13
ANEXO PRESUPUESTO DESCRIPCION Und. Cant. P. Unt P. Venta Tubo UF75m m C 7.5x6m UND 108.00 27 2916.00 Tubo UF2"C 7.5x6m UND 153.00 18.72 2864.16 Tubo 1.5"C 7.5x6m UND 202.00 16.2 3272.40 Reduccion PVc75m m -2" UND 1.00 5.5 5.50 Reduccion PVC 2"-1.5" UND 6.00 2.97 17.82 AdaptadorPVC 75m m UND 2.00 4.29 8.58 AdaptadorPVC 2" UND 5.00 2.97 14.85 AdaptadorPVC 1.5" UND 26.00 1.98 51.48 Codo PVC 75m m UND 1.00 19.2753 19.28 Codo PVC 2" UND 10.00 9.801 98.01 Codo PVC 1.5" UND 27.00 7.1874 194.06 Tee PVC 75m m UND 3.00 9.801 29.40 Tee PVC 2" UND 4.00 6.8607 27.44 Tee PVC 1.5" UND 4.00 4.9005 19.60 Tapon PVC 75m m RH UND 0.00 0 0.00 Tapon PVC 2"RH UND 2.00 7.8408 15.68 Tapon PVC 1.5"RH UND 17.00 3.9204 66.65 M onturasPVC 75m m -2" UND 3.00 64.81728 194.45 M onturasPVC 75m m -1.5" UND 3.00 50.11578 150.35 M onturasPVC2"-1.5" UND 5.00 36.62307 183.12 CurvaPVC 75m m 81º UND 1.00 17.9685 17.97 CurvaPVC 75m m 83º UND 1.00 17.9685 17.97 Union Universal PVC 2" UND 9.00 31.0365 279.33 Tuberia1 UND 366.00 10.92 3996.72 Tuberia1/2 UND 0.00 0 0.00 M angueraciega20m m m 1430.00 0.4 572.00 M angueraUniram 1.6LPH @ 1.00m UND 8.00 920 7360.00 M onturas2-1" UND 5.00 15.48558 77.43 M onturas1-1/2" UND 309.00 4.34511 1342.64 M onturas1.5-1" UND 38.00 5.48856 208.57 DifusorRain Bird 180032SA 4" UND 3.00 26.69 80.07 DifusorRain Bird 180032SA 2" UND 10.00 26.69 266.90 DifusorRain Bird 180032SA 1.5 UND 24.00 26.69 640.56 DifusorRain Bird 180032SA 1 UND 100.00 26.69 2669.00 DifusorRain Bird 180032SA 0.75 UND 163.00 26.69 4350.47 SupernetJet UND 97.00 4.617 447.85 Riser3 UND 300.00 3 900.00 M ANGUERA COM ANDO :2M X VALVULA RLL 3.00 291.06 873.18 ADAPTADOR PVC 1/1/2"RM UND 16.00 1.98 31.68 CODO PVC 11/2"SP UND 32.00 7.128 228.10 NIPLE 11/2"SP/RM PLASSON UND 16.00 9.207 147.31 VALVULA GAL11/2"DOROT+PILOTO UND 8.00 543.51 4348.08 HIDROM ETRO ARAD W OLTM AN W M R 2" UND 1.00 1407.92 1407.92 EM PAQUETADURA 2" UND 2.00 11.88 23.76 BRIDA PVC 75m m UND 2.00 41.58 83.16 AUTO M ATIZACIO N TUBERIA Y ACCESO RIO S DE PVC LO TES DE RIEGO TUBERIA Y ACCESO RIO S DE PVC M ATRIZ PARTE ALTA ARCO S DE RIEGO HIDRO M ETRO

ANEXO PRESUPUESTO

Embed Size (px)

DESCRIPTION

presupuesto de un sistema de riego

Citation preview

Page 1: ANEXO PRESUPUESTO

ANEXO PRESUPUESTO

DESCRIPCION Und. Cant. P. Unt P. Venta

Tubo UF 75mm C 7.5 x 6m UND 108.00 27 2916.00Tubo UF2" C 7.5 x 6m UND 153.00 18.72 2864.16Tubo 1.5" C 7.5 x 6m UND 202.00 16.2 3272.40Reduccion PVc 75mm - 2" UND 1.00 5.5 5.50Reduccion PVC 2"-1.5" UND 6.00 2.97 17.82Adaptador PVC 75mm UND 2.00 4.29 8.58Adaptador PVC 2" UND 5.00 2.97 14.85Adaptador PVC 1.5" UND 26.00 1.98 51.48Codo PVC 75 mm UND 1.00 19.2753 19.28Codo PVC 2" UND 10.00 9.801 98.01Codo PVC 1.5" UND 27.00 7.1874 194.06Tee PVC 75mm UND 3.00 9.801 29.40Tee PVC 2" UND 4.00 6.8607 27.44Tee PVC 1.5" UND 4.00 4.9005 19.60Tapon PVC 75mm RH UND 0.00 0 0.00Tapon PVC 2" RH UND 2.00 7.8408 15.68Tapon PVC 1.5" RH UND 17.00 3.9204 66.65Monturas PVC 75mm-2" UND 3.00 64.81728 194.45Monturas PVC 75mm-1.5" UND 3.00 50.11578 150.35Monturas PVC2"-1.5" UND 5.00 36.62307 183.12Curva PVC 75mm 81º UND 1.00 17.9685 17.97Curva PVC 75mm 83º UND 1.00 17.9685 17.97Union Universal PVC 2" UND 9.00 31.0365 279.33

Tuberia 1 UND 366.00 10.92 3996.72Tuberia 1/2 UND 0.00 0 0.00Manguera ciega 20mm m 1430.00 0.4 572.00Manguera Uniram 1.6 LPH @ 1.00m UND 8.00 920 7360.00Monturas 2-1" UND 5.00 15.48558 77.43Monturas 1-1/2" UND 309.00 4.34511 1342.64Monturas 1.5-1" UND 38.00 5.48856 208.57Difusor Rain Bird 1800 32SA 4" UND 3.00 26.69 80.07Difusor Rain Bird 1800 32SA 2" UND 10.00 26.69 266.90Difusor Rain Bird 1800 32SA 1.5 UND 24.00 26.69 640.56Difusor Rain Bird 1800 32SA 1 UND 100.00 26.69 2669.00Difusor Rain Bird 1800 32SA 0.75 UND 163.00 26.69 4350.47Supernet Jet UND 97.00 4.617 447.85Riser3 UND 300.00 3 900.00

MANGUERA COMANDO :2M X VALVULA RLL 3.00 291.06 873.18

ADAPTADOR PVC 1/1/2" RM UND 16.00 1.98 31.68CODO PVC 1 1/2" SP UND 32.00 7.128 228.10NIPLE 1 1/2" SP/RM PLASSON UND 16.00 9.207 147.31VALVULA GAL 1 1/2" DOROT + PILOTO UND 8.00 543.51 4348.08

HIDROMETRO ARAD WOLTMAN WMR 2" UND 1.00 1407.92 1407.92EMPAQUETADURA 2" UND 2.00 11.88 23.76BRIDA PVC 75mm UND 2.00 41.58 83.16

AUTOMATIZACION

TUBERIA Y ACCESORIOS DE PVC LOTES DE RIEGO

TUBERIA Y ACCESORIOS DE PVC MATRIZ PARTE ALTA

ARCOS DE RIEGO

HIDROMETRO

Page 2: ANEXO PRESUPUESTO

SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 75mm250.00 m/DIA Costo unitario directo por : m6.01

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.06OPERARIO hh 0.50 0.02 15.12 0.24PEON hh 2.00 0.06 11.84 0.76

1.06MaterialesTUBERIA PVC 75MM C/ANILLO m 1.05 4.50 4.73LUBRICANTE PARA TUBERIA UF und 0.00 49.92 0.05

4.77EquiposHERRAMIENTAS MANUALES %mo 0.03 5.84 0.18

0.18

SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 2"250.00 m/DIA Costo unitario directo por : m4.52

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.06OPERARIO hh 0.50 0.02 15.12 0.24PEON hh 2.00 0.06 11.84 0.76

1.06MaterialesTUBERIA PVC 2" C/ANILLO m 1.05 3.12 3.28LUBRICANTE PARA TUBERIA UF und 0.00 49.92 0.05

3.33EquiposHERRAMIENTAS MANUALES %mo 0.03 4.39 0.13

0.13

SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1 1/2"250.00 m/DIA Costo unitario directo por : m4.06

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.06OPERARIO hh 0.50 0.02 15.12 0.24PEON hh 2.00 0.06 11.84 0.76

1.06MaterialesTUBERIA PVC 1 1/2" SP m 1.05 2.70 2.84LUBRICANTE PARA TUBERIA UF und 0.00 49.92 0.05

2.88EquiposHERRAMIENTAS MANUALES %mo 0.03 3.95 0.12

0.12

PRESUPUESTO

Page 3: ANEXO PRESUPUESTO

SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1"250.00 m/DIA Costo unitario directo por : m3.11

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.06OPERARIO hh 0.50 0.02 15.12 0.24PEON hh 2.00 0.06 11.84 0.76

1.06MaterialesTUBERIA PVC 1" SP m 1.05 1.82 1.91LUBRICANTE PARA TUBERIA UF und 0.00 49.92 0.05

1.96EquiposHERRAMIENTAS MANUALES %mo 0.03 3.02 0.09

0.09

SUMINISTRO E INSTALACION DE ARCOS DE CONTROL Y TOMAS PARA CERCO PERIMETRICO8.00 m/DIA Costo unitario directo por : m675.30

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.10 18.14 1.81OPERARIO hh 2.00 2.00 15.12 30.24PEON hh 2.00 2.00 11.84 23.68

55.73MaterialesValvula 1 1/2" + Piloto Regulador m 1.05 500.00 525.00Accesorios Plasson und 1.00 74.90 74.90

599.90EquiposHERRAMIENTAS MANUALES %mo 0.03 655.63 19.67

19.67

Suministro e Instalacion de Difusor Rain Bird 1800 32SA 4" c/elevador 5cm80.00 m/DIA Costo unitario directo por : m35.51

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.01 18.14 0.18OPERARIO hh 0.50 0.05 15.12 0.76PEON hh 2.00 0.20 11.84 2.37

3.31MaterialesDifusor Rain Bird 1800 32SA 4" c/elevador 5cm m 1.05 29.69 31.17

31.17EquiposHERRAMIENTAS MANUALES %mo 0.03 34.48 1.03

1.03

Page 4: ANEXO PRESUPUESTO

Suministro e Instalacion de Manguera Uniram 1.6 LPH @ 1.00m2500.00 m/DIA Costo unitario directo por : m2.15

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.01OPERARIO hh 1.00 0.00 15.12 0.05PEON hh 2.00 0.01 11.84 0.08

0.13MaterialesManguera Uniram 1.6 LPH @ 1.00m m 1.05 1.84 1.93Conector Inicial und 0.01 1.50 0.02

1.95EquiposHERRAMIENTAS MANUALES %mo 0.03 2.09 0.06

0.06

Excavac. zanja (máq.) p/tub. terr-normal de 0,70 m prof.314.00 m/DIA Costo unitario directo por : m3.62

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.05OPERARIO hh 1.00 0.03 15.12 0.39OFICIAL hh 1.00 0.03 13.14 0.33PEON hh 1.00 0.03 11.84 0.30

1.07EquiposCargador retroexcava dor 0,5-0,75Yd3 62HP 1.00 0.03 99.03 2.52HERRAMIENTAS MANUALES %mo 0.03 1.07 0.03

2.56

Excavac. zanja (man) p/tub. terr-normal de 0,30 m prof.90.00 m/DIA Costo unitario directo por : m5.89

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.01 18.14 0.16OPERARIO hh 1.00 0.09 15.12 1.34PEON hh 4.00 0.36 11.84 4.21

5.72EquiposHERRAMIENTAS MANUALES %mo 0.03 5.71 0.17

0.17

TAPADO DE ZANJA TERRENO NORMAL HASTA 0,70m 180.00 m/DIA Costo unitario directo por : m1.51

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.08OPERARIO hh 0.50 0.02 15.12 0.34PEON hh 2.00 0.09 11.84 1.05

1.47EquiposHERRAMIENTAS MANUALES %mo 0.03 1.47 0.04

0.04

Page 5: ANEXO PRESUPUESTO

TAPADO DE ZANJA TERRENO NORMAL HASTA 0,30m 300.00 m/DIA Costo unitario directo por : m0.91

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.05OPERARIO hh 0.50 0.01 15.12 0.20PEON hh 2.00 0.05 11.84 0.63

0.88EquiposHERRAMIENTAS MANUALES %mo 0.03 0.88 0.03

0.03

DEMOLICION DE VEREDA DE CONCRETO C/EQUIPO E=0.10m50.00 m2/dia Costo unitario directo por : m28.51

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.50 0.08 18.14 1.45OPERARIO hh 2.00 0.32 15.12 4.84PEON hh 4.00 0.64 11.84 7.58

13.87EquiposCOMPRESORA NUMA.DISEL 250-330PCM 87HP HM 1.00 0.16 60.32 9.65MARTILLO NEUMATICO 25-29 KG SIN PUNTA HM 2.00 0.32 12.44 3.98PUNTA ROMPEPAVIMENTO 3/4" HM 2.00 0.32 2.52 0.81HERRAMIENTAS MANUALES %mo 0.03 6.94 0.21

14.65

DEMOLICION DE PAVIMENTO FLEXIBLE C/EQUIPO E=0.15m180.00 m2/dia Costo unitario directo por : m7.86

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.50 0.02 18.14 0.40OPERARIO hh 2.00 0.09 15.12 1.34PEON hh 4.00 0.18 11.84 2.10

3.85EquiposCOMPRESORA NUMA.DISEL 250-330PCM 87HP HM 1.00 0.04 60.32 2.68MARTILLO NEUMATICO 25-29 KG SIN PUNTA HM 2.00 0.09 12.44 1.11PUNTA ROMPEPAVIMENTO 3/4" HM 2.00 0.09 2.52 0.22HERRAMIENTAS MANUALES %mo 0.00 3.84 0.00

4.01

Suministro e Instalacion de Manguera Ciega 20mm3000.00 m/DIA Costo unitario directo por : m0.53

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.00OPERARIO hh 0.50 0.00 15.12 0.02PEON hh 2.00 0.01 11.84 0.06

0.09MaterialesManguera Uniram 1.6 LPH @ 1.00m m 1.05 0.40 0.42Conector Inicial und 0.01 1.00 0.01

0.43EquiposHERRAMIENTAS MANUALES %mo 0.03 0.51 0.02

0.02

Page 6: ANEXO PRESUPUESTO

Suministro e Instalacion de Supernet Jet Naranja150.00 und/DIA Costo unitario directo por : m6.81

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.01 18.14 0.10OPERARIO hh 0.50 0.03 15.12 0.40PEON hh 2.00 0.11 11.84 1.26

1.76MaterialesAsperdor Supernet Jet Naranja und 1.05 4.62 4.85

4.85EquiposHERRAMIENTAS MANUALES %mo 0.03 6.61 0.20

0.20 RETIRO DE ADOQUINES

15.00 m/DIA Costo unitario directo por : m17.99

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.50 0.27 18.14 4.84PEON hh 2.00 1.07 11.84 12.63

17.47EquiposHERRAMIENTAS MANUALES %mo 0.03 17.47 0.52

0.52

PISO DE ADOQUINES DE CONCRETO-PIEDRA20.00 m2/dia Costo unitario directo por : m56.81

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.04 18.14 0.73OPERARIO hh 1.00 0.40 15.12 6.05OFICIAL hh 1.00 0.40 13.14 5.26PEON hh 1.00 0.40 11.84 4.74

16.77MaterialesARENA FINA m3 0.01 37.86 0.30ARENA GRUESA m3 0.04 42.86 1.71ADOQUINES DE CONCRETO COLOR GRIS m2 1.10 21.18 23.30

25.32EquiposCOMPACTADOR VIBRATORIO TIPO PLANCHA 7 HPHM 1.00 0.40 33.67 13.47HERRAMIENTAS MANUALES %mo 0.03 42.09 1.26

14.73

Page 7: ANEXO PRESUPUESTO

PISO DE CEMENTO PULIDO70.00 m2/dia Costo unitario directo por : m36.47

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.30 0.03 18.14 0.62OPERARIO hh 2.00 0.23 15.12 3.46PEON hh 2.00 0.23 11.84 2.71

6.78MaterialesHORMIGON m3 0.13 100.00 13.00CEMENTO bls 0.60 19.20 11.52AGUA m3 0.02 7.20 0.11

24.63EquiposCOMPACTADOR VIBRATORIO TIPO PLANCHA 7 HPHM 1.00 0.11 33.67 3.85HERRAMIENTAS MANUALES %mo 0.03 40.45 1.21

5.06Suministro e instalacion de manguera comando

2000.00 m/DIA Costo unitario directo por : m0.94

Descripción Insumo Unidad Cuadrilla Cantidad Precio ParcialMano de ObraCAPATAZ hh 0.10 0.00 18.14 0.01OPERARIO hh 0.50 0.00 15.12 0.03PEON hh 2.00 0.01 11.84 0.09

0.13MaterialesManguera comando 8mm negra m 1.05 0.73 0.77Conector teffen und 0.01 1.00 0.01

0.78EquiposHERRAMIENTAS MANUALES %mo 0.03 0.91 0.03

0.03

Page 8: ANEXO PRESUPUESTO

Senor:(es)

Item Descripción 1 2 3 4 5 6 7 8

1 ESTRUCTURAS

1.01

01.01.01 MOVILIZACION

01.01.02 REPLANTEO Y UBICACIÓN DE VALVULAS HIDRAULICAS

1.02

1.02.01 EXCAVACION MANUAL DE ZANJA H = 1.00

1.02.02 EXCAVACION MANUAL DE ZANJA H= 0.50

1.02.03 TAPADO DE ZANJA TERRENO NORMAL HASTA 1.00m

1.02.04 TAPADO DE ZANJA TERRENO NORMAL HASTA 0.50m

1.03

1.03.01 DEMOLICION DE VEREDA DE CONCRETO C/EQUIPO E=0.10m

1.03.03 RETIRO DE ADOQUINES

1.03.04 CRUCE DE MUROS PERIMETRALES POR PERCUSION

1.04

1.02.01 PISO DE ADOQUINES DE CONCRETO-PIEDRA

1.02.02 PISO DE CEMENTO PULIDO E=2"

2 RED HIDRAULICA

2.01

2.01.01 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 75mm

2.01.02 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 2"

2.01.03 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1"

2.01.04 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1 1/2"

2.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC

2.01.06 INSTALACION DE ARCOS DE CONTROL Y TOMAS PARA CERCO PERIMETRICO

2.01.07 INSTALACION DE HIDROMETRO

2.02 EMISORES

2.02.01 Suministro e instalacion de Difusor Rain Bird 1800 32SA 4" c/elevador 5cm

2.02.02 Suministro e instalacion de Difusor Rain Bird 1800 32SA 2" c/elevador 5cm

2.02.03 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1. 1/2" c/elevador 5cm

2.02.04 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1" c/elevador 5cm

2.02.05 Suministro e instalacion de Difusor Rain Bird 1800 32SA 3/4" c/elevador 5cm

2.02.06 Suministro e instalacion de Aspesor Supernet Jet (Naranja)

2.02.07 Suministro e instalacion de Manguera Uniram 1.6 LPH @ 1.00m

2.02.08 Suministro e instalacion de Manguera Ciega 20mm

2.02.09 Lavado de Red de PVC

2.02 TUBERIAS Y ACCESORIOS DE PE

2.02.01 SUMINISTRO E INSTALACION DE MANGUERA COMANDO

2.02.03 SUMINISTRO E INSTALACION DE MONTURAS PVC

2.03

2.03.01 CONFIGURACION DE CONTROLADOR + AUTOMATIZACION DEL SISTEMA

CRONOGRAMA DE EJ ECUCION

CEMENTOS PACASMAYO SAA FECHA:10/06/2013

CERCO PERIMETRICO FORESTAL PLANTA PACASMAYO

OBRAS PRELIMINARES

Semanas

DEMOLICIONES DE PISOS Y OTROS

PISOS Y PAVIMENTOS

TUBERIAS Y ACCESORIOS DE PVC

AUTOMATIZACION

MOVIMIENTO DE TIERRA

Page 9: ANEXO PRESUPUESTO

Senor:(es)

Item Descripción Unidad Cantidad Precio Unit. Precio Parcial

1 ESTRUCTURAS 37,242.58

1.01 2,580.00

01.01.01 MOVILIZACION GLOB. 2.00 540.00 1,080.0001.01.02 REPLANTEO Y UBICACIÓN DE VALVULAS HIDRAULICAS GLOB. 1.00 1,500.00 1,500.00

1.02 25,832.07

1.02.01 Excavac. zanja (máq.) p/tub. terr-normal de 0,70 m prof. ML 1,340.50 3.91 5,245.06

1.02.02 Excavac. zanja (man) p/tub. terr-normal de 0,30 m prof. ML 2,507.10 6.36 15,938.21

1.02.03 TAPADO DE ZANJA TERRENO NORMAL HASTA 0,70m ML 1,340.50 1.63 2,190.671.02.04 TAPADO DE ZANJA TERRENO NORMAL HASTA 0,30m ML 2,507.10 0.98 2,458.131.03 5,252.41

1.03.01 DEMOLICION DE VEREDA DE CONCRETO C/EQUIPO E=0.15m M2 48.00 30.79 1,478.09

1.03.03 RETIRO DE ADOQUINES M2 27.50 19.43 534.33

1.03.04 CRUCE DE MUROS PERIMETRALES POR PERCUSION GLOB. 4.00 810.00 3,240.001.04 3,578.10

1.04.01 PISO DE ADOQUINES DE CONCRETO-PIEDRA M2 27.50 61.36 1,687.301.04.02 PISO DE CEMENTO PULIDO E=6" M2 48.00 39.39 1,890.80

2 RED HIDRAULICA 52,644.03

2.01 26,407.68

2.01.01 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 75mm ML 646.50 6.49 4,194.80

2.01.02 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 2" ML 694.00 4.88 3,384.34

2.01.03 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1" ML 1,765.10 4.39 7,741.80

2.01.04 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1 1/2" ML 742.10 3.36 2,491.96

2.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC GLB 1.00 1,620.00 1,620.00

2.01.06 SUMINISTRO E INSTALACION DE ARCOS DE CONTROL Y TOMAS PARA CERCO PERIMETRICO UND 7.00 729.33 5,105.292.01.07 SUMINISTRO E INSTALACION DE HIDROMETRO GLB 1.00 1,869.48 1,869.48

2.02 19,137.28

2.02.01 Suministro e instalacion de Difusor Rain Bird 1800 32SA 4" c/elevador 5cm UND 3.00 38.36 115.07

2.02.02 Suministro e instalacion de Difusor Rain Bird 1800 32SA 2" c/elevador 5cm UND 10.00 38.36 383.55

2.02.03 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1. 1/2" c/elevador 5cm UND 24.00 38.36 920.53

2.02.04 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1" c/elevador 5cm UND 100.00 38.36 3,835.54

2.02.05 Suministro e instalacion de Difusor Rain Bird 1800 32SA 3/4" c/elevador 5cm UND 163.00 38.36 6,251.94

2.02.06 Suministro e instalacion de Aspesor Supernet Jet (Naranja) UND 97.00 7.35 713.31

2.02.07 Suministro e instalacion de Manguera Uniram 1.6 LPH @ 1.00m ML 2,320.00 2.32 5,387.04

2.02.08 Suministro e instalacion de Manguera Ciega 20mm ML 1,430.00 0.58 823.852.02.09 Lavado de Red de PVC ML 3,847.70 0.18 706.44

2.03 4,993.08

2.03.01 SUMINISTRO E INSTALACION DE MANGUERA COMANDO ML 1,200.00 1.01 1,213.082.03.02 SUMINISTRO E INSTALACION DE MONTURAS PVC GLB 1.00 3,780.00 3,780.00

2.04 2,106.00

2.04.01 CONFIGURACION DE CONTROLADOR + AUTOMATIZACION DEL SISTEMA GLOB. 1.00 2,106.00 2,106.00

S/. 89,886.61S/. 89,886.61

I.G.V(18%) S/. 16,179.59

TOTAL: S/. 106,066.20

TOTAL SIN IGVSUB TOTAL SIN IGV

DEMOLICIONES DE PISOS Y OTROS

PISOS Y PAVIMENTOS

TUBERIAS Y ACCESORIOS DE PVC

EMISORES

TUBERIAS Y ACCESORIOS DE PE

AUTOMATIZACION

MOVIMIENTO DE TIERRA

CEMENTOS PACASMAYO SAA FECHA:10/06/2012

CERCO PERIMETRICO FORESTAL PLANTA PACASMAYO

OBRAS PRELIMINARES

Page 10: ANEXO PRESUPUESTO

PRESUPUESTO AREAS NUEVAS

Senor:(es)

Item Descripción Unidad Cantidad Precio Unit. Precio Parcial

1 ESTRUCTURAS 46,829.67

1.01 2,580.00

01.01.01 MOVILIZACION GLOB. 2.00 540.00 1,080.0001.01.02 REPLANTEO Y UBICACIÓN DE VALVULAS HIDRAULICAS GLOB. 1.00 1,500.00 1,500.00

1.02 31,408.71

1.02.01 Excavac. zanja (máq.) p/tub. terr-normal de 0,70 m prof. ML 1,340.50 3.91 5,245.06

1.02.02 Excavac. zanja (man) p/tub. terr-normal de 0,30 m prof. ML 3,267.10 6.36 20,769.70

1.02.03 TAPADO DE ZANJA TERRENO NORMAL HASTA 0,70m ML 1,340.50 1.63 2,190.671.02.04 TAPADO DE ZANJA TERRENO NORMAL HASTA 0,30m ML 3,267.10 0.98 3,203.281.03 7,466.59

1.03.01 DEMOLICION DE VEREDA DE CONCRETO C/EQUIPO E=0.15m M2 93.60 30.79 2,882.27

1.03.03 RETIRO DE ADOQUINES M2 27.50 19.43 534.33

1.03.04 CRUCE DE MUROS PERIMETRALES POR PERCUSION GLOB. 5.00 810.00 4,050.001.04 5,374.36

1.04.01 PISO DE ADOQUINES DE CONCRETO-PIEDRA M2 27.50 61.36 1,687.301.04.02 PISO DE CEMENTO PULIDO E=6" M2 93.60 39.39 3,687.06

2 RED HIDRAULICA 63,235.97

2.01 30,124.80

2.01.01 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 75mm ML 646.50 6.49 4,194.80

2.01.02 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 2" ML 694.00 4.88 3,384.34

2.01.03 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1" ML 2,373.10 4.39 10,408.51

2.01.04 SUMINISTRO E INSTALACION DE TUBERIA UF DIAM 1 1/2" ML 894.10 3.36 3,002.38

2.01.05 SUMINISTRO E INSTALACION DE ACCESORIOS DE PVC GLB 1.00 2,160.00 2,160.00

2.01.06 SUMINISTRO E INSTALACION DE ARCOS DE CONTROL Y TOMAS PARA CERCO PERIMETRICO UND 7.00 729.33 5,105.292.01.07 SUMINISTRO E INSTALACION DE HIDROMETRO GLB 1.00 1,869.48 1,869.48

2.02 24,608.09

2.02.01 Suministro e instalacion de Difusor Rain Bird 1800 32SA 4" c/elevador 5cm UND 3.00 38.36 115.07

2.02.02 Suministro e instalacion de Difusor Rain Bird 1800 32SA 2" c/elevador 5cm UND 10.00 38.36 383.55

2.02.03 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1. 1/2" c/elevador 5cm UND 24.00 38.36 920.53

2.02.04 Suministro e instalacion de Difusor Rain Bird 1800 32SA 1" c/elevador 5cm UND 100.00 38.36 3,835.54

2.02.05 Suministro e instalacion de Difusor Rain Bird 1800 32SA 3/4" c/elevador 5cm UND 302.00 38.36 11,583.34

2.02.06 Suministro e instalacion de Aspesor Supernet Jet (Naranja) UND 97.00 7.35 713.31

2.02.07 Suministro e instalacion de Manguera Uniram 1.6 LPH @ 1.00m ML 2,320.00 2.32 5,387.04

2.02.08 Suministro e instalacion de Manguera Ciega 20mm ML 1,430.00 0.58 823.852.02.09 Lavado de Red de PVC ML 4,607.00 0.18 845.85

2.03 6,397.08

2.03.01 SUMINISTRO E INSTALACION DE MANGUERA COMANDO ML 1,200.00 1.01 1,213.082.03.02 SUMINISTRO E INSTALACION DE MONTURAS PVC GLB 1.00 5,184.00 5,184.00

2.04 2,106.00

2.04.01 CONFIGURACION DE CONTROLADOR + AUTOMATIZACION DEL SISTEMA GLOB. 1.00 2,106.00 2,106.00

S/. 110,065.64S/. 110,065.64

I.G.V(18%) S/. 19,811.81

TOTAL: S/. 129,877.45

MOVIMIENTO DE TIERRA

CEMENTOS PACASMAYO SAA FECHA:10/06/2012

CERCO PERIMETRICO FORESTAL PLANTA PACASMAYO

OBRAS PRELIMINARES

TOTAL SIN IGVSUB TOTAL SIN IGV

DEMOLICIONES DE PISOS Y OTROS

PISOS Y PAVIMENTOS

TUBERIAS Y ACCESORIOS DE PVC

EMISORES

TUBERIAS Y ACCESORIOS DE PE

AUTOMATIZACION

Page 11: ANEXO PRESUPUESTO

ACCESORIOS

TUBERIA MATRIZ

CODOS REDUCCIONES TEE ADAPTADOR TAPON

75mm x 90º SP75mm x 113º

SP75mm x 140º

SP 75 mm SP 75 mm- 2" SP75mm x 75mm

SP 75mm RM 75mm RH

2.00 1.00 1.00 1.001.00 1.00

1.00 1.00 1.002.00 1.00 1.00 1.00

1.00 1.00 1.00 1.00 1.00

4.00 1.00 2.00 1.00 5.00 5.00 1.00 1.00

CURVAS

LOSA - 11 - 2

TOTAL (M)

2 - 33 - 44 - 5

VALV.

ACCESORIOS PVC UND CANT.

Curva PVC de 75mm x 90º SP UND 4.00 Curva PVC de 75mm x 110º SP UND 1.00 Curva PVC de 75mm x 140º SP UND 2.00 Codos PVC de 75mm SP UND 1.00 Reducción PVC de 75mm a 2" SP UND 5.00 Tee PVC de 75 mm SP UND 5.00 Adaptador PVC de 2" RM UND 1.00 Tapon PVC de 2" RH UND 1.00

Nº ACCESORIOS Cantidad

1 VALVULA DE AIRE 1" 1.0

2 BUSHING 2 " x 1 " 1.0

3 CODO 2" PLASSON 1.0

4 UNION UNIVERSAL 2" 1.0

5 TEE 2" PLASSON 1.0

6 NIPLE 2" PLASSON 3.0

7 VALVULA HIDRAULICA 2" ( Inc. Piloto Regulador) 1.0

8 ADAPTADOR (UPR) PVC 2" 2.0

ARCO DE RIEGO

Page 12: ANEXO PRESUPUESTO

Nº TUBOS 117.0

Nº TUBOS +% 123

DIF 6.0

NIPLES EN PURGA 1 1/2" C-5 5.00

Nº TUBOS 1.0

Nº TUBOS +% 2

Tubo PVC de 1.1/2" CL-5 x 5mts SP UND 125.00 Codo PVC de 1 1/2" x 90º SP UND 13.00 Adaptador PVC 1 1/2" (UPR) UND 11.00 Tapon Hembra PVC de 1 1/2" RH UND 11.00 Cinta Teflon UND 35.00 Tees UND 5.00 Monturas MTS 62.00 Adaptadores UND 122.00 Aspersores Naandanjain 5022SD UND 62.00

Tuberia CODOS SP UPR Tapones Tees Monturas Adaptadores Aspersores1 1/2" 1 1/2"x 90° 1 1/2" 1 1/2" 1 1/2" 1 1/2" x 3/4" 3/4" 3/4"

1 112.00 2.00 2.00 2.00 4.00 1.00 12.00 24.00 12.00

2 112.00 2.00 2.00 2.00 4.00 1.00 12.00 24.00 12.00

3 112.00 2.00 2.00 2.00 4.00 1.00 12.00 24.00 12.00

4 112.00 2.00 2.00 2.00 4.00 1.00 12.00 24.00 12.00

5 84.00 2.00 2.00 2.00 4.00 1.00 12.00 24.00 12.00

NIPLES EN ARCOS DE RIEGO 32.00

TOTAL (M) 564.00 10.00 10.00 10.00 20.00 5.00 60.00 120.00 60.00

TURNO Nº Valvula

I

Teflon

PORTALATERALES