5
The European Organisation for the Safety of Air Navigatio AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions Paul Bosman Manager SWIM/EA Unit, Agency focal point AIM EUROCONTROL

AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

  • Upload
    takara

  • View
    23

  • Download
    0

Embed Size (px)

DESCRIPTION

AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions. Paul Bosman Manager SWIM/EA Unit, Agency focal point AIM EUROCONTROL. ICAO Air Navigation Conference - I 19 – 30 Nov. ICAO Air Navigation Conference AIM/SWIM relevant papers. AIM. WP9ICAO – AIM progress - PowerPoint PPT Presentation

Citation preview

Page 1: AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

The European Organisation for the Safety of Air Navigation

AISAIM-SG-#7, 14 January 2013

AIM relevant - ANC conclusions

Paul BosmanManager SWIM/EA Unit, Agency focal point AIMEUROCONTROL

Page 2: AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

2

ICAO Air Navigation Conference - I19 – 30 Nov

Page 3: AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

3

ICAO Air Navigation ConferenceAIM/SWIM relevant papers

• WP9 ICAO – AIM progress• WP45 Europe – AIM/AIXM developments• WP47 Europe – Airport Mapping DataBase• WP84 Russia• WP103 CANSO• IP6 ICAO• IP32 South Africa• IP44 South Korea

• WP7 ICAO – basic SWIM concept• WP43 European progress on SWIM• WP64 FAA – Performance Based Info Management• WP102 CANSO – ISO standardisation• WP127 Industry – Support• IP35 South Africa

See http://www.icao.int/meetings/anconf12/pages/default.aspx

AIM

SWIM

Page 4: AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

4

ICAO Air Navigation ConferenceAIM Conclusions in a nutshell

• ICAO to• Expedite AIM SARPS and Guidance• Review NOTAM system - building from Digital NOTAM

• States• To accelerate AIS2AIM transition (via digital data-chain)• Encouraged to impl quality processes from data origin onwards• Encouraged to impl (sub-)regional Db & digital data exchange• Review NOTAM proc, guidance & oversight

• Industry• To provide AIM systems

Page 5: AISAIM-SG-#7, 14 January 2013 AIM relevant - ANC conclusions

5

ICAO Air Navigation ConferenceSWIM Conclusions in a nutshell

• ICAO• Develop (2014) global SWIM/IM• Develop relevant provisions/technical specifications (open & rely on generic international

standards) in close collaboration with aviation community• Specifically look at security and bandwidth requirements• Update ICAO IM/SWIM working arrangements

• States and stakeholders• Contribute to further development and harmonization of performance-based information

management• Demonstrate (together) how SWIM will meet needs of future ATM

• Industry• Support the transition towards SWIM with appropriate systems supporting automation and

the exchange of all relevant air traffic management data in a globally standardized manner