:00 daily distance relay testing. NTPC NTPC R
26 765 1500 ICT-1, Tamnar PS 18-May-14 8:00 18-May-14 18:00 Daily For commissioing of CSD WRTS-I POWERGRID C
27 400KV Korba Korba(West) 19-May-14 9:00 20-May-14 19:00 Continuous Bay Maint., equipment testing and
protection testing.
NTPC NTPC R
28 765 1500 ICT-2, Tamnar PS 19-May-14 8 19-May-14 18 Daily For commissioing of CSD WRTS-I POWERGRID C
29 765 765KV Bay no.-717, 718 (ICT#3 Dia) at Bilaspur s/s 19-May-14 8:00 20-May-14 18:00 Daily CSD (Control switching)Commissioning work WRTS-I POWERGRID C
30 400 SSP-Dhule-1 19-May-14 8:00 20-May-14 18:00 Daily Relay testing
31 400 Soja - Wanakbori 20-May-14 8:00 20-May-14 18:00 Daily PMM GETCO GETCO R
32 400 400 KV Indore - Itarsi Ckt-II 20-May-14 8:00 21-May-14 18:00 daily Crossing /stringing work of 400 kv Sarni-Ashta
Line
PGCIL EHT- M& I C
33 400 400 KV Khandwa - Rajgarh Ckt-I 20-May-14 8:00 22-May-14 18:00 daily stringing work of 400 kv Chhegaon - Julwaniya
DCDS Line
PGCIL EHT- M& I C
34 400/220 ICT-1 at Khedamara 20-May-14 8:00 21-May-14 18:00 Delta testing CSPTCL CSPTCL R
35 400 Seoni-Khandwa # 2 20-May-14 10:30 20-May-14 12:30 Daily Calibration of OTI & WTI of reactor at Seoni.
Line outage is required for taking Reactor out &
in.
WRTS-2 WRTS-I R
36 400 Kolhapur-Mapusa # 1 20-May-14 8:00 25-May-14 0:00 Daily Insulator replacement work WRTS-I WRTS-I R
ANNEXURE-3.2A
Outages Proposal of Transmission elements during the month of MAY -2014
From To
37 400 Vindhyachal - Sasan # 2 20-May-14 8:00 20-May-14 18:00 Daily For interconnection of 765kV V'chal - Rihand
line
POWERGRID WR-II C
38 400 Vindhyachal - Sasan # 1 20-May-14 8:00 21-May-14 18:00 Continuous For interconnection of 765kV V'chal - Rihand
line
POWERGRID WR-II C
39 400 400 KV S/C Sarni - Itarsi Ckt 20-May-14 8:00 21-May-14 18:00 daily Crossing /stringing work of 400 kv Sarni-Ashta
Line
PGCIL EHT- M& I C
40 765 1500 ICT-3, Tamnar PS 20-May-14 9:00 20-May-14 18:00 Daily For commissioing of CSD WRTS-I POWERGRID C
41 400 Bus-I at Raigarh 20-May-14 8:00 20-Jun-14 18:00 Daily Construction of bay shifting of Kotra-2 & Raipur
ckt-4
WRTS-I POWERGRID C
42 220 400kV D/C Tamnar (Jindal) - Raipur Transmission Line 20-May-14 8:00 21-May-14 18:00 Continuous
Overhead Powerline crossing works of 765kV
S/C Raigarh - Champa TL (M/s LANCO)
Loc. No. of under construction line: AP-18/0 &
AP-19/0
JINDAL POWERGRID c
43 400 Dehgam-Vadavi-1 21-May-14 8:00 22-May-14 18:00 Daily PMM GETCO GETCO R
44 400 Soja - Wanakbori 21-May-14 8:00 21-May-14 18:00 Daily PMM GETCO GETCO R
45 765 Seoni-Wardha-I Switchable L/R at Seoni 21-May-14 8:00 25-May-14 0:00 Daily Construction of firewall & Commissioning of
CSD in reactor breaker & with permission to
WRTS-1 WRTS-1 C
46 400 Navsari-Kala-Vapi line 21-May-14 0.33 21-May-14 18.00 Daily Balance work in Navasari- Boisar line on same
M/C tower.
WRTS-II WRTS-I C
47 400 Switchable 50Mvar Reactor (Bus Reactor) at Seoni 21-May-14 0.33 26-May-14 0.75 Conti. Replacement of 50MVar Reactor by 125MVar
Reactor
WRTS-I WRTS-I C
48 400 Bus-1 at Seoni 21-May-14 0.33 23-May-14 0.75 Daily Erection of New 125MVar Bus Reactor at
Seoni.
WRTS-I WRTS-I C
49 765 765/400KV ICT-1 at Solapur & 400kv Solapur-Parli #
2
21-May-14 7:00 22-May-14 18:00 Daily Commissioning of spare ICT unit Aux. bus. WRTS-I/ Reliance WRTS-I C
50 220 Vapi - Khadoli # 2 21-May-14 8:00 21-May-14 18:00 Daily LILO of 220kV Vapi- Khadoli Ckt.2 at Kala SS Powergrid WR-II C
51 400 Limbdi - Vadavi # 1 21-May-14 8:00 21-May-14 18:00 Daily For AMP Work Reliance WR-II R
52 765 BUS -2,Kotra PS 21-May-14 8:00 24-May-14 18:00 Daily Rectification of construction defects of Bus
Isolator
WRTS-I POWERGRID C
53 400 Bus-II at Raigarh 21-May-14 8:00 21-Jun-14 18:00 Daily Construction of bay shifting of Kotra-2 & Raipur
ckt-4
WRTS-I POWERGRID C
54 400 SSP-Kasor 21-May-14 8:00 23-May-14 18:00 Cont. Relay testing
55 400 ICT-I,Raipur 22-May-14 10 22-May-14 18 daily AMP works WRTS-I POWERGRID R
56 220 Pirana Bhat Line No 2 22-May-14 8:00 22-May-14 18:00 Daily PMM GETCO GETCO R
57 400 400 KV Khandwa - Rajgarh Ckt-II 22-May-14 8:00 23-May-14 18:00 daily stringing work of 400 kv Chhegaon - Julwaniya
DCDS Line
PGCIL EHT- M& I C
58 220 TAPS-Borivali 22-May-14 8:00 24-May-14 18:00 daily Maintenance MSETCL NPCIL R
59 400 Boisar-Padghe 22-May-14 0:00 31-May-14 0:00 Daily Insulator replacement work WRTS-I WRTS-I R
60 400 Parli(PG)-Parli(MSETCL) # 1 22-May-14 9:00 22-May-14 18:00 Daily AMP work at Parli s/s and Line & Girwali
substaion.
WRTS-I WRTS-I R
61 220 Korba-Bhudhipadar # 3 22-May-14 8:00 22-May-14 18:00 Daily Crossing work of 400KV Korba(Balco) -
Korba(PG) line by Balco
WRTS-I BALCO C
62 400 Limbdi - Vadavi # 2 22-May-14 8:00 22-May-14 18:00 Daily For AMP Work Reliance WR-II R
63 400 Bus -2 at Khandwa 22-May-14 0.33 22-May-14 0.75 Daily Commissioning of new tie bay of Itarsi # 2 and
Busbar stability of Bus-2 at Khandwa
Powergrid WR-II C
64 400 Khandwa - Itarsi Ckt.2 22-May-14 8:00 22-May-14 18:00 Daily Commissioning of new tie bay of Itarsi # 2 and
Busbar stability of Bus-2 at Khandwa
Powergrid WR-II C
65 765 765 KV Satna-Bina #1 22-May-14 10:00 22-May-14 18:00 Daily For AMP Work Powergrid WR-II R
66 400KV Korba-Bhatapara line 22-May-14 9:00 23-May-14 19:00 Continuous Bay Maint., equipment testing and
protection testing.
NTPC NTPC R
67 400 Vindhyachal-Jabalpur-4 22-May-14 9:00 22-May-14 19:00 Daily Basis AMP and rectification of hot spots NTPC NTPC R
68 400 ICT # 1 AT Raipur S/s 22-May-14 8:00 22-May-14 18:00 Daily For APM Work WRTS-I POWERGRID R
69 400 400kV D/C Korba - Raipur 3&4 Transmission Line 22-May-14 8:00 23-May-14 19:00 Continuous Bus Splitting Work WRTS-I POWERGRID c
70 765 765KV Bay no.- 723 (ICT#1 Tie) at Bilaspur s/s 22-May-14 8:00 22-May-14 18:00 Daily CSD (Control switching)Commissioning work WRTS-I POWERGRID C
71 400 400 KV Indore - Itarsi Ckt-I 23-May-14 8:00 26-May-14 18:00 daily Crossing /stringing work of 400 kv Sarni-Ashta
Line
PGCIL EHT- M& I C
72 400 Parli(PG)-Parli(MSETCL) # 2 23-May-14 9:00 23-May-14 18:00 Daily AMP work at Parli s/s and Line & Girwali
substaion.
WRTS-I WRTS-I R
73 765 765/400KV ICT-2 at Solapur 23-May-14 7:00 24-May-14 18:00 Daily Commissioning of spare ICT unit Aux. bus. WRTS-I WRTS-I C
74 400 400/220kv ICT-2 at Boisar 23-May-14 7:00 23-May-14 19:00 Daily Inspection of R-bushing at Boisar & AMP WRTS-I WRTS-I R
75 400 Vadavi - Kansari # 2 23-May-14 8:00 23-May-14 18:00 Daily For AMP Work Reliance WR-II R
76 765 1000 MVA Satna ICT#1 23-May-14 10:00 23-May-14 16:00 Daily For AMP Work Powergrid WR-II R
77 400 400kV D/C Raipur - Bhadrawati 2&3 Transmission Line 23-May-14 8:00 24-May-14 19:00 Continuous Bus Splitting Work WRTS-I POWERGRID c
78 400 400KV S/C Bhilai-Seoni( Satpura) TL 23-May-14 8:00 24-May-14 18:00 Continuous
Overhead Powerline crossing works of 2nd
CSPTCL POWERGRID c
79 765 765KV Seoni#1 Line Reactor at Bilaspur S/s 23-May-14 8:00 24-May-14 18:00 Cont. For attending Oil Leakages WRTS-I POWERGRID C
80 400 Bhachau-Vadavi-2 24-May-14 8:00 24-May-14 18:00 Daily PMM PGCIL GETCO R
81 400 Seoni-Khandwa # 1 24-May-14 0.33 24-May-14 18.00 Daily AMP of Line reactor, line in service w/o reactor WRTS-2 WRTS-I R
82 400 Line Reactor(50MVAr) of Pune-Parli # 2 at Pune 24-May-14 8:00 24-May-14 18:00 Daily AMP Work/ Line in service w/o
reactor.approved in OCC but not given.
WRTS-I WRTS-I R
83 765 765/400KV ICT-3 at Seoni 24-May-14 8:00 25-May-14 18:00 Daily Erection of New 125MVar Reactor at Seoni. WRTS-I WRTS-I C
84 400 SSP-Dhule-2 24-May-14 8:00 24-May-14 18:00 Daily Relay testing
85 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-I 25-May-14 8:00 3-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
86 400 Parli - Lonikhand # 2 25-May-14 8:00 25-May-14 18:00 Daily Crossing work of 765KV Solapur-Pune S/C. MSETCL WRTS-I C
87 400 400KV Bus Reactor # 1 (Main & Tie Bay) at Jabalpur
(pooling)
25-May-14 10:00 25-May-14 18:00 Daily Installation & Commissioning of CSD Relay POWERGRID WR-II C
88 220 Kawas -Navsari Ckt.1&2 25-May-14 0.42 25-May-14 0.67 Daily Rectification of low electrical clearance problem
between crossing span 47-48
POWERGRID WRTS-II C
89 220 Navsari (PG) - Navsari (GETCO) Ckt.1&2 25-May-14 0.42 25-May-14 0.67 Daily Rectification of low electrical clearance problem
between crossing span 47-48
POWERGRID WRTS-II C
90 220 Sugen - Batar S/C 25-May-14 10:00 25-May-14 16:00 Daily Rectification of low electrical clearance problem
between crossing span 47-48
TORRENT WRTS-II C
91 220 Tr. Bus coupler at Khandwa 25-May-14 10:00 25-May-14 18:00 Daily For AMP Work Powergrid WR-II R
92 220 220 KV D/C Bhopal -Bina & Bhopal- Vidisha 25-May-14 8:00 26-May-14 18:00 Continous Crossing of Bhopal -Jabalpur765 kv S/C Line MPPTCL BDTCL C
93 765 765/400 ICT-2 at Kotra 25-May-14 8:00 25-May-04 18:00 Daily For tertairy connection for SS loading WRTS-I POWERGRID C
94 765 765KV Seoni#2 Line Reactor at Bilaspur S/s 25-May-14 8:00 26-May-14 18:00 Cont. For attending Oil Leakages WRTS-I POWERGRID C
95 220 Bhilad - TAPS 26-May-14 8:00 26-May-14 18:00 Daily PMM GETCO /
MSETCL
GETCO R
96 400 Korba(W)-KSTPS line 26-May-14 8:00 31-May-14 18:00 Replacement of existing control and protection CSPTCL CSPTCL R
97 220 TAPS-Boisar 26-May-14 8:00 28-May-14 18:00 daily Maintenance MSETCL NPCIL R
98 765 Seoni-Wardha-II Switchable L/R at Seoni 26-May-14 0.33 31-May-14 18.00 Daily Construction of firewall & Commissioning of
CSD in reactor breaker & with permission to trip
WRTS-1 WRTS-1 C
99 400 Aurangabad(PG)-Aurangabad (MSETCL) # 2 26-May-14 0.33 28-May-14 0.75 Conti. Replacement of HCB Line Isolator, 3 nos of
CTs and IPS tube.
WRTS-I WRTS-I C
100 400 Kolhapur-Mapusa # 2 26-May-14 0:00 31-May-14 0:00 Daily Insulator replacement work WRTS-I WRTS-I R
101 765 Raichur ckt-1 line Reactor at Solapur 26-May-14 7:00 27-May-14 18:00 Daily Spare unit commissioning WRTS-I WRTS-I C
102 400 Bus 2 at Satna 26-May-14 10:00 26-May-14 16:00 Daily For Jumpering of Bus isolator of Nigrie line
after installation higher rating equipment
Powergrid WR-II C
103 765 1000 MVA Satna ICT#2 26-May-14 0.42 26-May-14 0.67 Daily For AMP Work Powergrid WR-II R
104 400 400KV Bus Reactor # 2 (Main & Tie Bay) at Jabalpur
(pooling)
26-May-14 0.42 26-May-14 0.75 Daily Installation & Commissioning of CSD Relay POWERGRID WR-II C
105 400 ICT # 2 at Raipur S/s 26-May-14 8:00 26-May-14 18:00 Daily For APM Work WRTS-I POWERGRID R
106 400 BUS-I,Bhatapara 26-May-14 9 27-May-14 18 continuous Extension of BUS-I for 125MVAR Reactor
Commissioning at Bhatapara ss
WRTS-I POWERGRID C
107 400 ICT-II,Raipur 26-May-14 10 26-May-14 18 daily AMP works WRTS-I POWERGRID R
108 400 SSP-Dhule-2 26-May-14 8:00 26-May-14 18:00 Daily Relay testing
109 400 Soja - Kansari 27-May-14 8:00 28-May-14 18:00 Daily PMM GETCO GETCO R
110 220 Vapi - TAPS 27-May-14 8:00 27-May-14 18:00 Daily PMM GETCO /
MSETCL
GETCO R
111 400 Wardha-Parli # 1 27-May-14 9:00 27-May-14 20:00 Daily Line & Bay AMP Work WRTS-I WRTS-I R
112 765 765KV Bus # 1 at Jabalpur (pooling) 27-May-14 10:00 27-May-14 18:00 Daily 765KV Bus # 1 Extension for Switchyard
Extension for Bina # 3 & Bhopal Lines Dia
POWERGRID WR-II C
113 765 Sipat 765KV Bay-16 (Bus sectionaliser-1) 27-May-14 9:00 27-May-14 19:00 Daily Annual Preventive maintenance NTPC NTPC R
114 765 765KV Bay no.-707, 708, 709 (Seoni-2 & Sipat-1 Dia)
at Bilaspur S/s
27-May-14 8:00 29-May-14 18:00 Daily AMP work WRTS-I POWERGRID R
115 220 220kV D/C Kotra (PGCIL) - Raigarh (CSPTCL)
Transmission Line
27-May-14 8:00 28-May-14 18:00 Continuous Overhead Powerline crossing works of 765kV
S/C Raigarh - Champa TL (M/s LANCO)
Loc. No. of under construction line: AP-4/0 &
AP-5/0
CSPTCL POWERGRID c
116 400 SSP-Asoj 27-May-14 8:00 29-May-14 18:00 Cont. Relay testing
117 400 Dehgam-Vadavi-2 28-May-14 8:00 29-May-14 18:00 Daily PMM GETCO GETCO R
118 400 Wardha-Parli # 2 28-May-14 9:00 28-May-14 20:00 Daily Line & Bay AMP Work WRTS-I WRTS-I R
119 765 765KV Bus # 2 at Jabalpur (pooling) 28-May-14 10:00 28-May-14 18:00 Daily 765KV Bus # 2 Extension for Switchyard
Extension for Bina # 3 & Bhopal Lines Dia
POWERGRID WR-II C
120 765 765 KV BUS#1, Jabalpur 28-May-14 0.33 28-May-14 0.75 Daily For Main Bus Extension Powergrid WR-II C
121 220/6.9k
V
Station Transformer-2 28-May-14 08:00Hrs. 29-May-14 17:00Hrs. Daily Anuual Preventive Maint. NSPCL NSPCL R
122 132 Sipat 132KV Bus coupler 28-May-14 9:00 28-May-14 19:00 Daily Annual Preventive maintenance NTPC NTPC R
123 400 BUS-II,Bhatapara 28-May-14 9 29-May-14 18 continuous Extension of BUS-II for 125MVAR Reactor WRTS-I POWERGRID C
124 400 Aurangabad(PG)-Aurangabad (MSETCL) # 1 29-May-14 8:00 31-May-14 18:00 Conti. Replacement of HCB Line Isolator, 3 nos of
CTs and IPS tube.
WRTS-I WRTS-I C
125 765 Bus-2 at Wardha 29-May-14 8:00 29-May-14 0:00 Daily To connect existing bus with extention bay for
765 KV New 330 MVAR Bus reactor.
WRTS-I WRTS-I R
126 220 Bus 1 at Pirana 29-May-14 8:00 30-May-14 18:00 Daily For erection of new equipment (Barejadi
GETCO line 1&2) under Bus 1
POWERGRID WRTS-II C
127 400 400 KV D/C Bhopal- Bina CKT I & II 29-May-14 8:00 30-May-14 18:00 Continous Crossing of Bhopal -Jabalpur765 kv S/C Line MPPTCL BDTCL C
128 765 765 kV Satna - Bina Ckt II 29-May-14 8:00 30-May-14 18:00 Continous Crossing of Jabalpur-Bina 765 kv S/C Line PGCIL JTCL C
129 400 Sipat 400KV Bay-16 ( Raipur-2 Main) 29-May-14 9:00 29-May-14 19:00 Daily Annual Preventive maintenance NTPC NTPC R
130 400 Wardha-Akola # 1 30-May-14 9:00 30-May-14 0:00 Daily For replacement of rigid connectors with flexible
connectors at MSETCL Akola
WRTS-I WRTS-I R
131 400 Bus-2 at Solapur 30-May-14 7:00 31-May-14 18:00 Daily Jumpering work of Pune line at Solapur WRTS-I WRTS-I C
132 765 Sasan - Satna Ckt.1 30-May-14 0.42 31-May-14 0.75 Daily For AMP Work POWERGRID WRTS-II C
133 765 765 KV Satna-Bina #2 30-May-14 10:00 30-May-14 18:00 Daily For AMP Work POWERGRID WRTS-II R
134 400 Bus A- SSP 30-May-14 8:00 30-May-14 18:00 Daily Bus bar differential
135 400 Wardha-Akola # 2 31-May-14 9:00 31-May-14 18:00 Daily For replacement of rigid connectors with flexible
connectors at MSETCL Akola
WRTS-I WRTS-I R
136 400 Bus B- SSP 31-May-14 8:00 31-May-14 18:00 Daily Bus bar differential
SN KV Line Basis Reason System Agency Type
Date Time Date Time
1765 Seoni-Bina line switchable Reactor at Seoni 1-Jun-14 8:00 2-Jun-14 0:00 Daily Commissioning of CSD in reactor breaker &
with permission to trip and close. Line in service
w/o reactor
WRTS-2 WRTS-1C
2400 Akola-Wardha # 1& 2 1-Jun-14 0:00 30-Jun-14 0:00 Daily For Online PID, Line in service with A/R in non-
auto mode.
WRTS-I WRTS-IFor IO
3400 Bhadrawati-Parli # 1& 2 1-Jun-14 9:00 30-Jun-14 18:00 Daily For OPGW installation, Line in service with A/R
in non-auto mode.
WRTS-I WRTS-IFor IO
4 400 Vapi-Boisar 1-Jun-14 8.00 10-Jun-14 18.00 Daily Insulator replacement work WRTS-I WRTS-I R
5 220 Bus -2 at Pirana 1-Jun-14 9:00 2-Jun-14 18:00 DailyFor erection of new equipment (Barejadi
GETCO line 1&2) under Bus 2Powergrid WR-II C
6 400 Nagda - Indore 1-Jun-14 0.33 30-Jun-14 0.75 DailyOnline replacement of E/W with OPGW. A/R
shall be kept in non auto modeMPPTCL WR-II R
7 400 Mundra - Bhachau # 1 1-Jun-14 8:00 30-Jun-14 18:00 DailyOnline replacement of E/W with OPGW. A/R
shall be kept in non auto modePOWERGRID WR-II R
8 400 Khandwa - Rajgarh # 1 1-Jun-14 0.33 30-Jun-14 0.75 DailyOnline replacement of E/W with OPGW. A/R
shall be kept in non auto modePOWERGRID WR-II R
9400 Birsinghpur-Damoh # 1 1-Jun-14 8:00 30-Jun-14 18:00 Daily Online replacement of E/W with OPGW. A/R
shall be kept in non auto mode
POWERGRID WR-IIR
10 400 Shujalpur - Nagda # 1 1-Jun-14 0.33 30-Jun-14 0.75 DailyOnline replacement of E/W with OPGW. A/R
shall be kept in non auto modePOWERGRID WR-II R
11 400 Gandhar - Navsari # 1 1-Jun-14 0.33 30-Jun-14 0.75 DailyOnline replacement of E/W with OPGW. A/R
shall be kept in non auto modePOWERGRID WR-II R
12 400 Hadala-Amreli 02-Jun-14 8:00 03-Jun-14 18:00 Daily PMM work GETCO GETCO R
13 400 Vadavi-Bhachau 1 2-Jun-14 8:00 2-Jun-14 18:00 Daily PMM work PGCIL GETCO R
14 400 50MVAR Bus Reactor No-II at 400KV S/s Nagda 2-Jun-14 8:00 4-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
15 220 Malanpur-Auriya Ckt 2-Jun-14 8:00 6-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
16 400 Transfer bus at Korba (W) 2-Jun-14 8:00 2-Jun-14 18:00 cleaning and tighetening of clamps of bus CSPTCL CSPTCL R
17 765 Pune line reactor at Solapur 2-Jun-14 0.29 4-Jun-14 0.75 Daily Spare unit commissioning. WRTS-I WRTS-I C
18 400 Mundra - Bhachau 1 2-Jun-14 0.42 2-Jun-14 0.67 DailyFor attending hot spots identified during
scanningPOWERGRID WR-II R
19 400 NSPCL #2 ( Main Bay) at Raipur S/S 2-Jun-14 9:00 2-Jun-14 17:00 Continuous For APM Work WRTS-I POWERGRID R
20 765 765/400KV ICT#3 at Bilaspur S/s 2-Jun-14 8:00 3-Jun-14 18:00 Cont. For attending Oil Leakages WRTS-I POWERGRID C
21 400 APL-Hadala 3-Jun-14 0.33 3-Jun-14 18:00 Daily PMM work GETCO GETCO R
22 400 400 KV Rajgarh(PGCIL)-Ssp Ckt-II 3-Jun-14 8:00 4-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
23 400 Bus coupler at Korba(W) 3-Jun-14 8:00 3-Jun-14 18:00 cleaning and tighetening of clamps of bus CSPTCL CSPTCL R
24 400 400/220KV ICT-2 at Seoni 3-Jun-14 9:00 3-Jun-14 0:00 Daily OLTC inspection & repair WRTS-I WRTS-I R
25 400 Mundra - Bhachau 2 3-Jun-14 0.42 3-Jun-14 0.67 DailyFor attending hot spots identified during
scanningPOWERGRID WR-II R
26400 Vindhyachal-Satna-1
3-Jun-14 9:00 4-Jun-14 19:00Continuous Retrofitting of Numerical Distance
Protection relays(Main-I and II)
NTPC NTPCR
27 400 Kasor - GPEC 4-Jun-14 8:00 4-Jun-14 18:00 Daily PMM work GETCO GETCO R
28 400 Amreli-Jetpur - 2 4-Jun-14 8:00 4-Jun-14 18:00 Daily PMM work GETCO GETCO R
29 220 Morbi - Bhimasar Line 4-Jun-14 8:00 4-Jun-14 18:00 Daily PMM work GETCO GETCO R
30 400 400 KV Isp - Sarni Ckt 4-Jun-14 8:00 6-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
31 220 Malanpur-Auriya Ckt 4-Jun-14 8:00 3-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
32 220 220 KV D/C Sukha - Narsingpur 4-Jun-14 0.33 5-Jun-14 0.75 Continous Crossing of Bhopal -Jabalpur765 kv S/C Line MPPTCL BDTCL C
33 400 NSPCL #2 ( Tie Bay) at Raipur S/S 4-Jun-14 9:00 4-Jun-14 17:00 Continuous For APM Work WRTS-I POWERGRID R
34 400 SSNL-Dhule-1 5-Jun-14 8:00 5-Jun-14 18:00 Daily PMM work GETCO / MSTCL GETCO R
35 220 Haldarva - Jhanor - 1 (NTPC) 5-Jun-14 8:00 5-Jun-14 18:00 Daily PMM work PGCIL GETCO R
36 220 Anuppur - Kotamikala Ckt - I 5-Jun-14 8:00 10-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
37 400 ICT at Korba (W)5-Jun-14
8:005-Jun-14
18:00cleaning and tighetening of clamps of bus,
isolator etc.CSPTCL CSPTCL R
38 765 Bus-1 at Solapur 5-Jun-14 7:00 7-Jun-14 18:00 Daily SCADA works at Solapur WRTS-I WRTS-I R
ANNEXURE-3.2B
Outages Proposal of Transmission elements during the month of JUNE -2014 From To
39 400KV Chandrapur II-Parli I 5-Jun-14 9.00 5-Jun-14 17.00 DailyProviding of Arching horn,corona rings, Bird
guards, quarter pins,Nut bolts.MSETCL MSETCL R
40 400KV Parali-Lonikand II ckt 1 5-Jun-14 0:00 5-Jun-14 0:00 Daily Q.M.work. MSETCL MSETCL R
41 400 Vindhyachal-Satna-2 5-Jun-14 9:00 6-Jun-14 19:00 Continuous Retrofitting of Numerical Distance NTPC NTPC R
42 400 Mundra Limbi-1 5-Jun-14 08:00am 5-Jun-14 6PM Daily
Insulator replcement and routine maintenance
alongwith bus 2 ( CGPL 400KV yard) shutdown
as insulator is near to bus-2 side
PGCIL CGPL r
43 400 Bus -2 shutdown 5-Jun-14 08:00am 5-Jun-14 6PM DailyBus -2 shutdown for insulator replacement as
well as bus isolator checking purposeCGPL CGPL R
44 400 400kV SSNL-Dhule-2 6-Jun-14 8:00 6-Jun-14 18:00 Daily PMM work GETCO GETCO R
45 400 Haldarva - Jhanor - 2 (NTPC) 6-Jun-14 0.33 6-Jun-14 18:00 Daily PMM work PGCIL GETCO R
46 400 400 KV Seoni -Sarni Ckt 6-Jun-14 8:00 10-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
47 765 765KV/400KV ICT # 1 at Jabalpur (pooling) 6-Jun-14 0.42 7-Jun-14 0.75 DailyInstallation & Commissioning of CSD Relay in
Main & Tie BayPOWERGRID WR-II C
48 400 315 MVA ICT#2, Satna 6-Jun-14 10:00 6-Jun-14 16:00 Daily For AMP Work Powergrid WR-II R
49765 1500 MVA ICT-1 at Indore 6-Jun-14 10:00 7-Jun-14 18:00 Continuous
Commissioning of CSD Relay in 400kV Side of
765kV ICT POWERGRID WR-IIC
50 400KV Bhusawal-Akola 6-Jun-14 9.00 6-Jun-14 17.00 DailyDisc string replacement,fixing of
spacers,dampers,earthbondMSETCL MSETCL R
51 400KV Padgha-Talegaon 6-Jun-14 0:00 6-Jun-14 0:00 Daily Q.M.work. MSETCL MSETCL R
52 765 765/400KV ICT-2 at Seoni 7-Jun-14 9:00 7-Jun-14 13:00 Daily AMP Work WRTS-I WRTS-I R
53 400KV Dhule-Babhleswar ckt 2 7-Jun-14 9.00 7-Jun-14 17.00 Daily Q.M.work MSETCL MSETCL R
54 400 400KV Bay no.-401, 402 7-Jun-14 8:00 9-Jun-14 18:00 Daily AMP work WRTS-I POWERGRID R
55 400 Mundra Jetpur-2 7-Jun-14 08:00am 7-Jun-14 6PM Daily
Insulator replcement and routine maintenance
alongwith bus 2 ( CGPL 400KV yard) shutdown
as insulator is near to bus-2 side
PGCIL CGPL R
56 400 Bus -2 shutdown 7-Jun-14 08:00am 7-Jun-14 6PM DailyBus -2 shutdown for insulator replacement as
well as bus isolator checking purposeCGPL CGPL R
57 400 Korba(W)-Raipur II between Korba-Bhatapara 8-Jun-14 8:00 9-Jun-14 18:00 construction of 400 kV Marwa-TPP-Raita line CSPTCL CSPTCL C
58 400 400 kV D/C Jabalpur - Itarsi 1&2 8-Jun-14 8:00 9-Jun-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line PGCIL BDTCL/JTCL C
59 220 GWL(PGCIL)-Malanpur Ckt-II 9-Jun-14 8:00 10-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
60400 400KV KSK (Mahanadi) - DBPL
[lilo of KSK - Raigarh ]9-Jun-14 8:00 12-Jun-14 18:00 Contineous for making second LILO for KMPCL WR-I KMPCL C
61 400 400KV Raipur - Raigarh # 4 9-Jun-14 8:00 16-Jun-14 18:00 Contineous for making second LILO for KMPCL WR-I KMPCL C
62 765 HVDC pole -2 at Bhadrawati 9-Jun-14 0:00 10-Jun-14 18:00 Daily
Half yearly maintenance. OLTC oil & diverter
switch replacement. WRTS-I WRTS-I R
63 765 Bus-2 at Solapur 9-Jun-14 0.29 11-Jun-14 0.75 Daily SCADA works at Solapur WRTS-I WRTS-I R
64 765 765KV Bus Reactor # 1 at Jabalpur (pooling) 9-Jun-14 0.42 10-Jun-14 0.75 DailyInstallation & Commissioning of CSD Relay in
Main & Tie BayPOWERGRID WR-II C
65 400KV Karad-Kolhapur Ckt I 9-Jun-14 9 9-Jun-14 17 Daily Q.M.work. MSETCL MSETCL R
66 400KV New Koyna-Dabhol ckt 1 9-Jun-14 8.3 9-Jun-14 17.3 Daily Q.M.work MSETCL MSETCL R
67 765 Sipat 765KV Bus-2 9-Jun-14 9:00 9-Jun-14 19:00 Daily Annual Preventove maintenance NTPC NTPC R
68 400 Bus -1 shutdown 9-Jun-14 08:00am 9-Jun-14 6PM Daily
Bus -1 shutdown for insulator replacement of
unit 10 Gandry as well as bus isolator checking
purpose
CGPL CGPL R
69 400 Amreli-Chorania 10-Jun-14 8:00 10-Jun-14 18:00 Daily PMM work GETCO GETCO R
70 400 Navsari - Dastan- 1 10-Jun-14 8:00 10-Jun-14 18:00 Daily PMM work PGCIL GETCO R
71 400 400 KV Indore - Nagda Ckt 10-Jun-14 8:00 11-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
72 220 Anuppur - Kotamikala Ckt - II 10-Jun-14 8:00 12-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
73 220 Damoh(PGCIL) - Tikamgarh Ckt 10-Jun-14 8:00 10-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
74 220 GWL(PGCIL)-Malanpur Ckt-I 10-Jun-14 8:00 12-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
75 765 Sipat 765KV Bus-4 10-Jun-14 9:00 10-Jun-14 19:00 Daily Annual Preventove maintenance NTPC NTPC R
76 400
400KV Bay no.-404, 405
(ICT-2 Dia) at Bilaspur s/s10-Jun-14 8:00 11-Jun-14 18:00 Daily AMP work WRTS-I POWERGRID R
77 400 Navsari - Dastan- 2 11-Jun-14 8:00 11-Jun-14 18:00 Daily PMM work PGCIL GETCO R
78 400 400 KV Isp - Nagda Ckt 11-Jun-14 8:00 12-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
79 400 DCDS Sipat-Raipur (I & II) 11-Jun-14 8:00 12-Jun-14 18:00 construction of 400 kV Marwa-TPP-Raita line CSPTCL CSPTCL C
80 765 765KV/400KV ICT # 2 at Jabalpur (pooling) 11-Jun-14 0.42 12-Jun-14 0.75 DailyInstallation & Commissioning of CSD Relay in
Main & Tie BayPOWERGRID WR-II C
81 400 400 KV Birsingpur - Katni Ckt- I 12-Jun-14 8:00 13-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
82 220 Badod - Kota Ckt 12-Jun-14 8:00 25-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
83 220 GWL(PGCIL)-Malanpur Ckt-II 12-Jun-14 8:00 13-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
84 400 63MVAr Bus Reactor-2, Satna 12-Jun-14 10:00 12-Jun-14 18:00 Daily For Commissioning of CSD Relay Powergrid WR-II C
85765 1500 MVA ICT-2 at Indore 12-Jun-14 10:00 13-Jun-14 18:00 Continuous Commissioning of CSD Relay in 400kV Side of
765kV ICT
POWERGRID WR-IIC
86 400KV Chandrapur II-Parli I 12-Jun-14 9 12-Jun-14 17 DailyProviding of Arching horn,corona rings, Bird
guards, quarter pins,Nut bolts.MSETCL MSETCL R
87 400KV Lonikand II-Lonikand Il 12-Jun-14 9 12-Jun-14 17 Daily Q.M.work. MSETCL MSETCL R
88 400KV Parali-Lonikand II ckt 2 12-Jun-14 9 12-Jun-14 17 Daily Q.M.work. MSETCL MSETCL R
89 400 400 kV D/C Jabalpur - Itarsi 3&4 12-Jun-14 8:00 13-Jun-14 18:00 Continous Crossing of Bhopal -Jabalpur 765 kv S/C Line PGCIL BDTCL/JTCL C
90 400 Sipat 400KV Bay 14 (tie IBT-1 ICT-1) 12-Jun-14 9:00 14-Jun-14 19:00 Continous 400KV CT 3nos replacement NTPC NTPC R
91 400
400KV Bay no.-407
(ICT-3 Dia) at Bilaspur S/s12-Jun-14 8:00 12-Jun-14 18:00 Daily AMP work WRTS-I POWERGRID R
92 220 Lalpar - Bhimasar Line 13-Jun-14 0.33 13-Jun-14 18:00 Daily PMM work GETCO GETCO R
93 400 400 KV Nagda-Rajgarh(PGCIL) Ckt-I 13-Jun-14 8:00 24-Jun-14 18:00 daily For maintenance work MPPTCL EHT- M& I R
94 220 Pithampur-Rajgarh(PGCIL) Ckt - I 13-Jun-14 8:00 16-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
95400 400KV Raipur -KSK (Mahanadi)
[lilo of Raipur - Raigarh # 3]13-Jun-14 8:00 16-Jun-14 18:00 Contineous for making second LILO for KMPCL WR-I KMPCL C
96 765 765KV Bus Reactor # 2 at Jabalpur (pooling) 13-Jun-14 0.42 13-Jun-14 0.75 DailyInstallation & Commissioning of CSD Relay in
Main & Tie BayPOWERGRID WR-II C
97 220 Transfer Bus at Bhachau 13-Jun-14 10:00 13-Jun-14 18:00 Daily For AMP Work Powergrid WR-II R
98 400KV Aurangabad-Akola II 13-Jun-14 9 13-Jun-14 17 Daily Q.M.work. MSETCL MSETCL R
99 400
400KV Bay no.-413, 414
(ACBIL-1 Dia) at Bilaspur s/s13-Jun-14 8:00 14-Jun-14 18:00 Daily AMP work WRTS-I POWERGRID R
100 400 Korb(W)-Raita & Raita-Khedamara line 14-Jun-14 8:00 15-Jun-14 18:00 construction of 400 kV Marwa-TPP-Raita line CSPTCL CSPTCL C
101 765765KV JBP - Dharmjaygarh Line Reactor # 1 at
Jabalpur (pooling)14-Jun-14 10:00 14-Jun-14 18:00 Daily Installation & Commissioning of CSD Relay POWERGRID WR-II C
102 400KV Akola-Nandgaonpeth 14-Jun-14 9 14-Jun-14 17 DailyDisc string replacement,fixing of
spacers,dampers,earthbondMSETCL MSETCL R
103 400KV Dhule-Khandwa Ckt.I 14-Jun-14 9 14-Jun-14 17 Daily Q.M.work MSETCL MSETCL R
104 765 765kV S/C Korba – Champa -Raipur 15-Jun-14 8:00 19-Jun-14 18:00 ContinuousFor Shifting of Champa-Korba line near Champa
Gantry required for contingency arrangement.WRTS-I POWERGRID C
105 220 Pithampur-Rajgarh(PGCIL) Ckt - II 16-Jun-14 8:00 17-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
106765
765KV JBP - Bina Line # 1 (Main & Tie Bay) at
Jabalpur (pooling) 16-Jun-14 10:00 16-Jun-14 18:00 Daily Installation & Commissioning of CSD Relay POWERGRID WR-IIC
107400 Gandhar - Navsari Ckt.1 16-Jun-14 9:00 16-Jun-14 18:00 Daily For replacement of porcelain insulator strings by
polymer insulators
POWERGRID WR-IIR
108 765 765 kV S/C Seoni - Bina Line 16-Jun-14 8:00 17-Jun-14 18:00 Continuous Crossing of Bhopal -Jabalpur 765 kv S/C Line PGCIL BDTCL C
109 400400KV Bay no.-417
(ACBIL-2 Dia) at Bilaspur S/s16-Jun-14 8:00 16-Jun-14 18:00 Daily AMP work WRTS-I POWERGRID R
110 220 Satna(PGCIL)-Katni Ckt- 17-Jun-14 8:00 17-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
111 220 Seoni(PGCIL) - Seoni Ckt- I 17-Jun-14 8:00 17-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
112 220 Seoni(PGCIL) - Seoni Ckt- II 17-Jun-14 8:00 18-Jun-14 18:00 daily For maintenance work MPPTCL EHT -M&I R
113 400 Gandhar - Navsari Ckt.2 17-Jun-14 9:00 17-Jun-14 18:00 DailyFor replacement of porcelain insulator strings by
polymer insulatorsPOWERGRID WR-II R
114765 765KV JBP - Bina Line # 2 (Main & Tie Bay) at
Jabalpur (pooling)
17-Jun-14 10:00 17-Jun-14 18:00 Daily Installation & Commissioning of CSD Relay POWERGRID WR-IIC
Annex-3.2 C1
List of Emergency Outages availed in April 2014
SL.
NO
ELEMENT KV AGENCY FROM
DATE TO DATE
REMARKS
1 CHANDRAPUR-
PARLI II
400 MSETCL 12-APR-14 12-APR-14 TO ATTEND HOT SPOT
2 UNOSUGEN-
PIRANA-S/C
400 GETCO 12-APR-14 13-APR-14 TP ATTEND HOT SPOT
3 KALWA-PADGE-I 400 MSETCL 13-APR-14 13-APR-14 TO ATTEND HOT SPOT
4 PIRANA-
PIRANA(PG)-I
400 GETCO 13-APR-14 13-APR-14 TP ATTEND HOT SPOT
5 DABHOL-
N'THANE-II
400 MSETCL 14-APR-14 14-APR-14 HOTSPOT AT N'THANE END
6 KASOR -
CHORANIA S/C
400 GETCO 15-APR-14 15-APR-14 HOTSPOT
7 400/220KV ICT-I
@ SATPURA
400/2
20
MPPTCL 17-APR-14 17-APR-14 HOTSPOT ON CT
8 VANDANA-B'PUR
S/C
400 WRTS-2 17-APR-14 17-APR-14 TO ATTEND HOT SPOTS
9 AMRELI-
CHOURNIA-S/C
400 GETCO 19-APR-14 19-APR-14 HOTSPOT ATTEND AT
CHORANIA END
10 VAPI-VAPI(PG) S/C 220 WRTS-2 20-APR-14 20-APR-14 TO ATTEND HOTSPOT
11 DEHGAM BUS-1 400 WRTS-2 21-APR-14 21-APR-14 MAGNETIC WIRE
REPLACEMENT
12 400/220KV ICT-I
@ KOLHAPUR
400/2
20
MSETCL 22-APR-14 22-APR-14 TO ATTEND HOTSPOT
13 RAIPUR-TAMNAR-
1
400 JPL 22-APR-14 22-APR-14 URGENT RELAY REPLACEMENT
14 CGPL-LIMDI-1 400 CGPL 23-APR-14 23-APR-14 SF6 PRESSURE LOW
15 BILASAPUR-
DM'JAIGARH-S/C
765 WRTS-1 24-APR-14 24-APR-14 B PH CT FIRE IN TIE BAY OF
JBL-I & B/R-I
16 400/220KV ICT-I
@ KASOR
400/2
20
GETCO 25-APR-14 25-APR-14 TO ATTEND AIR LEAKAGE
17 400/220KV ICT-I
@ BHOPAL
400/2
20
MPPTCL 25-APR-14 26-APR-14 CB FIRE
18 CGPL-LIMDI-II 400 WRTS-2 25-APR-14 25-APR-14 TO ATEND LINE CVT GAS
LEAHAGE PROBLEM @ CGPL
19 PARLI-DHARIWAL-
2
400 MSETCL 25-APR-14 25-APR-14 RECTIFICATION OF DAMAGED
INSULATOR
20 KAKRAPAR-
HALDARWA-II
220 GETCO 29-APR-14 29-APR-14 HOT SPOT
21 BINA-INDORE 765 WRTS-2 30-APR-14 30-APR-14 EMERGENCY INSULATOR
REPLACEMENT
22 KARAD-
LONIKHAND
400 MSETCL 30-APR-14 30-APR-14 TO ATTEND BROKEN JUMPER
Anaulagnak Anaulagnak Anaulagnak Anaulagnak 3.3(A)
ma[- 2014ma[- 2014ma[- 2014ma[- 2014 AaOr AaOr AaOr AaOr jaUna 2014jaUna 2014jaUna 2014jaUna 2014 maah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyaktamaah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyaktamaah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyaktamaah ko ilayao Apoixat maMaga evMa }jaa- kI AavaSyakta
ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR MAY 2014 AND JUNE 2014
maaMga maaMga maaMga maaMga }jaa- kI AavaSyakta }jaa- kI AavaSyakta }jaa- kI AavaSyakta }jaa- kI AavaSyaktarajyarajyarajyarajya State DEMAND ENERGY REQUIREMENT
maogaavaaTmaogaavaaTmaogaavaaTmaogaavaaT (MW) imailayana yauinaTsaimailayana yauinaTsaimailayana yauinaTsaimailayana yauinaTsa (MUs)
ma[- 2014ma[- 2014ma[- 2014ma[- 2014 jaUna 2014jaUna 2014jaUna 2014jaUna 2014 ma[- 2014ma[- 2014ma[- 2014ma[- 2014 jaUna 2014jaUna 2014jaUna 2014jaUna 2014MAY 2014 JUNE 2014 MAY 2014 JUNE 2014
1 gaujarat1 gaujarat1 gaujarat1 gaujarat
saIimat 13250 13000 8990 8540
AsaIimat 13290 13040 9000 8550
2 maQya p`doSa2 maQya p`doSa2 maQya p`doSa2 maQya p`doSa
saIimat 8340 9050 5338 5540
AsaIimat 8340 9050 5338 5540
3 C<aIsagaZ,3 C<aIsagaZ,3 C<aIsagaZ,3 C<aIsagaZ,
saIimat 3200 3075 1929 1809
AsaIimat 3225 3105 1944 1827
4 maharaYT/4 maharaYT/4 maharaYT/4 maharaYT/
saIimat 19050 18850 10800 11100
AsaIimat 19800 19600 10850 11150
5 gaaovaa5 gaaovaa5 gaaovaa5 gaaovaa
saIimat 425 410 300 295
AsaIimat 425 415 310 300
6 dmana dIva6 dmana dIva6 dmana dIva6 dmana dIva
saIimat 340 345 210 205
AsaIimat 345 350 225 210
7 DI ena eca7 DI ena eca7 DI ena eca7 DI ena eca
saIimat 635 640 445 425
AsaIimat 635 640 445 425
8 piScama xao~8 piScama xao~8 piScama xao~8 piScama xao~
saIimat 40756 41762 28500 27900
AsaIimat 40867 43221 29560 28840
RESTRICTED
UNRESTRICTED
DD
RESTRICTED
UNRESTRICTED
DNH
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
WESTERN REGION
GOA
MAHARASHTRA
CHHATISGARH
RESTRICTED
UNRESTRICTED
MADHYA PRADESH
GUJARAT
RESTRICTED
UNRESTRICTED
RESTRICTED
UNRESTRICTED
maah ApOla 2014 maah ApOla 2014 maah ApOla 2014 maah ApOla 2014
k`maaMk sToSana ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (Gwh) (Mw) (Gwh)
kkkk (A) gaujarat gaujarat gaujarat gaujarat GUJARAT
jalaIya jalaIya jalaIya jalaIya HYDRO
1. ]k[- Ukai - 1 47.36 76
]k[- Ukai - 2 0.26 75
]k[- Ukai - 3 0.00 0
]k[- Ukai - 4 48.66 76
]k[- ]k[- ]k[- ]k[- Ukai (Total) 96.29 0 0.000
2. ]k[- ela baI saI eca Ukai LBCH - 1 0.00 0
]k[- ela baI saI eca Ukai LBCH - 2 1.58 3
]k[- ela baI saI eca ]k[- ela baI saI eca ]k[- ela baI saI eca ]k[- ela baI saI eca Ukai LBCH (Total) 1.58 0 0.008
3. kDanaa Kadana - 1 0.00 0 0.005
kDanaa Kadana - 2 2.51 62 0.000
kDanaa Kadana - 3 1.86 60
kDanaa Kadana - 4 2.48 63 0.000
kDanaa kDanaa kDanaa kDanaa Kadana (Total) 6.86 0 0.005
4. pnama PANAM & Madhuban Dam 1 & 2 3.97 8 0.020
6. kula jalaIya kula jalaIya kula jalaIya kula jalaIya TOTAL(H) 108.69 225 0.401
tapIya tapIya tapIya tapIya THERMAL
1 TaoronT pavar ilaimaToD yauinaT saI 28.91 60 2.182
2 TaoronT pavar ilaimaToD yauinaT DI 78.35 124 6.980
3 TaoronT pavar ilaimaToD yauinaT [- 82.53 123 0.758
4 TaoronT pavar ilaimaToD yauinaT ef 81.74 123 6.691
5 TaoronT pavar ilaimaToD yauinaT jaI TI 1 0.00 0
6 TaoronT pavar ilaimaToD yauinaT jaI TI 2 0.00 0
7 TaoronT pavar ilaimaToD yauinaT esa TI jaI 0.00 0
8 Qauvarna tapIya Dhuvaran - 5 0.00 0 0.000
9 Qauvarna tapIya Dhuvaran - 6 0.00 0 0.000
10 Qauvarna tapIya Dhuvaran - GT 1 0.00 0 0.188
11 Qauvarna tapIya Dhuvaran - GT 2 0.00 0 0.419
12 Qauvarna tapIya Dhuvaran - STG 0.53 97
13 ]ka[- yauinaT 1 Ukai -1 0.00 0 0.051
14 ]ka[- yauinaT 2 Ukai -2 0.00 0 0.108
15 ]ka[- yauinaT 3 Ukai -3 117.95 202 2.972
16 ]ka[- yauinaT 4 Ukai -4 117.14 202 10.026
17 ]ka[- yauinaT 5 Ukai -5 116.61 210 8.841
18 ]ka[- yauinaT 6 Ukai -6 268.56 406 18.448
19 gaaMQaInagar 1 Gandhinagar - 1 0.00 0 0.086
20 gaaMQaInagar 2 Gandhinagar - 2 0.00 0 0.071
21 gaaMQaInagar 3 Gandhinagar - 3 31.58 211 0.296
22 gaaMQaInagar 4 Gandhinagar - 4 55.94 213 0.362
23 gaaMQaInagar 5 Gandhinagar - 5 128.80 214 11.489
24 vaNakbaaorI 1 Wanakbori - 1 115.36 210 0.000
25 vaaNakbaaOrI 2 Wanakbori - 2 65.47 207
26 vaaNakbaaOrI 3 Wanakbori - 3 123.85 208
27 vaaNakbaaOrI 4 Wanakbori - 4 86.41 210
28 vaaNakbaaOrI 5 Wanakbori - 5 114.65 210
Anaulagnak Anaulagnak Anaulagnak Anaulagnak 4.1
ACTUAL GENERATION & AVALABILITY FOR APRIL 2014
Actual vaastivak
29 vaaNakbaaOrI 6 Wanakbori - 6 105.47 210
30 vaaNakbaaOrI 7 Wanakbori - 7 121.03 210
31 ]%trna Utran GT 1 0.00 0 0.198
32 ]%trna Utran GT 2 0.00 0 0.000
33 ]%trna UTRAN - GT- 3 0.00 0 0.000
34 ]%trna UTRAN - GT-4 0.00 0 0.246
35 ]%trna UTRAN - STG-I 0.00 0 0.000
36 ]%trna UTRAN - STG-II 0.00 0 0.000
k`maaMk sToSana ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (Gwh) (Mw) (Gwh)
37 isa@ka Sikka - 1 47.84 111 4.398
38 isa@ka Sikka - 2 64.67 118 0.176
39 kcC ilagnaa[-T Kutch Lignite - 1 45.64 71 8.486
40 kcC ilagnaa[-T Kutch Lignite - 2 47.18 71
41 kcC ilagnaa[-T Kutch Lignite - 3 41.30 64
42 kcC ilagnaa[-T Kutch Lignite - 4 25.48 71 5.253
43 saUrt ilagnaa[-T Surat Lignite - 1 83.59 131 6.825
44 saUrt ilagnaa[-T Surat Lignite - 2 84.21 131 7.387
45 saUrt ilagnaa[-T Surat Lignite - 3 87.67 130 7.288
46 saUrt ilagnaa[-T Surat Lignite - 4 85.27 130 6.886
47 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 1 38.87 107 8.486
48 e@rImaaoTa ilagnaa[-T Akrimota Lignite - 2 60.09 113
49 jaI Aa[- pI saI ela GIPCL GT - 1 16.94 32 0.000
50 jaI Aa[- pI saI ela GIPCL GT - 2 15.74 32
51 jaI Aa[- pI saI ela GIPCL GT - 3 17.71 35
52 jaI Aa[- pI saI ela GIPCL ST - 1 30.43 51
53 jaI Aa[- pI saI ela GIPCL GT - 4 0.95 83 0.000
54 jaI Aa[- pI saI ela GIPCL ST - 2 0.00 0
55 [- esa esa e Aar ESSAR GT - 1 0.00 0 0.205
56 [- esa esa e Aar ESSAR GT - 2 0.00 0
57 [- esa esa e Aar ESSAR GT - 3 0.00 0
58 [- esa esa e Aar ESSAR STG 0.00 0
59 jaI pI [- saI GPEC GT - 1 0.67 106 0.000
60 jaI pI [- saI GPEC GT - 2 1.55 149 0.132
61 jaI pI [- saI GPEC GT - 3 29.13 150 0.027
62 jaI pI [- saI GPEC STG 12.82 201
63 jaI esa [- jaI GSEG GT - 1 0.00 0 0.989
64 jaI esa [- jaI GSEG GT - 2 8.98 48
65 jaI esa [- jaI GSEG STG 4.49 23
66 Sugen (GT 1 + GT 2) 0.01 22 6.024
67 saIpIpI sao Aayaat Imp from CPP+MUNDRA 4041.48 6881
kula tapIya Total (T) 6946.28 8386 302.021
kula jalaIya+tapIya Total (H+T) 7054.97 8604 302.422
ivaMD [najaI- Wind Energy 481.84
kula jalaIya+tapIya+hvaa Total (H+T+Wind) 7536.81 9539
ivainamaya Exchanges 0.00
saIimat }jaa- maaMga Restricted Energy Req. 7536.81
KKKK (B) MADHYA PRADESH
jalaIya jalaIya jalaIya jalaIya HYDRO
1 cambala pir Chambal Pr.(50%share) 5.97 195
1.1 gaaMQaI saagar Gandhi Sagar 9.11 118 0.070
1.2 raNaa p`tap sagar R.P.Sagar 1.79 172 0.040
1.3 javaahr sagar Jawahar Sagar 1.04 99 0.030
2 ponca Pench 15.82 164 0.100
3 baargaI Bargi 52.52 90 0.100
4 baargaI Bargi (LBCH) 0.00 0
5 banasaagar Toansa Bansagar-1 (Tons) 152.30 312 0.360
6 banasaagar Bansagar-2 (Deolondh) 0.00 0
7 banasaagar Bansagar-3 (Silpara) 15.89 32 0.060
8 banasaagar Bansagar-4 (Zinaha) 13.34 22 0.050
9 maoDIKoDa Medikheda 14.97 63
10 ibarisaMGapur Birsingpur 0.17 20 0.020
11 Tavaa Tawa 0.00 0
12 rajaGaaT Rajghat 0.00 3 0.040
13 Omkareshwar 123.26 381 .
14 [Midra saagar Indira Sagar 267.87 935 0.961
kula jalaIya TOTAL(H) MPPGCL 646.29 2209 1.388
Actual vaastivak
k`maaMk sToSna ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (Gwh) (Mw) (Gwh)
tapIya tapIya tapIya tapIya THERMAL
1 AmarkMTk II AMK II Unit -1 0.00 98 23.930
2 AmarkMTk II AMK II Unit -2 93.68 98
3 AmarkMTk III AMK III Unit -5 112.47 217 0
4 satpura I Satpura-I(60%Share) 0.00 0 0.000
5 satpura II Satpura-II Unit 6 97.21 180 11.240
6 satpura II Satpura-II Unit 7 0.00 0
7 satpura II Satpura-II Unit 8 127.13 195 13.090
8 satpura II Satpura-II Unit 9 0.00 0
9 satpura III Satpura-III Unit 10 0.00 0 9.250
10 satpura III Satpura-III Unit 11 111.46 184 21.850
11 esajaITIpIesa 1 SGTPS Unit - 1 111.46 184 21.850
12 esajaITIpIesa 2 SGTPS Unit - 2 118.84 185
13 esajaITIpIesa 3 SGTPS Unit - 3 0.00 0 14.770
14 esajaITIpIesa 4 SGTPS Unit - 4 118.37 175
15 esajaITIpIesa 5 SGTPS Unit - 5 316.88 511
16 SSTPS 90.29 431 10.720
kula tapIya Total (T) 1179.68 2735 110.250
kula jalaIya+tapIya Total (H+T) 1825.97 5046 111.638
Injection from WIND 0.00 0
kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 1825.97 5046
ivainamaya Exchanges 0.00 saIimat }jaa- maaMga Rest. En. Req. 1825.97
gagagaga (C) CHHATTISGARH
jalaIya jalaIya jalaIya jalaIya HYDRO
1 hsadova baaMgaao Hasdeo Bango 7.91 120 0.090
2 Gangrel 6.61 10 0.050
3 Mini Micro KWB 0.35 7
kula jalaIya TOTAL(H) CSEB 14.87 137 0.150
tapIya tapIya tapIya tapIya THERMAL
1 kaorbaa (pU) Korba (E) Unit-1 27.64 47 12.740
2 kaorbaa (pU) Korba (E) Unit-2 27.64 48
3 kaorbaa (pU) Korba (E) Unit-3 27.64 48
4 kaorbaa (pU) Korba (E) Unit-4 27.84 46
5 kaorbaa (pU) Korba (E) Unit -5 36.85 120 25.330
6 kaorbaa (pU) Korba (E) Unit -6 66.82 120
7 kaorbaa (p) Korba (W) Unit -1 116.93 210 24.780
8 kaorbaa (p) Korba (W) Unit -2 116.93 210
9 kaorbaa (p) Korba (W) Unit -3 116.93 210 15.410
10 kaorbaa (p) Korba (W) Unit -4 116.93 210
11 KORBA(EB) Extn - 1 175.45 256 11.970
12 KORBA(EB) Extn - 2 175.83 256 11.770
kula tapIya Total (T) 1407.31 1880 101.900
13 baalakao sao Aayaat BALCO Import 0.00 0
14 ijandla sao Aayaat JINDAL Import 0.00 0
kula tapIya Total (T+IPP) 1407.31 1880
kula jalaIya+tapIya Total (H+T) 1422.18 2017 102.050
ivainamaya Exchanges 0.00 0
saIimat }jaa- maaMga Rest. En. Req. 1422.18 2017
GaGaGaGa (D) MAHARASHTRA
jalaIya jalaIya jalaIya jalaIya HYDRO
1 kaoyanaa 1AaOr 2 Koyna 1 & 2 166.39 585 2.216
2 kaoyanaa III Koyna III 106.38 320
3 kaoyanaa IV Koyna IV 321.72 1120
4 kaoyanaa DIpIeca Koyna DPH 13.86 38
5 TaTa jalaIya TATA Hydro 122.59 741 2.935
6 vaOtrNaa Vaitarna 36.26 61
7 eladarI Eldari 4.25 16
8 BaTgar AaOr vaIr Bhatgar & Vir 2.40 4
9 pOzana Paithan 28.35 49
10 itlaarI Tillari 12.19 65
11 BaIra Tola rosa Bhira Tail Race 5.94 41
12 GaTGar Ghatghar 40.04 250
13 Anya CaoTo jalaIya Small Hydro (others) 107.11 0
kula jalaIya TOTAL(H) 913.37 1338 5.151
Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (Gwh) (Mw) (Gwh)
tapIya tapIya tapIya tapIya THERMAL
3 naaisak 3 Nasik Unit -3 111.80 195
4 naaisak 4 Nasik Unit -4 122.43 200
5 naaisak 5 Nasik Unit -5 132.98 199
6 T/ambao 4 Trombay Unit -4 0.00 0
7 T/ambao 5 Trombay Unit -5 336.94 504
8 T/ambao 6 Trombay Unit -6 89.27 0
9 T/ambao 8 Trombay Unit -8 0.00 0
10 T/ambao 7A gaOsa Trombay -7A (Gas) 78.85 128 2.895
11 T/ambao 7ba Trombay -7B (WHR) 46.75 71
12 kaoraD,I 5 Koradi Unit -5 0.40 0
13 kaoraD,I 6 Koradi Unit -6 87.36 173
14 kaoraD,I 7 Koradi Unit -7 102.02 185
15 Bausaavala 2 Bhusawal Unit -2 71.05 150
16 Bausaavala 3 Bhusawal Unit -3 93.43 165
17 Bausaavala 4 Bhusawal Unit -4 252.11 520
18 Bausaavala 4 Bhusawal Unit -5 181.14 425
19 parlaI 3 Parli Unit -3 0.00 0
20 parlaI 4 Parli Unit -4 94.36 186
21 parlaI 5 Parli Unit -5 69.50 183
22 parlaI 6 Parli Unit -6 139.28 257
23 parlaI 7 Parli Unit -7 137.16 250
24 KaprKoD,a 1 Khaperkheda Unit -1 113.88 200
25 KaprKoD,a 2 Khaperkheda Unit -2 108.71 185
26 KaprKoD,a 3 Khaperkheda Unit -3 0.80 200
27 KaprKoD,a 4 Khaperkheda Unit -4 138.54 215
28 KaprKoD,a 5 Khaperkheda Unit -5 280.90 508
30 parsa Paras-3 132.33 250
31 parsa Paras-4 133.16 253
32 ]rna Uran (Gas) 276.26 0
33 ]rna Uran (WHR) 0.00 150 5.862
34 caMd`pur 1 Chandrapur Unit -1 89.09 173
35 caMd`pur 2 Chandrapur Unit -2 110.31 190
36 caMd`pur 3 Chandrapur Unit -3 108.22 211
37 caMd`pur 4 Chandrapur Unit - 4 115.46 485
38 caMd`pur 5 Chandrapur Unit -5 308.46 459
39 caMd`pur 6 Chandrapur Unit -6 286.26 445
40 caMd`pur 7 Chandrapur Unit -7 276.28 0
41 DhaNaU 1 Dahanu Unit-1 187.63 250 15.907
42 DhaNaU 2 Dahanu Unit-2 185.06 250 15.907
43 CPP 2163.15 2975.00
44 RGPPL Share 0.04 0
kula tapIya kula tapIya kula tapIya kula tapIya Total (T) 7161.36 12953 402.414
MAH. Wind + Solar Generation 260.48 0
kula jalaIyakula jalaIyakula jalaIyakula jalaIya +tapIya tapIya tapIya tapIya Total (H+T+Wind) 8335.21 15035 448.136
TOTAL (H+T)ivainamaya Exchanges 0.00
saIimat }jaa- maaMga saIimat }jaa- maaMga saIimat }jaa- maaMga saIimat }jaa- maaMga Rest. En. Req. 8335.21
ca ca ca ca (E) gaaovaagaaovaagaaovaagaaovaa GOA
Aa[- pI pI irlaayaMsa IPP Reliance 21.28 30
ivainamaya Exchanges 0.00
saIimat }jaa- maaMga Rest. En. Req. 21.28 489
C C C C (F) dmana AaOr dIva dmana AaOr dIva dmana AaOr dIva dmana AaOr dIva DAMAN & DIU 0.00 298
ja ja ja ja (G) dadra nagar hvaolaI dadra nagar hvaolaI dadra nagar hvaolaI dadra nagar hvaolaI DNH 0.00 647
kula DD &DNH (T) 0.00 944
Actual vaastivak
k`maaMk sToSana ka naama }jaa- carma Auxillary
Sr. Station Name Energy Peak Consumption
No. (Gwh) (Mw) (Gwh)
(H) koMd``Iya xao~ koMd``Iya xao~ koMd``Iya xao~ koMd``Iya xao~ Central Sector
1. ena pI saI ena pI saI ena pI saI ena pI saI N.P.C.
1.1 tara`pur 1 TAPS Unit -1 119.24 160 15.640
1.2 tara`pur 2 TAPS Unit -2 105.17 160
1.3 tara`pur 3 TAPS Unit -3 386.10 540 70.840
1.4 tara`pur 4 TAPS Unit -4 354.13 525
1.5 kakrapr 1 KAPS Unit -1 159.12 540 19.850
1.6 kakrapr 2 KAPS Unit -2 31.16 525
kula ena pI saI NPC Total 1154.92 2450
2. ena TI pI saI ena TI pI saI ena TI pI saI ena TI pI saI N.T.P.C.
2.1 kaorbaa esaTIpIesa 1 KSTPS Unit-1 142.33 212
2.2 kaorbaa esaTIpIesa 2 KSTPS Unit-2 146.80 210
2.3 kaorbaa esaTIpIesa 3 KSTPS Unit-3 150.14 214
2.4 kaorbaa esaTIpIesa 4 KSTPS Unit-4 359.50 510
2.5 kaorbaa esaTIpIesa 5 KSTPS Unit-5 164.13 514
2.6 kaorbaa esaTIpIesa 6 KSTPS Unit-6 354.21 513
2.7 kaorbaa esaTIpIesa 7 KSTPS Unit-7 305.70 514
kula kaorbaa KSTPS Total 1622.82 2498 -17.851
2.7 ivanQa esaTIpIesa 1 VSTPS Unit-1 137.00 213
2.8 ivanQa esaTIpIesa 2 VSTPS Unit-2 45.55 215
2.9 ivanQa esaTIpIesa 3 VSTPS Unit-3 152.80 212
2.10 ivanQa esaTIpIesa 4 VSTPS Unit-4 115.10 214
2.11 ivanQa esaTIpIesa 5 VSTPS Unit-5 147.93 215
2.12 ivanQa esaTIpIesa 6 VSTPS Unit-6 148.47 214
2.13 ivanQa esaTIpIesa 7 VSTPS Unit-7 365.68 514
2.14 ivanQa esaTIpIesa 8 VSTPS Unit-8 332.81 513
2.15 ivanQa esaTIpIesa 9 VSTPS Unit-9 367.18 515
2.16 ivanQa esaTIpIesa 10 VSTPS Unit-10 365.56 512
2.17 ivanQa esaTIpIesa 11 VSTPS Unit-11 354.32 512
kula ivanQayaacala VSTPS Total 2850.26 3750 675.10
3.1 saIpt -1 -SIPAT-1 458.78 664.00
3.2 saIpt -2 -SIPAT-2 462.57 665.00
3.3 saIpt -3 -SIPAT-3 456.17 663.00
3.4 saIpt -4 -SIPAT-4 336.19 516.00
3.5 saIpt -5 SIPAT-5 303.89 514.00
kula saIpt -SIPAT TOTAL 2017.60 2850.00 472.10
4.1 kvaasa gaOsa 1e Kawas GT-1A 57.25 107
4.2 kvaasa gaOsa 1baI Kawas GT-1B 56.41 109
4.3 kvaasa esaTI 1saI Kawas ST-1C 62.95 114
4.4 kvaasa gaOsa 2e Kawas GT-2A 0.00 0
4.5 kvaasa gaOsa 2baI Kawas GT-2B 5.19 0
4.6 kvaasa esaTI 2saI Kawas ST-2C 2.07 0
kula kvaasa KGPS Total 183.87 304 136.242
5.1 gaMQaar gaOsa 1 Gandhar GT-1 41.88 0
5.2 gaMQaar gaOsa 2 Gandhar GT-2 81.91 0
5.3 gaMQaar gaOsa 3 Gandhar GT-3 0.00 0
5.4 gaMQaar esaTI 4 Gandhar ST-4 66.03 0
kula gaMQaar GGPS Total 189.82 0 189.822
6.1 maaOda 1 Mauda -1 212.72 514 0.000
6.2 maaOda 2 Mauda -2 165.62 0 0.000
kula maaOda MAUDA Total 378.34 514 196.429
6.1 RGPPL Block I 0.00 06.2 RGPPL Block II 0.05 06.3 RGPPL Block III 0.00 0
RGPPL TOTAL 0.05 31 0.001
7.1 esa esa pI SSP RBPH - 1 25.36 174
7.2 esa esa pI SSP RBPH - 2 33.33 174
7.3 esa esa pI SSP RBPH - 3 34.01 172
7.4 esa esa pI SSP RBPH - 4 43.35 173
7.5 esa esa pI SSP RBPH - 5 15.69 168
7.6 esa esa pI SSP RBPH - 6 56.80 173
7.7 esa esa pI SSP CHPH - 1 3.35 29
7.8 esa esa pI SSP CHPH - 2 7.89 28
7.9 esa esa pI SSP CHPH - 3 16.55 28
7.10 esa esa pI SSP CHPH - 4 10.56 29
7.11 esa esa pI SSP CHPH - 5 0.00 0
kula esa esa pI SSP Total 246.89 1147 2.469
8.1 kula poMca Pench Total 15.82 164 0.100
8.2 Jindal Injection 509.97 0
8.3 Amarkantak Lanco 174.70 0
(I) piScamaI xao~ piScamaI xao~ piScamaI xao~ piScamaI xao~ WESTERN REGION
ga`aosa ]%padna Gross generation 28486.47
(J) ]plabQata Availability 26803.58
naoT ivainamaya Net Exchanges 0.00
]plabQa }jaa- Energy Availability 26803.58
Actual vaastivak
maah ApOla 2014 maah ApOla 2014 maah ApOla 2014 maah ApOla 2014 ko daOrana carma maaMga ko daOrana carma maaMga ko daOrana carma maaMga ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivakyaaojanaabaQd banaama vaastivakyaaojanaabaQd banaama vaastivakyaaojanaabaQd banaama vaastivak Anaulagnak 4.2
PEAK DEMAND - SCHEDULE VS ACTUAL FOR APRIL 2014 ANNEX-4.2
rajya rajya rajya rajya State Anticipated vaastivakvaastivakvaastivakvaastivak Actual (MW) idnaaMkidnaaMkidnaaMkidnaaMk samayasamayasamayasamaya AavaRi<aAavaRi<aAavaRi<aAavaRi<aApoixatApoixatApoixatApoixat AapUit-AapUit-AapUit-AapUit- Date Time Frequency
(MW) Catered UNSCH LS FC SCH LS kulakulakulakula Total
gaujaratgaujaratgaujaratgaujarat GUJARAT
pMjaIkRt Registered 13740 - - - 13740 29.04.14 1600 49.93
saIimat Restricted 11700
AsaIimat Unrestricted 11740 13740 0 53 0 13793 29.04.14 1600 49.89
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 0 17.02.14 0500 50.07
maQya p`doSamaQya p`doSamaQya p`doSamaQya p`doSa MADHYA PRADESH
pMjaIkRt Registered 7271 - - - 7271 10.04.14 2000 50.06
saIimat Restricted 8340
AsaIimat Unrestricted 8340 7262 0 13 0 7275 10.04.14 1945 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 0 01.04.14 0300
C<aIsagaZ,C<aIsagaZ,C<aIsagaZ,C<aIsagaZ, CHHATTISGARH
pMjaIkRt Registered 3486 3486 06.04.14 1900 49.97
saIimat Restricted 3200
AsaIimat Unrestricted 3225 2997 627.82 14 0 3638 04.04.14 1900 49.87
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 2053 2053 17.04.14 1900 50.03
maharaYT/maharaYT/maharaYT/maharaYT/ MAHARASHTRA
pMjaIkRt Registered 19386 - - - 19386 29.04.14 1600 49.86
saIimat Restricted 19100
AsaIimat Unrestricted 19150 19370 1164 47 0 20581 28.04.14 1200 49.93
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 14728 14728 20.04.14 0500 49.98
gaaovaagaaovaagaaovaagaaovaa *GOA
pMjaIkRt Registered 489 489 - - 489 25.04.14 2100 49.87
AsaIimat Unrestricted 489 489 0 0 - 489 25.04.14 2100 49.87
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 0400
essaaressaaressaaressaar ESSAR(ESIL)
pMjaIkRt Registered 621 - - 621 04.04.14 0400 49.95
AsaIimat Unrestricted 621 0 0 - 621 04.04.14 0400 49.95
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dmana evaM dIvadmana evaM dIvadmana evaM dIvadmana evaM dIva DD
pMjaIkRt Registered 290 - - 290 28.04.14 1200 49.93
AsaIimat Unrestricted 290 0 0 - 290 28.04.14 1200 49.93
nyaUnatma pMjaIkRt maaMga Min. Registered Demand
dadra va na hvoalaIdadra va na hvoalaIdadra va na hvoalaIdadra va na hvoalaI DNH
pMjaIkRt Registered 685 - - 685 28.04.14 1700 49.95
AsaIimat Unrestricted 685 0 - 685 28.04.14 1700 49.95
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 477
piScama xao~piScama xao~piScama xao~piScama xao~ WESTERN REGION
pMjaIkRt Registered 42253 - - - 42253 11.04.14 1100 49.94
saIimat Restricted 40756
AsaIimat Unrestricted 40867 42021 850 235 0 43106 12.04.14 1100 49.94
nyaUnatma pMjaIkRt maaMga Min. Registered Demand 27524 27524 28.04.14 0400 50.40
NOTE: LS = Load Shedding
PC/RM = Power Cuts/Regulatory Measures
FC = Frequency Correction
Registered = Actual Demand Met
Restricted = Registered + LS + FC
Unrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering.