9
PROFILE ANURUEGBE BENJAMIN, N Telephone: +971 522808596 Email:[email protected] Summary Experience over 15years with Engineering Consultancy and EPC/FEED/PRODUCTION/MAINTENANCE/industry in Refinery, Oil & Gas/FPSO/Pipeline Projects, Power projects, Substation projects in India, Middle East, Africa and Canada. Specialized skills include: Conceptual design, Detailed engineering, design calculations, preparation of overall Single line diagram, Power and Protection Three line diagram, Equipment Layout, Cable Tray and Lighting Layout, Grounding Plan, Cable sizing, Voltage drop calculation, Cable and Conduit Schedule, Cable Tray fills calculation, HV Cable route drawings, Load List, AC & DC PI&D Distribution schedules, Electrical Heat Tracing wiring and Details, Preparation of scope of work and work packages Development of Control schematic diagram, PLC I/O, Wiring diagram, Interconnection diagram. GIS and AIS Substation Layout and Section, Switching Scheme & Equipment selection, Single Line diagram, Protective Relaying and Metering diagram. Preparation of Preliminary, Detailed Project Report, Bid documents. Procurement- Vendor identification, Preparation of purchase specification (MR), Scope of work, Bid evaluations, Vendor drawing review Knowledge of Electrical code BIS, IEEE, IEC,CEC

Anamin

Embed Size (px)

DESCRIPTION

CV

Citation preview

Page 1: Anamin

PROFILE

ANURUEGBE BENJAMIN, N

Telephone: +971 522808596Email:[email protected]

Summary

Experience over 15years with Engineering Consultancy and EPC/FEED/PRODUCTION/MAINTENANCE/industry in Refinery, Oil &

Gas/FPSO/Pipeline Projects, Power projects, Substation projects in India, Middle

East, Africa and Canada. Specialized skills include: Conceptual design, Detailed engineering, design calculations,

preparation of overall Single line diagram, Power and Protection Three line diagram,

Equipment Layout, Cable Tray and Lighting Layout, Grounding Plan, Cable sizing, Voltage drop calculation, Cable and Conduit Schedule, Cable

Tray fills calculation, HV Cable route drawings, Load List, AC & DC PI&D Distribution schedules,

Electrical Heat Tracing wiring and Details, Preparation of scope of work and work packages Development of Control schematic diagram, PLC I/O, Wiring

diagram, Interconnection diagram. GIS and AIS Substation Layout and Section, Switching Scheme &

Equipment selection, Single Line diagram, Protective Relaying and Metering diagram. Preparation of Preliminary, Detailed Project Report, Bid

documents. Procurement- Vendor identification, Preparation of purchase

specification (MR), Scope of work, Bid evaluations, Vendor drawing review Knowledge of Electrical code BIS, IEEE, IEC,CEC

Nationality: NIGERIAN Date of Birth: 19/12/76 Sex: MALE Marital Status: MARRIED Visa Status: TOURIST

Page 2: Anamin

LANGUAGE KNOWN

English :Fluent French :Basics

EDUCATIONAL BACKGROUND

Federal University Of TechnologyOwerri Imo State NigeriaM. Sc. in Project Management.2000 To 2002.

B, Eng. In ElectricalElectronics Engineering Option Power 1994 To 1999

Abayi Umuocha High School Aba Abia State1988-1993

General Certificate for Education (G.C.E) 1993

PROFESSIONAL TRAINING/SKILLS

2012 :) Helicopter Underwater Escape Training/With SURVIVAL AT SEA (HUET/ BOSIET,

2010) 4 Weeks Training With Areva T&D Electric Company France In Medium Voltage

Technical Solutions AS Primary Distributions, IS Switchgear, Secondary Distributions, Products,

Automation Systems, Automation Services Such As PAS (Process Automation System) And SIS (Safety Instrumented Systems), Ass. ESDV EBDV FM 2010 BY ERHA FPSO EXXONMOBILE NIGERIA, ON PARMIT TO WORK PTW THA JSA Et Management Thru Utilization Of

OPC Based ‘ 2008: 1Month Training Monitoring Systems/CAO / DCS/PLC Systems

And Subsea Controls Management Training Courses. In UK, 2000- NNPC KADUNA REFINENRY KADUNA NYSC TRAINEE ENGINEER

WORK EXPERIENCE

2009 – Till to Date 2009 till Date Elper Engineering and Oilfield Ltd Lagos Nigeria,Position, Snr. Electrical Mant, Engineer Seconded to ErhaFpso, Exxon Mobil Exploration and Production Company, Lagos, R 28x28Electrical Engineer with 15 Years’ Experience in Maintenance, Installation and Commissioning Projects in Oil EnergyField Section, My Experience In The Control, Switchgear, Transformer, Tgsvfd (Variable Frequency Drive)System, Abb Drives (Acs 800),Plc Siemens S7 &S5 ,Scada And DC’s System, Scr (Solid Control Rectification) ,

Page 3: Anamin

Daq System, Instrument Devices, Mcc ,Hps (Horizontal Pump System),Eps (Electrical Submersible Pump)Maintenance Installation and Overhaul For All Ac Motor (Up To 1600 Hp) Maintenance Installation And Overhaul Dc Motor (Up To 1000 Hp), Maintenance, Installation Generator (Cat) (Up To 1714 Kva), Diesel EngineE (Cat) 1000kva Tgs5, 2mw, Power Generation In The Site (Sharing, Synchronize, Excitation), Woodward 2301Speed Control, Amphenol System (I / O Interface), Top Drive Nov (Tds11s & Tds8s) Tesco Eci 900, ElectricalPower Cables Specification (Lv , Mv) ,Ups And Electrical Installation In Hazard Area According To Api ,Nfpa 70, Grounding And Bounding System According To Ieee-142, Nec And Many Projects For New Rigs (On Shore And Offshore Ri Esv Ebdv(Hps Prove Leadership Skills Involving Managing, Developing And Motivating Teams To Achieve Their Objectives.Reliable, Trustworthy and Meticulous, Gained A Good Understanding of What Is Required Of An Electrical EngineerElectrical /Power Generation Contracted On Month-On/Month-Off Rotation, Responsible For Daily OperationOf 4 X 11mw Power Generators, 2 X 2mw Diesel Generators and Associated Hv/Lv Power Distribution Network. Isolation and De-Isolation of Fpso Electrical Utilities (6.6kv, 400v, 230v).Completion Of All Outstanding Electrical Conduct 3yrs Pm on Transformers with Delta 3000 Megger, .As Condition Monitoring and Maintenance CrudeTransfer to Export Line Mov, Ensure That Valve Is Set On Limit or Torque per Oem Recommendation, Check TheMotor for Physical Damage. Inspect The Terminal Box /Gladding On The Motor. Run Pm On /Monthly Inspection Of Protective Relay on Switchgears. Run Pm/Corrective In Our Falls Equipment. /Installation of the New Equipment.Verify Grounding And Bonding On 11kv Electrical Distribution Panel / Bus. Experience in Elss/Pdcs.Basic Knowledge on Transformer, High Voltage Networks, Distribution Systems, Medium Voltage Switchgear, HighVoltage Circuit Breakers, and Conduit Systems and Admirable Experience Working As an ElectricalMaintenance Ieee-142, Nec And Many Projects For New Rigs (On Shore) And Offshore Rig Prove Leadership Skills Involving Managing, Developing and Motivating Teams To Achieve Their Objectives.Reliable, Trustworthy and Meticulous, Gained A Good Pre-Commissioning, Commissioning Of

Electrical Substations 30/5.5kv Mv Switchgear Abb 30 Kv. Mv Switchgear Abb 5.5 Kv.Lv Switchgear Abb 0.4 Kv.Megger and Hi-Pot Test Cables, Bus Duct and Bus Bar

Page 4: Anamin

Functional Test and Solo Run Test of MotorsTesting Different Protection the Switchgears with Vendor’s Manipulation in the Relay Abb Engineer Good Understand Of Electrical Maintenance Work Processes Practices Familiarity with Electrical Controls Systems Repair, Electrical Systems Repair and Installation Techniques Conduct Pm on the Equipment’sSolid Knowledge of Medium/High Voltage Motors and Electrical Distribution Systems Deep Knowledge of Plc and Automation Systems Skilled In Analyzing Root Cause Failure and Total Productive Exceptional Knowledge of the Plc Drives, Computerize Control and Power Distribution Outstanding Ability to Work on High Speed Packaging Equipment Ability to Work with Six Sigma and Nec Remarkable Communication Skills Provided Technical Support to the Team Members and Resolved All Problems. Familiar with Applicable Legislation and Isolation Procedures Relevant To All Aspects of the Maintenance To Be Performed. Ensure Completion of the Job Hazard Analysis Process for Work That Would Present Any Hazard or Risk to Personnel or Equipment. Work in Hazardous Areas under Permit to Work, Ptw, Tha, Jsa, Regulations Inspect and Maintain All Safety...To ensures The Completion Maintenance In Accordance With Policy and Procedures. To Function Test /Run Integrity Test on Equipment’s

2002 To 2009 KBR Halliburton NigeriaPositions, Electrical Engineer2009 Obumeze Gas Processing Plant in Ahoda East L.G.A. River State Nigeria Client Niger Delta Exp & Productions Plc.Detail Design of Electrical & Instrument, Preparation of Procurement Package For 17mwgas Turbine Generator 1000kw Diesel Engine 6,6kv And 415 Power Distribution Load Distribution, Generate Electrical Load List and Equipment List Update Electrical One Line Diagrams Assist The Lead Engineer In Control Philosophy Document. Responsible For E & I Site Visit in QitGas P

, GAS processing Plant, Alpha-Prime, Congo Position Snr, and ElectricalSupervisor, 2007 T0 2008Client Independent Energy Nigeria Limited Seconded Me to Congo Project Team Of 17 Design Specialists and Multiple Construction Subcontractors to Design, Procure, Install and CommissionThe Access Network for the World’s Largest Airport Which Is Surrounded by Seven Cities on a Territory

Page 5: Anamin

Of 147 Square Kilometers. Our Daily Operations Included Interfacing with All the Civil Site Construction And Working closely With the Client’s Engineering Team and Their Consultants to Obtain Approval For Our Network Designs, Qualify The Material Suppliers And Execute The Site Installations.The Following Departments Were Directly Reporting To Me: Engineering, Construction, Qa/Qc, Document Control, Project Controls, Scheduling and Procurement &Logistics(Open) 1recommendation For Project Management, Procurement Assists Site Supervision. Generate The Entire Qit Built Electrifications Drawing. Protection Divorce Coordination Supervision of All Power Installations, Transformer Generators Wiring And Positioning For Lighting, Power Cables and Circuit Breakers for ProtectionProvision of Power Sockets LayoutJob Responsibilities: Detailed Engineering, Design Calculations, Preparation Of Overall Single Line Diagram, Power, Protection & Metering Three LineDiagram, Equipment’s Layout, Gis and Ais Substation Layout AndSection, Substation Equipment’s& Switching Scheme Selection, Cable Sizing, VoltageDrop Calculation, Hv Cable Route Drawing, Grounding System. Cost EstimatesPreparation of Equipment's Technical Specifications, Tender Documents, Bid Evaluations, Vendors Drawing Review. Projects: Power and Substation Projects(Gis & Ais) 2004 Projects: 400kv & 220kv Gis Substation

Project, Abu Dhabi, UAE Feb 2005 Dec 2006Job Responsibilities: Detailed Engineering, Preparation of Substation Layout,Cable Sizing, Cable Schedule, Cable Tray Fill Calculation & Layout, Hv Route Drawings, Grounding System, Bill of Quantities Projects: 400kv & 220kv GIs Substation Project, Abu Dhabi, UaeJob Responsibilities: Detailed Engineering, Preparation of Substation Layout, CableSizing, Cable Schedule, Cable Tray Fill Calculation & Layout, Hv Cable Route Drawings, Grounding System, Bill of Quantities Projects: 400kv & 220kv Gis Substation Project,Abu Dhabi, UAEExpert at Providing Technical Support in the Energy, Thermal Sectors, I Am Highly Skilled InElectrical Programmable Control Systems. The Coherence of My Offer Is Supported By Proven Track Record As Much As a In Gingering Departments than As a Site / ConstructionManager in the Realization of Pilot Projects, Construction Projects, Equipment Installations& Startups. I Have Achieved the Startup of a Gis Substation- 2x 400kv Abb with Local

Page 6: Anamin

Supervisors & Teams, the Pre Commissioning & Commissioning For Two Mw UnitsI Organized My Teams and Supervisors for a Start up In Full Compliance With Standards, the Production and the O&M of the Pumping Station, HydroelectricPower Plant and Its Two Ais Substations of 220kv. Phase 6 Power System Expansion Inspection and Erection Activities for Both Subcontractors (Abb and Siemens).Contract Value for Quality and Delivery 6 Weeks After Confirmation of All Technical Details. In Charge Of Repairing And Testing Switchboard In Where Transients Blow-Up 350kw Motor, , Ht Fuses On Contactor AndCapacitor Bank In Various Panels. Analysis Showed That Prestriking - Disappeared After Final Repair Test.Working Well InMultinational Environment, Under Pressure, Have Tutorial Skills, Like Challenges, Quickly Adaptable On Changes. Good Planning AnD Coordination Skills between Different Departments. Specialties: Switchgear From 0,4-33kv GIs And Ais, Substations Up To 220kv, Protection Relays Testing, Siemens Digital Fault Recorders, Project Management, Market Analysis, Research,Manufacturer of Switchgears, Mcc, Control Panels, Protective Relays In Technical Collaboration Job Responsibilities: Preparation Of Single Line Diagram, General Arrangement/Layout Of Panels, Development Of Control Schematic & Wiring Diagram, Terminal Details, Selection Of Components, Bill Of QuantitiesAnd Estimates For Motor Control Centre, Controls & Relay Panels And Substations-Gis Type..

2000 To 2001 Nei (Uk) - Khartoum, Sudan (Africa) Position Electrical Engineer’Job Responsibilities: Co-Ordination With Client For Technical Matter, Interface, Supervision Of Electrical Work Project: North Khartoum Power Station 220kv.Power Transmission Substation. ElectricalEngineer For Feed And Detailed Design Of 220kv Wellhead Distribution Network For Csg Well Fields. Design Options, Supervision Of P50 Estimate, Integration With Ais Flow Line Design, Management System (Dms), Iec 61850 Protection Network, Underground Triplex Hv Substations, Lv Underground Network To Wellheads, Preparation Of Project Execution Plan, Design Basis And Scope Of WorkTo Outsource Detailed Design, Power System Modeling, Earthling And Lightning Protection. Liaison With Multi-Discipline Project Teams, Ais Substation Construction Supervisor And Hv Equipment Testing Supervisor2002 Mitsubishi Electric- Kuwait As An 'Electrical Engineer ‘Job Responsibilities:Pre-Commissioning Tests Project: Doha West Power Station Rich Multicultural Leadership Skills With Flexibility To Achieve Client Expectations Within Contractual And Project Budgetary Complete Project Technical And Financial Responsibility Including Progress Reporting And

Page 7: Anamin

Presentation For Projects Of $100m And Above In Value.Led Project Execution At Remote Oil & Gas Facilities With Full Responsibility For The Engineering, Procurement, Installation, Startup, Commissioning And P&L Project Financials For Client Progress Invoicing.- Executed Wellhead Gas Utilization Projects Using Micro Turbines Reduce Flaring In Upstream Oil & Gas Applications.- Selected, Mobilized And Led The Complete Project Team Of Engineering, Quality, Hse, Construction, - Managed Construction ProjectsIncluding Detailed Design, Site Works, Commissioning, & Handover At Oil Refineries, Pipelines, Tank Farms And Airports.Managed 180mw Combined Cycle Thermal Power Generation and Distribution Companies InKazakhstan And Led The Modernization Technical Team For The Replacement Of The Steam Turbines.Implemented Upstream Oil And Gas, Pipeline And Refining Automation And Control Projects With Full Project Management Responsibility from Project Definition, Through System Design, Procurement,Construction, Installation and Through Commissioning To Handover

HOBBIES/INTERESTS

Traveling, Reading detective novels/business journals, Watching Movies, listening to updates of

World events, Playing Football, active appreciation of Jazz Music.

REFERENCES

Available Upon Request