271
FORMAT: PX-I “Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission to Power Exchanges>> NOC No. 632/20-21/EEDC /314 Dated. 27/05/2020 1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB 2. Region : Southern 3. Name of the Entity : KPR Mill Ltd 4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 314) 5. Point(s) of Connection : TNEB 11 KV KPR Mill Feeder of 110/11KV SS-II 6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE 7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC) at Drawal Point (* SLDCs may specify different MW ceilings for different time blocks, if required.) 8. Validity Period : From 01-06-20 To 30-06-20 9. Transmission losses (besides Regional Transmission losses) Whether Applicable or not (Yes/No) (%) loss State Transmission losses Yes 4.29% (Subject to revision) Distribution Licensees losses Any other losses 10. Transmission charges (besides Regional Transmission charges) Whether Applicable or not (Yes/No) Rate (Rs./MWh) State Transmission Charges Yes Rs.126.55/MWh Distribution Licencees Any other charges/ 1) System Operating Charges. 2) Scheduling Charges Yes 1.Rs.1.41/MW/Hr. Subject to a ceiling of Rs.500/- per Day. 2. Rs. 160/- per Day Declaration: It is hereby certified that: We have “No Objection” to seeking and availing Open Access by KPR Mill Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of CERC/TNERC. We have the required infrastructure for energy metering and time block wise accounting in place. The State/ Distribution licensee network has the required transfer capability for transfer of power as per specified ceiling. The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for the State Load Despatch Centers shall be directly settled by Power Exchange with us. The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible for timely payment of State’s composite dues into the Regional Pool Account. Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be determined by us and will be covered in the intra-State UI accounting scheme, or as applicable. The Reactive Energy Charges shall be governed by the Regulations applicable within the State. We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the State Transmission Utility /Distribution Licensee directly. We shall inform the total import and export capability of the State as a whole to all concerned. Attempt shall be made to declare this in advance through our website. Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such cases, the Power Exchange(s) shall also be informed simultaneously. Date: 27/05/2020 /Sd . . 27/05/2020****** Client ID 039094260314 Executive Engineer / ABT, O/o.SE/OA&CO, TANTRANSCO, A Subsidiary of TNEB Limited NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

“Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 632/20-21/EEDC /314 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KPR Mill Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 314)

5. Point(s) of Connection : TNEB 11 KV KPR Mill Feeder of 110/11KV SS-II

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KPR Mill Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094260314 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 2: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 633/20-21/GEDC /137 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Akshara Spinning Mills Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 137)

5. Point(s) of Connection : TNEB 11 KV Feeder of 110/11KV of Thoppampalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.35MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Akshara Spinning Mills Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360137 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 3: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 634/20-21/ChEDC /634 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Steel Strips Wheels Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 634)

5. Point(s) of Connection : TNEB 33 KV Unipress Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Steel Strips Wheels Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110634 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 4: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 635/20-21/DEDC /6 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Rajaratna Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 6)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder of 110/22KV Palani SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.62MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Rajaratna Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500006 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 5: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 636/20-21/CEDC-W /1150 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Fastners Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1150)

5. Point(s) of Connection : TNEB 33 KV Sundaram Fastners Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.39MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Fastners Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 01909461150 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 6: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 637/20-21/GEDC /141 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Cotton Blossom India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 141)

5. Point(s) of Connection : TNEB 11 KV Mills Feeder of 110/11 KV Pungampalli SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Cotton Blossom India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360141 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 7: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 638/20-21/NEDC /181 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Saranya Spinning Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 181)

5. Point(s) of Connection : TNEB 22 KV Industrial Feeder of 110/22 KV Erumapatti

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Saranya Spinning Mills (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094370181 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 8: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 639/20-21/CEDC-W /1050 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Tube Products of India

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1050)

5. Point(s) of Connection : TNEB 110 KV Avadi Feeder of 110/33/11 KV Avadi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Tube Products of India, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094061050 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 9: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 640/20-21/CEDC-N /1902 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : ARS Steels and Alloy International Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1902)

5. Point(s) of Connection : TNEB 110 KV ARS Feeder of 110 / 33 / 11 KV

Gummidipoondi Sipcot 2- SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by ARS Steels and Alloy International

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041902 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 10: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 641/20-21/DEDC /91 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Rajaratna Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 91)

5. Point(s) of Connection : TNEB 22kv Mill feeder of Palani SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.26MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Rajaratna Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500091 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 11: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 642/20-21/ChEDC /562 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Orchid Pharma Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 562)

5. Point(s) of Connection : TNEB 110 KV Omega-Mambakkam feeder of Omega SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.45MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Orchid Pharma Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110562 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 12: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 643/20-21/TvEDC /162 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Subam Papers Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 162)

5. Point(s) of Connection : TNEB 33 KV Subam Feeder of 33 KV Mela Kallur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Subam Papers Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720162 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 13: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 644/20-21/DEDC /182 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Adisankara Spinning Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 182)

5. Point(s) of Connection : TNEB 22 KV Adisankara Mill feeder of 110/22 KV

Vedasandur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.23MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Adisankara Spinning Mills (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500182 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 14: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 645/20-21/MEDC /314 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hariharan Spinners India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 314)

5. Point(s) of Connection : TNEB 22kv Mill feeder of Pallipalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.05MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hariharan Spinners India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220314 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 15: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 646/20-21/CdEDC /77 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Pioneer Jellice India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 77)

5. Point(s) of Connection : TNEB 22 KV Pioneer Feeder of 110/22 KV

Semmannkuppam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.43MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Pioneer Jellice India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 029094180077 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 16: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 647/20-21/CEDC-N /1030 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : MRF Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1030)

5. Point(s) of Connection : TNEB 33KV ICI feeder of 110/33-11KV Ennore SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by MRF Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041030 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 17: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 648/20-21/CEDC-N /1015 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1015)

5. Point(s) of Connection : TNEB 33KV ALML-I Feeder of Ennore 110/33-11KV SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041015 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 18: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 649/20-21/CdEDC /64 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Solara Active Pharma Sciences Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 64)

5. Point(s) of Connection : TNEB 22kv Pentasia feeder of 110/22kv Semmankuppam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Solara Active Pharma Sciences Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 029094180064 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 19: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 650/20-21/EEDC /324 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Lakshmivel Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 324)

5. Point(s) of Connection : TNEB 11kv Kullampalyam of 110/33-11kv Sipcot SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Lakshmivel Mills Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260324 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 20: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 651/20-21/CEDC-W /1110 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : T.I.D.C. India

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1110)

5. Point(s) of Connection : TNEB 11kv TI Cycle feeder of 33/11KV TI Cycle SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by T.I.D.C. India, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094061110 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 21: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 652/20-21/CEDC-N /1395 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Tamilnadu Petroproducts Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1395)

5. Point(s) of Connection : TNEB 110KV TPL feeder of Manali 230/110kv SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 10MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Tamilnadu Petroproducts Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041395 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 22: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 653/20-21/VEDC /255 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Global Polybags Industries Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 255)

5. Point(s) of Connection : TNEB 11 KV Global dedicated feeder of 110/11 KV

Periavallikulam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Global Polybags Industries Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620255 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 23: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 654/20-21/CEDC-N /1559 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1559)

5. Point(s) of Connection : TNEB 11KV MMD feeder of 33/11 KV Nappalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.61MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041559 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 24: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 655/20-21/CdEDC /128 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Chemplast Cuddalore Vinyls Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 128)

5. Point(s) of Connection : TNEB 110 KV Chemplast Sanmar feeder of 110/22kv

Semmankuppam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 7.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Chemplast Cuddalore Vinyls Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 029094180128 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 25: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 656/20-21/TmEDC /43 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : AKCT Cidambaram Cotton Mill Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 43)

5. Point(s) of Connection : TNEB 11KV AKCT Mill Industrial feeder of 110/33-11kv

Mangalam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.39MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by AKCT Cidambaram Cotton Mill

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 029094140043 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 26: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 657/20-21/CEDC-N /1877 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Suryaans paper

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1877)

5. Point(s) of Connection : TNEB 11 KV Thervoy Kandigai feeder of 110/11KV

Thervoy Kandigai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.75MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Suryaans paper, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041877 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 27: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 658/20-21/VEDC /352 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sattur Sri Venkateshwara Duplex Boards Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 352)

5. Point(s) of Connection : TNEB 11 KV Mill Feeder of 110/33-11 KV

Nallamanaikanpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sattur Sri Venkateshwara Duplex

Boards Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620352 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 28: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 659/20-21/EEDC /301 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shri Hari Process

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 301)

5. Point(s) of Connection : TNEB 11kv Sanitorium feeder of 110/11kv Ingur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shri Hari Process, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260301 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 29: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 660/20-21/CBE-SEDC /236 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jayanthi Textiles Products Unit II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 236)

5. Point(s) of Connection : TNEB 11 KV Jayanthi Textiles dedicated feeder of 110-33-

11 KV Kaniyur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.375MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jayanthi Textiles Products Unit II,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320236 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 30: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 661/20-21/CEDC-C /2511 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hotel Leela Venture Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 2511)

5. Point(s) of Connection : TNEB 11KV Rani Meyyammai Tower feeder of 33/11KV

MRC Nagar SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hotel Leela Venture Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094022511 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 31: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 662/20-21/SEDC /152 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hatsun Agro Product Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 152)

5. Point(s) of Connection : TNEB 22KV Chinnagoundapuram feeder of 110/22

Mettupatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.735MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hatsun Agro Product Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240152 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 32: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 663/20-21/CBE-SEDC /704 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KPR Mill Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 704)

5. Point(s) of Connection : TNEB 11KV Kamanaickenpalayam Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KPR Mill Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320704 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 33: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 664/20-21/CEDC-N /1851 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Dalmia Laminators Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1851)

5. Point(s) of Connection : TNEB 11KV Sipcot Industrial feeder 9 of 110/33/11KV

Sipcot SS-II

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Dalmia Laminators Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041851 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 34: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 665/20-21/CEDC-N /1963 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Dalmia Laminators Ltd (Unit-2)

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1963)

5. Point(s) of Connection : TNEB 11KV Sipcot Industrial feeder of 110/33/11KV

Sipcot SS-II

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.62MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Dalmia Laminators Ltd (Unit-2),

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041963 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 35: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 666/20-21/GEDC /102 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Akshera Papers

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 102)

5. Point(s) of Connection : TNEB 11KV Sri Sakthi Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.35MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Akshera Papers, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360102 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 36: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 667/20-21/EEDC /337 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Sughan International

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 337)

5. Point(s) of Connection : TNEB 11KV Sanitorim Feeder of 110/33/11 KV Ingur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.125MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Sughan International, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260337 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 37: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 668/20-21/TvEDC /181 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Subburaj Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 181)

5. Point(s) of Connection : TNEB 11 KV Subburaj Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Subburaj Spinning Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720181 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 38: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 669/20-21/NEDC /347 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Daily Fresh Fruits India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 347)

5. Point(s) of Connection : TNEB 22 KV Kathiranallur Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Daily Fresh Fruits India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094370347 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 39: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 670/20-21/DEDC /127 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Raajco Spinners Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 127)

5. Point(s) of Connection : TNEB 11 KV SS Mills dedicated feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Raajco Spinners Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500127 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 40: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 671/20-21/DhEDC /374 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hatsun Agro Product Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 374)

5. Point(s) of Connection : TNEB 11 KV Hatsun feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hatsun Agro Product Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094200374 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 41: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 672/20-21/KpEDC /149 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hatsun Agro Product Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 149)

5. Point(s) of Connection : TNEB 11 KV Hatsun feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.115MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hatsun Agro Product Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094100149 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 42: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 673/20-21/MEDC /355 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hari Krishnaa Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 355)

5. Point(s) of Connection : TNEB 22 KV Navakadu Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.125MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hari Krishnaa Spinning Mills Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220355 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 43: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 674/20-21/ChEDC /821 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Orchid Health Care, A division of Orchid Pharma Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 821)

5. Point(s) of Connection : TNEB 11 KV BYD Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Orchid Health Care, A division of

Orchid Pharma Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance

with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110821 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 44: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 675/20-21/CEDC-S /774 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Tecci Park Owners Association

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 774)

5. Point(s) of Connection : TNEB 33 KV SAS Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Tecci Park Owners Association,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094010774 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 45: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 676/20-21/CEDC-N /1841 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Chennai Petroleum Corporation Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1841)

5. Point(s) of Connection : TNEB 110 KV L&T Feeder of 230 KV Athipattu SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Chennai Petroleum Corporation

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041841 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 46: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 677/20-21/MEDC /288 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : V. Thangavel and Sons Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 288)

5. Point(s) of Connection : TNEB 22 KV Pudupalayam Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by V. Thangavel and Sons Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220288 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 47: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 678/20-21/TvEDC /72 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Ramaraju Surgical Cotton Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 72)

5. Point(s) of Connection : TNEB 11 KV Rajapalayam Textiles Feeder of 110/11 KV

Perumalpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.205MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Ramaraju Surgical Cotton

Mills Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720072 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 48: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 679/20-21/CBE-MEDC /114 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ultimate Alloys Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 114)

5. Point(s) of Connection : TNEB 11 KV Ranganathapuram Feeder of 110/11 KV Sulur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ultimate Alloys Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094350114 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 49: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 680/20-21/MdEDC /194 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : GHCL Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 194)

5. Point(s) of Connection : TNEB 110 KV GHCL Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 10MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by GHCL Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094520194 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 50: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 681/20-21/CBE-SEDC /447 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K. P. R. Mill Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 447)

5. Point(s) of Connection : TNEB 110 KV palladam feeder of 230/110KV Arasur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K. P. R. Mill Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320447 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 51: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 682/20-21/GEDC /78 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Rohini Textile Industry (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 78)

5. Point(s) of Connection : TNEB 11KV Mill Feeder of Kodiveri 110 /11 KV SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Rohini Textile Industry (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360078 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 52: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 683/20-21/DEDC /279 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Bannari Amman Spinning Mills Ltd, Unit-II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 279)

5. Point(s) of Connection : TNEB 33KVdedicated feeder of 110/33-22-11KV

Thamaraipadi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Bannari Amman Spinning Mills Ltd,

Unit-II, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500279 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 53: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 684/20-21/DEDC /171 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Bannari Amman Spinning Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 171)

5. Point(s) of Connection : TNEB 11kv Mill Feeder of 110/ 33-11 KV Vadamadurai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.67MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Bannari Amman Spinning Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500171 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 54: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 685/20-21/DEDC /84 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shiva Mills Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 84)

5. Point(s) of Connection : TNEB 11KV Mill Feeder of 110/33-22-11kv Thamaraipadi

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.165MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shiva Mills Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500084 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 55: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 686/20-21/TvEDC /14 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Textiles Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 14)

5. Point(s) of Connection : TNEB 11 KV TVS Mill Feeder of 110/11kv Karantheneri

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Textiles Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720014 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 56: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 687/20-21/DEDC /30 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Rajalakshmi Paper Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 30)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder II of 110/22kv Madathukulam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.38MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Rajalakshmi Paper Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500030 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 57: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 688/20-21/SEDC /177 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sambandam Siva Textiles Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 177)

5. Point(s) of Connection : TNEB 22 KV Gopesska Feeder of 110 /22 KV Mettupatti

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sambandam Siva Textiles Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240177 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 58: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 689/20-21/NEDC /175 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KKP Spinning Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 175)

5. Point(s) of Connection : TNEB 22 KV Perumalpatti Feeder/ Valayapatti 110/22 KV

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.87MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KKP Spinning Mills Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094370175 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 59: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 690/20-21/NEDC /257 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KKP Textiles Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 257)

5. Point(s) of Connection : TNEB 22 KV Perumapatti Feeder of Valayapatti 110/22 KV

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KKP Textiles Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094370257 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 60: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 691/20-21/CBE-SEDC /418 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jagannath Textile Company Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 418)

5. Point(s) of Connection : TNEB 33 KV Jagannath Feeder of 110/33-11kv

Kaduvettipalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jagannath Textile Company

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320418 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 61: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 692/20-21/TvEDC /4 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Gomathy Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 4)

5. Point(s) of Connection : TNEB 11KV Gomathy feeder of 110/11KV Viravanallur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Gomathy Mills Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720004 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 62: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 693/20-21/PEDC /92 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K K P Textiles Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 92)

5. Point(s) of Connection : TNEB 11KV Industrial III Feeder of 110/33-11KV

Vadugapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.367MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K K P Textiles Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 069094460092 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 63: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 694/20-21/PMEDC /268 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kumaran Gin & Pressing Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 268)

5. Point(s) of Connection : TNEB 11 KV KGPP Feeder of 110/33-11 KV Elavanthy SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kumaran Gin & Pressing Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094390268 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 64: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 695/20-21/KGEDC /311 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Prime Gold International Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 311)

5. Point(s) of Connection : TNEB 33 KV Meenkshi feeder of 110/33-11kv Kempatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Prime Gold International Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210311 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 65: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 696/20-21/VEDC /82 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Fastners Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 82)

5. Point(s) of Connection : TNEB 33 KV Industrial Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Fastners Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620082 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 66: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 697/20-21/EEDC /224 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sasi Anand Spinning Mills (India) Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 224)

5. Point(s) of Connection : TNEB 11 KV Olapalayam Feeder of 110/22-11KV

Gandhinagar SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sasi Anand Spinning Mills (India)

Private Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260224 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 67: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 698/20-21/VEDC /65 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Valli Textile Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 65)

5. Point(s) of Connection : TNEB 11 KV Valli Mill Feeder of 110/11KV N.

Subbaiahpuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.41MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Valli Textile Mills, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620065 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 68: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 699/20-21/TEDC /227 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Loyal Textile Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 227)

5. Point(s) of Connection : TNEB 33KV loyal mill Feeder of 110/33-11 Kovilpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5.021MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Loyal Textile Mills Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094700227 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 69: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 700/20-21/SEDC /256 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sambandam Spinning Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 256)

5. Point(s) of Connection : TNEB 22 KVGopesska feeder of 110 KV Mettupatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sambandam Spinning Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240256 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 70: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 701/20-21/MdEDC /45 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : TVS Srichakra Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 45)

5. Point(s) of Connection : TNEB 33kv SriChakra Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by TVS Srichakra Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094520045 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 71: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 702/20-21/MdEDC /126 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : TVS Srichakra Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 126)

5. Point(s) of Connection : TNEB 33 KV Sri Chakra Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by TVS Srichakra Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094520126 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 72: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 703/20-21/SiEDC /70 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Loyal Textile Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 70)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder of 110/22KV Arasanur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.34MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Loyal Textile Mills Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094600070 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 73: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 704/20-21/MdEDC /86 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sree Ayyanar Spinning and Weaving Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 86)

5. Point(s) of Connection : TNEB 11 KV Ayyanar Mill Feeder of 33/11KV Kariyapatti

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sree Ayyanar Spinning and

Weaving Mills Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094520086 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 74: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 705/20-21/CEDC-W /1109 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Clayton Ltd 1109

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1109)

5. Point(s) of Connection : TNEB 33 KV Sundaram Clayton Feeder of 11 KV Padi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Clayton Ltd 1109,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094061109 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 75: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 706/20-21/CEDC-W /1514 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Clayton Ltd 1514

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1514)

5. Point(s) of Connection : TNEB 33 KV Sundaram Clayton TVS Feeder of 110 KV

Padi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Clayton Ltd 1514,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094061514 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 76: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 707/20-21/CBE-SEDC /13 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Super Sales India Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 13)

5. Point(s) of Connection : TNEB 22KV Arisipalayam feeder of 110/22KV

O.K.Mandapam SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Super Sales India Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320013 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 77: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 708/20-21/KgEDC /244 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Clayton Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 244)

5. Point(s) of Connection : TNEB 11 KV Clayton Feeder of 110/33-11 KV Kempatty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Clayton Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210244 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 78: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 709/20-21/DEDC /153 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thiagarajar Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 153)

5. Point(s) of Connection : TNEB 22KV Dedicated feeder of 110/22KV NILAKOTTAI

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thiagarajar Mills (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500153 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 79: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 710/20-21/MdEDC /10 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thiagarajar Mills Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 10)

5. Point(s) of Connection : TNEB 11KV Mill feeder of 110/11KV kappalur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thiagarajar Mills Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094520010 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 80: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 711/20-21/MEDC /229 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Victory Spinning Mills Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 229)

5. Point(s) of Connection : TNEB 22kv Valrajapalayam feeder of Sankari SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Victory Spinning Mills Private Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220229 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 81: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 712/20-21/ChEDC /153 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Delphi-TVS Technologies Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 153)

5. Point(s) of Connection : TNEB 33KV Mannur feeder of 110/33-11KV Sriperumbudur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Delphi-TVS Technologies Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110153 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 82: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 713/20-21/CBE-SEDC /275 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K.P.R. Mill Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 275)

5. Point(s) of Connection : TNEB 110KV Arasur-CBE Feeder of 230/110KV Arasur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K.P.R. Mill Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320275 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 83: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 714/20-21/CBE-SEDC /585 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Magna Electro Castings Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 585)

5. Point(s) of Connection : TNEB 22KV Thamaraikulam feeder of kinathukadavu

110/22kv SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Magna Electro Castings Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320585 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 84: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 715/20-21/GEDC /81 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K.P.R. Mill Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 81)

5. Point(s) of Connection : TNEB Moyar-Periyakodivery 110KV grid feeder of

Periyakodivery 110/11KV Grid SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K.P.R. Mill Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360081 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 85: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 716/20-21/VEDC /223 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Vijai spinners (RJPM) Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 223)

5. Point(s) of Connection : TNEB 11KV U3 feeder of 110/11kv Mudangiar SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.053MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Vijai spinners (RJPM) Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620223 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 86: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 717/20-21/CdEDC /83 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Tagros Chemicals India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 83)

5. Point(s) of Connection : TNEB 22 KV Tagros dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Tagros Chemicals India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 029094180083 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 87: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 718/20-21/NEDC /304 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KKP Weaving and Processing Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 304)

5. Point(s) of Connection : TNEB 22 KV Ayeepalayam Express feeder of 110/22 KV

Mallur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.098MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KKP Weaving and Processing Mills

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094370304 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 88: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 719/20-21/CEDC-N /1501 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kanishk steel Industries Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1501)

5. Point(s) of Connection : TNEB 11kv Feeder 7 of 110/33/11kv GPD Sipcot SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kanishk steel Industries Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041501 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 89: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 720/20-21/TvEDC /207 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Seshasayee Paper and Boards Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 207)

5. Point(s) of Connection : TNEB 110kv subburaj feeder of 110/11kv O Thulukkapatti

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Seshasayee Paper and Boards Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720237 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 90: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 721/20-21/CEDC-N /1283 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1283)

5. Point(s) of Connection : TNEB 33KV ALEL Feeder of Ennore 110/33-11KV SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094041283 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 91: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 722/20-21/KgEDC /24 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 24)

5. Point(s) of Connection : TNEB 33KV Ashok Leyland feeder from 230KV Hosur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210024 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 92: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 723/20-21/KgEDC /171 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Ltd Unit II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 171)

5. Point(s) of Connection : TNEB 22kv Ashok leyland feeder of 110/22-11KV Sipcot

phase -II SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Ltd Unit II, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210171 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 93: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 724/20-21/KgEDC /259 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashok Leyland Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 259)

5. Point(s) of Connection : TNEB 22kv Nerolac feeder of Bathlapalli SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashok Leyland Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210259 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 94: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 725/20-21/ChEDC /498 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Praxair India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 498)

5. Point(s) of Connection : TNEB 33kv Praxair Dedicated feeder of Mambakkam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 6.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Praxair India Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110498 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 95: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 726/20-21/ChEDC /482 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Stanadyne India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 482)

5. Point(s) of Connection : TNEB 11kv Veppampattu feeder of Thiruninravoor SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Stanadyne India Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110482 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 96: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 727/20-21/VEDC /181 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Arun Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 181)

5. Point(s) of Connection : TNEB 11kv Arun feeder of 110/11kv Thottiapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Arun Spinning Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620181 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 97: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 728/20-21/CBE-SEDC /641 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K.P.R. Mill Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 641)

5. Point(s) of Connection : TNEB 110KV Karuvalur - Thekkalur feeder of 230/110KV

Karuvalur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 11MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K.P.R. Mill Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320641 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 98: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 729/20-21/CBE-SEDC /580 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Texmo Precision Castings

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 580)

5. Point(s) of Connection : TNEB 22 KV Texmo Feeder of 110/22 KV Millkoilpalayam

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.11MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Texmo Precision Castings, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094320580 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 99: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 730/20-21/KrEDC /336 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Indus TMT Industries Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 336)

5. Point(s) of Connection : TNEB 33KV Meenakshi feeder of 110/33-11KV Kembatty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Indus TMT Industries Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210336 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 100: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 731/20-21/KgEDC /447 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Rathna Packaging India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 447)

5. Point(s) of Connection : TNEB 33 KV Kelamangalam Feeder of 110 KV Uthanapalli

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Rathna Packaging India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210447 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 101: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 732/20-21/UEDC /155 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Super Sales India Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 155)

5. Point(s) of Connection : TNEB 22KV Ayyampalayam feeder of 110/22KV Muthur

SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Super Sales India Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094340155 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 102: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 733/20-21/VEDC /292 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Valli Textile Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 292)

5. Point(s) of Connection : TNEB 11kv Industrial feeder of 110/11kv N.Subbiahpuram

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Valli Textile Mills, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620292 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 103: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 734/20-21/SEDC /148 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Steel Authority of India Ltd,Salem Steel Plant

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 148)

5. Point(s) of Connection : TNEB 230KV Steel Plant feeder of 400 / 230KV K R

Thoppur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 22.35MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 0.77% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Steel Authority of India Ltd,Salem

Steel Plant, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240148 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 104: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 735/20-21/TvEDC /217 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Brindha Cotton Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 217)

5. Point(s) of Connection : TNEB 11kv Mill feeder of Perumalpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Brindha Cotton Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094720217 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 105: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 736/20-21/ChEDC /264 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hindustan Coco-Cola Beverages Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 264)

5. Point(s) of Connection : TNEB 33kv Thirumazhisai Feeder of 110 KV Thirumazhisai

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.74MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hindustan Coco-Cola Beverages Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110264 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 106: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 737/20-21/SEDC /274 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Steel Authority of India Ltd, Salem Steel Plant

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 274)

5. Point(s) of Connection : TNEB 230kv steel plant feeder of 400/230kv Thoppur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 0.77% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Steel Authority of India Ltd, Salem

Steel Plant, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240274 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 107: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 738/20-21/ChEDC /222 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Brakes India Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 222)

5. Point(s) of Connection : TNEB 11kv Industrial feeder of 33/11kv polambakkam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Brakes India Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110222 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 108: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 739/20-21/VEDC /342 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sakthi Spintex Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 342)

5. Point(s) of Connection : TNEB 11kv Industrial feeder of 110/11kv Valayapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sakthi Spintex Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620342 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 109: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 740/20-21/GEDC /142 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sunrise Knitting Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 142)

5. Point(s) of Connection : TNEB 11KV Alukkuli Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.35MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sunrise Knitting Mills (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094360142 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 110: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 741/20-21/CEDC-S /946 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Reliance Jio Infocomm Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 946)

5. Point(s) of Connection : TNEB 33KV Feeder of 110/33KV SIPCOT SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Reliance Jio Infocomm Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094010946 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 111: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 742/20-21/CEDC-S /866 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Schneider Electric India Pvt. Ltd.

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 866)

5. Point(s) of Connection : TNEB 11KV Elecon Feeder of 33/11 KV Poonamallee SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Schneider Electric India Pvt. Ltd.,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094000866 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 112: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 743/20-21/CBE-NEDC /103 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Supertex Mills (India) Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 103)

5. Point(s) of Connection : TNEB 11KV KG Dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Supertex Mills (India) Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094300103 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 113: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 744/20-21/KpEDC /139 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Borg Warner Morse Systems India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 139)

5. Point(s) of Connection : TNEB 11KV Sidco feeder of 110/33-11KV Kakkalur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.12MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Borg Warner Morse Systems India

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094100139 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 114: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 745/20-21/MEDC /349 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Magnum Spinning Millss India (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 349)

5. Point(s) of Connection : TNEB 22KV Devana Goundanoor Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.125MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Magnum Spinning Millss India (P)

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220349 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 115: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 746/20-21/Tirupur /480 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KPR Mills Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 480)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/11 KV Avinashi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KPR Mills Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094380480 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 116: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 747/20-21/CEDC-W /1022 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : TI Cycles of India

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1022)

5. Point(s) of Connection : TNEB 11 KV Tass Feeder of 33/11 KV TI Cycle SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by TI Cycles of India, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 019094061022 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 117: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 748/20-21/EEDC /85 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sakthi Auto Component Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 85)

5. Point(s) of Connection : TNEB 110 KV Ingur - Thingalore Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 15MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sakthi Auto Component Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260085 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 118: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 749/20-21/CEDC-S /298 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ravindranath GE Medical Associates Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 298)

5. Point(s) of Connection : TNEB 11 KV Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.16MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ravindranath GE Medical

Associates Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance

with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094010298 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 119: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 750/20-21/VEDC /28 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sree Ayyanar Spinning and Weaving Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 28)

5. Point(s) of Connection : TNEB 11 KV Ayyanar Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sree Ayyanar Spinning and

Weaving Mills Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620028 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 120: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 751/20-21/ChEDC /1307 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hanon Automotive Systems India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1307)

5. Point(s) of Connection : TNEB 110 KV SP Koil- MM Nagar Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hanon Automotive Systems India

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094111307 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 121: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 752/20-21/PMEDC /201 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Anangoor Textile Mills Pvt Ltd - Unit I

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 201)

5. Point(s) of Connection : TNEB 11 KV Malamedu Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.26MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Anangoor Textile Mills Pvt Ltd -

Unit I, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094390201 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 122: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 753/20-21/DEDC /52 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sahana Textiles

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 52)

5. Point(s) of Connection : TNEB 22 KV Saravana Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.565MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sahana Textiles, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500052 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 123: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 754/20-21/MEDC /351 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Victory Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 351)

5. Point(s) of Connection : TNEB 22 KV Valrajapalayam Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Victory Spinning Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220351 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 124: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 755/20-21/ChEDC /701 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Lincoln Electric Company India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 701)

5. Point(s) of Connection : TNEB 11 KV Husky Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Lincoln Electric Company India Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094110701 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 125: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 756/20-21/SEDC /51 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Golden Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 51)

5. Point(s) of Connection : TNEB 22 KV Gopesska dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Golden Spinning Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094240051 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 126: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 757/20-21/PEDC /99 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sanmar Matrix Metals Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 99)

5. Point(s) of Connection : TNEB 33 KV Sanmar dedicated feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sanmar Matrix Metals Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 069094460099 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 127: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 758/20-21/PEDC /127 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sanmar Matrix Metals Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 127)

5. Point(s) of Connection : TNEB 33 KV Sanmar dedicated feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 6.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sanmar Matrix Metals Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 069094460127 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 128: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 759/20-21/KgEDC /636 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Daily Fresh Fruits India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 636)

5. Point(s) of Connection : TNEB 11 KV TNHB Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.44MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Daily Fresh Fruits India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 089094210636 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 129: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 760/20-21/ChEDC /662 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : NSK Bearings India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 662)

5. Point(s) of Connection : TNEB 33 KV Nokia Siemens Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by NSK Bearings India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 09994110662 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 130: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 761/20-21/TyEDC /248 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : GHCL Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 248)

5. Point(s) of Connection : TNEB 11 KV GHCL Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by GHCL Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 069094420248 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 131: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 762/20-21/TyEDC /3 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : GHCL Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 3)

5. Point(s) of Connection : TNEB 11 KV GHCL Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by GHCL Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 069094420003 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 132: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 763/20-21/MEDC /112 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K.S.R. Textile Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 112)

5. Point(s) of Connection : TNEB 22 KV Thokkavadi Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K.S.R. Textile Mills Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220112 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 133: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 764/20-21/MEDC /308 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : K.S.R. Textile Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 308)

5. Point(s) of Connection : TNEB 22 KV Thokkavadi Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by K.S.R. Textile Mills Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094220308 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 134: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 765/20-21/DEDC /454 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shri Hari Krishna Papers Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 454)

5. Point(s) of Connection : TNEB 33 KV Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shri Hari Krishna Papers Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 059094500454 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 135: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 766/20-21/CEDC-S /1073 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Eicher Motors Ltd Unit Royal Enfield

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1073)

5. Point(s) of Connection : TNEB 33 KV SAS Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.79MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Eicher Motors Ltd Unit Royal

Enfield, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094011073 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 136: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 767/20-21/VEDC /222 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Rajashree Spintex Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 222)

5. Point(s) of Connection : TNEB 11 KV Thottiapatti feeder of 110/11kv Thottiapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Rajashree Spintex Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 079094620222 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 137: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 768/20-21/EEDC /498 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sahuwala Flour Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 498)

5. Point(s) of Connection : TNEB 11 KV ETP Feeder of 110/33-11 KV Sipcot I SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.134MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sahuwala Flour Mills, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 049094260498 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 138: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 769/20-21/ChEDC /1290 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Clayton Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1290)

5. Point(s) of Connection : TNEB 33 KV Sundaram Clayton Feeder of 230/110 - 33 KV

Oragadam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Clayton Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094111290 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 139: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 770/20-21/ChEDC /1311 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Inox Air Products Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1311)

5. Point(s) of Connection : TNEB 110 KV Hinduja - Inox Feeder of 230/110/33-11 KV

Mambakkam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Inox Air Products Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094111311 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 140: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 771/20-21/PMEDC /458 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Kumaran Steels India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 458)

5. Point(s) of Connection : TNEB 11 KV Mill Feeder of 110/11 KV Uthiyur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Kumaran Steels India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094390458 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 141: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 772/20-21/TrEDC /34 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kesharinandan Knit Fabrics Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 34)

5. Point(s) of Connection : TNEB 11 KV Silical Feeder of 110/11 KV Avinashi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kesharinandan Knit Fabrics Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094380034 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 142: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 773/20-21/CBE-NEDC /521 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sahuwala Flour Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 521)

5. Point(s) of Connection : TNEB 22 KV S.C. Pudur Feeder of 110/22 KV MGC

Palayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.26MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sahuwala Flour Mills, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 039094300521 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 143: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 774/20-21/KpEDC /167 Dated. 27/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kwality Milk Foods Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 167)

5. Point(s) of Connection : TNEB 11 KV Thimmasamuthiram Feeder of 110 KV Kanchi

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kwality Milk Foods Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 27/05/2020

/Sd . . 27/05/2020******

Client ID 099094100167 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 144: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 775/20-21/VEDC /259 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shri Ramalinga Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 259)

5. Point(s) of Connection : TNEB 110 KV Ramalinga EHT Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shri Ramalinga Mills Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 079094620259 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 145: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 776/20-21/MEDC /279 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Cheran Synthetics India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 279)

5. Point(s) of Connection : TNEB 22 KV E-Kattur dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.89MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Cheran Synthetics India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220279 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 146: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 777/20-21/DEDC /144 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Chenduran Cotspin India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 144)

5. Point(s) of Connection : TNEB 22 KV Dollar Feeder of 110/22kv Minukkampatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Chenduran Cotspin India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 059094500144 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 147: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 778/20-21/EEDC /210 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Gomathi Spinning Mills India P ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 210)

5. Point(s) of Connection : TNEB 11kv Gomathy feeder of 110/11kv Kunnathur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.115MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Gomathi Spinning Mills India P

ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094260210 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 148: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 779/20-21/ChEDC /424 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Asahi India Glass Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 424)

5. Point(s) of Connection : TNEB 110 KV Irungattukottai -Asahi Feeder of 400/230/110

KV Sriperumbudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Asahi India Glass Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 099094110424 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 149: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 780/20-21/CBE-MEDC /141 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Karthikeya Spg and Wvg Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 141)

5. Point(s) of Connection : TNEB 11 KV Karthikeya Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Karthikeya Spg and Wvg Mills

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094350141 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 150: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 781/20-21/MEDC /189 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Pallava Textiles Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 189)

5. Point(s) of Connection : TNEB 22 KV pachampalayam dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Pallava Textiles Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220189 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 151: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 782/20-21/GEDC /131 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : P.V. Spinning Mill India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 131)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/11kv Shenbagapudur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by P.V. Spinning Mill India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094360131 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 152: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 783/20-21/CBE-NEDC /529 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sharadha Terry Products Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 529)

5. Point(s) of Connection : TNEB 110 KV Pykara Mettupalayam Feeder of 400 KV

Karamadai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sharadha Terry Products Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094300529 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 153: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 784/20-21/GEDC /33 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Arun Textiles Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 33)

5. Point(s) of Connection : TNEB 11 KV Arun Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.61MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Arun Textiles Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094360033 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 154: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 785/20-21/VelEDC /1203 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ultratech Cement Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1203)

5. Point(s) of Connection : TNEB 110 KV L&T feeder of 110/11 KV Salai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5.85MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ultratech Cement Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094121203 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 155: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 786/20-21/CBE-SEDC /488 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Craftsman Automation Ltd Unit 3

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 488)

5. Point(s) of Connection : TNEB 33 KV Sengothipalayam Feeder of 110/33-11 KV

Kaniyur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.89MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Craftsman Automation Ltd Unit 3,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094320488 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 156: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 787/20-21/CBE-SEDC /1 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : ACC Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1)

5. Point(s) of Connection : TNEB 110 KV Othakkaimandapam to Thudiyalur feeder of

230/110kv O K mandapam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 6.75MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by ACC Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094320001 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 157: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 788/20-21/DEDC /155 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Elkaypee Spinners (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 155)

5. Point(s) of Connection : TNEB 22 KV Dollar feeder of 110/22KV Vedasandur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Elkaypee Spinners (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 059094500155 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 158: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 789/20-21/VelEDC /1180 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : MRF Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1180)

5. Point(s) of Connection : TNEB 33 KV MRF feeder of 110/33-11KV Ichipudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by MRF Ltd, through Power Exchange

upto the MW ceiling as specified above, in accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094121180 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 159: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 790/20-21/VelEDC /1199 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : MRF Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1199)

5. Point(s) of Connection : TNEB 110 KV MRF Feeder from 110/33-11KV Ichipudur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by MRF Ltd, through Power Exchange

upto the MW ceiling as specified above, in accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094121199 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 160: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 791/20-21/CEDC-N /1923 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : J.R. Metal Chennai Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1923)

5. Point(s) of Connection : TNEB 110kv Periyapalayam feeder of 110 /11KV Panjetty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by J.R. Metal Chennai Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 019094041923 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 161: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 792/20-21/CBE-SEDC /358 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Craftsman Automation Ltd Unit 3 (Sheet Metal Division)

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 358)

5. Point(s) of Connection : TNEB 33KV Sangothipalayam Feeder of 110/33-11 KV

Kaniyur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Craftsman Automation Ltd Unit 3

(Sheet Metal Division), through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094320358 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 162: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 793/20-21/PrEDC /81 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : MRF Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 81)

5. Point(s) of Connection : TNEB 110 KV Permbalur Kallakudi feeder of Perambalur

230KV Auto SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 9.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by MRF Ltd, through Power Exchange

upto the MW ceiling as specified above, in accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 069094400081 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 163: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 794/20-21/VelEDC /1064 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : United Foundries Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1064)

5. Point(s) of Connection : TNEB 11kv Foundry feeder of 110/11KV Ranipet Sipcot SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by United Foundries Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094121064 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 164: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 795/20-21/CEDC-N /1778 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Janakiram Steel and Power Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1778)

5. Point(s) of Connection : TNEB 11 KV Sadayankuppam -I Feeder of 110/33/11 KV

Manali SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.475MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Janakiram Steel and Power Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 019094041778 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 165: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 796/20-21/PMEDC /231 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Lakshmi Mills Company Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 231)

5. Point(s) of Connection : TNEB 11 KV Lakshmi Mill Feeder of 110/33-11 KV

Karadivavi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Lakshmi Mills Company

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094390231 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 166: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 797/20-21/TEDC /2 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Lakshmi Mills Company Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 2)

5. Point(s) of Connection : TNEB 11KV Mill feeder of 110/11KV Kovilpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Lakshmi Mills Company Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 079094700002 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 167: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 798/20-21/MEDC /333 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Prince Yarnn India Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 333)

5. Point(s) of Connection : TNEB 22KV Uppupalayam feeder of 110/22KV

Uppupalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.21MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Prince Yarnn India Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220333 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 168: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 799/20-21/EEDC /306 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jay Jay Mills (India) Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 306)

5. Point(s) of Connection : TNEB Jay Jay Mill 33 KV Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jay Jay Mills (India) Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094260306 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 169: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 800/20-21/MEDC /345 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shrie Harivallabi Spinners Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 345)

5. Point(s) of Connection : TNEB 22 kV Perumpalam feeder of Veppadai 110/22KV SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shrie Harivallabi Spinners Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220345 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 170: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 801/20-21/EEDC /219 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Bannari Amman Spinning Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 219)

5. Point(s) of Connection : TNEB 11KV Bannari Amman feeder of 110/11KV Sipcot SS

II

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Bannari Amman Spinning Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094260219 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 171: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 802/20-21/VelEDC /1129 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Munipachaiyappan Textiles Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1129)

5. Point(s) of Connection : TNEB 11KV Mill feeder of 33/11KV Karikkal SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Munipachaiyappan Textiles Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094121129 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 172: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 803/20-21/CBE-MEDC /184 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Siva Subramania Textiles

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 184)

5. Point(s) of Connection : TNEB 11KV Thottipalayam pirivu feeder of 110/11KV

Irugur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Siva Subramania Textiles, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094350184 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 173: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 804/20-21/CBE-MEDC /345 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Vellingiri Andavar Textiles (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 345)

5. Point(s) of Connection : TNEB 11KV MG Road feeder of 110/11KV Irugur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Vellingiri Andavar Textiles (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 039094350345 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 174: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 805/20-21/SEDC /137 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jai Hind Wire Rod Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 137)

5. Point(s) of Connection : TNEB 22KV Dhadhakapatty feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jai Hind Wire Rod Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094240137 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 175: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 806/20-21/KgEDC /329 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thriveni Earth Movers Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 329)

5. Point(s) of Connection : TNEB 11KV Berandapalli SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thriveni Earth Movers Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094210329 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 176: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 807/20-21/KgEDC /322 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Laxmi Rolling & Strips Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 322)

5. Point(s) of Connection : TNEB 33KV Field fresh feeder of 110/33-11 KV Kempatty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Laxmi Rolling & Strips Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094210322 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 177: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 808/20-21/MEDC /300 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Cheran Synthetics India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 300)

5. Point(s) of Connection : TNEB 22KV Pudupalayam feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.04MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Cheran Synthetics India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220300 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 178: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 809/20-21/ChEDC /1099 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Salem Mines & Aggregates

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1099)

5. Point(s) of Connection : TNEB 11 KV Water Works Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Salem Mines & Aggregates, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 099094111099 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 179: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 810/20-21/KgEDC /527 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thriveni Earth Movers Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 527)

5. Point(s) of Connection : TNEB 33 KV Suguna Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thriveni Earth Movers Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094210527 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 180: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 811/20-21/CEDC-W /1800 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ambattur Infra Developers

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1800)

5. Point(s) of Connection : TNEB 33 KV Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ambattur Infra Developers, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 019094061800 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 181: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 812/20-21/EEDC /451 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jay Jay Mills (India) Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 451)

5. Point(s) of Connection : TNEB 33 KV J.J. Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jay Jay Mills (India) Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094260451 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 182: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 813/20-21/MEDC /407 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Cheran Synthetics India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 407)

5. Point(s) of Connection : TNEB 22 KV Pudupalayam Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Cheran Synthetics India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220407 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 183: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 814/20-21/CEDC-W /1717 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Wabco India Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1717)

5. Point(s) of Connection : TNEB 11 KV TRB Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.07MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Wabco India Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 019094061717 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 184: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 815/20-21/CEDC-N /1509 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Mitsuba Sical India Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1509)

5. Point(s) of Connection : TNEB 33 KV D-8 & D-9 Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.15MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Mitsuba Sical India Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 019094041509 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 185: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 816/20-21/MEDC /265 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Mothi Spinner Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 265)

5. Point(s) of Connection : TNEB 22 KV Metukadai Feeder of 110/22 KV

Komarapalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Mothi Spinner Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 049094220265 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 186: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 817/20-21/TnEDC /65 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Theni Gurukrishna Textile Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 65)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder of 110/22 KV Madurapuri SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.44MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Theni Gurukrishna Textile Mills

Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 059094760065 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 187: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 818/20-21/DEDC /196 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Dindigul Steel Rolling Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 196)

5. Point(s) of Connection : TNEB 33 KV DSRM Feeder of 110/33-11 KV Nallamanar

Kottai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Dindigul Steel Rolling Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 059094500196 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 188: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 819/20-21/CEDC-S /505 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : SRM Institute of Science and Technology

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 505)

5. Point(s) of Connection : TNEB 11 KV Kumaran Colony Feeder of 33/11 KV

Saligramam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by SRM Institute of Science and

Technology, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 099094000505 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 189: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 820/20-21/KgEDC /60 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Tenneco Automotive India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 60)

5. Point(s) of Connection : TNEB 11 KV Tenneco dedicated feeder of 110/11 KV

Zuzuvadi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Tenneco Automotive India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 089094210060 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 190: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 821/20-21/CEDC-S /1080 Dated. 29/05/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Apollo Hospitals Enterprise Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1080)

5. Point(s) of Connection : TNEB 33 KV Apollo Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Apollo Hospitals Enterprise Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 29/05/2020

/Sd . . 29/05/2020******

Client ID 099094011080 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 191: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 822/20-21/KGEDC /314 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Annapoorani Textiles Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 314)

5. Point(s) of Connection : TNEB 33KV Berigai Industrial feeder of 110/33-11KV

Bagalur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.44MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Annapoorani Textiles Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094210314 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 192: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 823/20-21/CBE-SEDC /411 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Avaneetha Textiles (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 411)

5. Point(s) of Connection : TNEB 33KV avaneetha Feeder of Sellapalayam 110/11 KV

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.45MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Avaneetha Textiles (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094320411 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 193: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 824/20-21/CBE-MEDC /351 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shiva Textyarn Ltd Unit II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 351)

5. Point(s) of Connection : TNEB 33KV Shivatexyarn Feeder of 110/33-11kv

Karadivavi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.9MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shiva Textyarn Ltd Unit II, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094350351 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 194: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 825/20-21/GEDC /119 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ranger Cotton Mills (India) Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 119)

5. Point(s) of Connection : TNEB 11KV Mill Feeder of 110/11kv getticheviyur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ranger Cotton Mills (India) Private

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 049094360119 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 195: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 826/20-21/VEDC /117 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Jeyajothi Textile Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 117)

5. Point(s) of Connection : TNEB 11 KV Feeder of 110/11KV Reddiapattti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Jeyajothi Textile Mills (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 079094620117 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 196: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 827/20-21/VEDC /145 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Jeyajothi Textiles Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 145)

5. Point(s) of Connection : TNEB 11 KV dedicated Feeder of 110/11KV Reddiapattti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Jeyajothi Textiles Mills (P) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 079094620145 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 197: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 828/20-21/KgEDC /23 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Fasteners Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 23)

5. Point(s) of Connection : TNEB 33 KV SFL Dedicated Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Fasteners Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094210023 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 198: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 829/20-21/VEDC /5 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sudarsanam Spinning Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 5)

5. Point(s) of Connection : TNEB 11 KV Sudarsanam Mill Feeder of 110/11KV

Rajapalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.43MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sudarsanam Spinning Mills, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 079094620005 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 199: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 830/20-21/DEDC /120 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Cheran Spinning Mills Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 120)

5. Point(s) of Connection : TNEB 22KV Gugan feeder of 110/22KV Minukkampatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Cheran Spinning Mills Private Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 059094500120 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 200: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 831/20-21/ChEDC /453 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Motherson Automotive Technologies & Engg

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 453)

5. Point(s) of Connection : TNEB 11kv Motherson dedicated feeder of 230/110-11kv

Nokia SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Motherson Automotive

Technologies & Engg, through Power Exchange upto the MW ceiling as specified above, in accordance

with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110453 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 201: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 832/20-21/CBE-NEDC /357 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shristi Cotspinn Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 357)

5. Point(s) of Connection : TNEB 22KV Ellappalayam Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shristi Cotspinn Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094300357 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 202: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 833/20-21/KgEDC /301 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Venkraft Paper Mill Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 301)

5. Point(s) of Connection : TNEB 33kv kelamangalam feeder of 110/33-11kv

Uddanapalli SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.24MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Venkraft Paper Mill Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094210301 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 203: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 834/20-21/KgEDC /396 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Venkraft Paper Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 396)

5. Point(s) of Connection : TNEB 110 KV Hosur Feeder of 230/110 KV Guruparalli SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Venkraft Paper Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094210396 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 204: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 835/20-21/VelEDC /1159 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Abishowatech (India) limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1159)

5. Point(s) of Connection : TNEB 33KV Brakes India Feeder from Sholingur 110/233-

11KV SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.11MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Abishowatech (India) limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094121159 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 205: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 836/20-21/VelEDC /1084 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Murugappa Morgan Thermal Ceramics Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1084)

5. Point(s) of Connection : TNEB 11kv-MM-TCL feeder of 110/11kv Ranipet Sipcot SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Murugappa Morgan Thermal

Ceramics Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094121084 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 206: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 837/20-21/VEDC /310 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sudarsanam Spinning Mills Unit II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 310)

5. Point(s) of Connection : TNEB 11kv Rajapalayam Spinners feeder of 110/11kv

Thottiapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.44MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sudarsanam Spinning Mills Unit II,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 079094620310 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 207: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 838/20-21/VelEDC /1305 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Abi-Soorai Green

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1305)

5. Point(s) of Connection : TNEB 11kv SOORAI INDUSTRIAL feeder of 110/11kv

MV puram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.17MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Abi-Soorai Green, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094121305 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 208: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 839/20-21/DEDC /27 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Naga Limited (Foods)

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 27)

5. Point(s) of Connection : TNEB 22 KV Naga Feeder of 110/33-22-11 KV Thamarai

Padi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Naga Limited (Foods), through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 059094500027 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 209: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 840/20-21/ChEDC /588 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : TIMKEN Engineering & Research India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 588)

5. Point(s) of Connection : TNEB 33KV dedicated feeder of 230KV Veerapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by TIMKEN Engineering & Research

India Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110588 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 210: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 841/20-21/CBE-SEDC /56 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shanthi Gears Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 56)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/11 KV

Muthugoundenpudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shanthi Gears Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094320056 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 211: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 842/20-21/ChEDC /603 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Young Brand Apparel Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 603)

5. Point(s) of Connection : TNEB 11KV Industrial feeder of 33/11KV Nelvoy SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Young Brand Apparel Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110603 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 212: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 843/20-21/GEDC /62 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thenpandian Spinning Mills India Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 62)

5. Point(s) of Connection : TNEB 11KV TTK Mill feeder of 33/11 KV Pudu

Suripalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.322MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thenpandian Spinning Mills India

Private Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 049094360062 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 213: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 844/20-21/DEDC /125 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Guruvayurappan Textiles (Pvt) Limited 'B' Unit

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 125)

5. Point(s) of Connection : TNEB 22KV suzlon Feeder from 110/22KV Thalayuthu SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Guruvayurappan Textiles (Pvt)

Limited 'B' Unit, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 059094500125 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 214: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 845/20-21/VelEDC /1144 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Brakes India Private Limited, Foundry division-B Unit

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1144)

5. Point(s) of Connection : TNEB 110 KV Brakes India Unit I Feeder of 110/33-11 KV

Sholinghur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Brakes India Private Limited,

Foundry division-B Unit, through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094121144 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 215: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 846/20-21/CBE-MEDC /179 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Shanthi Gears Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 179)

5. Point(s) of Connection : TNEB 11 KVChinthamanipudur Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Shanthi Gears Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094350179 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 216: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 847/20-21/ChEDC /1119 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : BASF Catalysts India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1119)

5. Point(s) of Connection : TNEB 11 KV S.P. Koil Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by BASF Catalysts India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094111119 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 217: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 848/20-21/MdEDC-M /81 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kalpana Cotton Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 81)

5. Point(s) of Connection : TNEB 11 KV Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kalpana Cotton Mills, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 059094630081 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 218: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 849/20-21/NEDC /166 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Hariprasath Textiles Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 166)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Hariprasath Textiles Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 049094370166 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 219: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 850/20-21/VelEDC /1235 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Brakes India Private Limited, Foundry division Unit II

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1235)

5. Point(s) of Connection : TNEB 110 KV Brakes India Unit II Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Brakes India Private Limited,

Foundry division Unit II, through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 089094121235 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 220: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 851/20-21/ChEDC /1080 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : India Yamaha Motors Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1080)

5. Point(s) of Connection : TNEB 110 KV SVC Vallam Vadagal Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by India Yamaha Motors Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094111080 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 221: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 852/20-21/PMEDC /463 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Poomer Spinning Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 463)

5. Point(s) of Connection : TNEB 11 KV Kongu Nagar Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Poomer Spinning Mills, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094390463 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 222: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 853/20-21/TEDC /20 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Emperor Textile Processors

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 20)

5. Point(s) of Connection : TNEB 11 KV Veerapandy Feeder of 110/11 KV Veerapandy

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Emperor Textile Processors, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094380020 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 223: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 854/20-21/TrEDC /500 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sreedhara Textiles Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 500)

5. Point(s) of Connection : TNEB 11 KV Sengalipalayam Feeder of 110/11KV

Kanoorpudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sreedhara Textiles Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 039094380500 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 224: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 855/20-21/ChEDC /964 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Madras Engineering Industries Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 964)

5. Point(s) of Connection : TNEB 33 KV Mambakkam Feeder of 230 KV Mambakkam

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Madras Engineering Industries Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110964 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 225: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 856/20-21/CEDC-NEDC /1985 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Caplin Steriles Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1985)

5. Point(s) of Connection : TNEB 11 KV Industrial feeder of 110/33/11 KV

Gummidipoondi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Caplin Steriles Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 019094041985 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 226: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 857/20-21/ChEDC /623 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Wabco India Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 623)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 33/11 KV Veerapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Wabco India Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110623 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 227: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 858/20-21/VMEDC /38 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Aurofood Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 38)

5. Point(s) of Connection : TNEB 22 KV Aurofood Feeder of 110/22 KV

Thiruchitrambalam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Aurofood Private Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 029094160038 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 228: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 859/20-21/SEDC /267 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : The Ramco Cements Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 267)

5. Point(s) of Connection : TNEB 110 KV MCL Feeder of 230 KV Singhipuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 6.75MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by The Ramco Cements Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 049094240267 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 229: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 860/20-21/ChEDC /499 Dated. 02/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Saint-Gobain India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 499)

5. Point(s) of Connection : TNEB 110 KV Saint-Gobain Feeder of 400/230 KV

Sriperumbudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 7.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 04-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Saint-Gobain India Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 02/06/2020

/Sd . . 02/06/2020******

Client ID 099094110499 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 230: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 861/20-21/MEDC /246 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : R G Spinning Mills Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 246)

5. Point(s) of Connection : TNEB 22 KV Sowthapuram Feeder of 110/22kv Sankari SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by R G Spinning Mills Private Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 049094220246 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 231: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 862/20-21/VEDC /175 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Vindhya Spinning Mills Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 175)

5. Point(s) of Connection : TNEB 11 KV Vindhya Spinning Mill Feeder of 33/11 KV

Mallipudur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Vindhya Spinning Mills Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 079094620175 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 232: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 863/20-21/VEDC /13 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : VTM Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 13)

5. Point(s) of Connection : TNEB 11KV VTM Mill feeder of 110/11KV Sulakarai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by VTM Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 079094620013 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 233: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 864/20-21/PMEDC /208 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : RRD Spintex Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 208)

5. Point(s) of Connection : TNEB 22KV RRD-Kurinji Feeder of 110/22kv Kundadam

SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.15MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by RRD Spintex Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 039094390208 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 234: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 865/20-21/CEDC-N /1812 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : GBR Metals Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1812)

5. Point(s) of Connection : TNEB 33 KV Industrial feeder of 110/33-11kv Durainallur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by GBR Metals Pvt Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 019094041812 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 235: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 866/20-21/PMEDC /129 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Best Cotton Mills Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 129)

5. Point(s) of Connection : TNEB 22kv Best Balu feeder of 110/22KV Dharapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.71MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Best Cotton Mills Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 039094390129 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 236: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 867/20-21/CEDC-N /1824 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s RBA Exports, (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1824)

5. Point(s) of Connection : TNEB 33KV Industrial V feeder of 110/33-11kv GPD

Sipcot SS II

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by M/s RBA Exports, (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 0 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 237: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 868/20-21/TmEDC /51 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ashley Alteams India Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 51)

5. Point(s) of Connection : TNEB 11kv Ashley alteams feeder of 110/33/11kv mangal

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ashley Alteams India Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 029094140051 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 238: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 869/20-21/CEDC-N /1817 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : GBR Metals Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1817)

5. Point(s) of Connection : TNEB 33kv Industrial feeder of 110/33-11kv Durainallur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by GBR Metals Private Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 019094041817 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 239: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 870/20-21/EEDC /50 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Agni steels Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 50)

5. Point(s) of Connection : TNEB 33kv Agni steel feeder of 110/33-11kv Ingur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5.2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Agni steels Pvt Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 049094260050 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 240: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 871/20-21/DEDC /307 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Gainup Industries India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 307)

5. Point(s) of Connection : TNEB 22kv alamelu ammal feeder of 110/22kv Sempatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.16MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Gainup Industries India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 059094500307 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 241: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 872/20-21/KgEDC /535 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sonal Irons Industry Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 535)

5. Point(s) of Connection : TNEB 33KV Suguna feeder of 230/110/33-11KV Hosur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sonal Irons Industry Private

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 089094210535 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 242: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 873/20-21/DEDC /293 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Lan Spintex Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 293)

5. Point(s) of Connection : TNEB 110/22 KV Pushpathur SS - 22 KV GVG Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.97MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Lan Spintex Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 059094500293 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 243: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 874/20-21/CBE-SEDC /562 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Bradken India Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 562)

5. Point(s) of Connection : TNEB 110 KV O K mandapam to Sulur Feeder of 230 KV O

K mandapam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Bradken India Private Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 039094320562 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 244: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 875/20-21/ChEDC /452 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Polyhose India Rubber Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 452)

5. Point(s) of Connection : TNEB 33 KV Fuso Glass Feeder of 110/33 KV

Irungattukottai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.105MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Polyhose India Rubber Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 099094110452 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 245: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 876/20-21/CEDC-C /2380 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Bharti Airtel Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 2380)

5. Point(s) of Connection : TNEB 11 KV PTC Feeder of 33/11 KV Foreshore Estate SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Bharti Airtel Limited, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 019094022380 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 246: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 877/20-21/CBE-SEDC /593 Dated. 11/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Precot Meridian Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 593)

5. Point(s) of Connection : TNEB 22 KV Nanjegoundanpudur Feeder of 110/22 KV

kovilpalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.42MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Precot Meridian Limited, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:11/06/2020

/Sd. . 11/06/2020******

Client ID 039094320593 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 247: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 878/20-21/VEDC /176 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Venkatram Spinners Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 176)

5. Point(s) of Connection : TNEB 11 KV Venkatram mill Feeder of 110/11KV

Perumalpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.85MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Venkatram Spinners Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 079094620176 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 248: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 879/20-21/PMEDC /419 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : NSP Knitting Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 419)

5. Point(s) of Connection : TNEB 11 KV Bagathipalayam feeder of 110/33 /11KV

Kangayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.65MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by NSP Knitting Mills, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 039094390419 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 249: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 880/20-21/KREDC /302 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Meenakshi Udyog (India) Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 302)

5. Point(s) of Connection : TNEB 33KV Meenakshi feeder of 230/110/33 KV Kempatty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.31MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Meenakshi Udyog (India) Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 089094210302 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 250: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 881/20-21/EEDC /313 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : KAS Industries India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 313)

5. Point(s) of Connection : TNEB 33KV Mill Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by KAS Industries India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 049094260313 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 251: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 882/20-21/CBE-NEDC /68 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hindustan Textiles

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 68)

5. Point(s) of Connection : TNEB 22 KV CRPF Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.4085MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hindustan Textiles, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 039094300068 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 252: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 883/20-21/CBE-NEDC /99 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Hindustan Textiles B Unit

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 99)

5. Point(s) of Connection : TNEB 22 KV Press Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.485MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Hindustan Textiles B Unit, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 039094300099 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 253: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 884/20-21/EEDC /346 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sree Palani Andavar Alloys and Steels Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 346)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/33-11 KV

Periyandipalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sree Palani Andavar Alloys and

Steels Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 049094260346 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 254: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 885/20-21/CEDC-S /850 Dated. 12/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ascendas IT Park (Chennai) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 850)

5. Point(s) of Connection : TNEB 33 KV Ascendas Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 14/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ascendas IT Park (Chennai) Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:12/06/2020

/Sd. . 12/06/2020******

Client ID 099094010850 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 255: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 886/20-21/CBE-NEDC /290 Dated. 15/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Karpagam Mills India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 290)

5. Point(s) of Connection : TNEB 22 KV Udayampalayam Feeder of 110/22KV

Saravanampatti Sub Station

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 16/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Karpagam Mills India Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:15/06/2020

/Sd. . 15/06/2020******

Client ID 039094300290 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 256: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 887/20-21/TvEDC /210 Dated. 15/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.ATC Tires Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 210)

5. Point(s) of Connection : TNEB 110KV ATC feeder of 110KV Gangaikondan SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 7MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 16/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by M/s.ATC Tires Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:15/06/2020

/Sd. . 15/06/2020******

Client ID 079094720210 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 257: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 888/20-21/CBE-SEDC /104 Dated. 16/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Indoshell Cast (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 104)

5. Point(s) of Connection : TNEB 22 KV Indoshell feeder of 110/22KV Kurichi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 17/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by M/s Indoshell Cast (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:16/06/2020

/Sd. . 16/06/2020******

Client ID 039094320104 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others

Page 258: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 889/20-21/CBE-SEDC /479 Dated. 17/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Saudagar Enterprise HTSC 479

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 479)

5. Point(s) of Connection : TNEB 11 KV Alampalayam Feeder of 110/11 KV Thekkalur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.62MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Saudagar Enterprise HTSC 479,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:17/06/2020

/Sd. . 17/06/2020******

Client ID 039094320479 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 259: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 890/20-21/TyEDC /95 Dated. 18/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Dhandapani Cements Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 95)

5. Point(s) of Connection : TNEB 110 KV DCPL Feeder of 110/11 KV Puthanampatty

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Dhandapani Cements Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:18/06/2020

/Sd. . 18/06/2020******

Client ID 069094420095 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 260: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 891/20-21/KpEDC /225 Dated. 18/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Aravind Ceramic Industries Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 225)

5. Point(s) of Connection : TNEB 11kv AP chatram feeder of 33 KV Nelvoy SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Aravind Ceramic Industries Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:18/06/2020

/Sd. . 18/06/2020******

Client ID 099094100225 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 261: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 892/20-21/MEDC /99 Dated. 18/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : PKPN Spinning Mills (P) Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 99)

5. Point(s) of Connection : TNEB 22KV Veppadai Feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by PKPN Spinning Mills (P) Limited,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:18/06/2020

/Sd. . 18/06/2020******

Client ID 049094220099 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 262: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 893/20-21/VEDC /1026 Dated. 18/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Ultramarine and Pigments Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1026)

5. Point(s) of Connection : TNEB 11 KV TCL Feeder of 110/11 KV Sipcot Ranipet SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.28MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Ultramarine and Pigments Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:18/06/2020

/Sd. . 18/06/2020******

Client ID 089094121026 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 263: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 894/20-21/PMEDC /378 Dated. 19/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sree Jagathguru Textiles Mills (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 378)

5. Point(s) of Connection : TNEB 11kv jagathguru dedicated feeder of 110KV Periyar

Nagar SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.6MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 21/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sree Jagathguru Textiles Mills (P)

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:19/06/2020

/Sd. . 19/06/2020******

Client ID 039094390378 Executive Engineer / ABT,

CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 264: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 895/20-21/TmEDC /42 Dated. 19/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sri Lakshmi Saraswathi Textiles (Arni) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 42)

5. Point(s) of Connection : TNEB 11 KV SLST “B” Mill Feeder of 33/11 KV

Kunnathur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.25MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 21/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sri Lakshmi Saraswathi Textiles

(Arni) Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:19/06/2020

/Sd. . 19/06/2020******

Client ID 029094140042 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 265: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 896/20-21/CBE-SEDC /559 Dated. 19/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : PC Sons Castings (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 559)

5. Point(s) of Connection : TNEB 22KV Malumichampatty feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 21/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by PC Sons Castings (P) Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:19/06/2020

/Sd. . 19/06/2020******

Client ID 039094320559 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 266: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 897/20-21/KgEDC /377 Dated. 19/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Kansai Nerolac Paints Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 377)

5. Point(s) of Connection : TNEB 22KV Nerolac feeder of 110/22KV Sipcot Phase II SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 21/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Kansai Nerolac Paints Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:19/06/2020

/Sd. . 19/06/2020******

Client ID 89094210377 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and others.

Page 267: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 898/20-21/PEDC /80 Dated. 19/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Thirumathi Muthammal Textiles (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 80)

5. Point(s) of Connection : TNEB 11KV Industrial IV feeder of 110/33-11KV

Vadugapatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.35MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 21/06/2020To30/06/2020

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.29% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Thirumathi Muthammal Textiles (P)

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date:19/06/2020

/Sd. . 19/06/2020******

Client ID 69094460080 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP(MD) No.16564 of 2019 and other

Page 268: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 899/20-21/EEDC /421 Dated. 23/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Saint-Gobain India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 421)

5. Point(s) of Connection : TNEB 110 KV Ingur Thingalore Feeder of 230/110 KV

Ingur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.3 MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 24-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Saint-Gobain India Pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 23/06/2020

/Sd . . 23/06/2020******

Client ID 049094260421 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 269: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 900/20-21/CEDC-N /1411 Dated. 23/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Sundaram Fastners Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1411)

5. Point(s) of Connection : TNEB 33 KV RKKR feeder of 110/33/11kv GPD Sipcot SS

I

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.4MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 25-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.06% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Sundaram Fastners Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 23/06/2020

/Sd . . 23/06/2020******

Client ID 019094041411 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 270: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 901/20-21/CBE-SEDC /584 Dated. 23/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : HI Tec Die Cast Pvt ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 584)

5. Point(s) of Connection : TNEB 22KV /Unicast feeder of 110/22KV Mill

Kovilpalayam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.1 MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 25-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 4.24% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by HI Tec Die Cast Pvt ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 23/06/2020

/Sd . . 23/06/2020******

Client ID 039094320584 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.

Page 271: “Standing Clearance” / “No Objection Certificate”tnebldc.org › EXNOC › SC-JUN 20 › SC-JUN-20.pdf · 2020-06-12 · “Standing Clearance” / “No Objection Certificate”

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 902/20-21/ChEDC /738 Dated. 25/06/2020

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : Jeppiaar Furnace and Steels Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 738)

5. Point(s) of Connection : TNEB 110 KV Palayaseeveram Feeder of 400 KV

Sunguvachatiram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.45MW from 00:00 To 24:00 Hrs (RTC)

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-06-20 To 30-06-20

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.34% (Subject to revision)

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.126.55/MWh

Distribution Licencees

Any other charges/

1) System Operating Charges.

2) Scheduling Charges

Yes 1.Rs.1.41/MW/Hr. Subject to a

ceiling of Rs.500/- per Day.

2. Rs. 160/- per Day

Declaration:

It is hereby certified that:

➢ We have “No Objection” to seeking and availing Open Access by Jeppiaar Furnace and Steels Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

➢ We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

➢ The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

➢ The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

➢ Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

➢ The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

➢ We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

➢ We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

➢ Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/06/2020

/Sd . . 25/06/2020******

Client ID 099094110738 Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

NOTE: This Standing Clearance is subject to the outcome of the WP (MD) No.16564 of 2019 and others.