37
FORMAT: PX-I “Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission to Power Exchanges>> NOC No. 2310/16/DEDC /179 Dated. 24/03/2017 1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB 2. Region : Southern 3. Name of the Entity : M/s.Sri Sarvana Spinning Mills Unit II HTSC 179 4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 179) 5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/11KV Renganathapuram SS 6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE 7. Max. MW ceiling allowed for Drawal* : 2.52MW from 00:00 To 24:00 Hrs at Drawal Point (* SLDCs may specify different MW ceilings for different time blocks, if required.) 8. Validity Period : From 28-03-17 To 27-04-17 9. Transmission losses (besides Regional Transmission losses) Whether Applicable or not (Yes/No) (%) loss State Transmission losses Yes 3.44% Distribution Licensees losses Any other losses 10. Transmission charges (besides Regional Transmission charges) Whether Applicable or not (Yes/No) Rate (Rs./MWh) State Transmission Charges Yes Rs.120.97/MWh Distribution Licencees Any other charges/ Operating charges Yes Rs. 2000 Rs/Day Declaration: It is hereby certified that: We have “No Objection” to seeking and availing Open Access by M/s.Sri Sarvana Spinning Mills Unit II HTSC 179, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of CERC/TNERC. We have the required infrastructure for energy metering and time block wise accounting in place. The State/ Distribution licensee network has the required transfer capability for transfer of power as per specified ceiling. The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for the State Load Despatch Centers shall be directly settled by Power Exchange with us. The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible for timely payment of State’s composite dues into the Regional Pool Account. Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be determined by us and will be covered in the intra-State UI accounting scheme, or as applicable. The Reactive Energy Charges shall be governed by the Regulations applicable within the State. We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the State Transmission Utility /Distribution Licensee directly. We shall inform the total import and export capability of the State as a whole to all concerned. Attempt shall be made to declare this in advance through our website. Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such cases, the Power Exchange(s) shall also be informed simultaneously. Date: 24/03/2017 /Sd/24/03/2017****** Client ID #REF! Executive Engineer / ABT, O/o.SE/LD&GO, TANTRANSCO, A Subsidiary of TNEB Limited

FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

Embed Size (px)

Citation preview

Page 1: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2310/16/DEDC /179 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Sri Sarvana Spinning Mills Unit II HTSC 179

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 179)

5. Point(s) of Connection : TNEB 11 KV Industrial Feeder of 110/11KV

Renganathapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.52MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Sri Sarvana Spinning Mills Unit

II HTSC 179, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 2: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2311/16/MdEDC-M /36 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Madura Coats Private Ltd HTSC 36

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 36)

5. Point(s) of Connection : TNEB 33KV Mill feeder of 110/33-11 KV Arasaradi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 5MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Madura Coats Private Ltd

HTSC 36, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 3: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2312/16/MEDC /17 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Seshasayee Paper and Board Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 17)

5. Point(s) of Connection : TNEB 110 KV Bhavani Kattalai Barriage 1 Feeder of

110/11KV BKB SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 13MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 1.73%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Seshasayee Paper and Board

Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 4: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2313/16/CBE-SEDC /13 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Super Sales India Ltd, (HTSC 13),

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 13)

5. Point(s) of Connection : TNEB 22KV Arisipalayam feeder of 110/22KV

O.K.Mandapam SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 29-03-17 To 28-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Super Sales India Ltd, (HTSC

13),, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 5: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2314/16/UEDC /306 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.patspin India Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 306)

5. Point(s) of Connection : TNEB 110kv Ponnapuram feeder of 230/110kv Udumalpet

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.95MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 1.73%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.patspin India Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 6: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2315/16/UEDC /134 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s GTN Enterprises Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 134)

5. Point(s) of Connection : TNEB 22KV GTN feeder of 110/22KV Palappampatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.61MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s GTN Enterprises Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 7: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2316/16/VEDC /223 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Vijai spinners

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 223)

5. Point(s) of Connection : TNEB 11KV U3 feeder of 110/11kv Mudangiyar SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Vijai spinners, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 8: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2317/16/TvEDC /207 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.SPB Papers Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 207)

5. Point(s) of Connection : TNEB 110kv subburaj feeder of 110/11kv O Thulukkapatti

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 26-03-17 To 25-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 1.73%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.SPB Papers Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 9: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2318/16/CEDC-N /1030 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s MRF Ltd, (HTSC 1030),

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1030)

5. Point(s) of Connection : TNEB 33KV ICI feeder of 110/33-11KV Ennore SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.1MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 26-03-17 To 25-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s MRF Ltd, (HTSC 1030),,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 10: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2319/16/UEDC /155 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Super Sales India Ltd, (HTSC 155),

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 155)

5. Point(s) of Connection : TNEB 22KV Puliambattu feeder of 110/22KV Pollachi SS.

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Super Sales India Ltd, (HTSC

155),, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 11: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2320/16/SEDC /148 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Steel Authority of India Ltd,Salem Steel Plant

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 148)

5. Point(s) of Connection : TNEB 230KV Steel Plant feeder of 400 / 230KV K R

Thoppur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 25MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 0.76%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Steel Authority of India

Ltd,Salem Steel Plant, through Power Exchange upto the MW ceiling as specified above, in accordance

with applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 12: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2321/16/SEDC /274 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Steel Authority of India Ltd,Salem Steel Plant

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 274)

5. Point(s) of Connection : TNEB 230kv steel plant feeder of 400/230kv Thoppur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 13MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 0.76%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Steel Authority of India

Ltd,Salem Steel Plant, through Power Exchange upto the MW ceiling as specified above, in accordance

with applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 13: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2322/16/CEDC-S /803 Dated. 24/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Sutherland Global Services (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 803)

5. Point(s) of Connection : TNEB 11 Kv Tansi Nagar of 110 KV Velachery SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.17MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Sutherland Global Services (P)

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 24/03/2017

/Sd/24/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 14: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2323/16/MEDC /246 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.R G Spinning Mills Ltd HTSC 246

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 246)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder of 110/22kv Sankari SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.R G Spinning Mills Ltd HTSC

246, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 15: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2324/16/ChEDC /582 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Pyung HWA India Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 582)

5. Point(s) of Connection : TNEB 11kv Palnallur feeder of 230/110-11kv Mambakkam

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.5MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 26-03-17 To 25-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Pyung HWA India Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 16: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2325/16/CBE-NEDC /329 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.JS Auto Cast Foundry (I) Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 329)

5. Point(s) of Connection : TNEB 22kv JS Auto cast feeder of 110/22kv Kovilpalayam

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.93MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.JS Auto Cast Foundry (I) Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 17: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2326/16/CBE-NEDC /228 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Sakthi Auto Ancillary Private Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 228)

5. Point(s) of Connection : TNEB 22kv Mill feeder of 110/22kv Keerantham SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.42MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Sakthi Auto Ancillary Private

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 18: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2327/16/VelEDC /1180 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s MRF Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1180)

5. Point(s) of Connection : TNEB 33 KV Dedicated feeder of 110/33-11KV Mosur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s MRF Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 19: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2328/16/VelEDC /1199 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s MRF Ltd 1199

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 1199)

5. Point(s) of Connection : TNEB 33 KV Dedicated feeder of 110/33-11KV Mosur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.5MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s MRF Ltd 1199, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 20: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2329/16/PrEDC /81 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s MRF Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 81)

5. Point(s) of Connection : TNEB 110 KV Sirvachur feeder of Perambalur 230KV Auto

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 8MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 1.73%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s MRF Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 21: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2330/16/KrEDC /158 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Deccan Alloys pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 158)

5. Point(s) of Connection : TNEB 11kv TTK feeder of 110/11kv Zuzuvadi SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.13MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 30-03-17 To 29-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Deccan Alloys pvt Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 22: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2331/16/ChEDC /588 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.TIMKEN Engineering & Research India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 588)

5. Point(s) of Connection : TNEB 33KV MRV feeder of 230KV Veerapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 27-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.TIMKEN Engineering &

Research India Pvt Ltd, through Power Exchange upto the MW ceiling as specified above, in

accordance with applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

FORMAT: PX-I

Page 23: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2332/16/ChEDC /917 Dated. 25/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s J.K.Tyre and Industries Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 917)

5. Point(s) of Connection : TNEB 110KV S.P.Koil-Kadaperi feeder II of 230/110KV

S.P.Koil SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 10MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 1.73%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s J.K.Tyre and Industries Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 25/03/2017

/Sd/25/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 24: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2333/16/VEDC /65 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Valli Textile Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 65)

5. Point(s) of Connection : TNEB 11 KV Valli Mill Feeder of 110/11KV N.

Subbaiahpuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 3.899MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Valli Textile Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 25: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2334/16/TEDC /227 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Loyal Textile Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 227)

5. Point(s) of Connection : TNEB 33KV loyal mill Feeder of 110/33-11 Kovilpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.51MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Loyal Textile Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 26: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2335/16/SiEDC /70 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Loyal Textile Mills Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 70)

5. Point(s) of Connection : TNEB 22 KV Mill Feeder of 110/22KV Arasanur SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.3MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Loyal Textile Mills Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 27: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2336/16/CdEDC /64 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s. Strides Shasun Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 64)

5. Point(s) of Connection : TNEB 22kv Pentasia feeder of 110/22kv Semmankuppam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s. Strides Shasun Ltd, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 28: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2337/16/VEDC /292 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Valli Textile Mills

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 292)

5. Point(s) of Connection : TNEB 11kv Industrial feeder of 110/11kv N.Subbiahpuram

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.739MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Valli Textile Mills, through

Power Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 29: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2338/16/ChEDC /491 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s perfetti Van Melle India Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 491)

5. Point(s) of Connection : TNEB 11KV Police Acadamy feeder

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 28-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s perfetti Van Melle India Pvt

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 30: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2339/16/ChEDC /153 Dated. 28/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Delphi-TVS Diesel System (P) Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 153)

5. Point(s) of Connection : TNEB 33KV Mannur feeder of 110/33-11KV Sriperumbudur

SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 29-03-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Delphi-TVS Diesel System (P)

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 28/03/2017

/Sd/28/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 31: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2340/16/ChEDC /668 Dated. 31/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Sundram Auto components Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 668)

5. Point(s) of Connection : TNEB 33kv Delphi TVS feeder of 230/110/33-11kv

Oragadam SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.2MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-04-17 To 25-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Sundram Auto components Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 31/03/2017

/Sd/31/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 32: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2341/16/TvEDC /210 Dated. 31/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.ATC Tires Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 210)

5. Point(s) of Connection : TNEB 33kv feeder of 110/33-11kv Gangaikondan SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 4.633MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-04-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.ATC Tires Ltd, through Power

Exchange upto the MW ceiling as specified above, in accordance with applicable regulations of

CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 31/03/2017

/Sd/31/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 33: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2342/16/ChEDC /603 Dated. 31/03/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Young Brand Apparel Pvt Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 603)

5. Point(s) of Connection : TNEB 11KV Industrial feeder of 33/11KV Nelvoy SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 01-04-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Young Brand Apparel Pvt Ltd,

through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 31/03/2017

/Sd/31/03/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 34: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2343/16/KgEDC /122 Dated. 05/04/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s Sundaram Auto Components Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 122)

5. Point(s) of Connection : TNEB 11kv Talli feeder of 110/33/11kv Kempatty SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.8MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 06-04-17 To 28-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s Sundaram Auto Components

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 05/04/2017

/Sd/05/04/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 35: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2344/16/MEDC /272 Dated. 05/04/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Sri Vinayakha Spinning Mills Private Limited

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 272)

5. Point(s) of Connection : TNEB 22KV Perumpallam feeder of 110/22KV Veppadai SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 1.12MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 06-04-17 To 27-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.07%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Sri Vinayakha Spinning Mills

Private Limited, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 05/04/2017

/Sd/05/04/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/LD&GO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 36: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2345/16/TEDC /2 Dated. 11/04/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s The Lakshmi Mills Company Ltd

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 2)

5. Point(s) of Connection : TNEB 11KV Mill feeder of 110/11KV Kovilpatti SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 0.87MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 13-04-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 3.44%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s The Lakshmi Mills Company

Ltd, through Power Exchange upto the MW ceiling as specified above, in accordance with applicable

regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 11/04/2017

/Sd/11/04/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited

Page 37: FORMAT: PX-I “Standing Clearance” / “No Objection Certificate”tnebldc.org/collectivetransaction/MAR17-APR17/NOCRENEWAL-MAR-A… · “Standing Clearance” / “No Objection

FORMAT: PX-I

“Standing Clearance” / “No Objection Certificate” <<Format in which Standing Clearance/NOC to be given by SLDCs to a State Utility or intra-state Entity for submission

to Power Exchanges>>

NOC No. 2346/16/VEDC /249 Dated. 19/04/2017

1. Name of the SLDC issuing NOC : SLDC / Chennai / TNEB

2. Region : Southern

3. Name of the Entity : M/s.Sri Parameswari Spinning Mills Ltd HTSC 249

4. Status of Entity (e.g.; State Utility/CPP/IPP/Discom etc.) : HT Consumer (HTSC 249)

5. Point(s) of Connection : TNEB 33KV Mill Feeder of Velayudhapuram SS

6. Max. MW ceiling allowed for Injection* : NOT APPLICABLE

7. Max. MW ceiling allowed for Drawal* : 2.7MW from 00:00 To 24:00 Hrs

at Drawal Point

(* SLDCs may specify different MW ceilings for different time blocks, if required.)

8. Validity Period : From 19-04-17 To 26-04-17

9. Transmission losses (besides Regional Transmission losses)

Whether Applicable or not (Yes/No) (%) loss

State Transmission losses Yes 2.05%

Distribution Licensees losses

Any other losses

10. Transmission charges (besides Regional Transmission charges)

Whether Applicable or not (Yes/No) Rate (Rs./MWh)

State Transmission Charges Yes Rs.120.97/MWh

Distribution Licencees

Any other charges/ Operating

charges

Yes Rs. 2000 Rs/Day

Declaration:

It is hereby certified that:

We have “No Objection” to seeking and availing Open Access by M/s.Sri Parameswari Spinning Mills

Ltd HTSC 249, through Power Exchange upto the MW ceiling as specified above, in accordance with

applicable regulations of CERC/TNERC.

We have the required infrastructure for energy metering and time block wise accounting in place. The

State/ Distribution licensee network has the required transfer capability for transfer of power as per

specified ceiling.

The Transmission Charges for the use of State/Distribution Licensee network and Operating Charges for

the State Load Despatch Centers shall be directly settled by Power Exchange with us.

The State Utility designated for the purpose of collection/disbursement of UI charges shall be responsible

for timely payment of State’s composite dues into the Regional Pool Account.

Any mismatch between the Scheduled and Actual drawal/injection for the intra-State Entity shall be

determined by us and will be covered in the intra-State UI accounting scheme, or as applicable.

The Reactive Energy Charges shall be governed by the Regulations applicable within the State.

We shall disburse the Transmission Charges for use of the State/Distribution Licensee Network to the

State Transmission Utility /Distribution Licensee directly.

We shall inform the total import and export capability of the State as a whole to all concerned. Attempt

shall be made to declare this in advance through our website.

Any change in the contents of the Standing Clearance/NOC shall be conveyed to the party to whom

Standing Clearance/NOC was given, latest by 10 Hrs. of the day prior to the day of transaction. In such

cases, the Power Exchange(s) shall also be informed simultaneously.

Date: 19/04/2017

/Sd/19/04/2017******

Client ID #REF! Executive Engineer / ABT,

O/o.SE/OA&CO, TANTRANSCO,

A Subsidiary of TNEB Limited