ANALISA PRODUKTIVITAS DAN FAKTOR YANG
MEMPENGARUHI KINERJA TUKANG PADA PEMASANGAN
BATA DENGAN METODE PRODUCTIVITY RATING
(Studi Kasus: Rumah Susun-SNVT Universitas Brawijaya)
Skripsi
Diajukan Kepada Universitas Muhammadiyah Malang
Untuk Memenuhi Salah Satu Persyaratan Akademik
Dalam Menyelesaikan Program Sarjana Teknik
Disusun Oleh:
FITRI MAULIDIA
201310340311078
JURUSAN TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS MUHAMMADIYAH MALANG
2017
ii
LEMBAR PENGESAHAN
JUDUL : ANALISA PRODUKTIVITAS DAN FAKTOR YANG
MEMPENGARUHI KINERJA TUKANG PADA
PEMASANGAN BATA DENGAN METODE PRODUCTIVITY
RATING (STUDI KASUS: RUSUN-SNVT UNIVERSITAS
BRAWIJAYA)
NAMA : FITRI MAULIDIA
NIM : 201310340311078
Pada Hari Selasa, 21 Maret 2017, telah diuji oleh tim penguji:
1. Ir. Rofikatul Karimah, MT. Dosen Penguji I ……………
2. Moh. Abduh, ST., MT. Dosen Penguji II ……………
Disetujui:
Dosen Pembimbing I Dosen Pembimbing II
(Ir. Yunan Rusdianto, MT.) (Rini Pebri Utari, SPd., MT.)
Mengetahui,
Ketua Jurusan Teknik Sipil
(Ir. Rofikatul Karimah, MT.)
iii
SURAT PERNYATAAN
Yang bertanda tangan di bawah ini:
Nama : FITRI MAULIDIA
NIM : 201310340311078
Jurusan : TEKNIK SIPIL
Fakultas : TEKNIK
UNIVERSITAS MUHAMMADIYAH MALANG
Dengan ini saya menyatakan sebenar-benarnya bahwa: Tugas Akhir dengan judul:
“ANALISA PRODUKTIVITAS DAN FAKTOR YANG MEMPENGARUHI
KINERJA TUKANG PADA PEMASANGAN BATA DENGAN METODE
PRODUCTIVITY RATING (STUDI KASUS: RUSUN-SNVT UNIVERSITAS
BRAWIJAYA)” adalah hasil karya saya dan bukan karya tulis orang lain, dan dalam
naskah tugas akhir ini tidak terdapat karya ilmiah yang pernah diajukan orang lain
untuk memperoleh gelar akademik di suatu Perguruan Tinggi dan tidak terdapat karya
atau pendapat orang yang pernah ditulis atau diterbitkan oleh orang lain, baik
sebagian maupun seluruhnya, kecuali yang secara tertulis dikutip dalam naskah ini
dan disebutkan dalam sumber kutipan atau daftar pustaka. Demikian pernyataan ini
saya buat dengan sebenarnya dan apabila pernyatan ini tidak benar saya bersedia
mendapat sanksi akademis.
Malang, 19 April 2017
Yang menyatakan
Fitri Maulidia
iv
KATA PENGANTAR
Puji syukur alhamdulillah penulis panjatkan kehadirat Allah SWT atas berkat,
rahmat, taufik dan hidayah-Nya, penyusunan skripsi yang berjudul “Analisa
Produktivitas dan Faktor yang Mempengaruhi Kinerja Tukang pada Pemasangan
Bata dengan Metode Productivity Rating (Studi Kasus: Rusun-SNVT Universitas
Brawijaya)” dapat diselesaikan sebagai syarat yang harus ditempuh oleh mahasiswa
Jurusan Teknik Sipil Fakultas Teknik Universitas Muhammadiyah Malang.
Penulis menyadari bahwa dalam proses penulisan skripsi ini banyak mengalami
kendala, namun berkat bantuan, bimbingan, kerjasama dari berbagai pihak dan berkah
dari Allah SWT sehingga kendala-kendala yang dihadapi tersebut dapat diatasi.
Untuk itu penulis menyampaikan rasa hormat dan banyak terima kasih kepada:
1. Ibu, Bapak dan Kakak yang sangat saya cintai, yang tiada hentinya mendukung
dan mendoakan saya, sehingga selalu diberikan kemudahan oleh Allah SWT.
2. Ibu Ir. Rofikatul Karimah MT., sebagai Ketua Jurusan Teknik Sipil Universitas
Muhammadiyah Malang, yang telah memberikan arahan, petunjuk dalam
penyelesaian skripsi ini.
3. Bapak Ir. Yunan Rusdianto, MT. selaku pembimbing I yang telah dengan sabar,
tulus dan ikhlas meluangkan waktu, tenaga dan pikiran memberikan bimbingan,
motivasi, arahan, dan saran-saran yang sangat berharga kepada penulis selama
menyusun skripsi.
4. Ibu Rini Pebri Utari, Spd., MT. selaku pembimbing II yang telah dengan sabar,
tulus dan ikhlas meluangkan waktu, tenaga dan pikiran memberikan bimbingan,
motivasi, arahan, dan saran-saran yang sangat berharga kepada penulis selama
menyusun skripsi.
5. Bapak Moh. Abduh, ST., MT., Bapak Ir. Ernawan Setyono, MT., Bapak Ir. HE.
Meiyanto, MT. selaku pembanding yang telah memberikan banyak saran.
v
6. Seluruh Dosen Program Studi Teknik sipil Universitas Muhammadiyah Malang
yang telah memberi bekal ilmu pengetahuan sehingga penulis dapat
menyelesaikan studi dan menyelesaikan penulisan skripsi ini.
7. Seluruh Karyawan Program Studi Teknik Sipil Universitas Muhammadiyah
Malang, yang telah membantu dan memudahkan penulis dalam penyelesaian
skripsi ini.
8. Bapak Gon selaku pihak PT. Rahmat Utama Mulia yang sudah sering membantu
saya dalam penelitian ini.
9. Teman-teman seperjuangan saya: Alviani, Dina Kamelia, Nadya Widyastuti,
Dimas Alfiyan Saputra, Al Luthfi Dwi Kurnia P., Oldi Martha Fermana,
Muhammad Rifqi K., dan Sugiarta Sepmita. “You are my besties guys, thanks for
always stay with me in my difficult time. Semoga Allah membalas kebaikan
kalian ya Oppa dan Oennie, amiin. “
10. Teman-teman dan adik kost Tombo Ati (Gang IV No.9): Siti Mardiyah, Zakiyah
Rakhma, Febriana D. S., Rizki Maulida, Luluk Nur H., Rohmatul Maghfiroh,
Ramandita Ananda, Dwi Oktavya N, Rosalina, Vega Meyriska dan Yunda Sizilia
selaku TIM HORE dan penyemangat di kost.
11. Kak Akhmad Rizal dan Adham Amirullah yang menjadi penasehat saya selama
mengerjakan Tugas Akhir ini.
12. Rekan-rekan Mahasiswa Program Studi Teknik Sipil yang telah banyak
memberikan masukan kepada penulis baik selama dalam mengikuti perkuliahan
maupun dalam penulisan skripsi ini.
13. Semua pihak yang tidak dapat penulis sebut satu persatu yang telah membantu
dalam penyelesaian penulisan skripsi ini.
Akhirnya, dengan segala kerendahan hati penulis menyadari masih banyak
terdapat kekurangan-kekurangan, sehingga penulis mengharapkan adanya saran dan
kritik yang bersifat membangun demi kesempurnaan skripsi ini. Penulis juga
berharap semoga Skripsi ini dapat bermanfaat bagi pembacanya. Amiin
viii
DAFTAR ISI
LEMBAR PENGESAHAN ..............................................................................ii
SURAT PERNYATAAN ..................................................................................iii
KATA PENGANTAR .......................................................................................iv
ABSTRAK .........................................................................................................vi
DAFTAR ISI ......................................................................................................viii
DAFTAR TABEL .............................................................................................xi
DAFTAR GAMBAR .........................................................................................xiv
DAFTAR RUMUS ............................................................................................xv
BAB I PENDAHULUAN
1.1. Latar Belakang Masalah ...........................................................................1
1.2. Rumusan Masalah ..................................................................................4
1.3. Tujuan Penelitian ......................................................................................4
1.4. Manfaat Penelitian ....................................................................................5
1.5. Batasan Masalah .......................................................................................5
BAB II TINJAUAN PUSTAKA
2.1. Tinjauan Umum .........................................................................................6
2.2. Dasar Teori .................................................................................................8
2.2.1. Produktivitas ......................................................................................8
2.2.2. Produktivitas Tenaga Kerja ................................................................9
2.2.3. Tenaga Kerja ......................................................................................10
2.2.4. Pengukuran Produktivitas Tenaga Kerja ...........................................10
2.2.5. Peningkatan Produktivitas Kerja ........................................................12
2.2.6. Pengaruh Produktivitas Terhadap Scheduling ...................................13
ix
2.2.7. Faktor-faktor Mempengaruhi Produktivitas.......................................14
2.2.8. Batu Bata ............................................................................................17
2.2.9. Alat dan Bahan untuk Pekerjaan Pasangan Bata ...............................19
2.2.10. Pekerjaan Pasangan Bata .................................................................20
BAB III METODE ANALISIS
3.1. Uraian Umum ..............................................................................................23
3.2. Lokasi dan Waktu Penelitian ......................................................................23
3.3. Tahap dan Prosedur Penelitian ....................................................................24
3.4. Teknik Pengumpulan Data ..........................................................................28
3.5. Metode Productivity Rating dalam Pengukuran Produktivitas ...................29
3.6. Alat Pengumpulan Data ..............................................................................30
3.7. Definisi Operasional dan Pengukuran Operasional Variabel......................30
3.7.1. Definisi Operasional Variabel ...........................................................30
3.7.2. Pengukuran Variabel .........................................................................32
3.8. Analisa Data Penelitian..............................................................................41
3.8.1. Analisis Deskriptif .............................................................................41
3.8.2. Uji Validitas dan Reliabilitas .............................................................42
3.8.3. Uji Normalitas ...................................................................................44
3.8.4. Analisis Regresi Linier Sederhana ....................................................44
3.8.5. Analisis Regresi Linier Berganda ......................................................45
3.8.6. Uji Hipotesis ......................................................................................46
3.9. Cara Kerja SPSS ........................................................................................47
BAB IV ANALISA DATA DAN PEMBAHASAN
4.1. Gambaran Umum Proyek Rusun-SNVT Universitas Brawijaya ................49
4.2. Pekerjaan Pasangan Bata Merah di Rusun-SNVT UB ...............................50
x
4.3. Pengumpulan Data ......................................................................................51
4.4. Data Hasil Pengamatan ...............................................................................52
4.4.1. Data Jawaban Kuesioner ....................................................................52
4.4.2. Skoring Data ......................................................................................54
4.4.3. Data Faktor Utilitas (LUR) dan Produktivitas Tukang ......................55
4.4.4. Rekapitulasi Faktor Utilitas & Produktivitas Tukang ........................65
4.5. Pengaruh Produktivitas Terhadap Scheduling ............................................67
4.6. Analisa Data Hasil Penelitian ....................................................................70
4.6.1. Analisis Data Deskriptif ....................................................................70
4.6.2. Uji Validitas dan Reliabilitas .............................................................78
4.6.2.1. Uji Validitas .............................................................................78
4.6.2.2. Uji Reliabilitas .........................................................................81
4.6.3. Uji Normalitas Data ...........................................................................83
4.6.4. Analisis Regresi Linier Sederhana ....................................................84
4.6.5. Analisis Regresi Linier Berganda ......................................................93
4.6.6. Uji Hipotesis ......................................................................................94
4.6.7. Koefisien Determinasi Berganda .......................................................101
4.6.8. Uji Dominasi .....................................................................................102
4.7. Pembahasan Hasil Penelitian .....................................................................103
BAB V KESIMPULAN DAN SARAN
5.1. Kesimpulan .................................................................................................108
5.2. Saran ............................................................................................................108
DAFTAR PUSTAKA ........................................................................................110
xi
DAFTAR TABEL
3.1. Perhitungan LUR Tukang pada Pemasangan Bata ......................................29
3.2. Hubungan Jumlah Butir dengan Reliabilitas Instrumen ..............................43
4.1. Jawaban hasil kuisioner untuk tukang pada pemasangan bata.....................53
4.2. Skoring jawaban kuesioner tukang pada pemasangan bata .........................54
4.3. Hasil LUR dan produktivitas waktu efektif tukang hari ke-1 ......................55
4.4. Hasil LUR dan produktivitas waktu efektif tukang hari ke-2 ......................57
4.5. Hasil LUR dan produktivitas waktu efektif tukang hari ke-3 ......................59
4.6. Hasil LUR dan produktivitas waktu efektif tukang hari ke-4 ......................61
4.7. Hasil LUR dan produktivitas waktu efektif tukang hari ke-5 ......................63
4.8. Rekapitulasi hasil perhitungan LUR tukang selama 5 hari ..........................65
4.9. Rekapitulasi hasil pemasangan bata tukang selama 5 hari...........................66
4.10. Distribusi responden berdasarkan umur (X1.1) ...........................................71
4.11. Distribusi responden berdasarkan ketrampilan dan kecekatan (X1.2) ........72
4.12. Distribusi responden berdasarkan ketrampilan dan kecekatan (X1.3) ........72
4.13. Distribusi responden berdasarkan pengalaman kerja (X2.1) .......................73
4.14. Distribusi responden berdasarkan umur memulai bekerja sebagai tukang
(X2.2) ............................................................................................................73
4.15. Distribusi responden berdasarkan upah yang diterima (X3.1) ....................73
xii
4.16. Distribusi responden berdasarkan kesesuaian upah (X3.2) .........................74
4.17. Distribusi responden berdasarkan kesesuain upah dengan jam kerja
(X3.3) ...........................................................................................................74
4.18. Distribusi responden berdasarkan kesesuaian upah dengan ketrampilan dan
kecekatan pekerja (X3.4) .............................................................................74
4.19. Distribusi responden berdasarkan pernyataan kondisi kesehatan
mempengaruhi kinerja (X4.1) ......................................................................75
4.20. Distribusi responden berdasarkan pernyataan diharuskan tetap bekerja saat
kondisi sakit (X4.2) .....................................................................................75
4.21. Distribusi responden berdasarkan hubungan baik antar pekerja akan
mempercepat pekerjaan (X5.1) ....................................................................76
4.22. Distribusi responden berdasarkan pernyataan hubungan yang kurang baik
akan menghambat kinerja (X5.2).................................................................76
4.23. Distribusi responden berdasarkan ketepatan waktu dalam penyediaan
material kontruksi terhadap kebutuhan (X6.1) ............................................77
4.24. Distribusi responden berdasarkan kelengkapan alat/mesin terhadap
kebutuhan pekerjaan konstruksi (X6.2) .......................................................77
4.25. Distribusi responden berdasarkan kebijakan peraturan perusahaan yang
diterapkan (X6.3) .........................................................................................77
xiii
4.26. Distribusi responden berdasarkan komposisi kelompok kerja (X7.1) .........78
4.27. Distribusi responden berdasarkan kesesuaian komposisi kelompok kerja
(X7.2) ...........................................................................................................78
4.28. Korelasi Product Moment ..........................................................................79
4.29. Hasil uji validitas .......................................................................................80
4.30. Hasil uji validitas .......................................................................................81
4.31. Hubungan jumlah butir dengan reliabilitas Instrumen ...............................82
4.32. Hasil uji reliabilitas ....................................................................................83
4.33. Hasil pengujian normalitas data .................................................................84
4.34. Hasil analisis regresi linier berganda dengan SPSS versi 16 .....................93
4.35. Rekapitulasi nilai t, F, sig dan beta ............................................................94
4.36. Titik persentase distribusi F untuk probabilita = 0,05 ...............................96
4.37. Titik persentase distribusi t ........................................................................98
xiv
DAFTAR GAMBAR
3.1. Bagan alur penelitian..................................................................................25
3.2. Variabel bebas dan Variabel terikat ...........................................................45
3.3. Cara Kerja SPSS ........................................................................................47
4.1. Site Plan Rusun-SNVT Universitas Brawijaya ..........................................49
4.2. Tampak depan dan belakang Rusun-SNVT Universitas Brawijaya ..........50
4.3. Schedule Rencana ......................................................................................67
4.4. Schedule Pelaksanaan ................................................................................68
4.5. Bobot Scheduling Harian Rencana ............................................................68
4.6. Bobot Scheduling Harian Pelaksanaan ......................................................68
4.7. Grafik hubungan variabel umur dengan produktivitas ...............................86
4.8. Grafik hubungan variabel pengalaman kerja dengan produktivitas ...........87
4.9. Grafik hubungan variabel kesesuaian upah dengan produktivitas .............88
4.10. Grafik hubungan variabel kesehatan pekerja dengan produktivitas ..........89
4.11. Grafik hubungan variabel hubungan antar pekerja dengan
produktivitas ...............................................................................................90
4.12. Grafik hubungan variabel manajerial dengan produktivitas ......................91
4.13. Grafik hubungan variabel komposisi kelompok kerja dengan
produktivitas ...............................................................................................92
xv
DAFTAR RUMUS
2.1. Produktivitas ..............................................................................................8
2.2. Produktivitas tenaga kerja .......................................................................9
2.3. Labor Utilization Rate (LUR) ................................................................. 12
2.4. Total pengamatan .....................................................................................12
3.1. Uji Validitas (Korelasi Product Moment) ............................................... 42
3.2. Uji Reliabilitas (Alpha Cronbach) ...........................................................43
3.3. Analisis Regresi Linier Sederhana ...........................................................44
3.4. Analisis Regresi Linier Berganda…………………………………….....45
110
DAFTAR PUSTAKA
Abdurrahman, M. Asad dan Latief, R. Usman. 2013. “Studi Faktor-Faktor Yang
Mempengaruhi Produktivitas Tenaga Kerja Konstruksi Pada Pekerjaan
Pembesian”. Prosiding Penelitian Teknik Sipil Fakultas Teknik
Universitas Hasanuddin. Vol.7 ISBN: 978-878-127255-0-6.
Andi, et al. 2004. “Analisa Produktivitas Pekerja Dengan Metode Work Sampling:
Studi Kasus Pada Proyek X dan Y”. Jurnal Teknik Sipil Universitas
Kristen Petra. Vol.6 No.2.
Aprilian, Thomas. 2010. “Analisis Produktivitas Tenaga Kerja pada Pekerjaan
Struktur Rangka Atap Baja”. Skripsi pada Jurusan Teknik Sipil
Universitas Sebelas Maret Surakarta.
Badan Standarisasi Nasional 2008. SNI 6897:2008: Tata Cara Perhitungan Harga
Satuan Pekerjaan Dinding untuk Konstruksi Bangunan Gedung dan
Perumahan.
Binus University. 2014. “Uji Validitas dan Reliabilitas”. Online at:
http://qmc.binus.ac.id/2014/11/01/u-j-i-v-a-l-i-d-i-t-a-s-d-a-n-u-j-i-r-e-l-i-
a-b-i-l-i-t-a-s (diakses pada 23 November 2016).
Dipohusodo, I. 1996. Manajemen Proyek dan Konstruksi. KANIKUS. Yogyakarta.
Ervianto, W. I. 2002. Manajemen Proyek Konstruksi. ANDI. Yogyakarta.
Ervianto, W. I. 2008. “Pengukuran Produktivitas Kelompok Pekerja Bangunan
Dalam Proyek Konstruksi (Studi Kasus Proyek Gedung Bertingkat
Surakarta)”. Jurnal pada Jurusan Teknik Sipil Universitas Atma Jaya
Yogyakarta. Vol.9 No.1.
Hasan, M. Iqbal. 2013. Analisis Data Penelitian dengan Statistik. PT. Bumi Aksara.
Jakarta.
Kamali, L. 2014. “BAB II TINJAUAN PUSTAKA”. Online at:
http://eprints.ung.ac.id/5017/6/2012-1-22201-511410071-bab2-
10092012031053.pdf.
Mahendra, Giri. 2013. “Pengujian Hipotesis (Uji Koefisien Determinasi, Uji F, Uji
t)”. Online at:
111
http://girimahendra.blogspot.co.id/2013/05/pengujian-hipotesis-uji-
koefisien.html. (diakses pada 27 Oktober 2016).
Mandani, T. 2010. “Analisis Produktivitas Tenaga Kerja Pada Pekerjaan Pasangan
Bata”, Skripsi pada Jurusan Teknik Sipil Universitas Sebelas Maret
Surakarta.
Putti, J. M. 1985. Memahami Produktivitas. National University of Singapore.
Singapore
Tamamengka, J., Pratasis, Pingkan A. K., dan Walangitan, D. R. O. 2016. “Analisis
Tenaga Kerja Terhadap Produktivitas Pada Proyek Konstruksi (Studi
Kasus: Rehabilitasi dan Perluasan Rumah Dinas Rektor Unsrat)”. Jurnal
pada Jurusan Teknik Sipil Universitas Sam Ratulangi Manado. Vol.14
No. 65.
Rini, I. Prasetya dan Tenriajeng, A. Tenrisukki. 2014. “Analisis Risiko Produktivitas
Tenaga Kerja Terhadap Kinerja Waktu Proyek Pada Bangunan
Bertingkat”. Jurnal Desain Konstruksi. Vol.13 No.2.
Simanjuntak, M. Ronald dan A. Yudhia. 2015. “Analisis Faktor-Faktor dan Variabel
Produktivitas Pekerjaan Fasade Kaca Pada Bangunan Gedung Tinggi
Perkantoran di Kawasan Kuningan Jakarta Selatan”. Prosiding SENATEK
2015 Fakultas Teknik, Universitas Muhammadiyah Purwekerto.
Sinungan, Muchdarsyah. 1992. Produktivitas Apa dan Bagaimana. Bumi Aksara.
Jakarta.