23

Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 2: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 3: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

Annexure-I

Page 4: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 5: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 6: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 7: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 8: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 9: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 10: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 11: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 12: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 13: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

Annexure-II

Page 14: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 15: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b
Page 16: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

PREPARED BY: TATA STEEL LIMITED

REGN.NO. :RQP/CAL/039/87/B

r ~,~ '-~l

GTATA

NOAMUNDI IRONOF

M/S TATA STEEL LIMITED(Lease area: 1160.060Ha.)

MINING PLAN

FROM 01.01.2012 TO 2016-17(SUBMITTED UNDER RULE 24A OF MeR 1960)

(i) Name of the mine: Noamundi Iron Mine

(ii) Lease area : 1160.060 Ha

(iii) Forest Area : 762.43 Ha

(iv) Non Forest Area : 397.63 Ha

(v) Category of Mine: Category A (Fully Mechanized)

(vi) Name of the mineral: Iron Ore

(vii) District: West Singhbhum, Jharkhand

(viii) Period: From 01.01.2012 To 2016-17

(ix) Date of execution of lease: 20.10.1985

(x) Lease Renewal period: 01.01.2012- 31.12.2031

Page 17: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

CONTENTS

SL. DESCRIPTION PAGE NO.

NO.

INTRODUCTION

1 GENERAL

2 LOCATION & ACCESSIBILITY

PART-A

3 GEOLOGY & EXPLORATION

4 MINING

5 BLASTING

6 MINE DRAINAGE

7 STACKING OF MINERAL REJECTS AND DISPOSAL OF WASTE

8 USE OF MINERAL

9 OTHER

10 MINERAL PROCESSING

PART-B

11 ENVIRONMENT AL MANAGEMENT PLAN

PART-C

12 PROGRESSIVE MINE CLOSURE PLAN

!

Page 18: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

V;:-ft:.j::(t::;t5~<,.;;~.,;:~~-;.•..~~::::.~~::~,.~~:~~~tt;~·:·.·-. ,

]·2./ . ',<'>',l" ~!~~ ~:g)r~\(~'~\.....•.} -"- . ~" ..' \

(I =t \., \;i f:~t

4. MINING \\'~\ \. . .1

'~'o \ .\\ .r... \ :~'~"_'~' _. .

Noamundi Iron Mine was started way back in 1925 with manuat~.Wn.g. Afte!. ....<

expansion of the Steel Works at Jamshedpur, the mine was partially ih~al!W~tfiI;i~.;:/)'<1953 after which it has been gradually developed into a fully mechalliselt''affU;'

environment friendly mine over the past few decades. Mining operations have so far

been confined to the Eastern and Western Ridges separated by Balijhor nallah. The

mine has been the major captive source for meeting demand of Iron Ore for Tata

Steel's Jamshedpur Plant and will continue to be so in foreseeable future.

a) Method of mining

Mechanized method of open cast mining has been adopted for mining iron ore in a

series of 12 m high benches with the help of shovel-dumper combination. The

minimum bench width in the working benches shall be maintained at 25 m while in

the ultimate stage, the bench width shall be reduced to 12 m thus having a final pit

slope of 45 degrees. Drilling is done using 150/165 mm diameter drills with 10%

sub grade drilling. Secondary drilling (if required) is done by Jackhammer or

boulders are broken with rock breaker or splitted with the help of hydraulic splitter.

Blasting is done by adopting the State of Art technology by using mostly SME (Site

Mixed Emulsion Explosives) along with conventional explosives such as PGC and

Toeblast. Both conventional as well as Nonel (non-electric initiation) blasting are

being done. The blasted material is excavated by shovels and loaded onto 50160/1 00

tonne dumpers for transportation of the ROM, subgrade or waste.

Rigorous quality control procedure is adopted in the mine to avoid mixing of ore,

subgrade and waste. Blasthole drill cuttings are sampled and analyzed in the

laboratory using Inductively coupled plasma spectrophotometer (ICP) for Iron

values. Depending upon the analysis results, mine face is demarcated as Ore,

subgrade and waste zones and daily schedule for the material hauling is prepared

accordingly. The Subgrade is stacked separately at the earmarked place. Waste

rocks encountered during the course of mining are handled separately and used for

bench floor leveling, making berms etc. The ROM is transported from different

mining faces in a pre-determined proportion (for blending different qualities of ore),

and deliver the same to the processing plant. The blending is aimed at maintaining

the alumina content of ROM at the desired range of 2.8% - 3.5% in Wet ROM feed

and 1.6% - 2.2% in Dry ROM feed. In the Processing Plant, the ore is crushed,

washed and screened followed by classification and jigging to produce lumps and

fines ore. The haul roads are maintained with a gradient of less than 1 in 16 except

for short ramps, which have a maximum gradient of 1 in 10. The floor level of each

bench is maintained by employing graders and dozers. This helps in easy, safe and

efficient mobility of HEMM.

RQP: THE TATA IRON & STEEL COMPANY LIMITED

REGN.: RQP/CAL/039/87/B

Signature of Key Person:

."

~~/

Awnish Kumar

Page 19: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

1)~UL~loS3

i·;~;:~?~"'~"~2::.:,:'.~~..-,:;.~~1/ ~.~-::.:. '.,'. .:~

Haul road dust suppression is effected with the help of 28 KL'?i~ 50 K~'water '. ,/~:!

sprinklers. Drills are operated with in-built dust extraction/suppression system. The

dump hopper of Primary Crusher of wet circuit Plant as well as dfy 'c~\cuit P.JMJare .. '.

equipped with dry fog/water sprinkling system of dust suppression'systems ~~.!..~.ep,,<.the dust emission under check. Entire dry circuit and the ore loading~(~tiomhav~>:~'

been provided with a network of dust extraction systems with facilities t~"cr-earltip

the air before letting it out to the atmosphere.

The existing dimension of benches in each pit is shown below in Table 4.1

Table 4.1

PITWISE BENCH DIMENSIONS

(All Figures are in mtrs)

PIT Bench Toe mRL Bench Crest mRL Length Width Height

588 600 683 34 12

600 612 1235 45 12

612 624 810 40 12

624 636 910 38 12

HILL-6 636 648 900 50 12

648 660 1195 45 12

660 672 1241 40 12

672 684 1065 25 12

684 696 1419 20 12

588 600 751 40 12

600 612 800 42 12

612 624 702 26 12

HILL-S624 636 924 30 12

636 648 765 36 12

648 660 663 40 12

660 672 582 40 12

672 684 489 47 12

576 588 422 83 12

HILL-4 588 600 340 60 12

600 612 200 12 12

HILL-3576 588 949 130 12

588 600 661 60 12

RQP: THE TATA IRON & STEEL COMPA Y LIMITED

REGN.: RQP/CALl039/87/B

Signature of Key Person:

Page 20: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

(a'i:Lc 154/i' ,."." .

• :' ::et", .

Mining Method at B1ock-II/IIA & WR (Jojo Area): Block-IIIIIA and Jojo area of

Noamundi iron Mine is proposed to be developed from 2013-14, after award of

dereservation proposal from MOEF (Gal). Initially, this Block shall beoperated

with mechanized method of mining with 6m bench height. Drilling shall bedone b1"_-_ . - '

1OOmmdrill with 10% sub grade drilling. Blasting shall be done by using SME (Site

Mixed Emulsion explosives) along with other conventional explosives. Shovel and

dumper combination shall be used for excavating and loading of ROM. The ROM

shall be transported to beneficiation plant at Noamundi.

Discontiguous Ore Bodies: The steel company has long term conceptual plan to

work in all the discontiguous blocks of Mining lease viz Block IV, V, VA and VI.

Presently, Mining cannot be carried out in these discontiguous blocks either because

of want of various statutory clearances or unavailability of technology for

beneficiation of low grade ores.

As advised by IBM, Kolkata office, we have already sent sample of 300 kg low

grade iron ore from Block-VI area for beneficiation testing at Modern Mineral

Processing Laboratory and Pilot plant, Indian Bureau of Mines, MIDC, Nagpur for

further testing and analysis. Future plan of the area will be based on the results of

beneficiation test.

Manual Mining: There is a existence of Incidental ore/Float ore along the

periphery of the lease area predominantly between the lease pillar nos 5 to 8 located

along the slopes of Eastern ridge (between the grids 12200N to 13800N and 12600E

to 13400E) . To prevent unauthorized workings and theft of float ore, it is proposed

to win the incidental/float ores as per following production schedule.

TABLE - 4.2

YEARL Y EXCA VATION PROGRAMME

(FOR MANUAL MINING)

(All Figures in Tonnes)

YEAR ROM

2011-12· 3000

2012-13 10000

2013-14 10000

2014-15 10000

2015-16 10000

*The year 2011-12 here denotes the period from 1st January, 2012 to 31st March,

2012.

RQP : THE TA TA IRON & STEEL COMPANY LIMITED

REGN.: RQP/CAL/039/87/B

Signature of Key Person:,-- (,

~.,Awnish Kumar

Page 21: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

",<'-"~~t)j-~·~~:-:::«z;~,,'1..:..,._~r;~ ~~.".

~,:?I ••••• .,~,/"" " '\.,

(~ / ~~/! (;.,/ ,·""rtr"": ".. , ,;" \/f. ~;'/ c .t~'~:',..,:,'lI <: f/ \If*(~:. ·r \ ':~q'/" , \'

b) Development and production programme: :~~ \ 'I ~ ;'\,,'-5. \ :'" ", /} ,:

The ROM and the associated waste & subgrade likely to be enco'unt~~~ during th~{i,:/course of mining opera~ions in the plan period are shown in Table<,:~:4;.);;;~~~·~~,:/f

process ore shall compnses of approx (30-40)% hard ore, (40-60)% flaky..Gr.e..,anQ

(10-15)% soft ore. The dry process ore consists of (60-70)% blue dust and (30-

40)% flaky ore. The blending of ROM is accomplished by sequential dumping in

the primary crushers.

TABLE - 4.3

YEARWISE ROM AND PRODUCTION - NOAMUNDI

(All Figures in Million Tonnes)

YEAR ROM PRODUCTSTAILING

(Slime + Jig Tailings)

2011-12* 2.00 1.75 0.25

2012-13 7.00 6.40 0.60

2013-14 10.00 8.80 1.20

2014-15 10.00 8.80 1.20

2015-16 10.00 8.80 1.20

2016-17 10.00 8.80 1.20

TOTAL 49.00 43.35 5.65

*The year 2011-12 here denotes the period from 1st January, 2012 to 31st March,

2012.

TABLE - 4.4

YEARL Y EXCA VATION PROGRAMME

(All Figures in Million Tonnes)

YEAR ROM SUBGRADE WASTE EXCAVATION

2011-12* 2.00 0.31 0.18 2.49

2012-13 7.00 0.87 0.72 8.59

2013-14 10.00 1.20 0.85 12.05

2014-15 10.00 1.05 1.20 12.25

2015-16 10.00 1.45 0.90 12.35

2016-17 10.00 0.75 1.40 12.15

TOTAL 49.00 5.63 5.24 59.88

*The year 2011-12 here denotes the penod from 1st January, 2012 to 31st March,

2012.

RQP : THE TA TA IRON & STEEL COMPANY LIMITED

REGN.: RQP/CALl039/871B

Signature of Key Person: AP~p

\ \ \CS\

~ A4~Cfj (+ft~

Controller of Mines (Central Zone'

~~~

Indian Bureau of Mines

~~/

Awnish Kumar

Page 22: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b

Annexure-III

Page 23: Annexure-I€¦ · Rda PMK ]j` pda ]ook_e]pa` s]opa # oq^cn]`a hegahu pk ^a aj_k%qjpyyy `qnejc `UgeV&4) _kqnoa kb iejejc klan]yekjo ej pda lh]j lanek` ]na odksj ej R]^ha:*8y829,'999yyy|yy*8-b