1 Executive Summary and Introduction to 2013 AER 1.1 Summary Report for 2013
1.2 Introduction to the 2013 AER
1.3 WWTP Overview
2 Monitoring Report Summary
2.1 Summary Report on monthly Influent monitoring
2.2 Discharges from the agglomeration
2.3 Ambient Monitoring summary
2.4 Data collection and reporting requirements under the Urban Waste Water
Treatment Directive
2.5 Pollutant Release and Transfer Register (PRTR)
3 Operational Reports Summary 3.1 Treatment Efficiency Report
3.2 Treatment Capacity Report
3.3 Extent of Agglomeration Summary Report
3.4 Complaints Summary
3.5 Reported Incidents Summary
3.6 Sludge / Other inputs to the WWTP
4 Infrastructural Assessments and Programme of Improvements
4.1 Storm water Overflow Identification and Inspection Report
4.2 Report on progress made and proposals being developed to meet the
improvement programme requirements
4.3 Statement of Measures
5 Licence Specific Reports 5.1 Priority Substances Assessment
5.2 Drinking Water Abstraction Point Risk Assessment
5.3 Shellfish Impact Assessment Report.
5.4 Toxicity / Leachate Management
5.5Toxicity of the Final Effluent Report
5.6 Pearl Mussel Measures Report
5.7Habitats Impact Assessment Report
6 Certification and Sign off 6.1 Statement
Sign off
7 Appendices
Figures
Figure 1 Location
Figure 2 WWTP Layout
Figure 3 WWTP Layout 2
Figure 4 WWTP Schematic
Figure 5 Location of Sampling points
Figure 6 Location of Primary Discharge
Figure 7 Location of EPA Monitoring points
Figure 4 Location of Monitoring points
Appendices Monitoring Results
Schedule A1 Compliance Results
Ambient Monitoring Results
Influent Monitoring Results
Quality UWWT Results
Flow Results
Emergency Response Procedure
Maintenance Procedure
Public Awareness & communications Programme
1 Executive Summary and Introduction to 2013 AER
Figure 1 Location
1.1 Executive Summary
This report comprises an Annual Environmental Report (AER) for the Killygordon
Agglomeration. This is the first Annual Environmental Report (AER) for this wastewater
treatment works. The Killygordon Wastewater Discharge Licence was granted on 11th
December 2013. No sampling data is available for the 2013 licence period 11th
December
2013 to 31st December 2013 but an evaluation of all results collected in 2013 is presented.
A new Waste Water Treatment Plant was constructed in 2007. This replaced an
overloaded Primary Settlement Tank, which was the method of Waste Water Treatment
for the area, since 1967. The Waste Water treatment plant provides Secondary Treatment
to the waste water by means of a Sequential Batch Reactor, with the treated effluent
discharging to the River Finn.
As no results have been collected for the licence period of sample monitoring, the outlet
shows the discharge to be in compliance under normal conditions with the Urban Waste
Water Treatment Directive of 25mg/lBOD, and 125mg/lCOD. There were three ELV
exceedences over UWWT levels, one for CBod, COD and SS but these complied with
Condition 2 ELVs.
The plant is showing the following efficiencies
cBod removal 98%
COD removal 97%
SS removal 96%
Total P removal 89%
No ELV limits were exceeded in the Licence Period 11th
December 2013 to 31st
December 2013. In relation to water quality, The monitoring results indicate that there is
no significant impact on the receiving water as a result of the discharge from the plant.
The Killygordon WWTP has a design capacity if 600p.e. Average p.e. in 2013 was 1000
p.e.
The WWTP is hydraulically and biologically over loaded and does not have the capacity
to treat additional sewage and further
Figure 2 WWTP Plant Layout
Irish Water is currently developing a Capital Investment Programme and an Asset Needs
Brief. This involves a Business Needs Assessment and will be a national strategy.
Supporting information for Killygordon WWTP has been submitted to Irish Water
outlining a statement of needs for capital works at Killygordon WWTP.
1.2 Introduction to 2013 AER
The report has been compiled in accordance with Condition 6 and Schedule D of
Wastewater Discharge Licence D0518-01 and in accordance with the Environmental
Protection Agency’s (EPA) Guidance notes on the preparation and submission of Annual
Environmental Report AERs for Waste Water Discharge Licences for 2013. The report
covers the period of 11th
December 2013 to 31st December 2013.
The AER fulfills the following objectives:
• Brings together all reports required under the Conditions of the Wastewater
Discharge Licence.
• Allows an evaluation of those reports, results and programmes prepared to
monitor, track and improve environmental performance.
Killygordon is a small village in the Finn Valley of east County Donegal, Ireland.
Killygordon is located on the N15 about 4 miles from Ballybofey and 10 miles from
Lifford. It is a small village. It has a population of 608 (2011) and is located on the N15
between Ballybofey and Castlefin. The separate townland of the Crossroads lies half a
mile from Killygordon. The village of Crossroads is approximately 0.5 miles off the main
road. The River Finn passes by the village on its way towards its confluence with the
River Mourne and the River Foyle. There are plans to connect Crossroads village to the
WWTP. This would accommodate existing houses not able to connect, at present, to the
works and planned housing developments not yet constructed. These works are proposed
to be delivered by a developer led scheme. This work would facilitate the Domestic and
Commercial growth of both villages. It is not possible at this stage to indicate a timeframe
for this upgrade, due to the present economic situation, but when the scheme does go
ahead it will accommodate the villages future waste water treatment requirements.
1.3 WWTP Overview Killygordon Waste Water Treatment Plant was constructed in 2007 to provide Secondary
Treatment for wastewater generated within the Killygordon catchment. It replaced the old
primary settlement tank which had been the method of sewage treatment since its
construction in 1967.
The new 2007 scheme provided for a new treatment plant. There was no upgrade to the
existing sewer network. The entire network drains under gravity to the WWTP located to
the East of the Village. There are no combined sewer overflows or pump stations on the
network under the control of Donegal County Council. There is a storm water overflow
bypass at the intake to the works, which discharges directly to the old septic tank on site,
which has been refurbished for this purpose as part of the new upgrade.
Figure 3 WWTP Layout 2
The Killygordon agglomeration is served by a secondary wastewater treatment plant
which has a design capacity of 600p.e. The activated sludge plant consists of inlet works,
manually raked screen, Sequence Batch Reactor and a sludge holding tank. There is no
chemical dosing for Phosphorous removal at the plant.
The WWTP at Killygordon comprises of:
Preliminary Treatment - intake collection manhole
- intake works containing manually racked screen
- storm water overflow bypass facility
- flow measurement and intake sampler
- pump sump
Secondary Treatment - treatment unit(SBR Tank)
- effluent flow measurement and sampling chamber
- sludge holding tank
- Storm tank
The incoming sewer discharges to the inlet collection manhole which contains a penstock
for inlet works maintenance. The flow moves forward through the manually raked screens
and splits into 2 streams. Each stream is 600PE. (The second flow stream is to be used for
future upgrade). Flows in excess of 3 times the Dry Weather Flow(DWF) pass into the
storm tank. Measured flows up to 3DWF pass into the pump sump. The pump sump has a
capacity of 2 hours at 3 DWF. The waste water then passes to the treatment system. A
sequential batch reactor is adopted as the form of treatment. Most activated sludge plants
perform the two fundamental aspects of the activated sludge process in two tanks. SBR’s
allow for both processes to be carried out in one tank. This process allows aeration,
settlement and decanting to occur employing a five-stage cycle: fill, react, settle, empty
and rest.
Waste Water enters the reactor during the fill stage; it is aerobically treated in the react
stage; the biomass settles in the settle stage; the supernatant is decanted during the empty
stage; sludge is withdrawn from the reactor during the rest stage; and the cycle
commences again with a new fill
stage.
The effluent flow is measured and sampled using a composite sampler. It discharges to
the River Finn approximately 350m upstream of Killygordon Bridge.
Sludge is drawn off periodically and stored in the Sludge Holding Tank. It has a 27 days
holding capacity. There are 3 decant levels which return the supernatant liquid to the head
of the works. Sludge is removed from site when required and sent to the Sludge Hub in
Donegal Town for treatment. Operation and maintenance of the treatment plant and sewer
network is carried out by the Waste Water inspector.
The WWTP has a design capacity of 600PE and serves an existing population equivalent
of 608 (2011).
There are 3 flow measurement devices on site. These are located at
1. intake
2. treated outlet
3. storm overflow
There are 2 composite samplers on site. These are located at
1. intake
2. treated outlet
Samples are lifted 6 times/ year as required under the Urban Waste Water Treatment
Directive.
The wastewater collection system serving the agglomeration drains by gravity. A
combined sewer network generally serves the catchment with some residential
developments served by a separate system.
2 Monitoring Report Summary
2.1 Summary Report on monthly Influent Monitoring
Table 1 The Results of influent Monitoring
cBOD levels increased significantly in August with COD levels increasing significantly
in August and October. SS levels increased significantly in December.
Bi-monthly based influent sampling takes place by Donegal County Council Laboratory
Services in 2013. Since the Licence was granted on 11th
December 2013 none of
sampling data is relevant to the licence period. A summary of the 2013 results is given
below.
The table shows a significant over-loading of the plant as the design loading is 600p.e.
while the existing loading is 1000p.e.
pH
cBOD
COD SS Ammonia
(as N) Ortho
P TP (mg/l)
Hydraulic Loading (m3/d)
Organic Loading (PE/day)
pH
Units (mg/l) (mg/l)
(mg/l)
(mg/l) (mg/l)
Number of Samples
6 6 6 6 6 6 6
Annual Max. 8.36 316.4 550 601 17 2.77 5.38
Annual Mean
7.4 159 398 222 17 2.77
5.38
376.4
1000
Location Lab.ref. Date pH Cond cBOD COD SS Ammonia Nitrate Nitrite Ortho
P Total
(as N) (as N) (as N) P P
Killygordon (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l)
Feburary
Inlet 132501494 14/02/2013 6.94 443 85 234 96 NT NT NT NT NT
April
Inlet 132502271 09/04/2013 6.79 494 94 303 118 NT NT NT NT NT
June
Inlet 132503256 06/06/2013 7.64 512 117 434 145 NT NT NT NT NT
August
Inlet 132504509 21/08/2013 7.63 708 316.4 550 180 NT NT NT NT NT
October
Inlet 132505370 17/10/2013 8.36 617 146.8 519 194 NT NT NT NT NT
December
Inlet 132506228 05/12/2013 7.01 514 198 350 601 17 0 0.11 2.77 5.38
Figure 5 Location of Sampling points
2.2 Summary Report on Discharge from the agglomeration
Schedule A.1 of the DL sets interim emissions. The results of monitoring of discharges
from the agglomeration are included in Appendix.
No ELV limits were exceeded in the Licence Period 11th
December 2013 to 31st
December 2013. No sample results were recorded above ELVs with Condition 2
interpretation in 2013.
The Total Outlet Discharge from the Plant in 2013 was 43280 m3
Lab. Ref Date FLOW pH cBOD COD SS NH3-(as
N) Ortho
P Reported to EPA
(m3/day) (mg/l) (mg/l) (mg/l)
OUTLET Schedule
A
ELV continuous 6-9 25 125 35 5 9
132501495 14/02/2013 7.23 7.41 35 23 NT NT
132502272 09/04/2013 6.92 2.04 35 13 NT NT
132503257 06/06/2013 7.31 2.94 22 5.5 NT NT
132504510 21/08/2013 6.94 7.14 48 17 NT NT
132505371 17/10/2013 6.9 5.82 17 26 NT NT
132506229 05/12/2013 7.16 31.92 192 73 9.38 1.02
pH
cBOD
COD
TSS
Ammonia as N
Ortho P
Comment
(mg/l) (mg/l) (mg/l) (mg/l) (mg/l) WWDL ELV (Schedule A)
6-9
25
125
35
5
9
ELV with Condition 2 Interpretation included
6-9 50 250 87.5 6 10.8
Number of sample results
6 6 6 6 6 6
Number of sample results above WWDL ELV
0 1 1 1 1 0
Number of sample results above ELV with Condition 2 Interpretation included
0 0 0 0 1 0
Annual Max(for parameters where a max ELV applies)
7.31 31.92 192 73 9.38 1.02
Annual Mean (for parameters where a mean ELV applies)
7.08 9.55 58.17 26.25 9.38 1.02
Overall Compliance (Pass/Fail)
pass pass pass pass pass pass
The discharge licence emission limit values have been set having regard to the
designations of and water quality objectives for the receiving water and downstream
abstraction and uses of water.
Figure 6 Location of Primary Discharge
2.3 Ambient Monitoring
Ambient monitoring results for both upstream and downstream of the discharge outlet are
included.
Ambient Monitoring Report Summary Table:
Ambient Monitoring Point from WWDL (or as agreed with EPA)
Irish Grid
Reference
EPA Feature Coding Tool code
Does assessment of the ambient monitoring results indicate that the discharge is impacting on water quality?
Upstream
E220233
N394151 RS01F010880 No discernable impact
Downstream
E220503
N393894 RS01F010899 No discernable impact
Summary results are presented in Table below:
UPSTREAM DOWNSTREAM
Range Average Range Average
PH 6.9 – 7.38 7.15 6.88 – 7.43 7.16
BOD 0.39 – 2.43 1.57 0.45 – 2.29 1.55
Ortho P <0.01 <0.01 <0.01 <0.01
DO 9.47 – 12.21 10.92 9.9 – 12.65 11.1
SS 0.5 – 19.4 7 0.25 – 18.6 5.82
Ammonia as N <0.04 <0.04 <0.04 <0.04
The monitoring results indicate that there is no significant impact on the receiving water.
Location Lab Ref Date pH DO BOD Suspended
solids NH3(as
N) Ortho
P Visual
Inspection
(mg/l) (mg/l) (mg/l) (mg/l)
Upstream 132501493 14/02/2013 7.03 12.1 1.03 1.6 NT NT Nothing
Observed
Downstream 132501496 14/02/2013 7.26 11.85 1.11 1.6 NT NT Nothing
Observed
Upstream 132502270 09/04/2013 7.28 12.21 0.39 0.5 NT NT Nothing
Observed
Downstream 132502273 09/04/2013 7.19 12.65 0.45 0.25 NT NT Nothing
Observed
Upstream 132503255 06/06/2013 6.9 9.47 2.23 7 NT NT Nothing
Observed
Downstream 132503258 06/06/2013 6.88 9.9 2.29 7.5 NT NT Nothing
Observed
Upstream 132504508 21/08/2013 7.09 9.9 2.43 6.25 NT NT Nothing
Observed
Downstream 132504511 21/08/2013 6.95 10 2.15 0.25 NT NT Nothing
Observed
Upstream 132505369 17/10/2013 7.38 11.27 1.71 19.4 NT NT Nothing
Observed
Downstream 132505372 17/10/2013 7.43 11.17 1.79 18.6 NT NT Nothing
Observed
Upstream 132506227 05/12/2013 7.27 12.94 1.64 7.25 <0.04 <0.01 Nothing
Observed
Downstream 132506230 05/12/2013 7.25 12.9 1.54 6.75 <0.04 <0.01 Nothing
Observed
2.4 Data collection and reporting requirements under the Urban Waste
Water Treatment Directive.
The Donegal County Council Laboratory Service under the 2013 EPA Urban Wastewater
Returns has submitted this information electronically.
This data is included in the Appendix.
NOTE: As a discharge to freshwater from an agglomeration of less than 2000 p.e., appropriate
treatment is required as specified in Article 7 of the Urban Waste Water Treatment
(UWWT) Regulations ( S.I. No. 254 of 2001 and amendments) but there is no
requirement for compliance with the absolute effluent limits ( 25:125:35 BOD:COD:SS)
in the Regulations for plants serving less than 2000 p.e.
2.5 Pollutant Release and Transfer Register ( PRTR) Report for 2013 No PRTR required.
Agglomerations less than 2000 p.e. have no PRTR reporting requirements in 2013.
Refer to Guidance on the Preparation & Submission of the Annual Environmental Report
(AER) for Waste Water Discharge Licences for 2013.
3 Operational Reports Summary
3.1 Treatment Efficiency Report
The annual Influent flow for 2013 was 137388 m3
Treatment Efficiency Report Summary Table
cBOD COD SS Total P Total N Comments
(Kg/day) (Kg/day) (Kg/day) (Kg/day) (Kg/day)
Influent mass loading (Kg/day) 60.22 257 83 0.6804 NT
Effluent mass
emissions(Kg/day) 1.13 6.89 3.11 0.0767 NT
% Efficiency 98% 97% 96% 89% NT
(% reduction of influent load)
NT Not Tested
3.2 Treatment Capacity Report
Preferred format for the Treatment Capacity Report Summary Table:
Hydraulic Capacity – Design / As Constructed (m3/day) 200 Estimated
Hydraulic Capacity – Current loading (m3/day) 376.4
Hydraulic Capacity – Remaining (m3/day) 0
Organic Capacity - Design / As Constructed (PE) 600
Organic Capacity - Current loading (PE) 1000
Organic Capacity – Remaining (PE) 0
Will the capacity be exceeded in the next three years? (Yes / No) YES
The treated effluent from Killygordon WWTP discharges into the River Finn. In addition
to legislation under the Water Framework Directive(2000/60/EC) the river has been
classified as a Salmonoid River under S.I. No 293/1988:European Communities(Quality
of Salmonoid Waters) Regulations. The receiving waters of the River Finn is a designated
SAC. The River Finn is located within the North Western International River Basin
District in County Donegal.
3.3 Extent of Agglomeration Summary Report
Extent of Agglomeration Summary Report
% of total load generated in the agglomeration
Load generated in the agglomeration that is collected in the sewer network (estimated)
90
Load collected in the agglomerations that enters treatment plant (estimated)
90
Load generated in the agglomeration going to individual and appropriate treatment systems(estimated)
10
Load generated in the agglomeration that is not collected and not individually treated. (estimated)
10
These are estimated figures. Until load surveys are complete.
3.4 Complaints Summary
There were no reportable environmental complaints relating to the operation of
Killygordon WWTP within the agglomeration for the reporting period.
DATE CALLER COMPLAINT DEALT BY REMARKS
3.5 Reported Incidents Summary
There were no reportable environmental incidents within the agglomeration for the
reporting period.
In addition the following details must be provided:
Number of Incidents in 2013 0
Number of Incidents reported to the EPA via EDEN in 2013 0
Explanation of any discrepancies between the two numbers above
No discrepancy
3.6 Sludge / Other inputs to the WWTP
Preferred format for Other Inputs table Input type
m3/year PE/year % of load
Domestic /Septic Tank Sludge
o o o
Industrial / Commercial Sludge
o o o
Landfill Leachate (delivered by tanker)
o o o
Landfill Leachate (delivered by sewer network)
o o o
Other (specify) Reseeding sludge from Stranorlar WWTP December 2013
30 o o
Incident Type (e.g. Non-compliance, Emission, spillage, pollution incident)
Incident Description
Cause No. of incidents
Corrective Action
Authorities Contacted Note 1
Reported to EPA (Yes/No)
Closed (Y/N)
0
4 Infrastructural Assessments and Programme Improvements
4.1 Storm Water Identification and inspection Report A report on the storm water overflows is not required in the first AER submission.
There is one Stormwater overflow located at the inlet works of the Waste Water
Treatment Plant which discharges to the River Finn via the primary discharge point.
Condition 4.12 Storm Water Overflows (SWO) requires an investigation for the
identification and assessment of SWOs be carried out. A compliance report on the
DoECLG ‘Procedures and criteria in relation to Storm Water Overflows’ 1995 has not
been undertaken and a preliminary assessment will begin in 2014. The WWTP cannot
comply with the DoECLG guidelines until adequate capacity is provided to avoid
overflow/untreated discharge to the receiving water.
SWO Identification and Inspection Summary Report Table A: WWDL Name / Code for Storm Water Overflow
Irish Grid Reference
Included in Schedule A4 of the WWDL
Compliance with DoECLG Criteria
No. of times activated in 2013 (No. of events)
Total volume discharged in 2013 (m3)
Total volume discharged in 2013 (P.E.)
Estimated /Measured data
SW1 E 220271 N394146
N/A Not yet assessed
5 1688 12 E
SWO Identification and Inspection Summary Report Table B: How much sewage was discharged via SWOs in the agglomeration in the year (m3/yr)?
1688
How much sewage was discharged via SWOs in the agglomeration in the year (p.e.)?
12
What % of the total volume of sewage generated in the agglomeration was discharged via SWOs in the agglomeration in 2013?
12
Is each SWO identified as non-compliant with DoEHLG Guidance included in the Programme of Improvements?
Yes
The SWO assessment includes the requirements of Schedule A3 & C3 YES
Have the EPA been advised of any additional SWOs / changes to Schedule C3 and A4 under Condition 1.7?
N/A
4.2 Report on progress made and proposals being developed to meet the
improvement programme requirements
Killygordon Waste Water Treatment Plant was constructed in 2007 to provide Secondary
Treatment for wastewater generated within the Killygordon catchment. It replaced the old
primary settlement tank which had been the method of sewage treatment since its
construction in 1967.
The WWTP has a design capacity of 600PE
The long term development of the area would see waste water from Crossroads also being
treated at Killygordon WWTP. Phase 2 of the WWTP would need to be implemented
before this could proceed. This would involve the expansion of the WWTP by the
inclusion of an additional SBR and associated equipment and increased sludge capacity.
It would also require the construction of a municipal wastewater pumping station in
Crossroads to transfer all waste water to Killygordon. These works are proposed to be
delivered by a developer led scheme. A special development contribution scheme is in
place so as to allow the collection of the necessary funding.
It is not possible at this time to state a timeframe for the project but once complete will
cater for waste water treatment within the Killygordon/Crossroads catchment area.
Specified Improvement Programmes
(under Schedule A
and C of WWDL)
Licence Schedule (A or C)
Licence Completion
Date
Date Expired? (N/NA/Y)
Status of Works ((i) Not Started; (ii) At planning stage; (iii) Work ongoing on-site;
(iv) Commissioning
Phase; (v) Completed; (vi)
Delayed;)
% Construction
Work Completed
Licensee Timeframe
for Completing
the Work
Comments
No specific improvements works are specified in schedule C of the Licence.
Sewer Integrity Assessment Tool has not been completed to date. Data gathering has
commenced and it is envisaged that the report will be included in the next AER.
Increasing the treatment capacity of the WWTP is necessary to improve the discharge
quality. Kilygordon SS was not on the WSIP 2010 – 2013. Details in relation to Asset
Needs Brief have been submitted to Irish Water for inclusion on the Irish Water Capital
Investment Programme.
The discharge licence emission limit values (ELVs) have been set having regard to the
designations of the water quality objectives for the receiving water and down stream
abstraction and uses of the water. Condition 3.1 where discharges from the wastewater
works are required to comply with ELVs by specified dates (Schedule A) the Water
Service authority shall prior to this date take such measures as are necessary to ensure
that environmental pollution is not caused as a result of the discharge.
4.3 Statement of Measures
It is the stated objective of Donegal County Council to ensure that the capacity o the
Killygordon Waste Water Treatment Plant is not exceeded and to operate the wastewater
works and supervise the operation of the WWTP by its area staff and Laboratory staff.
With regard to financial provisions, Donegal County Council’s current stated position is
that all operational costs that may arise will be covered by its own operational budget.
The following measures have been identified and may be actioned under minor
improvement works at the plant under an Irish Water Minor Works Improvement
programme. The major upgrade of the plant will be subject to available funding.
ID
Mitigation
Measures to
be taken
Outcome Action Date for
completion
Contact
Person
I Assessment of
surfacewater
Inflow
Reduced
surfacewater
inflow
CCTV survey
of Network
Dec 2016 Mr J
McGettigan
SEE
II Provide
Standby
generator.
Ensure
continuity of
power supply
Provide
Standby
generator.
Improved site
management
Dec 2015 Mr J
McGettigan
SEE
III Specific
construction
works
Improved site
operation
Fixed ladder
and hand rails
on the sludge
holding tank
Dec 2014 Mr J
McGettigan
SEE
!IV Specific
construction
works
Improved site
operation
Provide
Platform at
the S.B.R. for
working
safely at the
decant arm
Dec 2014 Mr J
McGettigan
SEE
V Specific
construction
works
Ground work
Concrete
apron round
the tanks and
driveway.
Dec 2015 Mr J
McGettigan
SEE
VI Provide
Welfare
facilities for
personnel
Health &
Safety
Separate
welfare
facility from
blower room
Dec 2016 Mr J
McGettigan
SEE
VII Electrical
inspection
survey
Continual
Power supply
Regular
Maintenance
by DCC
electrician
Dec 2014 Mr J
McGettigan
SEE
VIII Provide
Mechanical
Screen
Improved
Screening
Source
funding
Specify &
Tender Install
Mechanical
Screen
Dec 2016 Mr J
McGettigan
SEE
IX Upgrade of
plant and
equipment
Modernisation
of Plant and
Increase
capacity
Capital works
Application
Funding
Dependant
Irish
Water
A Mechanical screen is required due to the interference of the manually raked screen with
flow monitoring.. The inlet meter is an ultra sonic sensor and flume, this is affected by the
hand raked screen blocking which in turn backs up in the flume thus giving a higher inlet
flow. The infrastructural improvements outlined in Schedule C specified Improvement
Programme would be subject to funding being made available.
It is the intention of Donegal County Council to carry out the proposed improvement
works, subject to the availability of appropriate funding.
5. Licence Specific Reports
5.1 Priority Substances Assessment
5.2 Drinking Water Abstraction Point Risk Assessment
5.3 Shellfish Impact Assessment Report.
5.4 Toxicity / Leachate Management
5.5Toxicity of the Final Effluent Report
5.6 Pearl Mussel Measures Report
5.7Habitats Impact Assessment Report
There are no licence specific reports required. Preferred format for the Licence Specific Reports Summary Table:
Licence Specific Report
Required in 2013 AER or outstanding from previous AER
Included in 2013 AER
Reference
Priority Substances Assessment
No No
Drinking Water Abstraction Point Risk Assessment
No No
Habitats Impact Assessment
No No
Shellfish Impact Assessment
No No
Pearl Mussel Report
No No
Toxicity/Leachate Management
No No
Toxicity of Final Effluent Report
No No
5.1 Priority Substances Assessment
Condition 4.19 of the licence details the specific information required in this report. This
assessment includes an assessment of the significance of the discharge on the receiving
water (e.g. assessment against the EQS Regulations).
The Priority Substance Assessment summary has not been completed.
Section 6. Certification and Sign Off
This AER report is certified as accurate and is representative by a nominated and suitably qualified person. The AER contains the following;
• Introduction and background to 2013 AER
• Monitoring reports summary.
• Operational reports summary.
• Infrastructural Assessment and Programme of Improvements.
• Licence specific reports.
• Certification and Sign Off
• Appendix
Does the AER include an executive summary? Yes
Does the AER include an assessment of the performance of the Waste Water Works
(i.e. have the results of assessments been interpreted against WWDL requirements
and or Environmental Quality Standards)? Yes
Is there a need to advise the EPA for consideration of a technical amendment / review
of the licence? No
List reason e.g. additional SWO identified (insert lines as required)
Is there a need to request/advise the EPA of any modifications to the existing WWDL?
Refer to Condition 1.7 (changes to works/discharges) & Condition 4 (changes to
monitoring location, frequency etc.)
No
List reason e.g. failure to complete specified works within dates specified in the
licence, changes to monitoring requirements (insert lines as required) N/A
Have these processes commenced? (i.e. Request for Technical Amendment / Licence
Review / Change Request) N/A
Are all outstanding reports and assessments from previous AERs included as an
appendix to this AER? N/A
List outstanding reports NA
Lab. Ref Date FLOW pH BOD COD SS NH3-(as N) Ortho P
(m3/day) (mg/l) (mg/l) (mg/l)
Outlet
Schedule A
ELV continuous 6-9 25 125 35 5 1.5
132501495 14/02/2013 7.23 7.41 35 23 NT NT
132502272 09/04/2013 6.92 2.04 35 13 NT NT
132503257 06/06/2013 7.31 2.94 22 5.5 NT NT
132504510 21/08/2013 6.94 7.14 48 17 NT NT
132505371 17/10/2013 6.9 5.82 17 26 NT NT
132506229 05/12/2013 7.16 31.92 192 73 9.38 1.02
42.46 57.27 349 157.5 9.38 1.02
Mean 7.08 9.55 58.17 26.25 1.56 0.17
Killygordon Schedule A1 Compliance Results 2013
Location Lab Ref Date pH DO BOD Suspended
solids NH3(as
N) Ortho
P Visual
Inspection
(mg/l) (mg/l) (mg/l) (mg/l)
Upstream 132501493 14/02/2013 7.03 12.1 1.03 1.6 NT NT Nothing
Observed
Upstream 132502270 09/04/2013 7.28 12.21 0.39 0.5 NT NT Nothing
Observed
Upstream 132503255 06/06/2013 6.9 9.47 2.23 7 NT NT Nothing
Observed
Upstream 132504508 21/08/2013 7.09 9.9 2.43 6.25 NT NT Nothing
Observed
Upstream 132505369 17/10/2013 7.38 1.71 19.4 NT NT Nothing
Observed
Upstream 132506227 05/12/2013 7.27 1.64 7.25 <0.04 <0.01 Nothing
Observed
Mean 7.1583 10.92 1.5717 7 0 0
Downstream 132501496 14/02/2013 7.26 11.85 1.11 1.6 NT NT Nothing
Observed
Downstream 132502273 09/04/2013 7.19 12.65 0.45 0.25 NT NT Nothing
Observed
Downstream 132503258 06/06/2013 6.88 9.9 2.29 7.5 NT NT Nothing
Observed
Downstream 132504511 21/08/2013 6.95 10 2.15 0.25 NT NT Nothing
Observed
Downstream 132505372 17/10/2013 7.43 1.79 18.6 NT NT Nothing
Observed
Downstream 132506230 05/12/2013 7.25 1.54 6.75 <0.04 <0.01 Nothing
Observed
42.96 44.4 9.33 34.95 0 0
Mean 7.16 11.1 1.555 5.825 0 0
Killygordon Ambient Monitoring Results 2013
Location Lab.ref. Date pH Cond BOD COD SS Ammonia Nitrate Nitrite Ortho P Total
(as N) (as N) (as N) P P
Killygordon (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l)
Feburary
Inlet 132501494 14/02/2013 6.94 443 85 234 96 NT NT NT NT NT
April
Inlet 132502271 09/04/2013 6.79 494 94 303 118 NT NT NT NT NT
June
Inlet 132503256 06/06/2013 7.64 512 117 434 145 NT NT NT NT NT
August
Inlet 132504509 21/08/2013 7.63 708 316.4 550 180 NT NT NT NT NT
October
Inlet 132505370 17/10/2013 8.36 617 146.8 519 194 NT NT NT NT NT
December
Inlet 132506228 05/12/2013 7.01 514 198 350 601 17 0 0.11 2.77 5.38
Location Lab.ref. Date pH Cond BOD COD SS Ammonia
(as N) Nitrate (as N)
Nitrite (as N) Ortho P Total P
(mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l) (mg/l)
Killygordon
Feburary
Upstream 132501493 14/02/2013 7.03 83 1.03 1.6 NT NT NT NT NT
Inlet 132501494 14/02/2013 6.94 443 85 234 96 NT NT NT NT NT
Outlet 132501495 14/02/2013 7.23 312 7.41 35 23 NT NT NT NT NT
Downstream 132501496 14/02/2013 7.26 80.9 1.11 1.6 NT NT NT NT NT
April
Upstream 132502270 09/04/2013 7.28 135 0.39 0.5 NT NT NT NT NT
Inlet 132502271 09/04/2013 6.79 494 94 303 118 NT NT NT NT NT
Outlet 132502272 09/04/2013 6.92 387 2.04 35 13 NT NT NT NT NT
Downstream 132502273 09/04/2013 7.19 127.5 0.45 0.25 NT NT NT NT NT
June
Upstream 132503255 06/06/2013 6.9 52.4 2.23 7 NT NT NT NT NT
Inlet 132503256 06/06/2013 7.64 512 117 434 145 NT NT NT NT NT
Outlet 132503257 06/06/2013 7.31 455 2.94 22 5.5 NT NT NT NT NT
Downstream 132503258 06/06/2013 6.88 51.1 2.39 7.5 NT NT NT NT NT
August
Upstream 132504508 21/08/2013 7.09 79.3 2.43 6.25 NT NT NT NT NT
Inlet 132504509 21/08/2013 7.63 708 316.4 550 180 NT NT NT NT NT
Outlet 132504510 21/08/2013 6.94 487 7.14 48 17 NT NT NT NT NT
Downstream 132504511 21/08/2013 6.95 80.5 2.15 0.5 NT NT NT NT NT
October
Upstream 132505369 17/10/2013 7.38 86 1.71 19.4 NT NT NT NT NT
Inlet 132505370 17/10/2013 8.36 617 146.8 519 194 NT NT NT NT NT
Outlet 132505371 17/10/2013 6.9 403 5.82 17 26 NT NT NT NT NT
Downstream 132505372 17/10/2013 7.43 86 1.79 18.6 NT NT NT NT NT
December
Upstream 132506227 05/12/2013 7.27 106 1.64 7.25 <0.04 0.132 <0.01 <0.01 0.043
Inlet 132506228 05/12/2013 7.01 514 198 350 601 17 0 0.11 2.77 5.38
Outlet 132506229 05/12/2013 7.16 586 31.92 192 73 9.38 0.077 0.02 1.02 4.59
Downstream 132506230 05/12/2013 7.25 109 1.54 6.75 <0.04 0.168 <0.01 <0.01 0.065
cBOD COD SS Total P Total N Comments
(Kg/day) (Kg/day) (Kg/day) (Kg/day) (Kg/day)
Influent mass loading (Kg/day) 60.22 257 83 0.6804 NT
Effluent mass
emissions(Kg/day) 1.13 6.89 3.11 0.0767 NT
% Efficiency 98% 97% 96% 89% NT
(% reduction of influent load)
NT Not Tested
Date Inlet Flow Storm Outlet Total Final Flow
01/07/2013 reading 19098 218 270249
31/12/2013 reading 87792 1062 291889
6 months Flow 68694 844 21640
Annual Flow 137388 1688 43280
m3
Sludge Removal 2013
Date Time Volume (ton) Nr of loads
Location
Removed
To
Transported
By
Plant Hire
Sheet No. Comments
10/01/13 9.00 11 1 Donegal A. Vance 96DL6068
18/01/13 9.00 11 1 Donegal A. Vance 96DL6068
28/01/13 9.00 11 1 Donegal A. Vance 96DL6068
21/02/13 9.00 11 1 Donegal A. Vance 96DL6068
03/03/13 9.00 11 1 Donegal A. Vance 96DL6068
14/03/13 9.00 11 1 Donegal A. Vance 96DL6068
17/04/13 9.00 11 1 Donegal A. Vance 96DL6068
18/04/13 9.00 11 1 Donegal A. Vance 96DL6068
14/05/13 9.00 11 1 Donegal A. Vance 96DL6068
31/05/13 9.00 11 1 Donegal A. Vance 96DL6068
19/07/13 9.00 11 1 Donegal A. Vance 96DL6068
26/08/13 9.00 11 1 Donegal DM Waste 02DL9086 132
16/09/13 8.00 11 1 Letterkenny DM Waste 02DL9086
07/10/13 8.00 22 2 Letterkenny DM Waste 02DL9086
29/10/13 8.00 22 2 Letterkenny DM Waste 02DL9086
02/12/13 8.00 11 1 Letterkenny DM Waste 02DL9086 66
Appendix
Emergency Response Procedure
Killygordon WWTW
CRITICAL INCIDENT MANAGEMENT
PROCEDURE
2013
ACTION / RESPONSE IN THE
EVENT OF AN INCIDENT
AT
Killygordon
Wastewater Treatment Works & Associated Pumping Stations
THIS PROCEDURE MUST BE READ IN
CONJUNCTION WITH:
• DONEGAL COUNTY COUNCIL PARENT SAFETY STATEMENT
• WATER & ENVIRONMENT SERVICES ANCILLARY SAFETY
STATEMENT
• KILYGORDON WWTW SITE SPECIFIC SAFETY STATEMENT
AND RISK ASSESSMENT
DONEGAL COUNTY COUNCIL
CONTACT NUMBERS
WATERWORKS
INSPECTORS Andrew Scanlon 087 7857854
Asst. Waterworks
Inspector JOSIE MCKELVEY 087 6637626
AREA SUPERVISOR HUGH ALEXANDER 087 2581215
AREA ENGINEER MARTIN 0’ DONNELL 0861724473
AREA MANAGER JOHNNY Mac GETTIGAN
087 6697407
FITTER DANNY GREENE 087 8162993
ELECTRICIAN FRANK O’CONNOR 087 0610438
DCC LABORATORY
Senior Executive Chemist: Joe Ferry
087 2533126
074 9122 423.
DCC LABORATORY HUGH KERR
OFFICE
087 2705331
074 9122787
EMERGENCY NUMBERS
LOCAL HOSPITAL LETTERKENNY 074 9125888
LOCAL DOCTOR DR. LAVELL
NOW DOC
074 9131023
1850 400911
GARDA SIOCHANA KILYGORDON
BALLYBOFEY
074 914 5114
074 9132002
HEALTH AND
SAFETY
AUTHORITY SLIGO 071 9143942
ENVIRONMENTAL
PROTECTION
AGENCY CASTLEBAR 094 9048400
LOUGHS AGENCY DERRY 0044 28 71342100
ALL EMERGENCIES 999 / 112
This Site Safety Statement should be read in conjunction with the Donegal Local
Authorities Parent Safety Statement.
The Parent Safety Statement covers the general headings and areas:
� The County Manager’s Policy Declaration
� Safety Resources Provided
� Safety Management System
� Distribution List
� Organisation Chart
� Consultation and Safety Representatives
� Safety Responsibilities / Duties of Staff
� Manner and Arrangements for Securing Health & Safety at Work
� Safety Audits
� Safety Policies / Procedures / Rules
� Emergency Plans
CONTENTS
Introduction
General Safety
1. FIRE OUTBREAK
• 1.1 GENERAL
• 1.2 OFFICE BUILDING
2. ACCIDENT:
• 1.2 FIRST AID
• 1.3 SERIOUS INJURY
• 1.4 FATALITY
• 1.5 NEAR MISS INCIDENTS
3 TRANSPORTATION/VEHICLE ACCIDENT ON SITE
• 3.1 FATALITY
• 3.2 SERIOUS INJURY
• 3.3 PROPERTY/EQUIPMENT DAMAGE ONLY
4 FALL INTO WATER (OPEN TANK OR CHAMBER) ON SITE
• 4.1 CONSCIOUS CASUALTY
• 4.2 UNCONSCIOUS CASUALTY
• 4.3 FALL INTO AERATION TANK
5 RESCUE FROM A SAFETY HARNESS WHILE WORKING AT HEIGHT
6 CONFINED SPACE RESCUE
7 EXPLOSION ON SITE
8 PERSON TRAPPED BY AN OBJECT
9 ELECTRIC SHOCK:
• 9.1 USE OF PORTABLE ELECTRICAL APPLIANCE
• 9.2 CONTACT WITH OVERHEAD POWER LINES
10 EXPOSURE TO TOXIC GAS (NOT CHLORINE)
11 NO WATER TO SUPPLY ESSENTAIL SAFETY EQUIPMENT
12 DISRUPTION OF PROCESS/SERVICE
13 INTRUDER ALARM ACTIVATED OUTSIDE OF NORMAL WORKING
HOURS
14 EXTREME WEATHER CONDITIONS
15 SPILL OR OVERFLOW OF SLUDGE ON SITE
16 ELECTRICTY SUPPLY FAILURE
17 ENVIRONMENTAL POLLUTION
18 RESPONDING TO ALARMS – OUT OF HOURS:
• 18.1 FIRE
• 18.2 PROCESS
• 18.3 POWER FAILURE
Introduction
General Safety
First Aid Qualified First Aiders are appointed to cover all activities.
A NOTICE IS POSTED LISTING THE NAMES OF QUALIFIED OCCUPATIONAL FIRST AIDERS
AND THE LOCATION OF THE FIRST AID BOX. THE QUALIFIED FIRST AID PERSONNEL FOR
THIS SITE ARE:
• Danny Greene
All treatments given must be recorded in the Accident Record Book.
A record of all medical requisitions dispensed must be kept by the First Aiders & all
treatments given must be recorded in the Accident Record Book.
It should be noted that First Aiders are not empowered to dispense analgesics, pills or
medications. Supplies of such items will not be kept in the First Aid boxes.
An advisory sign indicating the location of first aid facilities is positioned on the exterior
of the site office
1. Personal Protective Equipment The Parent Safety Statement contains the PPE Policy and details the process for
replenishment of PPE.
The Waterworks Inspector retains a register noting issue and receipt of all PPE.
The receiver must sign to validate the issues of PPE
The Personal Protective Equipment provided to staff on site is:
� PROTECTIVE FOOTWEAR
For use at all times while at work
� HIGH VISIBILITY VEST OR JACKET
For use at all times while at work
� RIGGER GLOVES
For use when handling wood, metal, glass and other items which may cause
cuts etc,
� RUBBER GLOVES
For use when handling batteries etc,
� HARD HAT
To be worn when heavy plant is in operation on site
� EYE PROTECTION
To be worn when heavy plant is crushing wood etc,
When handling potential hazardous chemicals
� CHEMICAL SPILL KIT
For use in event of oil, chemical spills
FIRE OUTBREAK GENERAL
EMERGENCY POSSIBLE CAUSES APPLICABLE TO Fire: Occurring in specific
areas of the plant.
Could be caused by arson and
extent of fire could require the
assistance of the Fire Services Fire cannot be safely
extinguished using fire fighting
equipment on the site
Property damage
Equipment damage
Smoke inhalation
Personal injury
Fatality
Evacuation of the plant/site
Shut down off the plant
Operations
Fire within the
Laboratory Personal injury Fatality
Chemical fire
Operations
THE DESIGNATED FIRE ASSEMBLY POINT FOR SITE IS AT
THE MAIN ENTRANCE OF THE SITE.
THIS POINT IS SIGNED WITH THE APPROPRIATE SAFETY WARNING
SIGN “ASSEMBLY POINT” WHITE LETTERING ON A GREEN
BACKGROUND.
ALL PERSONS WILL BE MADE FAMILIAR WITH THE LOCATION OF THE
FIRE ASSEMBLY POINT DURING THEIR SITE SAFETY INDUCTION.
THIS SIGN MUST NOT BE OBSTRUCTED OR DEFACED.
IN THE EVENT OF A FIRE:
The principal objective of a Fire / Emergency Evacuation is to ensure that the site is
cleared of all personnel in the shortest possible time.
The first priority is to avoid putting persons in danger and to avoid injury or death
The Fire Officer has overall authority and responsibility during the Emergency.
The following steps should be taken in the event of an Emergency or Fire
DO NOT PANIC
• STOP WORK IMMEDIATELY AND RAISE THE NEAREST
FIRE ALARM.
• DO NOT PUT YOURSELF OR ANY OTHER PERSONS AT
RISK.
• NO PERSON IS PERMITTED TO ENTER OR SEARCH A
BURNING BUILDING/AREA FOR MISSING PERSONS OR
PERSONAL BELONGINGS.
• LEAVE THE BUILDING/AREA IMMEDIATELY BY USING
THE NEAREST FIRE EXIT.
• ENSURE THAT ANYONE WORKING WITH YOU OR NEAR
TO YOU ALSO LEAVES.
• GO TO THE DESIGNATED ASSEMBLY POINT LOCATED
AT THE MAIN ENTRANCE TO THE SITE
• CALL THE FIRE BRIGADE (IF THIS HAS NOT BEEN
DONE ALREADY)
• REMAIN THERE UNTIL YOU ARE GIVEN THE ALL
CLEAR TO RETURN TO THE SITE
THE WATERWORKS INSPECTOR WILL TAKE CHARGE OF
THE INCIDENT. YOU MUST CO-OPERATE WITH THEIR
INSTRUCTIONS.
IF THE SERVICES OF THE FIRE BRIGADE ARE NECESSARY
THE WATERWORKS INSPECTOR WILL CALL THEM.
THE WATERWORKS INSPECTOR WILL ENSURE THAT ALL
PERSONS ARE ACCOUNTED FOR AND WILL ASSIST THE FIRE
BRIGADE IN THE EVENT THAT THEY COME ON SITE.
1.2 DEALING WITH A FIRE IN THE OFFICE BUILDING
DUE TO THE RISK THAT THE FIRE COULD CAUSE AN EXPLOSION RISK
DUE TO THE CHEMICALS OCCASIONALLY PRESENT IN THE BUILDING
AND THE POSSIBILITY OF TOXIC FUMES BEING RELEASED NO PERSON
ON SITE IS PERMITTED TO DEAL WITH THIS TYPE OF FIRE.
In the event of a fire involving chemicals take the following action:
• Stop work immediately and if possible close the door to the laboratory
• Do not panic and do not run
• Raise the fire alarm
• Alert other persons on the site that there is a fire and get the help of others
present on site to ensure that all persons stop work and leave the area.
• Go to the designated assembly point at the main entrance to the plant.
• Remain at the designated assembly point until given the all clear that it is safe
to return to the site
• The Waterworks Inspector will contact the fire brigade and request their
presence on the site explaining the cause of the fire and its location.
2. PROCEDURE IN THE EVENT OF AN ACCIDENT
Should an accident occur on site the following applies:
A) The first priority when an accident/incident happens is not to panic, stay calm and
without putting yourself at risk determine how serious it is and if required:
(i) Give immediate assistance to the injured party and enlist the help of the nearest
First Aider.
(ii) In the event of a fatality/serious injury that requires medical treatment call the
required Emergency Service (Ambulance, Fire Brigade and if necessary the
Gardai – on 999 or 112 ) without delay, speak slowly and clearly and request
which service you need on site.
(iii) The Waterworks Inspector must have a clear account of what has happened. The
Waterworks Inspector must inform the Area Supervisor of the accident. If the
injured party has been taken to hospital, the Waterworks Inspector shall advise if
their next of kin has been contacted. If this has not happened it must be done so
promptly by the Area Supervisor.
B) The Area Supervisor and Area Engineer will ensure that the
accident is investigated and details recorded in the site accident
book and the Accident Report Form completed. C) The completed accident form must be sent to the Water & Environment Safety
Officer.
D) The Safety Officer shall discharge the duty where required to notify the Health
and Safety Authority and shall submit the appropriate IR1 or IR3 form. In the
event of a reportable accident or incident copies of the completed forms will be
provide to the Area Engineer for inclusion in the site accident file.
2.1 PROCEDURE IN THE EVENT OF A FIRST AID INCIDENT
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Medical/First Aid
emergencies resulting from
an accident or incident on
the site
Personnel in need of medical
assistance Personal injury
Operations
• Attend to the injured person and provide assistance
• Use the appropriate first aid facilities and get help.
• Treat the injury and determine if the injured party should be advised to seek
further medical attention from their own GP or attend the nearest A & E hospital.
• The Waterworks Inspector will report he accident to the Area Supervisor.
• The Area Supervisor and Area Engineer will ensure that the accident is
investigated and details recorded in the site accident book and the Accident Report
Form completed.
• The completed accident form must be sent to the Water & Environment Safety
Officer.
• The Area Supervisor & Area Engineer shall carry out an investigation of the
accident to identify cause and to ensure that adequate control measures are put in
place prevent a reoccurrence.
2.2 PROCEDURE IN THE EVENT OF A SERIOUS INCIDENT
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Serious incident resulting in
a person receiving medical
attention and possible
detainment in hospital
Person in need of medical
assistance Personal injury
Operations
SERIOUS INJURY:
• Stay calm and keep the injured party at rest.
• Contact the Ambulance Service immediately indicating the precise location and
extent of the incident and injuries and number of persons injured. This is
important to enable the Ambulance service to provide adequate facilities to the
site to cover the emergency.
• Attempt rescue of persons only if it safe to do so and without putting themselves
or any other persons at risk and they have the correct equipment available.
• Try and maintain contact and communication with the injured party assuring them
that help and assistance is on the way.
• Remain with the injured party and ensure someone is designated on site to meet
with the ambulance and other emergency services on their arrival at site and to
guide them to the location of the incident
• Arrange for someone to accompany the injured party in the ambulance.
• The Area Supervisor will contact the persons next of kin.
• Ensure that the area(s) involved in the incident are secured and that nothing is
tampered with or removed from the scene until the appropriate investigations have
been made by the Water & Environment Safety Officer.
• The area may also need to be retained longer to allow for an inspection by the
enforcing authorities. The Water & Environment Safety Officer will advise if this
is necessary.
• Full co-operation must be given to those involved in assisting with the
investigation and details of any witnesses provided.
• Upon completion of the investigation only then can the area be returned for work
to continue.
2.3 PROCEDURE IN THE EVENT OF A FATALITY
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Unsafe methods of working Struck by moving or falling
object
Vehicle accident
Exposure to toxic gas or
acid.
Person(s) found dead or
seriously injured.
Fatality Serious personal injury
Equipment damage
Property damage
Operations
Where there is an emergency on site that involves the FATALITY :
• The Waterworks Inspector must immediately contact the Gardai and the
Ambulance Services and request their presence on site. Then contact the Area
Supervisor and Area Engineer.
• The Area Supervisor must immediately contact the Health & Safety Officer and
the persons next of kin
• The Health and Safety Officer will contact the Enforcing Authority for the area.
• Secure the area of the site where the emergency has occurred until the Gardai and
Ambulance services have arrived and keep the area secure
• Do not permit any other person to enter the scene of the incident or tamper with
anything
• Provide full co-operation to all enforcement agencies in attendance to facilitate the
investigation.
• Ensure that the area(s) involved in the incident remain secured and unauthorized
access prevented until the appropriate investigations have been made.
• Ensure that details of any witnesses to the emergency have been recorded.
• Complete the accident book and accident report form and submit to the Health &
Safety Officer. The Health and Safety Officer will complete the necessary
notifications to the Enforcing Authority.
2.4 PROCEDURE IN THE EVENT OF A NEAR MISS
NEAR MISS
“If something happens which does not result in a reportable
injury but which clearly could have done, then it must be reported
immediately”
The Waterworks Inspector must inform the Area Supervisor of any Near Miss.
All near miss incidents that occur must be investigated by the Area Supervisor and
Area Engineer to establish cause and prevent reoccurrences.
The Near Miss Incident Report Form shall be completed, listing the actions that will
be taken to prevent reoccurrences.
The completed incident form must be submitted to the Water & Environment
Health & Safety Officer as soon as possible after the event.
3. PROCEDURE IN THE EVENT OF A TRANSPORTATION/VEHICLE
ACCIDENT
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Transportation/Vehicle
accident Property and / or equipment
damage Fatality/casualties requiring
the attendance of the
Emergency services, HSA on
site
Personal injury
Operations
3.1 In the event that this type of incident results in a fatality
• The Waterworks Inspector must immediately contact the Gardai and the
Ambulance Services and request their presence on site. Then contact the Area
Supervisor and Area Engineer.
• The Area Supervisor must immediately contact the Health & Safety Officer and
the persons next of kin
• The Health and Safety Officer will contact the Enforcing Authority for the area.
• Cordon off the area immediately and prevent unauthorized access and prevent on-
lookers accumulating in the area of the incident which may also impede the rescue
attempt.
• No person or persons should attempt rescue of the injured party if there is a risk to
their safety
• Secure the area of the site where the emergency has occurred including the plant
and equipment until the Gardai and Ambulance services have arrived.
• Due to the equipment involved it may be necessary to bring in other assistance to
lift and remove plant and equipment that may be causing an obstruction or
preventing access to the injured party.
• Keep the area secure until all investigations have been completed.
• The equipment contributing to the accident shall be secured in a safe area to allow
for any independent tests to be undertaken.
• Complete the accident book and accident report form and submit to the Health &
Safety Officer. The Health and Safety Officer will complete the necessary
notifications to the Enforcing Authority.
• A full investigation of the incident shall be undertaken and the area returned to
work only when all investigations are complete.
3.2 PROCEDURE IN THE EVENT OF A TRANSPORTATION / VEHICLE
ACCIDENT
In the event that this type of incident results in serious injury:
Where the emergency involves casualties:
• Use the appropriate first aid facilities and enlist the help of a designated first aider
on the site to provide assistance to the injured party.
• Arrange for someone to call the emergency services ambulance, the fire brigade
may also be required if heavy lifting has to be undertaken. This person should
meet with the emergency services upon their arrival on site and guide them to the
location of the incident
• Attempt rescue of persons only if it safe to do so and without putting themselves
or any other persons at risk and the correct equipment is available on site to assist
with lifting or moving any obstruction.
• Try and maintain contact and communication with the injured party assuring them
that help and assistance is on the way.
• Ensure that the area(s) involved in the incident are secured and that nothing is
tampered with or removed from the scene and keep all other unauthorized persons
away from the scene of the incident
• Due to the equipment involved it may be necessary to bring in other assistance to
lift and remove plant and equipment that may be causing an obstruction or
preventing access to the injured party.
• Keep the area secure until all investigations have been completed
• The equipment contributing to the accident shall be secured in a safe area to allow
for any independent tests to be undertaken.
• The Health & Safety Officer will make the formal notification to the Enforcing
Authority.
• Full investigation of the incident shall be undertaken and area returned to work
only when all investigations are complete.
3.3 PROCEDURE IN THE EVENT OF A PROPERTY / EQUIPEMENT
ACCIDENT
Where the emergency involves damage to plant and property or equipment only:
• Without putting themselves or any other persons at risk ensure that the plant
and/or property or equipment is safe to approach.
• Carry out a check of what has happened and identify affected areas.
• Cordon off areas that are affected and contact the appropriate contractor to begin
clear up, repairs etc if this is necessary and where resources are not available on
the site.
• Keep the area cordoned off and prevent unauthorized access until area is safe to
return to work
Where it is deemed that plant, property and/or equipment are not safe:
• The area shall remain cordoned off
• Unauthorized persons will not be permitted access to the area
• The appropriate arrangements shall be taken to make safe the area i.e. repairs
made before the area is deemed safe to return to work.
In the event of this situation the Near Miss Incident Form shall be completed
and submitted to the Health and Safety Officer
4. PROCEDURE IN THE EVENT OF AN EMERGENCY
– FALL INTO WATER
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Falling into Water while
working near or adjacent to
water.
Fatality Personal injury
Operations
ANY PERSON WORKING ABOVE WATER OR ADJACENT TO WATER
WHERE THEY MAY BE AT RISK OF FALLING INTO THE WATER MUST
WEAR A PERSONAL FLOTATION DEVICE (LIFE JACKET)
4.1 CONSCIOUS CASUALTY
• In the event that a person has fallen into water and they are conscious the first
person on the scene throws the life buoy to them holding onto the end of the rope
attached to the buoy
• Use the rope to slowly pull the person into safety and the use the life buoy to bring
them into safety. Once they are safely out of the water, keep them warm and get
first aid help if needed.
• If rescue cannot be achieved by using the life buoy raise the alarm immediately
and get assistance do not attempt to enter the water alone.
• The person in contact with the emergency service shall meet with them on their
arrival at site and guide them to the location of the incident.
• Keep unauthorized persons away form the immediate area and maintain a clear
and unobstructed access to facilitate the rescue
• It is advisable for the person to seek medical attention in the event that they have
fallen in the water and been in the water for some time.
• If the person is fit enough to attend their own GP and they are close to the site
they should be brought here if this is not possible the person should be brought to
the nearest Hospital A&E department.
• The Area Supervisor and Area Engineer will complete the accident book and
accident report form and fax to the Health and Safety Officer.
• The Area Supervisor & Area Engineer shall carry out an investigation of the
accident to identify cause and to ensure that adequate control measures are put in
place prevent a reoccurrence.
4.2 UNCONSCIOUS CASUALTY
In the event that the person in the water is unconscious do not attempt alone as you
may put yourself in danger, get help immediately
• Get someone else to call the ambulance and fire brigade
• Put on a life jacket and only attempt to enter/wade into the water to assist the
person if you are not putting yourself at risk.
• Do not go out of your depth. If you cannot rescue the person you must come
out of the water and wait for the emergency services to provide assistance.
• Keep the area restricted and prevent unauthorized access.
• Provide full co-operation to the emergency services.
• In the event that a fatality results the Gardai must be informed and the Health
and Safety Officer shall contact the relevant Enforcing Authority.
• A full investigation of the incident shall be undertaken and area returned to
work only when all investigations are complete.
• The Health and Safety Officer will make the formal notification to the Health
and Safety Authority.
4.3 PROCEDURE IN THE EVENT OF A FALL INTO IMHOFF TANK.
EMERGENCY OUTCOME/LIKELY
EFFECTS PHASE OF
CONTRACT
LIKELY TO
OCCUR WORKING NEAR OR
ADJACENT TO TANK
WHILE UNDERTAKING
REPAIRS AND/OR
MAINTENANCE
Fatality Personal injury
Equipment Damage
Non-buoyant media – will
prevent person being able to
float/swim
Commissioning of
plant & equipment Daily plant
operations –
cleaning and routine
maintenance. DUE TO THE NATURE OF THE CONTENTS OF AERATION TANKS,
BUOYANCY MAY BE DIFFICULT TO ACHIEVE.
IT IS ESSENTIAL THAT ANY WORK TO BE CARRIED OUT WHERE A
PERSON IS AT RISK OF FALLING INTO AN AERATION TANK
(CONTAINING NON-BOUYANT MEDIA) THAT THE SAFE SYSTEM OF
WORK AS OUTLINED BELOW IS IMPLMENTED AS A MINIMUM
ALL WORK INVOLVING MAINTENANCE AND REPAIRS ON THE
IMHOFF TANK AND ASSOCIATED EQUIPMENT WHERE THERE IS A
RISK OF FALLING:
• A MINIMUM OF TWO PERSONS MUST BE PRESENT FOR THE FULL
DURATION OF THE WORK
• A SAFETY HARNESS OR OTHER SUITABLE SAFETY RESTRAINT
MUST BE WORN FOR THE FULL DURATION OF THE WORK
• ACCESS MUST BE GIVEN TO ALLOW FOR A LANDLINE
TELEPHONE TO BE USED IN AN EMERGENCY
• IN THE ABSENCE OF A LANDLINE TELEPHONE PERSONS
INVOVLED IN THE WORK MUST HAVE A MOBILE PHONE
A PERSONAL FLOTATION DEVICE (LIFE JACKET) MUST BE WORN FOR
THE DURATION OF THE WORK
LIFE BUOYS (MINIMUM TWO ON THE TANK WITH SUITABLE AND
ROBUST ROPE ATTACHMENT – 30M LENGTH PROVIDED AT THE TANK
DO NOT ATTEMPT TO ENTER THE TANK AT ANY TIME DURING RESCUE
In the event of an accident or incident the following action must be taken:
CONSCIOUS CASUALTY
SPEED IS ESSENTIAL TO GET THE PERSON OUT OF THE TANK AS
QUICKLY AS POSSIBLE
• Do not panic, remain calm and do not attempt to enter the tank.
• Switch off the aerator or instruct someone else to do this.
• Raise the alarm and get help from others on site to assist with rescue.
• Throw in the life ring and secure the rope to a fixed structure. The aim is to get the
person in the tank to hold onto the ring and to try to retain them at the surface.
• Using the safety harness pull the person to the side of the tank as quickly as
possible.
• Assist the casualty up and out of the tank, get them to a safe area and undo the
safety harness.
• If the person is mobile and they have no obvious visual injuries take tem to the
nearest hospital A&E for a checkup.
• If the person is not mobile or has sustained injuries that may be aggravated if
moved, contact 999 or 112 and request the presence of the emergency services on
site.
DURING RESCUE USING OTHER SITE PERSONNEL SHALL:
• Maintain a clear and unobstructed access to facilitate the rescue.
• Get help from other persons present on site to keep all other persons not involved
in the rescue away from the scene.
ACTION AFTER THE INCIDENT:
• The Area Supervisor and Area Engineer or other responsible person shall
complete the Site accident book and accident report form.
• The completed form must be submitted to the Health and Safety Officer.
• The Health & Safety Officer shall visit the site as soon as possible after the
incident.
• The cause of the incident must be investigated immediately to establish cause.
Actions identified during the investigation must be implemented as soon as is
reasonably practicable to prevent reoccurrences.
In the event of an accident or incident the following action must be taken:
UNCONSCIOUS CASUALTY
SPEED IS ESSENTIAL TO GET THE PERSON OUT OF THE TANK AS
QUICKLY AS POSSIBLE
• Do not panic, remain calm and do not attempt to enter the tank. Switch off the aerator.
• Raise the alarm and get help from others on site to assist with the rescue.
• Immediately dial 999 or 112 and request the attendance on site of both the fire and
ambulance services – explain clearly what has occurred and provide directions to
the site.
• Do not attempt rescue if the person is not attached to a safety harness. If they are
attached to a safety harness pull the person in to the side of the tank using the
safety harness attachment.
• Do not put yourself at risk of trying to lift an unconscious person from the tank –
if necessary secure yourself with a safety harness to a fixed point and get help
from other site personnel to lift the casualty.
• If the casualty cannot be lifted out of the tank wait for the emergency services to
arrive.
• Upon arrival of the emergency services, provide assistance to them as required.
DURING RESCUE USING OTHER SITE PERSONNEL TO:
• Maintain a clear and unobstructed access to facilitate the rescue
• Get help from other persons present on site to keep all other persons not involved
in the rescue away from the scene.
ACTION AFTER THE INCIDENT:
• The Area Supervisor, Area Engineer or other responsible person shall complete
the site accident book and accident report form.
• The completed form must be submitted to the Health and Safety Officer as soon as
possible. The Health and Safety Officer shall visit the site as soon as possible after
the incident.
• The cause of the incident must be investigated immediately to establish cause.
Actions identified during the investigation must be implemented as soon as is
reasonably practicable to prevent reoccurrences.
5 PROCEDURE IN THE EVENT OF A FALL ARREST (RESCUE FROM A
SAFETY HARNESS)
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR FALL ARREST RESCUE (SAFETY HARNESS)
Fatality Personal injury
Property damage
Equipment damage
Operations
• Time is critical in this situation and the person must be rescued from the harness
as quickly as possible otherwise they are at serious risk of their circulation being
cut off and a fatality may result.
• Raise the alarm on the site and get help from someone else as quickly as possible.
• Get someone else to ring both the ambulance and the fire brigade to request their
presence on site. This person should meet with the emergency services on their
arrival at site and guide them to the location of the incident.
• Use what ever equipment is available on the site such as lifting equipment or a
platform that can be moved into position under the trapped person to take their
weight
• Two persons should assist with cutting the person down from the harness. These
persons must not put themselves at unnecessary risk or at risk of falling while
assisting with bringing the person down safely.
• Once the cutting of the harness begins one of the persons assisting should move in
close to the injured party to take their weight and prevent them from falling down.
Cut the lanyard through and lower the injured party down safely to a safe location.
• Keep the person at rest and stay with them until the emergency services have
arrived and take control of the situation.
• If necessary arrange for the injured party to be accompanied to hospital. The
safety harness and any other equipment must not be tampered with or removed
teed with and are retained in a safe area for inspection.
• The area where the incident occurred shall be made secure and will not be
tampered with including the fall arrest system and all associated attachments until
a full investigation has been completed.
• The site accident book and accident report form must be completed and submitted
to the Health and Safety Officer as soon as possible.
• Failure of fall arrest equipment may require an investigation by the enforcing
authority and by the supplier / manufacturer of the equipment. The Health and
Safety Officer will arrange this where required.
6. EMERGENCY REQUIRING RESCUE FROM A CONFINED SPACE
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Persons in need of a rescue
from a confined space. Confined spaces on site
include: Sewers, sumps,
underground chambers and
manholes where there is a risk
of exposure to toxic gases
Deep water tanks including
effluent, aerated sludge
Person(s) trapped within a
confined space Drowning, oxygen
deficiency, oxygen
enrichment
Explosion, exposure to
toxic gases
Personal injury
Fatality
Operations
In the event that persons become trapped while working in a confined space:
• Try and maintain contact with the injured party assuring them that help and
assistance is on the way. Do not enter the confined space alone
.
• Get someone to call the both the ambulance and the fire brigade as specialist
lifting equipment may be required to remove the person safely
• While waiting on the arrival of the emergency services rescue should only be
attempted if it safe to do so and using appropriate safety equipment: is on hand i.e.
Tripod and life line, winch, safety harness and full breathing apparatus worn if
there is a risk of exposure to toxic gases
• One person should enter the confined space and attach the injured party to the life
line, the person on top shall slowly winch them to safety with the person in the
confined space guiding the casualty to prevent them hitting the sides of the
confined space.
• When out safely place casualty lying down in a safe location remove the harness
attachment provide first aid assistance and remain with casualty until the
emergency services arrives and takes control of the situation. Keep the person at
rest and reassure them.
• If casualty cannot be rescued safely wait for the emergency services.
• Provide assistance to the emergency services when they arrive on site.
• Arrange for the injured party to be accompanied to hospital
• Ensure that the area(s) involved in the incident are secured and that a full
investigation has been made of the cause of the incident.
• The site accident book and accident report form must be completed and submitted
to the Health and Safety Officer as soon as possible.
7 PROCEDURE IN THE EVENT OF AN EXPLOSION ON SITE
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Explosion or potential
explosion due to unsafe
working or carrying out
work in high risk areas.
Personal injury Fatality
Property damage
Equipment damage
Operations
In the event of an explosion on the site:
• Raise the alarm and use the assistance of the other site staff to contact the
appropriate emergency services
• Remove all persons from the site immediately and direct them to a safe area that is
far away from the possibility of flying debris, glass. Ensure that all persons
present on the site are accounted for.
• Prevent all unauthorized persons from the vicinity of the incident and maintain a
clear and unobstructed access to the location of the incident
• In the event that a person(s) are injured attend to them only if safe to do so and
there is no risk of further explosion or fire.
• Anyone with serious injures must not be moved until the emergency services have
arrived and taken control of the situation.
• The only reason an injured person should be moved is in the event that their life is
in immediate danger due to the circumstances of the location and they are at
further risk of injury.
• Ensure that someone stays with the injured person until the emergency services
arrive
• Once the emergency services arrive on site assist them and if necessary arrange
for injured persons to be accompanied to hospital.
• The area where the incident occurred shall be made secure and will not be
tampered with until a full investigation has been completed.
• The site accident book and accident report form must be completed and submitted
to the Health and Safety Officer as soon as possible.
• In the event that the Enforcing Authorities need to be notified this will be done by
the Health & Safety Officer.
8 PROCEDURE FOR DEALING WITH PERSONS TRAPPED BY AN
OBJECT:
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR PERSON TRAPPED BY AN
OBJECT
Fatality Personal injury
Property damage
Equipment damage
Operations
In the event of an emergency on the site that involves a person being trapped an
object:
• Raise the alarm and call the appropriate emergency services.
• If the person trapped by the object is not in any further danger do not attempt
rescue and the person should not be removed until the emergency services arrive
on site.
• Ensure that someone remain with the trapped person and provides reassurance.
• If the person who is trapped is in serious danger and is in danger of suffering
greater injury, before the emergency services arrive on site, action should be taken
to try and prevent the object from causing further entrapment.
• No one should be put at unnecessary risk by trying to assist; the object should be
if possible be mechanically lifted clear and secured in a safe manner.
• Keep all other unauthorized persons away from the vicinity of the incident and
maintain a clear and unobstructed access to the location of the incident.
• Provide assistance to the emergency services when they arrive on site.
• Arrange for the injured party to be accompanied to hospital.
• The area where the incident occurred shall be made secure and will not be
tampered with until a full investigation has been completed.
• The site accident book and accident report form must be completed and submitted
to the Health and Safety Officer as soon as possible.
• The Health & Safety Officer shall undertake to notify the authority of the incident
and will advise if they are attending site.
9.1 PROCEDURE FOR DEALING WITH A PERSON WHO HAS SUFFERED AN
ELECTRIC SHOCK FROM A PORTABLE ELECTRICAL APPLIANCE:
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR ELECTRIC SHOCK/INJURY
FROM UNSAFE, DAMAGED
PORTABLE ELECTRICAL
APPLIANCES
Fatality Electric shock
Fire
Personal injury
Property damage
Equipment damage
Operations
DO NOT APPROACH THE PERSON WHO HAS BEEN ELECTROCUTED
UNTIL YOU ARE CERTAIN THE AREA IS SAFE.
• The first person on site shall raise the alarm and shall contact the emergency
services. Do not provide assistance to the person if there is a risk to your own
safety. Stand on a rubber mat or stack of newspapers or another non conducting
material.
• First break contact between the person and the current by shutting off the current
at the main fuse box, do not use the switch of the appliance. If this is not possible
use a wooden stick to separate the person from the appliance.
• Do not touch the person until you are sure the power supply is turned off and there
is no further risk to the person or to yourself.
• Check that the person is breathing and check for shock. Loosen any tight clothing
and keep the person warm.
• Cover any burnt area with a sterile gauze bandage or a clean cloth.
• If there is no possibility of fracture, get the person to lie down and raise and
support their legs.
• Arrange for the person to be taken to their GP or to the nearest A&E.
• The area where the incident occurred shall be made secure and will not be
tampered with until a full investigation has been completed.
• The site accident book and accident report form must be completed and submitted
to the Health and Safety Officer as soon as possible.
• The equipment shall not be returned into use until it has been checked by a
competent person and it is PAT tested and safe to use. In the event the equipment
is not safe it shall be disposed off in a safe manner.
9.2 PROCEDURE FOR DEALING WITH A PERSON WHO HAS SUFFERED
AN ELECTRIC SHOCK FROM OVERHEAD POWER LINES:
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR ELECTRIC SHOCK / INJURY
FROM CONTACT WITH
OVERHEAD POWER LINES
Fatality Electric shock
Fire
Personal injury
Property damage
Equipment damage
Operations
DO NOT APPROACH THE PERSON WHO HAS BEEN ELECTROCUTED
UNTIL YOU ARE CERTAIN THE AREA IS SAFE.
• The first person on site shall raise the alarm and shall contact the emergency services.
Do not provide assistance to the person if there is a risk to your own safety.
• Arrange for someone to call the ESB Network supplier as they may be required to
attend site to turn off the power supply.
• It is likely that the person may have sustained back, head or neck injuries, proceed
with caution and handle the person with extreme care.
• Do not touch any plant or equipment that may be in contact with the power supply
and do not touch the person until you are sure there is no risk to your own safety.
• Check that the person is breathing and check for shock in the event that the person is
unconscious start resuscitating them.
• If you have no first aid knowledge follow the emergency services call taker will give
easy to follow instructions over the phone so you can increase the person’s chance of
survival until the ambulance arrives on the site.
• Loosen any tight clothing and keep the person warm and cover any burnt area with a
sterile gauze bandage or a clean cloth.
• In the event that the person is not unconscious and there is no possibility of fracture or
other injury, get the person to lie down and raise and support their legs.
• Monitor and reassure the person until medical assistance arrives.
• Remove any other unauthorized persons well away from the vicinity of the incident.
• Arrange to have the injured party accompanied to hospital.
• The area where the incident occurred shall be made secure and will not be tampered
until a full investigation has been completed.
• The site accident book and accident report form must be completed and submitted to
the Health and Safety Officer as soon as possible.
• The Health and Safety Officer shall liaise with the Health and Safety Authority for the
area and will advise if the enforcing authority are to visit the site and will arrange for
the appropriate notification to be undertaken and a copy provided on the site safety
file.
10 EXPOSURE TO A TOXIC GAS
In the event that a person is exposed to a toxic gas the following action must be taken:
• Two persons are required to attempt a rescue. They must not put themselves at risk
and must wear chemical resistant personal protection and SCBA, when attempting to
remove the person from the exposure.
• Isolate the source of exposure.
• Speed is essential in all cases where a person has been injured or contaminated.
Irrespective of injury, medical attention must be sought.
• The ambulance service must be contacted and requested to attend site.
• Remain with the injured person keep them at rest and warm.
• If there is a risk of chemical contacting skin and casualty is conscious take them to the
nearest safety shower to drench with water.
• Using the chemical shower wash the affected areas with plenty of water. DO NOT
REMOVE CLOTHING.
• Care must be taken to prevent the spread of material from contaminated clothing.
• Keep drench with water until medical attention arrives on site.
• Arrange for the person to be accompanied to hospital
UNCONSCIOUS PERSON
Only apply artificial respiration if trained and competent to do so and use a VENT-AID
(provided in the site first aid box) to prevent risk of contamination. if breathing is
retained place casualty into the recovery position and stay with them until medical
ambulance arrives and takes control of the situation.
11 PROCEDURE IN THE EVENT THERE IS NO WATER TO SUPPLY
ESSENTIAL SAFETY EQUIPMENT
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR No water supply No water on site for supply to
safety equipment, to operate
toilets, and for drinking
purposes
Operations
Where there is an emergency on site that involves a failure in the water
supply affecting the operation of essential safety equipment and welfare
facilities the Waterworks Inspector shall:
.
• Carry out an inspection of the affected areas and if necessary implement a
controlled shut down of the affected areas and inform all those who are likely to
be effected.
• Arrange a temporary supply of drinking water and have it available on the site
until return of normal services
• If the water supply cannot be resumed and there is no water supply to enable fire
hydrants on the site to operate, then any work on site that could result in a fire
must stop until full service has been established.
• Persons in the affected areas will be instructed by the Waterworks Inspector to
stop work and if deemed necessary will ask those at risk to remain off site until
the appropriate arrangements have been made and services are fully resumed.
• The Waterworks Inspector will ascertain if there is a direct effect on the final
effluent water leaving the site. Should this situation arise they will immediately
inform the Area Supervisor and Area Engineer. If it is a notifiable incident the
Senior Executive Engineer will notify the EPA.
• Appropriate arrangements shall be made to restore normal supplies as soon as is
reasonably practicable.
12 PROCEDURE IN THE EVENT OF DISRUPTION OF PROCESS/SERVICE
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Disruption of
Process/Service Fault could interfere with
treatment process Operations
Where there is an emergency on site that involves a disruption in the process
Waterworks Inspector shall:
• Carry out a check of the site and identify all areas affected and the source of the
problem if it exists on the site.
• Organize a controlled shut down of the affected areas of the plant if this is
required.
• The Area Supervisor shall be contacted and will remain in contact with the
Waterworks Inspector particularly if there is a direct effect on the quality of water
leaving the site.
• Once the problem has been identified and where it cannot be resolved on site the
Area Supervisor and Area Engineer shall organize the appropriate people to
remedy the situation.
• Once problem has been rectified return plant to normal operation.
• The Waterworks Inspector will carry out a further check to ensure all work
processes are operating safely and inform the Area Supervisor that services have
returned to normal and plant is fully operational.
• If it is a notifiable incident the Senior Executive Engineer shall contact the EPA.
13 PROCEDURE IN THE EVENT OF INTRUDER ALARM – SECURITY
BREACH OUTSIDE OF NORMAL WORKING HOURS
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Intruder Alarm – security Personal injury
Property damage Operations
Where there is a security breach and the Intruder Alarm has activated outside
of normal working hours, the contacts for obtaining access to the site are (in
order of which they should be contacted):
• STEPHEN SIMMS 087 2593011
• JOSIE MCKELVEY 087 6637626
IN THEIR ABSENCE THE NEXT PERSON IN THE CHAIN OF REPORTING
SHALL BE CONTACTED:
• HUGH ALEXANDER AREA SUPERVISOR 087 2581215
• MARTIN O’ DONNELL AREA ENGINEER 086 1724473
• JOHNNY MCGETTIGAN SEE/ AREA MANAGER 087 6697407
On receipt of receiving the alarm call, make your way to the site/plant, it is
advisable to have a torch with you DO NOT ENTER THE SITE ALONE.
Next call the local Gardai station at:
• BALLYBOFEY @ 074 9137740
Provide them with a clear account of what has taken place and request
their attendance as you do not wish to enter the premises alone
DO NOT ENTER THE SITE/BUILDING ALONE IT IS POSSIBLE THAT
THERE MAY BE AN INTRUDER STILL ON THE PREMISES
Remain at a safe area until the GARDAI arrive. Upon arrival of the GARDAI,
conduct a joint search of the premises to ascertain:
• How the break in occurred (how did the intruders gain access to the premises)
• What damage (if any) has been caused to the premises and equipment etc
• What property/equipment is missing or misplaced
• Check that there has been no interference with the process of plant and equipment
Take care when undertaking checks of the area affected, there may be
broken glass, debris etc that could cause injury.
Once check has been completed, provide GARDAI with information
necessary to enable them to complete their report i.e. company details,
contact persons etc.
If it is possible secure the premises, board up/close any broken windows or
doors, (It may not be possible depending upon the time the break in has
occurred to obtain the services of repair contractors, lock smiths etc if not
leave it until the next morning).
Reset the intruder alarms and leave the premises.
The Area Engineer shall complete the incident report in conjunction with the
Waterworks Inspector (where they are involved in the incident) and forward it to the
Health and Safety Officer.
In the case of any loss or damage Head Office will notify the Groups Insurers
Any repairs required must be arranged as soon as is reasonably possible.
14 PROCEDURE IN THE EVENT OF EXTREME WEATHER CONDTIONS
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Extreme Weather conditions Extreme weather resulting in
damage to property and/or
equipment
Operations
• Without putting themselves or any other persons at risk ensure that the area is safe to
enter.
• Contact the Area Supervisor.
• If safe to do so carry out a check of what has happened and identify affected areas.
• Cordon off areas that are affected and inform any other persons who are coming onto
the site what has occurred.
• If the situation cannot be addressed and satisfactorily dealt with on the site, the Area
Supervisor will contact the appropriate Contractor where needed to begin clear up,
repairs etc.
• The Area Supervisor may also need to contact the Fire Service to assist with clearing
up floodwaters etc.
• No person should be allowed to enter any area where they may be at risk. Only when
area has been cleared up and it is safe should persons be allowed to enter.
15 SPILL OR OVERFLOW OF SLUDGE ON SITE
In the event of a spill or over flow the Waterworks Inspector will take charge of the
situation and as follows:
Enlist the help of the other site operators to remove all unauthorised persons from the
affected areas.
Prevent further spill or overflow occurring.
Determine if there are adequate resources available on the site to assist with clean up if
this is not the case will agree with the Area supervisor additional resources
necessary.
All persons involved in clean up must wear adequate personal protection.
All areas affected must be pumped out, cleaned down and thoroughly disinfected. Clean
up will remain in progress until all sludge product has been removed and areas
affected cleaned.
Checks must be undertaken to determine if any damage has occurred to electrical and
mechanical installations. Any equipment and installations damaged must be signed
“UNSAFE TO USE”
Where equipment and installations are damaged they must be made safe and the
necessary repairs carried out as soon as possible by a competent person to ensure
minimum disruption to the running of the plant.
All safety alarms must be checked to ensure that they are fully operational and where
repairs are necessary these must be carried out as soon as possible by a competent
person.
When satisfied that the areas are clean and persons can return to work those involved in
the clean up should remove all contaminated personal protection and this should be
disposed off or laundered on the site.
SLUDGE REMOVAL FROM SITE – ROUTINE OPERATIONS
• Sludge is removed from site by approved Sludge Removal contractors.
• Samples are taken from the sludge on a regular basis to ensure that they meet
statutory compliance
16 PROCEDURE IN THE EVENT OF ELECTRICITY SUPPLY FAILURE
EMERGENCY POSSIBLE
CAUSES/EFFECTS PHASE OF
PROJECT LIKELY
TO OCCUR Electricity supply failure: Caused by work carried out
on electrical systems on site
Caused externally by other
working on electrical
installations serving the site
No electricity on site
resulting in a shutdown or
electrical equipment
including safety devices
failing to operate Affects water production on
site
Operations
Carry out an organized and controlled shut down of the plant if that is required
and:
• Inform others working on the site of the situation.
• Check the site and identify all areas affected and locate the source of the problem.
• Isolate and make safe plant and equipment that may start automatically and without
warning. Operate a lock off and tag out policy if required and put up safety warning
signs to inform others that there is a risk.
• Organise for a competent electrician to carry out any necessary repairs.
• In the event that the electricity supply is on the main network and is a problem
outside of the plant. Contact should be made with the ESB to ascertain extent of
problem and how long it will be before full service resumes.
• Once problem has been repaired the plant should be brought back onto line in a
controlled and safe manner.
• Checks must be undertaken to confirm that all effected plant is now working safely.
• All lock out and tag outs and safety notices to be taken down.
• In the event that services cannot be restored and the problem is outside of the plant,
the Waterworks Inspector will liaise with the Area Supervisor to discuss appropriate
action.
• If events result in a notifiable incident the Senior Executive Engineer shall contact
the EPA.
17 ACTION TO TAKE IN THE EVENT OF A POLLUTION INCIDENT
Operations are carried out on site in a controlled manner to minimize the possibility
of a pollution incident occurring. These controls are monitored and maintained on
site by the Waterworks Inspector.
For the purposes of this plan a pollution incident on site may result from:
Spill or Uncontrolled Release into the Water Course
In the event that an uncontrolled release causes an affect on aquatic life and river/stream quality the EPA shall be notified through the correct reporting channels.
Odour Pollution
Appropriate Odour abatement and Odour reduction equipment put in place for specific
incidents.
Noise Pollution
Designs of work equipment and plant take into consideration measures to reduce
environmental noise nuisance. Works on site are restricted so as not to present a nuisance
to neighboring residents. Environmental noise monitoring shall be undertaken in the event
that there is a concern relating to noise levels omitting from the site.
Illegal Dumping of Waste
All waste on the site is stored in skips and is removed by a reputable waste disposal
contractor. All contractors and others working on site are required to comply with site
rules relating to the storing and removal of waste.
Burning of Waste
Burning on site is strictly prohibited at all times. All persons working on this site are
made aware of this requirement.
RESPONDING TO A POLLUTION INCIDENT ON SITE
In the event of pollution incident on the site the Waterworks Inspector will take charge of
the situation immediately and will take the appropriate action necessary to:
• Stop further pollution
• Employ a clean up policy in agreement with the Area Supervisor.
• Take appropriate measures to prevent re-occurrence.
• Ensure that the relevant parties are notified of the pollution occurrence.
• Complete the pollution incident form and submit it to the Health and Safety
Officer as soon as possible.
18. RESPONDING TO ALARMS – OUT OF HOURS
WHEN RESPONDING TO AN ALARM CALL OUT OF HOURS NO OPERATOR
IS PERMITTED TO:
• ENTER A CONFINED SPACE ALONE
• PUT THEMSELVES AT RISK BY TRYING TO CARRY OUT A REPAIR
UNAIDED
• CARRY OUT ANY FORM OF REPAIR WHERE THEY MAY BE AT
RISK OF FALLING INTO A TANK, DEEP CHAMBER, WELL ETC
• ATTEMPT TO FIGHT A FIRE
18.1 FIRE ALARM – SMOKE OR FLAMES PRESENT
1) Upon arrival at site PROCEED WITH CAUTION and do a visual inspection from
the external of the building for any obvious signs of smoke and/or flames
2) If smoke and/or fire is observed immediately dial 99 or 112 and request the
presence of the Fire Brigade on site.
3) Go to the designated assembly point and wait for the arrival of the emergency
services
4) Contact line management and alert them of the situation.
5) Remain at the designated assembly point until the emergency services arrive and
provide them with any necessary assistance to locate:
• Turn off valves/switches
• Fire hydrants
• Water supply.
6) The Fire Brigade will take responsibility for ensuring that the fire is extinguished
before they leave the site.
7) Do not permit anyone to enter or interfere into the area where the fire has
occurred, this area should be cordoned of if possible.
8) A full examination of the fire will be carried out the next morning following the
incident and when daylight has resumed.
FIRE ALARM – FALSE ALARM
1) Upon arrival at site PROCEED WITH CAUTION and do a visual inspection from
the external of the building for any obvious signs of smoke and/or flames
2) If smoke and/or fire is NOT observed, continue to proceed with caution opening
the main door to the building.
.3) Stop and check the control panel and identify the cause of the alarm activating
4) If at any time smoke/fire occurs, LEAVE THE PREMISES IMMEDIATELY
AND RING THE FIRE BRIGADE
5) If fault can be rectified on site, proceed and reset alarm.
6) If fault cannot be rectified, then leave the premises and secure the site
7) Inform the Area Supervisor who shall arrange for the fault to be rectified as soon
as possible on the next working day.
18.2 PROCESS ALARMS
1) Upon arrival at site, carrying out a preliminary check of where the alarm is
occurring and what is the cause of the alarm.
2) In the event that an alarm has tripped, and there is no obvious sign of a problem,
attempt to reset the alarm.
3) In the event that the alarm fails to reset, it may be necessary to carry out a further
inspection, however this is only permissible if the Waterworks Inspector is not
putting their safety and health at risk.
4) If the cause of the alarm can be determined and it can be rectified by the
Waterworks Inspector, proceed to fix the fault and reset the alarm.
5) In the event that the fault cannot be rectified, the Operator shall leave the
area and secure the site.
6) The Operator shall notify the Area Supervisor
7) The Area Supervisor shall arrange for fault to be rectified as soon as possible on
the next working day.
18.3 POWER FAILURE - ESB
1) Upon arrival at site, the Waterworks Inspector carries out a preliminary check of
what areas are affected.
2) The Waterworks Inspector checks that the back up generator is working and that
power is supplying the site.
3) In the event of a power failure at the main supply external to the site, this remains
outside the control of Donegal County Council and therefore the ESB will need to
be contacted to:
• Alert them to the situation in the event that they are not already aware of
the problem
• Identify how soon power supply will be returned
4) The Waterworks Inspector should secure the site and leave.
5) On return to site the next morning a check is carried out to ensure that power has
been restored and all plant and equipment is checked to ensure that it is operating
safely.
POWER FAILURE – ON SITE FAULT
1) Upon arrival at site, the Waterworks Inspector carries out a preliminary check of
what areas are affected.
2) The Waterworks Inspector checks that the back up generator is working and that
power is supplying the site.
3) The Operator undertakes an assessment of the problem and if they are off the
opinion that the fault can be rectified, they will undertake the repair.
4) In the event that the Waterworks Inspector cannot make the repair, they leave the
area safe and secure the site.
5) The Waterworks Inspector notifies the Area Supervisor who shall arrange for
repairs to be undertaken as soon as is reasonably practicable on the next working
day.
Appendix Maintenance Procedure
Responsible Persons for Monitoring & Maintenance
WATERWORKS
INSPECTORS STEPHEN SIMMS 087 2593011
Asst. Waterworks
Inspector JOSIE MCKELVEY 087 6637626
AREA SUPERVISOR HUGH ALEXANDER 087 2581215
AREA ENGINEER MARTIN O’ DONNELL 086 - 1724473
AREA MANAGER JOHNNY
Mac GETTIGAN 087 697407
FITTER DANNY GREENE 087 8162993
ELECTRICIAN FRANK O’CONNOR 087 0610438
STRANORLAR ELECTORAL AREA
KILLYGORDON WWTW
Weekending:
MAINTENANCE DUTIES Signature:
Duties
Mon
Tues
Wed
Thur
Fri
Sat
Sun
Record Daily Inlet to Treatment, Outlet and Storm Flows
Record Water Reading
Hose down Manual Raking Screen as necessary
Clean Manual Raking screen daily
Remove Screenings from Screen to Landfill
Break up septic tank in preparation for sludge removal
weekly
Record all Sludge Removals
Decanting Supernatant to Discharge
Inspect Perimeter Site Fencing & Access Gate
Inspect & Carry out House keeping within Administration
Building
Maintain and Keep WWTW site tidy as required
Cut Grass and weed as necessary
Record phone calls, incidents and complaints and report to
relevant personnel. Maintain file of incidents.
Investigate Sewer Network Problems and report to relevant
personnel.
Resolve Sewer Network Problems and report completion to
relevant personnel.
Investigate and report on proposed connections to Sewer
Network
COMMENTS:
Appendix
Donegal County Council Public Awareness & Communications Programme
Donegal County Council has put in place a Public Awareness & Communications
Programme (PACP) in relation to Licensed Waste Water Treatment Plants (WWTPs) and
their discharges within the Stranorlar Electoral Area. The purpose of the PACP is to
advise the general public on how waste is processed in the Stranorlar Electoral Area.
The Environmental Protection Agency (EPA) oversees wastewater discharge from the
Local Authorities WWTPs through the issuing of Waste Water Discharge Licences.
Donegal County Council has established a Public Awareness File containing
environmental information such as monitoring results, reports, complaints and details of
any incidents relating to this licence. These files are available for public viewing at the
locations listed below.
Addresses and contact details for the Donegal County Council Public Services Offices are
available on the Donegal county council website using the link below:
http://www.donegalcoco.ie
Wastewater
Treatment Plant
Licence No.
Status
Local Area Office
where
Environmental
Information may
be viewed
Kilygordon WWTP
D0518-01
Licensed
County House
Lifford
The AER document is uploaded on the Donegal County Council website donegalcoco.ie
in the Water Environment & Emergency Services Section and is made available for
viewing at the Public Service Centres.
A document is located at each WWTP which outlines the following
• Outline Plant Details
• AER 2013 including monitoring results, reports, complaints and incidents
• Emergency Response Plan
• Contact Telephone Numbers