Hat Sheet Pile (900mm wide) Tubular Pile Construction Revolution An efficient wall structure combining Tubular Piles (Strength & Stiffness) and Hat Sheet Piles (Watertightness) Combi-Gyro Method

An efficient wall structure combining Tubular Piles (Strength ......diameter, pile length, and distance between piles of Tubular piles in accordance with height of wall structure and

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: An efficient wall structure combining Tubular Piles (Strength ......diameter, pile length, and distance between piles of Tubular piles in accordance with height of wall structure and

Hat Sheet Pile (900mm wide)

Tubular Pile

Construction Revolution

An efficient wall structure combining Tubular Piles (Strength & Stiffness) andHat Sheet Piles (Watertightness)

Combi-Gyro Method

Page 2: An efficient wall structure combining Tubular Piles (Strength ......diameter, pile length, and distance between piles of Tubular piles in accordance with height of wall structure and

Press-in Work Operation

Hat Sheet Piles and Tubular Piles can be installed by the same Press-in Machine

Work is Possible under Severe Construction Conditions

Building Highly Stiff Wall Structure with Excellent WatertightnessHat Sheet Piles and Tubular Piles can be installed bythe same Press-in Machine

Systemized method overcoming overhead restrictionSystemized method for over water, in narrow space,or on sloping or uneven ground

■ The Pile Diameter and Distancebetween Piles are Flexibly Adjustable

Non-Staging System Overhead Clearance System

Standard ModeWater Jetting Mode

Ground Hardness

Gyropress Method TM

■ Cross-Sectional Shape

Hat Sheet Pile (900mm wide)

Super Crush Mode

SofterHarder

Tubular Piles

Silent Piler

StandardMode Chuck

Tubular PileChuck

Post ExcavationInstallation in Progress

Hat Sheet Pile (900mm wide)

Tubular Pile

Combi-Gyro Method

Piler Jet Reel

StandardMode Chuck

Hose Reel

Pile Auger

Super CrushMode Chuck

■ All piling procedures can be carried out on the pressed-in piles with GRB System and enables fast construction at various places with emilinating temporary works.

Page 3: An efficient wall structure combining Tubular Piles (Strength ......diameter, pile length, and distance between piles of Tubular piles in accordance with height of wall structure and

Levee Reinforcement

© 2014 GIKEN LTD. All Rights Reserved. Ver 2.1EN05 / 12 Jan 2018

Practical Example

■ Building a rational and very economic wall structure by adjusting pile length of Hat sheet piles and pile diameter, pile length, and distance between piles of Tubular piles in accordance with height of wall structure and ground conditions.

Excellent Waterproofing andThe Wall Structure is Easily Dismantled

Very Suitable for Fast Construction for Anti-Seismic Reinforcement andLiquefaction Measures

Highway Retaining Wall

Temporary Cofferdam

Construction Design & Planning Group

1-3-28 Ariake, Koto-ku, Tokyo 135-0063, Japan

Tel. : +81-(0)3-3528-2633 Fax : +81-(0)3-3527-6055

Email : [email protected]

GIKEN LTD.

For more contact information, please visit:

http://www.giken.com/en/contactus/groupcompanies

Construction Solutions Company www.giken.com

Global Network : Japan, USA, UK, Germany, Singapore, China, Australia

The Combi-Gyro Wall System is a joint development between GIKEN LTD. and NIPPON STEEL & SUMITOMO METAL CORPORATION.