22
AMS TIM & General Meeting AMS TIM & General Meeting ACC Testbeam Performance & ACC Testbeam Performance & KSC Cosmic Data KSC Cosmic Data Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th January 2011

AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data

Embed Size (px)

DESCRIPTION

AMS TIM & General Meeting ACC Testbeam Performance & KSC Cosmic Data. Ch Chung, A. Goerres, Th. Kirn I. Phys. Institute B, JSC Gilruth Center Houston, 24th January 2011. 2010 August Testbeam → ACC Inefficiency Studies. Beam. Rotation stand. 2010 August Testbeam Configuration. - PowerPoint PPT Presentation

Citation preview

Page 1: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

AMS TIM & General Meeting AMS TIM & General Meeting ACC Testbeam Performance & ACC Testbeam Performance &

KSC Cosmic Data KSC Cosmic Data

Ch Chung, A. Goerres, Th. Kirn

I. Phys. Institute B,

JSC Gilruth Center Houston, 24th January 2011

Page 2: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

2

2010 August Testbeam → ACC Inefficiency Studies

Beam

Rotationstand

Page 3: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

3

2010 August Testbeam Configuration

4 positions for ACC-test

(1) panel (8mm thickness), exchanged PMT (3) slit region (2x4mm thickness), shared PMT

(2) panel (8mm thickness), original PMT (4) slit region (2x4mm thickness), separate PMT

180 GeV proton-beam

Ø beamspot: ~ 3 cm

Page 4: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

4

Event Selection

Requirements:

- Trigger from Upper TOF

- Single reconstructed TRD-Track

- TRD-Track matching beam config.

- matching TOF-hit positions

Page 5: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

5

TOF-hit matching TRD track

TRD track – center of TOF panel

good event

Page 6: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

6

Event Selection

Requirements:

- Trigger from Upper TOF

- Single reconstructed TRD-Track

- TRD-Track matching beam config.

- matching TOF-hit positions

Page 7: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

7

Requirements: 7.661.060

- Trigger from Upper TOF 5.310.522

- Single reconstructed TRD-Track 2.994.861

- TRD-Track matching beam config. 705.926

- matching TOF-hit positions 528.643

Event Selection

Page 8: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

8

Inefficiency (only TRD-Track)

ACC inefficiency:

I < 6.00 · 10-6 (@ 95% CL)

requirement: Idesign < 10-4

Missed Events

Panel (8 mm thickness) (P1, P2):

0 out of 259,245 → I < 1.16·10-5

Slit region (2x4mm thickness),

shared PMT (P3):

0 out of 125,010 → I < 2.40·10-5

Slit region (2x4mm thickness),

different PMT (P4):

1 out of 144,268 → I < 4.00·10-5

~6cm

P4P1 P2 P3

8mm panel region: ~73%slit region: ~27%

Page 9: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

9

Event Selection using Tracker

Requirements:

- Trigger from Upper TOF

- Single reconstructed TRD-Track

- TRD-Track matching beam config.

- matching TOF-hit positions

- Tracker information

Tracker information(3 Tracker-layers below TRD)

Page 10: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

10

Requirements: 7661060

- Trigger from Upper TOF 5310522

- Single reconstructed TRD-Track 2994861

- TRD-Track matching beam config. 705926

- matching TOF-hit positions 528643

- min. 2 matching TrCluster-hits

on first 3 layers below TRD 415966

- linear fit / check for chi² 324826

- track predicts ACC-hit 322884

Event Selection

322,884 events after all cuts

Page 11: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

11

TrCluster:

- distance from all Cluster-hits to extrapol. TRD-track

- x & y coordinate of nearest hit is within TRD-track- uncertainty (~1cm)

Matching Tracker-hits

Page 12: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

12

Matching Tracker-hits

TrCluster:

• distance from all Cluster-hits (incl. multiplicity) to extrapol. TRD-track

• x & y coordinate of nearest hit is within TRD-track- uncertainty (~1cm)

multiplicity

Page 13: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

13

Fit Quality of Tracker track

• min. 2 matching hits on 3 Tracker-layers below TRD

• fit linear Track through points, not including bending in y-direction

• check for chi²

Page 14: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

14

Dimensions

panel width: 22 cm

beamspot Ø: 3 cm

Slit region (nut & spring)

width of slit regionbetween panel: 0.6 cm

Inefficiency

Missed Events and Inefficiency

Panel (8 mm thickness):

1 out of 304,022 → I < 1.90·10-5

Slit region (2x4mm thickness), shared PMT:

0 out of 9,450 → I < 3.17·10-4

Slit region (2x4 mm thickness), different PMT:

0 out of 9,412 → I < 3.18·10-4

Page 15: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

15

~97% ~3%of total scintillator-area

ACC Inefficiency:

I < 1.89 · 10-5 (@ 95% CL)

requirement: Idesign < 10-4

Inefficiencies

Panel (8 mm thickness):

I < 1.90·10-5

Slit region (2x4mm thickness),

shared PMT:

I < 3.17·10-4

Slit region (2x4mm thickness),

different PMT:

I < 3.18·10-4

single inefficiencies weighted corresponding to area

Dimensions

panel width: 22 cm

beamspot Ø: 3 cm

Slit region (nut & spring)

width of slit regionbetween panel: 0.6 cm

Inefficiency

Page 16: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

16

ADC-Spectra for 180 GeV p-Beam

Typical ADC-spectra as input for MC-studies

Page 17: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

17

TDC-Spectra for 180 GeV p-Beam

Typical ADC-spectra as input for MC-studies

Page 18: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

18

2010 KSC Cosmic Data Period → ACC Stability

Page 19: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

19

- TRD-track for prediction of ACC-hit

- only the center of panel is taken into account

2010 KSC Cosmic Data Period

Wake Ram

Page 20: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

20

2010 KSC Cosmic Data Period

ACC Signal MOP / 10,000 events

Zoom ..

Page 21: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

21

2010 KSC Cosmic Data PeriodACC Stability

ACC Signal MOP / 10,000 events

In the same configuration period, all 16 PMTs are stable less than 2% level

Page 22: AMS TIM & General Meeting  ACC Testbeam Performance &  KSC Cosmic Data

22

2010 KSC Cosmic Data Period ACC Stability

Wake +Z RAM +Z

Wake -Z RAM -Z