    Coating Structural Coating Structural Coating Structural Coating Structural

    1

    2

    CLIENT

    Inspection Findings, Anomalies & Recommendations Summary Report

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No. Unit

    Component

    InspectedAnomaly PHOTO / ANOMAL

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Little or No Attention

    Prioritynspection Findings/Anomalies Recommendationsating

    Date Inspected:

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    2/7

    Coating Structural Coating Structural Coating Structural Coating Structural

    CLIENT

    Inspection Findings, Anomalies & Recommendations Summ

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    Inspected

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months

    Prioritynspection Findings/Anomalies Recommendationsating

    7 GT 3 & 4 Manifold -GT4

    Valve Approximately 75% coating failurenoted

    There are a few areas of moderate

    localized corrosion noted on thevalve body and some moderate to

    heavy scaling observed on the top

    2 3

    Clean, de-scale,

    inspect and

    recoat affected

    areas withPowergen

    approved coating

    system

    De-scale andrecoat

    D C

    8GT 3 & 4 Manifold -

    GT4

    6"Flanged

    Connection100% coating failure

    Heavily corroded flanged

    connection with severe metal loss

    and missing bolts

    1 1

    Clean, de-scale,

    inspect and

    recoat affected

    areas with

    Powergen

    approved coating

    system

    Before this

    system goes into

    service, these

    flanges should

    be replaced

    A A

    9 GT 3 4"Piping

    Approximately 70% coating

    failure overall with moderate to

    heavy moss build up on the line

    on the underside and

    throughout in several areas

    Slight corrosion in areas of

    coating failure

    3 4

    Clean, de-scale,

    inspect and

    recoat affected

    areas with

    Powergenapproved coating

    system

    De-scale and

    recoat

    D E

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    3/7

    Coating Structural Coating Structural Coating Structural Coating Structural

    CLIENT

    Inspection Findings, Anomalies & Recommendations Summa

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    InspectedAn

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E

    Prioritynspection Findings/Anomalies Recommendationsating

    10 GT 3 4" FlangesApproximately 75% coating failure

    noted

    Moderate to heavy scaling with

    metal loss at underside edges of

    the flanges, in between the flanged

    connections and around the bolt

    heads at one flange

    3 2

    Clean, de-scale,

    inspect and

    recoat affected

    areas with

    Powergen

    approved coating

    system

    De-scale, re-

    inspect, and

    once acceptable,

    recoat.

    C D

    11 GT 3 Instrument Support Approximately 25% coating failure

    Moderate corrosion with flaking of

    metal on the underside edges of the

    clamp of the instrument support

    3 3

    Clean, de-scale,

    inspect and

    recoat affected

    areas with

    Powergen

    approved coating

    system

    Remove clamp,

    de-scale, recoat

    and replace

    support

    D D

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    4/7

    Coating Structural Coating Structural Coating Structural Coating Structural

    CLIENT

    Inspection Findings, Anomalies & Recommendations Summary R

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    InspectedAnomaly

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Lit

    Prioritynspection Findings/Anomalies Recommendationsating

    12 GT 4 4"Piping System

    Generally, the entire system is with

    approximately 85% coating failure

    including isolated areas of flaking

    and heavy moss growth underside

    piping throughout

    At areas of failed coating, there is a

    presence of light corrosion3 3

    Clean, de-scale,inspect and

    recoat affected

    areas with

    Powergen

    approved coating

    system

    Clean offunderside and

    other areas free

    of moss. Clean,

    de-scale and

    recoat

    D C 12

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    5/7

    Coating Structural Coating Structural Coating Structural Coating Structura

    CLIENT

    Inspection Findings, Anomalies & Recommendations Sum

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    Inspected

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months

    Prioritynspection Findings/Anomalies Recommendationsating

    13 GT 4 Piping Support

    Piping supports are with

    approximately 40% coating failure

    overall

    The most northern pipe support isheavily corroded at the area just

    under the support plate. On the 2

    most northern supports, there is

    evidence of movement noted from

    the failed coating on the piping

    3 2

    Clean, de-scale,

    inspect andrecoat affected

    areas with

    Powergen

    approved coating

    system

    De-scale pipe

    support and

    inspect the

    heavily corrodedarea's integrity.

    Renew the

    section if need

    be and recoat

    with Powergen

    approved coating

    system

    C B

    14 GT 4 4" FlangedConnections

    100% coating failure Heavy scaling observed aroundthe nuts

    2 2

    Clean, de-

    scale, inspect

    and recoataffected areas

    with Powergen

    approved

    coating system

    De-scale,inspect and

    recoat

    C C

    15 GT 4 1 " ValveApproximately 85% coating failure

    on the flanged connections of this

    valve

    Deteriorated valve packing noted 3 2

    Clean, de-scale,

    inspect and

    recoat affected

    areas (excluding

    flange gasket

    seating area)with Powergen

    approved coating

    system

    Change out

    packing at next

    carded

    turnaround, but

    monitor valve

    gasketmeanwhile

    through annual

    inspections

    D D

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    6/7

    Coating Structural Coating Structural Coating Structural Coating Structu

    CLIENT

    Inspection Findings, Anomalies & Recommendations Sum

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    Inspected

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months

    Prioritynspection Findings/Anomalies Recommendationsating

    16 GT 5 Entire Piping System

    There are numerous areas ofcoating failure noted throughout the

    system such as runs, sags, "fish

    eyes", mechanical damage and

    failure due to contaminated

    surfaces. Newly coated areas

    exhibit many symptoms of poor

    preparation and application of

    coating techniques. Underside of

    almost all the piping has moss build-

    up (with corrosion) due to

    condensate presence.

    Underside of piping exhibits slight

    corrosion developing due to

    poor/lack of coating coverage and

    the presence of moisture.

    3 3

    Clean free of

    moss and all

    contaminants, de-

    scale and recoat

    to Powergen

    approved coating

    system

    Clean free of

    moss and all

    contaminants, de-

    scale, inspect

    and recoat

    D D

    17 GT 5 Piping Support

    Evidence shows that the pipe

    supports were not removed to

    recoat the piping

    Crevice corrosion is noted at some

    of the contact areas between the

    piping and piping support as well as

    at some of the areas where is

    visible at the clamps

    3 3

    Remove clamp,

    clean, de-scale

    and recoat as

    per Powergen

    approved coating

    system

    Remove clamp,

    clean, de-scale,

    inspect and

    recoat

    D C

    18 GT 5

  • 8/12/2019 Anomaly Spreadsheet Sample by Michelle

    7/7

    Coating Structural Coating Structural Coating Structural Coating Structural

    CLIENT

    Inspection Findings, Anomalies & Recommendations Summary Report

    CLIENT's Scope of Work Name

    Rating : 1 - Bad 2 - Poor 3 - Moderate 4 - Good

    Item

    No.Unit

    Component

    InspectedAnomaly PHOTO / ANOM

    Priority: A - Immediate Attention B - Within 3 months C - Within 6 months D - Between 12 to 18 months E - Little or No Attention

    Prioritynspection Findings/Anomalies Recommendationsating

    19 GT 5 19

    20 GT 5 20

    20 GT 5 21

    Date Inspected: