2
© COPYRIGHT MACCAFERRI © 2019 Maccaferri. All rights reserved. Maccaferri will enforce Copyright. Construction period: Products used: Contractor: Designer: Client: Consultant: CASE HISTORY Rev: 01, Apr 08, 2019 SLOPE PROTECTION Production: MacMat R 6822 GO EROSION CONTROL ON THE AMUR GPP RAILWAY AMUR REGION, DISTRICT OF THE CITY OF SVOBODNIY Construction site Amur GPP Problem description The railway was built from the station of Ust-Pera of the Trans -Siberian Railway to Amur gas processing plant for equipment and materials transportation and finished products delivery. The height of the railway embankment is more than 26 meters and slope length exceeds 50 m. Such high and extended slopes required the stabilizing. Solution description To stabilize the subgrade slopes, the project envisaged the slope strengthening with MacMat R 6822 GO, geosynthetic material, reinforced with a double twist wire mesh. To ensure the subgrade stability the 640,000 sq. m of reinforced geomat were installed. The steel wire mesh of the geomat has additional PVC coating that protects the wire from the chemical and biological effects of the environment. The geomat MacMat is a three-dimensional panel of polypropylene fibers tangled together and forming a highly elastic layer of high porosity. Thanks to this structure, the plant roots sprout through it. Tangled with the material fibers they form complex structure that stabilizes the topsoil. For germination of plant roots through the geomat, at the stage of dumping vegetable soil, hydro-seeding was used at the construction site. MACMAT R 6822 GO - 640 000 М 2 APRIL 2018 - SPRING 2019 Rolls of MacMat at the construction site The process of installing geomats GAZPROM PROCESSING BLAGOVESHCHENSK, LLC NIPIGAZ, LLC NIPIGAZ, JSC MACCAFERRI GABIONS CIS, LLC

AMUR REGION - maccaferri.com

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AMUR REGION - maccaferri.com

© C

OPYRIG

HT

MACCAFE

RRI

© 2

01

9 M

acca

ferr

i. A

ll ri

gh

ts r

ese

rve

d.

Ma

ccafe

rri w

ill e

nfo

rce

Co

pyri

gh

t.

Construction period:

Products used:

Contractor:

Designer:

Client:

Consultant:

CASE HISTORY Rev: 01, Apr 08, 2019

SLOPE PROTECTION

Production: MacMat R 6822 GO

EROSION CONTROL ON THE AMUR GPP RAILWAY AMUR REGION, DISTRICT OF THE CITY OF SVOBODNIY

Construction site Amur GPP

Problem description

The railway was built from the station of Ust-Pera of the Trans

-Siberian Railway to Amur gas processing plant for equipment

and materials transportation and finished products delivery.

The height of the railway embankment is more than 26 meters

and slope length exceeds 50 m. Such high and extended

slopes required the stabilizing.

Solution description

To stabilize the subgrade slopes, the project envisaged the

slope strengthening with MacMat R 6822 GO, geosynthetic

material, reinforced with a double twist wire mesh. To ensure

the subgrade stability the 640,000 sq. m of reinforced geomat

were installed. The steel wire mesh of the geomat has

additional PVC coating that protects the wire from the

chemical and biological effects of the environment.

The geomat MacMat is a three-dimensional panel of

polypropylene fibers tangled together and forming a highly

elastic layer of high porosity. Thanks to this structure, the

plant roots sprout through it. Tangled with the material fibers

they form complex structure that stabilizes the topsoil.

For germination of plant roots through the geomat, at the

stage of dumping vegetable soil, hydro-seeding was used at

the construction site.

MACMAT R 6822 GO - 640 000 М2

APRIL 2018 - SPRING 2019

Rolls of MacMat at the construction site

The process of installing geomats

GAZPROM PROCESSING BLAGOVESHCHENSK,

LLC

NIPIGAZ, LLC

NIPIGAZ, JSC

MACCAFERRI GABIONS CIS, LLC

Page 2: AMUR REGION - maccaferri.com

© C

OPYRIG

HT

MACCAFE

RRI

MACCAFERRI GABIONS CIS, LLC Build. 1, 13 Sharikopodshipnikovskaya st., Moscow, 115088 T: +7 (495) 108-58-84 E: [email protected]

www.maccaferri.ru

© 2

01

9 M

acca

ferr

i. A

ll ri

gh

ts r

ese

rve

d.

Ma

ccafe

rri w

ill e

nfo

rce

Co

pyri

gh

t.

The geomats at the construction site were installed by the

“NIPIGAZ” JSC. The geomat roll limited weight allowed

avoiding the use of special equipment. So the geomats were

installed by teams of 4–5 workers. The standard width of a

rolled material is 2 meters when the roll length is up to 75

running meters. This ensured quick covering of large areas.

Properly organized work process allowed team to install from

3 to 5 thousand sq. meters per shift.

The geomats are made with high-quality primary raw

materials at the LLC “MACCAFERRI GABIONS CIS” plant in

Zaraysk (Moscow Region). The laboratory thoroughly controls

the quality of each geomat batch.

Laying geomats MacMat R 6822 GO on railway slopes

Installing and rolling rolls of MacMat on the slope

Geomats backfilling with vegetable soil