AIRPORT PAVEMENT MANAGEMENT
Pavement Management
Tom Freeman
Program Manager, Pavement ManagementTexas A&M Transportation Institute
Phone: 979-317-2320
E-Mail [email protected]
2
Pavement Management
PMS Concepts
3
Pavement Management
Based on finding a cost-effective treatment,
At a given time,
To give the desired level of service.
4
PMS Concepts
Pay me NOW!
or
Pay me LATER!
5
PMS Concepts
6
PMS Concepts
Good Pavement Costs LessThan Bad Pavement
7
PMS Concepts
Good Pavement Costs LessThan Bad Pavement
Over the long-term
If and reasonable level of service is provided
If the pavement will respond to preventive maintenance
8
Airport Pavement Inspection
Old Method was Based on LOI Currently on Inspection Schedule
Approximately 90/Yr
3 Year Cycle
9
Airport Pavement Inspection
10
Airport Pavement Inspection
11
Airport Pavement Inspection
TEXT
12
Airport Pavement Inspection
13
Airport Pavement Inspection
14
Airport Pavement Inspection
15
Airport Pavement Inspection
Inspect Aircraft Pavements FAA Condition Survey (150/5320-17A)20% Inspection Rate
– 2 Runways (Usually)– Taxiways– Aprons
Overall and Close-up Pictures of– RW Center, Edge, Close-up, and RW Extended– Each Section– Office, Fuel Area
16
Airport Pavement Inspection
17
Airport Pavement Inspection
18
Airport Pavement Inspection
TEXT
19
Airport Pavement Inspection
TEXT
20
Airport Pavement Inspection
Inspect Aircraft Pavements Videos
– 360o at Runway Ends and Center-ish– Pavement Condition Discussion– High-speed (60mph) – Tour of TWs and Aprons– Entrance Road
21
Airport Pavement Inspection
TEXT
22
Airport Pavement Inspection
23
Airport Pavement Inspection
24
Airport Pavement Inspection
Inspect Aircraft Pavements Other Testing
– Deflection
– Profile
25
Airport Pavement Inspection
TEXT
26
Airport Pavement Inspection
27
Airport Pavement Inspection
28
Airport Pavement Inspection
Summarize Quantities
29
Airport Pavement Inspection
30
Airport Pavement Inspection
Write Final Report
– Send to Aviation
– Sent to Airport Manager
31
Lessons Learned
Three Major Distresses
–Edge Cracking and Encroachment
–Block Cracking
–Weathering and Raveling
32
Edge Cracking and Encroachment
Probably LowSeverity
Lessons Learned
Not Low Severity!
Lessons Learned
Lessons Learned
Edge Happens !!– Moisture Changes Along Edge of Pavement
• Less Water Under Pavement
• More Water Along Edge
– Soil Shrinks and Swells
– Differential Temperature
– Fix By Crack Sealing (Kill Weeds)
– May Be Able To Address In Design - Wider Bases
Encroachment
37
Lessons Learned
Encroachment–Weeds and Grasses Along Edge of Pavement
–Causes Cracking Along Edge, FOD, Weathering of Pavement
–Reduces Width of Pavement
–Fix With Mowing, Herbicide, Grading, Millings, Wider Bases
Block Cracking - Low SeverityLessons Learned
Medium Block Cracking, Medium Weathering
Lessons Learned
Lessons Learned
What Causes This?–Sun/Ultraviolet and Oxygen Remove Volatiles
(Maltenes)
–Pavement Gets Brittle
–Daily and Annual Temperature Cycling
–Lack of Traffic
–Asphalt Wears Away, Aggregate Gets Loose
–Hello FOD, Goodbye Paint
41
Lessons Learned
For Airports, Block Cracking is Death.
–No Inexpensive Treatments to Fix
42
Lessons Learned
What Fixes This–Fix By Mill and Overlay, Cape Seal, or Reconstruct
• Expensive
• Deteriorates Slowly, So We Can Wait. Fog to Reduce Rate
• Best to PREVENT
43
Lessons Learned
Weathering and Ravelling– Weather is Loss of Fine Aggregate
– Ravelling is Loss of Coarse Aggregate
– Most Common Distress
44
Lessons Learned
45
Lessons Learned
46
Lessons Learned
What Fixes This• Fix Weathering and Raveling by Fog, Coal Tar, Rejuvenator,
Slurry, Overlay, Reconstruct
– Best to PREVENT
47
Lessons Learned
Plan of Attack– Seal Cracks (Every Two Years@ $0.10/Ft)
– Blade Edges and Kill Weeds (Annual)
– Fog Seal (Every 2-4 Years @ $0.10 - $0.20/SY)
– Rejuvenator (See Manufacturer)
– Slurry Seal (5-7 Years @ $1/SY)
48
Lessons Learned
Why Preventive Maintenance?
Why Not Just Let it Rot?
49
Lessons Learned
Advantages of a Preventive Maintenance Strategy
• Lower Overall Cost
• Better Overall Condition
• Fewer Complaints
• Less Down Time
50
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50Age
PC
IPreventiveMaintenance
$1.50/SY $1.20/SY $1.50/SY
Total = $4.20
Runway Closed 1 - 3 Days Each Time
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50Age
PCI
Overlay
$6/SY $6/SY $6/SY
Total = $18
Runway Closed 4 - 10 Days Each Time
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50Age
PC
IReconstruct
$12/SY $12/SY
Total = $24
Runway Closed 4- 6 Months Each Time
Where Do You Turn For Assistance TxDOT
– Division of Aviation
• 1-800-68-Pilot
Department of Transportation
• RAMP Coordinators
Consultants
Me - Tom Freeman [email protected]
Finale
55
Questions?