Airbus a320 Idg Service

Embed Size (px)

Citation preview

  • 7/24/2019 Airbus a320 Idg Service

    1/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 1 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    ** ON A/C ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    TASK 12-13-24-680-010-ADraining of the Oil from the IDG

    WARNING: BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER

    THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE

    HOUR.

    WARNING: WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.

    HOT OIL CAN BURN YOUR EYES AND SKIN.

    IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.

    CAUTION: DO NOT OPERATE THE IDG:

    - IF IT CONTAINS TOO MUCH OIL

    - IF IT DOES NOT CONTAIN ENOUGH OIL

    IF YOU DO, YOU CAN CAUSE DAMAGE TO THE IDG.

    CAUTION: DO NOT DO THE SERVICING OF A DISCONNECTED IDG. CONTINUED OPERATION OF A DE-

    FECTIVE IDG CAN CAUSE DAMAGE.

    1. Reason for the JobSelf explanatory

    2Job Set-up Information

    A. Fixtures, Tools, Test and Support Equipment

    REFERENCE QTY DESIGNATION

    No specific 1 CONTAINER 10 L(2 1/2 USGAL)

    No specific AR FILLING EQUIPMENT - TANK OIL, DH13PM TYP

    No specific AR WARNING NOTICE(S)

    No specific Torque wrench: range

    to between 30.00 and 220.00 lbf.in (0.34 and 2.60 m.daN)

    B. Consumable Materials

    REFERENCE DESIGNATION

    (Material No. V02-119) corrosion resistant steel lockwire

    (Material No. 03-ABA1) Synthetic base Lubricating Oil-Turbine Engine - -

    C. Work Zones and Access Panels

    ZONE/ACCESS ZONE DESCRIPTION

    FOR 1000EM1 (ENGINE-1)

    437AL, 438AR

    FOR 1000EM2 (ENGINE-2)

    447AL, 448AR

  • 7/24/2019 Airbus a320 Idg Service

    2/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 2 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    D. Expendable Parts

    FIG.ITEM DESIGNATION IPC-CSN3 packing 24-21-51-81-020

    E. Referenced Information

    REFERENCE DESIGNATION

    (Ref. 12-13-24-612-011-A). IDG Servicing - Filling of the IDG with Oil or Addition of Oil after aLevel Check

    (Ref. 12-32-24-281-001-A). Sampling of the IDG Oil for Analysis

    (Ref. 24-21-00-612-044-A). Servicing of the IDG after Oil Chemical Contamination

    (Ref. 24-21-00-612-044-A-01). Servicing of the IDG after Oil Chemical Contamination and Extensionof the Oil-Filter Differential-Pressure Indicator (DPI)

    (Ref. 24-42-00-861-001-A). Energize the Ground Service Network from the External Power

    (Ref. 24-42-00-862-001-A). De-energize the Ground Service Network Supplied from the ExternalPower

    (Ref. 71-13-00-010-010-A). Opening of the Fan Cowls 437AL(447AL),438AR(448AR)

    (Ref. 71-13-00-410-010-A). Closing of the Fan Cowls 437AL(447AL),438AR(448AR)

    ** ON A/C 108-200, 251-300

    IDG Servicing - IDG Drain and Fill Ports SHEET 1

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    IDG Servicing - IDG Drain and Fill Ports SHEET 1

  • 7/24/2019 Airbus a320 Idg Service

    3/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 3 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    A

    PACKING

    DUST CAP

    CASE DRAIN

    PLUGOVERFLOW

    DRAIN HOSE

    OVERFLOW

    DRAIN HALF-COUPLING

    OIL LEVEL

    INDICATOR

    7

    6

    CONTAINER

    3

    4

    5

    1

    A

    IDG2

    N_MM_121324_3_XENA_01_00

    Figure 12-13-24-991-15200-B / SHEET 1/1 - IDG Servicing - IDG Drain and Fill Ports** ON A/C 108-200, 251-300

  • 7/24/2019 Airbus a320 Idg Service

    4/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 4 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    A

    A

    CONTAINER

    PACKING3

    5CASE DRAIN

    PLUG

    IDG 2

    7OVER FLOW

    DRAIN HALF-COUPLING

    4

    DUST CAP6OVER FLOWDRAIN HOSE

    1

    OIL LEVELINDICATOR

    N_MM_121324_3_XEPA_01_00

    Figure 12-13-24-991-15200-C / SHEET 1/1 - IDG Servicing - IDG Drain and Fill Ports** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

  • 7/24/2019 Airbus a320 Idg Service

    5/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 5 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    3. Job Set-up

    Subtask 12-13-24-861-056-A

    A. Energize the ground service network(Ref. AMM TASK 24-42-00-861-001) .

    Subtask 12-13-24-941-060-A

    B. Safety Precautions

    (1) On the center pedestal, on the ENG panel 115VU:

    (a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.

    (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do thisprocedure.

    (3) On the overhead maintenance panel 50VU:

    (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

    (b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).

    Subtask 12-13-24-010-058-A

    C. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-010) :

    (1) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (2) FOR 1000EM2 (ENGINE-2)447AL448AR.

    4. Procedure

    ** ON A/C 108-200, 251-300(Ref. Fig. IDG Servicing - IDG Drain and Fill Ports SHEET 1)

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    (Ref. Fig. IDG Servicing - IDG Drain and Fill Ports SHEET 1)

    ** ON A/C ALL

    Subtask 12-13-24-864-057-A

    A. Depressurization of the Integrated Drive Generator (IDG) Case

    WARNING: POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT

    THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT

    BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES ANDSKIN.

    CAUTION: DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE FIT-

    TING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE DAMAGE TO

    THE OVERFLOW DRAIN HALF-COUPLING SEAT.

    (1) Put a CONTAINER 10 L(2 1/2 USGAL) below the IDG (2).

    (2) Remove the dust cap (4) from the overflow drain half-coupling (7).

    (3) Put the end of the overflow drain hose (6) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP inthe CONTAINER 10 L(2 1/2 USGAL).

    (4) Do this step to depressurize the IDG case:

  • 7/24/2019 Airbus a320 Idg Service

    6/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 6 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    (a) Connect the overflow drain hose (6) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP tothe overflow drain half-coupling (7).

    NOTE: Some oil can come out of the overflow drain hose (6) of the FILLING EQUIPMENT -TANK OIL, DH13PM TYP when you connect it.

    ** ON A/C 108-200, 251-300

    Subtask 12-13-24-680-055-C

    B. Draining of the IDG Oil

    WARNING: USE GOGGLES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT

    LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT

    YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.

    (1) Cut and remove the lockwire from the case drain plug (5).

    NOTE: Approximately 3.965 l (1.0474 USgal) of oil will flow into the container.

    (2) Remove the case drain plug (5).

    (3) Remove the packing (3) and discard it.

    (4) Drain the oil.

    (a) If the drained oil has a fuel odor, do the servicing of the IDG after oil chemical contamination(Ref. AMM TASK 24-21-00-612-044) .

    (b) If you think that the condition of the drained oil is not correct, do a sampling of the IDG oil foranalysis (Ref. AMM TASK 12-32-24-281-001) .

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    Subtask 12-13-24-680-055-D

    B. Draining of the IDG Oil

    WARNING: USE GOGGLES WHEN YOU REMOVE OR INSTALL LOCKWIRE. EACH TIME YOU CUT

    LOCKWIRE, REMOVE AND DISCARD IT IMMEDIATELY. LOOSE LOCKWIRE CAN CUT

    YOU OR MAKE YOU BLIND, AND/OR CAN CAUSE DAMAGE.

    (1) Cut and remove the lockwire from the case drain plug (5).

    NOTE: Approximately 5.72 l (1.5111 USgal) of oil will flow into the container.

    (2) Remove the case drain plug (5).

    (3) Remove the packing (3) and discard it.

    (4) Drain the oil.

    (a) If the drained oil has a fuel odor, do the servicing of the IDG after oil chemical contamination(Ref. AMM TASK 24-21-00-612-044) .

    (b) If you think that the condition of the drained oil is not correct, do a sampling of the IDG oil foranalysis (Ref. AMM TASK 12-32-24-281-001) .

    ** ON A/C ALL

    Subtask 12-13-24-640-052-A

  • 7/24/2019 Airbus a320 Idg Service

    7/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 7 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    C. Lubricate the new IPC -CSN (24-21-51-81-020) packing (3) with Synthetic base Lubricating Oil-TurbineEngine - - (Material No. 03-ABA1).

    Subtask 12-13-24-420-057-A

    D. Installation of the Case Drain Plug

    (1) Install the new O-ring (3) on the case drain plug (5).

    (2) Install the case drain plug (5).

    (3) TORQUE the case drain plug (5) to between 55 and 75 lbf.in (0.62 and 0.85 m.daN).

    (4) Safety the case drain plug (5) with corrosion resistant steel lockwire (Material No. V02-119) 0.032 in.(0.8128 mm) dia..

    Subtask 12-13-24-420-064-A

    E. Installation of the Dust Cap

    (1) Disconnect the overflow drain hose (6) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP fromthe overflow drain half-coupling (7).

    (2) Install the dust cap (4) on the overflow drain half-coupling (7).

    Subtask 12-13-24-612-064-A

    F. Fill the IDG with oil or add oil to the IDG after a level check (Ref. AMM TASK 12-13-24-612-011) , if youmust not remove the IDG.

    5. Close-up

    Subtask 12-13-24-410-061-A

    A. Close Access

    (1) Make sure that the work area is clean and clear of tools and other items.(2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010) :

    (a) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (b) FOR 1000EM2 (ENGINE-2)447AL448AR.

    (3) Remove the warning notice(s).

    Subtask 12-13-24-862-056-A

    B. De-energize the ground service network(Ref. AMM TASK 24-42-00-862-001) .

    TASK 12-13-24-612-011-AIDG Servicing - Filling of the IDG with Oil or Addition of Oil after a Level Check

    WARNING: BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER

    THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE

    HOUR.

    WARNING: WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.

    HOT OIL CAN BURN YOUR EYES AND SKIN.

    IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.

    CAUTION: DO NOT OPERATE THE IDG:

    - IF IT CONTAINS TOO MUCH OIL- IF IT DOES NOT CONTAIN ENOUGH OIL

  • 7/24/2019 Airbus a320 Idg Service

    8/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 8 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    IF YOU DO, YOU CAN CAUSE DAMAGE TO THE IDG.

    CAUTION: USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO THE IDG.

    THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST DETERIORA-

    TION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: REMOVE THE REMAINING OIL FROM THE FILLING EQUIPMENT. FILL THE EQUIPMENT

    ONLY WITH NEW CANS OF OIL BEFORE YOU FILL THE IDG WITH OIL OR ADD OIL TO THE

    IDG. THE CONTAMINATION IN THE OIL THAT STAYS IN THE FILLING EQUIPMENT CAN

    CAUSE FAST DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT (PUMP,

    HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.

    CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE OIL

    AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: DO NOT DO THE SERVICING OF A DISCONNECTED IDG. CONTINUED OPERATION OF A DE-

    FECTIVE IDG CAN CAUSE DAMAGE.

    1. Reason for the JobYou must do this procedure if you: Fill an Integrated Drive Generator (IDG) installed on the aircraft after you drained it Fill a replacement IDG installed on the aircraft Add oil when the oil level at the sightglass is not correct Add oil after replacement of the scavenge filter element Add oil after replacement of a component of the IDG oil-cooling system.

    NOTE: If during transit, you do not have enough time to do this procedure, you can do quick oil servicing (Ref.TASK 12-13-24-612-010, Filling of the Integrated Drive Generator (IDG) with Oil for Oil Complementafter Level Check).

    2Job Set-up Information

    A. Fixtures, Tools, Test and Support Equipment

    REFERENCE QTY DESIGNATION

    No specific 1 CONTAINER 10 L(2 1/2 USGAL)

    No specific AR FILLING EQUIPMENT - TANK OIL, DH13PM TYP

    No specific AR WARNING NOTICE(S)

    B. Consumable Materials

    REFERENCE DESIGNATION

    (Material No. 03-ABA1) Synthetic base Lubricating Oil-Turbine Engine - -

    C. Work Zones and Access Panels

    ZONE/ACCESS ZONE DESCRIPTION

    FOR 1000EM1 (ENGINE-1)

    437AL, 438AR

    FOR 1000EM2 (ENGINE-2)

    447AL, 448AR

  • 7/24/2019 Airbus a320 Idg Service

    9/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 9 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    D. Referenced Information

    REFERENCE DESIGNATION

    (Ref. 24-21-00-612-047-A). IDG Oil-Type Change

    (Ref. 24-42-00-861-001-A). Energize the Ground Service Network from the External Power

    (Ref. 24-42-00-862-001-A). De-energize the Ground Service Network Supplied from the ExternalPower

    (Ref. 71-00-00-710-043-A). Normal Engine Automatic Start Procedure

    (Ref. 71-00-00-710-045-A). Test No.1 : Dry Motor Leak Check

    (Ref. 71-13-00-010-010-A). Opening of the Fan Cowls 437AL(447AL),438AR(448AR)

    (Ref. 71-13-00-410-010-A). Closing of the Fan Cowls 437AL(447AL),438AR(448AR)

    ** ON A/C 108-200, 251-300

    IDG - Servicing

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    IDG - Servicing

    DRAIN HOSE

    OVERFLOW

    CONTAINER

    PRESSURE

    FILL HOSE

    1

    OIL LEVEL

    INDICATOR

    8

    OVERFLOWDRAIN HALF-COUPLING

    PRESSUREFILL HALF-COUPLING

    7

    6DUST CAP

    5

    IDG2

    34DUST CAP

    A

    A

    B

    N_MM_121324_3_XANA_01_00

    Figure 12-13-24-991-15000-B / SHEET 1/2 - IDG - Servicing** ON A/C 108-200, 251-300

  • 7/24/2019 Airbus a320 Idg Service

    10/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 10 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER ENGINESHUTDOWN

    (HOT OIL/IDG)

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    ACTION: ACTION:

    OVER FULL

    RED

    RED

    ADD

    OIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADD

    OIL

    YELLOW

    GREEN

    CORRECTLY FILLED IDG

    OIL LEVEL MUST BE AT OR NEARTHE LINE BETWEEN THE YELLOW BANDAND THE GREEN BAND

    OIL LEVEL CAN BEIN THE GREEN BAND OR THEYELLOW BAND

    THE OIL LEVEL MUST NOT BE INTHE YELLOW BAND BUT IT CANBE IMMEDIATELY ABOVE THELOWER LIMIT OF THE YELLOWBAND BECAUSE OF THE AIRCRAFTRAMP ANGLE

    DO THE IDG SERVICINGTO GET THE CORRECT IDGOIL LEVEL.

    AT ALL TIMES(HOT OR CO LD OIL/IDG)

    THE OIL LEVEL MUST NOT BEIN THE RED BAND

    PERFORM IDG OIL SERVICINGTO GET THE CORRECT IDG OIL LEVEL.DO NOT USE THE OVERFLOW DRAIN HOSETO GET THE CORRECT IDG OIL LEVEL.

    INCORRECTLY FILLED IDG

    BB

    B B

    V2500 V2500 V2500

    V2500V2500

    N_MM_121324_3_XANA_02_00

    Figure 12-13-24-991-15000-B / SHEET 2/2 - IDG - Servicing** ON A/C 108-200, 251-300

  • 7/24/2019 Airbus a320 Idg Service

    11/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 11 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    1

    OIL LEVELINDICATOR

    CONTAINER

    IDG 2

    7PRESSURE

    FILL HALF-COUPLING

    8OVER FLOW

    DRAIN HALF-COUPLING

    3OVER FLOWDRAIN HOSE

    6DUST CAP

    5PRESSUREFILL HOSE

    4DUST CAP

    A

    A

    B

    N_MM_121324_3_XAPA_01_00

    Figure 12-13-24-991-15000-C / SHEET 1/2 - IDG - Servicing** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

  • 7/24/2019 Airbus a320 Idg Service

    12/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 12 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER ENGINESHUTDOWN

    (HOT OIL/IDG)

    ACTION: ACTION:

    CORRECTLY FILLED IDG

    OIL LEVEL MUST BE AT OR NEARTHE LINE BETWEEN THE YELLOW BANDAND THE GREEN BAND

    OIL LEVEL CAN BEIN THE GREEN BAND OR THEYELLOW BAND

    THE OIL LEVEL MUST NOT BE INTHE YELLOW BAND BUT IT CANBE IMMEDIATELY ABOVE THELOWER LIMIT OF THE YELLOWBAND BECAUSE OF THE AIRCRAFTRAMP ANGLE

    DO THE IDG SERVICINGTO GET THE CORRECT IDGOIL LEVEL.

    AT ALL TIMES(HOT OR CO LD OIL/IDG)

    THE OIL LEVEL MUST NOT BEIN THE RED BAND

    PERFORM IDG OIL SERVICINGTO GET THE CORRECT IDG OIL LEVEL.DO NOT USE THE OVERFLOW DRAIN HOSETO GET THE CORRECT IDG OIL LEVEL.

    INCORRECTLY FILLED IDG

    BB

    B B

    OVER FULL

    A320

    ADDOIL

    ADDOIL

    V2500

    OVER FULL

    A320

    ADDOIL

    ADDOIL

    V2500

    OVER FULL

    A320

    ADDOIL

    ADDOIL

    V2500

    OVER FULL

    A320

    ADDOIL

    ADDOIL

    V2500

    OVER FULL

    A320

    ADDOIL

    ADDOIL

    V2500

    RED

    RED

    YELLOW

    GREEN

    RED

    RED

    YELLOW

    GREEN

    RED

    RED

    YELLOW

    GREEN

    RED

    RED

    YELLOW

    GREEN

    RED

    RED

    YELLOW

    GREEN

    N_MM_121324_3_XAPA_02_00

    Figure 12-13-24-991-15000-C / SHEET 2/2 - IDG - Servicing** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

  • 7/24/2019 Airbus a320 Idg Service

    13/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 13 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    3. Job Set-up

    Subtask 12-13-24-861-055-A

    A. Energize the ground service network(Ref. AMM TASK 24-42-00-861-001)

    Subtask 12-13-24-941-062-A

    B. Safety Precautions

    (1) On the center pedestal, on the ENG panel 115VU:

    (a) Put a WARNING NOTICE(S) in position to tell persons not to start the engine.

    (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do thisprocedure.

    (3) On the overhead maintenance panel 50VU:

    (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

    (b) Put a WARNING NOTICE(S) in position to tell persons not to energize the FADEC 1(2).

    Subtask 12-13-24-010-059-A

    C. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-010) :

    (1) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (2) FOR 1000EM2 (ENGINE-2)447AL, 448AR

    4. Procedure

    ** ON A/C 108-200, 251-300(Ref. Fig. IDG - Servicing)

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    (Ref. Fig. IDG - Servicing)

    ** ON A/C ALL

    Subtask 12-13-24-864-058-A

    A. Depressurization of the IDG Case

    WARNING: POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT

    THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT

    BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES ANDSKIN.

    CAUTION: DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE FIT-

    TING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE DAMAGE TO

    THE OVERFLOW DRAIN HALF-COUPLING SEAT.

    (1) Put a CONTAINER 10 L(2 1/2 USGAL) below the IDG (2).

    (2) Remove the dust cap (4) from the overflow drain half-coupling (8).

    (3) Put the end of the overflow drain hose (3) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP inthe CONTAINER 10 L(2 1/2 USGAL).

    (4) Do this step to depressurize the IDG case:

  • 7/24/2019 Airbus a320 Idg Service

    14/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 14 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    (a) Connect the overflow drain hose (3) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP tothe overflow drain half-coupling (8).

    NOTE: Some oil can come out of the overflow drain hose (3) of the FILLING EQUIPMENT -TANK OIL, DH13PM TYP when you connect it.

    Subtask 12-13-24-612-059-A

    CAUTION: THE OIL OVERFLOW DRAINAGE PROCEDURE CAN TAKE UP TO 20 MINUTES TO COM-

    PLETE. FAILURE TO OBSERVE THE OVERFLOW TIME REQUIREMENTS CAN CAUSE

    HIGH IDG OIL LEVEL CONDITION RESULTING IN ELEVATED OPERATING TEMPERAT-

    URES AND DAMAGE TO THE IDG.

    CAUTION: USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX TYPES//BRANDS

    OF LUBRICANTS.

    B. Filling of the IDG with Oil

    NOTE: In case of OIL type/brand change, refer to (Ref. AMM TASK 24-21-00-612-047) .

    NOTE: In rain, fog or wet conditions, be careful to prevent water contamination of the IDG oil during thefilling procedure.

    (1) Remove the dust cap (6) from the pressure fill half-coupling (7).

    (2) Connect the pressure fill hose (5) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP to thepressure fill half-coupling (7).

    (3) Fill the IDG with the filtered Synthetic base Lubricating Oil-Turbine Engine - - (Material No. 03-ABA1)at a maximum of 35 psi (2.4132 bar).

    NOTE: The AMM 20-34-00 gives a list of oil brand-names approved for IDG servicing.

    (4) Stop the filling procedure when the quantity of oil collected from the overflow drain hose (3) of theFILLING EQUIPMENT - TANK OIL, DH13PM TYP is 0.95 l (0.2510 USgal) minimum.

    Subtask 12-13-24-080-058-A

    C. Removal of the Hoses

    (1) Disconnect the pressure fill hose (5) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP fromthe pressure fill half-coupling (7).

    (2) Install the dust cap (6) on the pressure fill half-coupling (7).(3) Wait for the flow of oil from the overflow drain hose (3) to decrease and become only drops.

    (4) Remove the overflow drain hose (3).

    (5) Install the dust cap (4) on the overflow drain half-coupling (8).

    Subtask 12-13-24-710-053-A

    D. If you replaced a part of the oil system (filter, external system component, drain plug), do dry motoring forleak check before inspection (Ref. AMM TASK 71-00-00-710-045) .

    Subtask 12-13-24-210-054-A

    E. Inspection of the Oil Level

    NOTE: To fill the external oil system to its maximum level before the oil level check, it is necessary to:- Dry-motor the engine (Ref. AMM TASK 71-00-00-710-045) for two minutes, or to

  • 7/24/2019 Airbus a320 Idg Service

    15/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 15 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    - Operate the engine at minimum idle (Ref. AMM TASK 71-00-00-710-043) .

    NOTE: The IDG oil temperature is shown on the lower ECAM display unit. When the oil temperature is thesame as the ambient air temperature, the oil is cold. When the oil temperature is more than theambient air temperature, the oil is hot.

    (1) Inspection of the oil level with dry motoring

    CAUTION: IF YOU DRY-MOTOR THE ENGINE, MAKE SURE THAT THE OIL LEVEL IS STABLE

    BEFORE YOU DO THE INSPECTION. THE OIL LEVEL WILL BECOME STABLE

    ONLY AFTER 30 MINUTES. THUS THE LEVEL INDICATIONS ON THE SIGHT-

    GLASS WILL NOT BE CORRECT BEFORE THE END OF THIS PERIOD. IF YOU

    ADD OIL WHEN IT IS NOT NECESSARY, THERE IS A RISK THAT YOU WILL

    CAUSE FAILURE OF THE IDG.

    (a) Wait thirty minutes to let the oil in the IDG become stable.

    (b) Look at the oil level sightglass of the IDG:

    1 If the oil is cold:If the oil level is only immediately above the lower limit of the yellow band because of theaircraft ramp angle, IDG oil draining is not necessary. If the oil level is in the yellow band, do the steps 4.A. and 4.C. again. If the oil level is below the green band, do the steps 4.A. thru 4.C. again.

    2 If the oil is hot:If the oil level is in the yellow band, oil servicing is not necessary. If the oil level is below the green band, do the steps 4.A. thru 4.C. again. If the oil level is above the yellow band, do the steps 4.A. and 4.C. again.

    NOTE: After oil level correction, no further dry motoring is necessary.

    NOTE: If the oil level is below the middle of the green band, we recommend that you do thetop up.

    (2) Inspection of the oil level after an engine run (alternative procedure)

    (a) Let the oil in the IDG become stable for 5 minutes.

    (b) Look at the oil level sightglass of the IDG:

    1 If the oil is cold:If the oil level is only immediately above the lower limit of the yellow band because of the

    aircraft ramp angle, IDG oil draining is not necessary. If the oil level is in the yellow band, do the steps 4.A. and 4.C. again. If the oil level is below the green band, do the steps 4.A. thru 4.C. again.

    2 If the oil is hot:If the oil level is in the yellow band, oil servicing is not necessary. If the oil level is below the green band, do the steps 4.A. thru 4.C. again. If the oil level is above the yellow band, do the steps 4.A. and 4.C. again.

    NOTE: After oil level correction, no further dry motoring is necessary.

    NOTE: If the oil level is below the middle of the green band, we recommend that you do thetop up.

    5. Close-up

  • 7/24/2019 Airbus a320 Idg Service

    16/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 16 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    Subtask 12-13-24-410-057-A

    A. Close Access

    (1) Make sure that the work area is clean and clear of tools and other items.

    (2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010) :

    (a) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (b) FOR 1000EM2 (ENGINE-2)447AL, 448AR

    (3) Remove the warning notice(s).

    Subtask 12-13-24-862-055-A

    B. De-energize the ground service network

    (Ref. AMM TASK 24-42-00-862-001) .

    ** ON A/C 108-200, 251-300

    TASK 12-13-24-612-010-ADo Quick Oil Servicing - Filling of the Integrated Drive Generator (IDG) with Oil for Oil Complement after LevelCheck

    WARNING: BE CAREFUL WHEN YOU WORK ON THE ENGINE COMPONENTS IMMEDIATELY AFTER

    THE ENGINE IS SHUTDOWN. THE ENGINE COMPONENTS CAN STAY HOT FOR UP TO ONE

    HOUR.

    WARNING: WEAR GOGGLES, INSULATED GLOVES AND OTHER PROTECTIVE CLOTHES.

    HOT OIL CAN BURN YOUR EYES AND SKIN.IF OIL TOUCHES YOUR EYES OR SKIN, GET MEDICAL AID.

    CAUTION: DO NOT OPERATE THE IDG:

    - IF IT CONTAINS TOO MUCH OIL

    - IF IT DOES NOT CONTAIN ENOUGH OIL

    IF YOU DO, YOU CAN CAUSE DAMAGE TO THE IDG.

    CAUTION: USE ONLY NEW CANS OF OIL WHEN YOU FILL THE IDG WITH OIL OR ADD OIL TO THE IDG.

    THE CONTAMINATION IN OIL THAT STAYS IN OPEN CANS CAN CAUSE FAST DETERIORA-

    TION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: REMOVE THE REMAINING OIL FROM THE FILLING EQUIPMENT. FILL THE EQUIPMENT

    ONLY WITH NEW CANS OF OIL BEFORE YOU FILL THE IDG WITH OIL OR ADD OIL TO THE

    IDG. THE CONTAMINATION IN THE OIL THAT STAYS IN THE FILLING EQUIPMENT CAN

    CAUSE FAST DETERIORATION OF THE OIL AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: DO NOT USE SOLVENTS THAT CONTAIN CHLORINE TO CLEAN THE EQUIPMENT (PUMP,

    HOSES, TANK AND FUNNEL) USED TO FILL THE IDG WITH OIL.

    CHLORINE CONTAMINATION OF THE OIL CAN CAUSE FAST DETERIORATION OF THE OIL

    AND WILL DECREASE THE LIFE OF THE IDG.

    CAUTION: DO NOT DO THE SERVICING OF A DISCONNECTED IDG. CONTINUED OPERATION OF A DE-

    FECTIVE IDG CAN CAUSE DAMAGE.

    1. Reason for the Job

  • 7/24/2019 Airbus a320 Idg Service

    17/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 17 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    This procedure is for quick adjustment of the IDG oil level during transit only if there is no time to do the normalprocedure.With this oil servicing procedure, it is not necessary to let the oil drain from the overflow drain hose forapproximately 20 minutes.

    2Job Set-up Information

    A. Fixtures, Tools, Test and Support Equipment

    REFERENCE QTY DESIGNATION

    No specific 1 CONTAINER 10 L(2 1/2 USGAL)

    No specific 2 FILLING EQUIPMENT - TANK OIL, DH13PM TYP

    No specific AR WARNING NOTICE(S)

    B. Consumable Materials

    REFERENCE DESIGNATION

    (Material No. 03-ABA1) Synthetic base Lubricating Oil-Turbine Engine - -

    C. Work Zones and Access Panels

    ZONE/ACCESS ZONE DESCRIPTION

    FOR 1000EM1 (ENGINE-1)

    437AL, 438AR

    FOR 1000EM2 (ENGINE-2)

    447AL, 448AR

    D. Referenced Information

    REFERENCE DESIGNATION

    (Ref. 24-21-00-612-047-A). IDG Oil-Type Change

    (Ref. 24-42-00-861-001-A). Energize the Ground Service Network from the External Power

    (Ref. 24-42-00-862-001-A). De-energize the Ground Service Network Supplied from the ExternalPower

    (Ref. 71-13-00-010-010-A). Opening of the Fan Cowls 437AL(447AL),438AR(448AR)

    (Ref. 71-13-00-410-010-A). Closing of the Fan Cowls 437AL(447AL),438AR(448AR)

    Quick Oil Servicing - IDG

  • 7/24/2019 Airbus a320 Idg Service

    18/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 18 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    OIL LEVEL

    SIGHT GLASS

    IDG

    DRAIN HOSE

    OVERFLOW

    CONTAINERPRESSURE

    FILL HOSE

    A

    8

    2

    7

    6

    5

    4

    1

    3

    A

    B

    N_MM_121324_3_XCNA_01_00

    Figure 12-13-24-991-15100-A / SHEET 1/2 - Quick Oil Servicing - IDG** ON A/C 108-200, 251-300

  • 7/24/2019 Airbus a320 Idg Service

    19/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 19 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER SERVICING ORENGINE SHUTDOWN

    (COLD OIL/IDG)

    AFTER ENGINESHUTDOWN

    (HOT OIL/IDG)

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    OVER FULL

    RED

    RED

    ADDOIL

    YELLOW

    GREEN

    CORRECTLY FILLED IDG

    OIL LEVEL MUST BE AT OR NEARTHE LINE BETWEEN THE YELLOW BANDAND THE GREEN BAND

    OIL LEVEL CAN BEIN THE GREEN BAND OR THEYELLOW BAND

    THE OIL LEVEL MUST NOT BE INTHE YELLOW BAND BUT IT CANBE IMMEDIATELY ABOVE THELOWER LIMIT OF THE YELLOWBAND BECAUSE OF THE AIRCRAFTRAMP ANGLE

    AT ALL TIMES(HOT OR COLD O IL/IDG)

    THE OIL LEVEL MUST NOT BEIN THE RED BAND

    INCORRECTLY FILLED IDG

    V2500 V2500

    V2500V2500 V2500

    AT ALL TIMES(HOT OR COLD OIL/IDG)

    THE OIL LEVEL MUST NOT BEIN THE RED BAND

    NOTE: IF THERE IS OVERFILLING, DO THENORMAL PROCEDURE TO ADJUST

    THE OIL LEVEL.

    N_MM_121324_3_XCNA_02_00

    Figure 12-13-24-991-15100-A / SHEET 2/2 - Quick Oil Servicing - IDG** ON A/C 108-200, 251-300

  • 7/24/2019 Airbus a320 Idg Service

    20/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 20 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    3. Job Set-up

    Subtask 12-13-24-861-052-A

    A. Energize the ground service network(Ref. AMM TASK 24-42-00-861-001) .

    Subtask 12-13-24-941-054-A

    B. Safety Precautions

    (1) On the center pedestal, on the ENG panel 115VU:

    (a) Put a WARNING NOTICE(S) to tell persons not to start the engine.

    (2) Make sure that the engine 1(2) shutdown occurred not less than 5 minutes before you do thisprocedure.

    (3) On the overhead maintenance panel 50VU:

    (a) Make sure that the ON legend of the ENG/FADEC GND PWR/1(2) pushbutton switch is off.

    (b) Put a WARNING NOTICE(S) to tell persons not to energize the FADEC 1(2).

    Subtask 12-13-24-010-052-A

    C. Open the fan cowl doors (Ref. AMM TASK 71-13-00-010-010) :

    (1) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (2) FOR 1000EM2 (ENGINE-2)447AL, 448AR

    4. Procedure(Ref. Fig. Quick Oil Servicing - IDG)

    Subtask 12-13-24-864-052-A

    A. Depressurization of the IDG Case

    WARNING: POINT THE OVERFLOW DRAIN HOSE INTO A CONTAINER WHEN YOU CONNECT

    THE HOSE TO THE OVERFLOW DRAIN HALF-COUPLING. THIS WILL PREVENT

    BURNS FROM THE HOT OIL SPRAY. HOT OIL CAN CAUSE BURNS TO EYES AND

    SKIN.

    CAUTION: DO NOT USE DEVICES OTHER THAN THE APPROVED OVERFLOW DRAIN-HOSE FIT-

    TING. HARD METAL OBJECTS SUCH AS SCREWDRIVERS CAN CAUSE DAMAGE TO

    THE OVERFLOW DRAIN HALF-COUPLING SEAT.

    (1) Put a CONTAINER 10 L(2 1/2 USGAL) (3) below the IDG.

    (2) Remove the dust cap (1) from the overflow drain half-coupling (7).

    (3) Put the end of the overflow drain hose (2) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP inthe container CONTAINER 10 L(2 1/2 USGAL) (3).

    (4) Depressurize the IDG case. To do this, connect the overflow drain hose (2) of the FILLINGEQUIPMENT - TANK OIL, DH13PM TYP to the overflow drain half-coupling (7). Some oil can comeout of the overflow drain hose (2) when you connect it.

    Subtask 12-13-24-612-050-A

    CAUTION: USE ONLY APPROVED TYPES/BRANDS OF LUBRICANTS. DO NOT MIX TYPES//BRANDS

    OF LUBRICANTS.

  • 7/24/2019 Airbus a320 Idg Service

    21/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    Print Date: October 27, 2015 Page 21 of 22

    AIRBUS S.A.S. ALL RIGHTS RESERVED. CONFIDENTIAL AND PROPRIETARY DOCUMENT.

    B. Filling of the IDG with Oil

    NOTE: In case of OIL type/brand change, refer to (Ref. AMM TASK 24-21-00-612-047) .

    NOTE: In rain, fog or wet conditions, you must use precautions to prevent water contamination of the IDGoil during filling procedures.

    NOTE: The AMM 20-34-00 gives a list of approved oil brand-names for IDG servicing.

    (1) Remove the dust cap (5) from the pressure fill half-coupling (6).

    (2) Connect the pressure fill hose (4) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP to thepressure fill half-coupling (6).

    (3) Slowly pump the filtered Synthetic base Lubricating Oil-Turbine Engine - - (Material No. 03-ABA1) intothe IDG to 35 psi (2.4132 bar) maximum.

    (4) Stop this operation when the oil level in the sightglass (8) is at the top of the green band.

    NOTE: There is a delay between the oil complement and the oil level change in the sightglass.

    NOTE: Look at the oil level sightglass of the IDG: (Ref. Fig. Quick Oil Servicing - IDG)- the oil level must be at or near the line between the yellow band and the green band,- if the oil level is above this position, do the normal procedure of oil replenishing to adjust the

    oil level.

    Subtask 12-13-24-020-057-A

    C. Removal of Hoses

    (1) Remove the pressure fill hose (4) of the FILLING EQUIPMENT - TANK OIL, DH13PM TYP from thepressure fill half-coupling (6).

    (2) Install the dust cap (5) on the pressure fill half-coupling (6).

    (3) Remove the overflow drain hose (2) from the overflow drain half-coupling (7).

    (4) Install the dust cap (1) on the overflow drain half-coupling (7).

    5. Close-up

    Subtask 12-13-24-410-052-A

    A. Close Access

    (1) Make sure that the work area is clean and clear of tools and other items.

    (2) Close the fan cowl doors (Ref. AMM TASK 71-13-00-410-010) :

    (a) FOR 1000EM1 (ENGINE-1)437AL, 438AR

    (b) FOR 1000EM2 (ENGINE-2)447AL, 448AR

    (3) Remove the warning notice(s).

    Subtask 12-13-24-862-052-A

    B. De-energize the ground service network(Ref. AMM TASK 24-42-00-862-001) .

    Figure 12-13-24-991-15000-B / SHEET 1/2 - IDG - ServicingFigure 12-13-24-991-15000-B / SHEET 2/2 - IDG - Servicing

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

  • 7/24/2019 Airbus a320 Idg Service

    22/22

    Customer : AEEType : TF-NRev. Date : Aug 01, 2015

    Manual : AMMSelected applicability : ALL

    12-13-24 PB 301 CONF 13 - ELECTRICAL POWER - SERVICING

    P i D O b 27 2015 P 22 f 22

    Figure 12-13-24-991-15000-C / SHEET 1/2 - IDG - ServicingFigure 12-13-24-991-15000-C / SHEET 2/2 - IDG - Servicing

    ** ON A/C 108-200, 251-300

    Figure 12-13-24-991-15200-B / SHEET 1/1 - IDG Servicing - IDG Drain and Fill Ports

    ** ON A/C 001-018, 025-025, 027-028, 053-104, 201-250, 301-500, 513-700

    Figure 12-13-24-991-15200-C / SHEET 1/1 - IDG Servicing - IDG Drain and Fill Ports

    ** ON A/C 108-200, 251-300

    Figure 12-13-24-991-15100-A / SHEET 1/2 - Quick Oil Servicing - IDGFigure 12-13-24-991-15100-A / SHEET 2/2 - Quick Oil Servicing - IDG

    End of document