AP2-Debuncher AP2-Debuncher Injection Area 2004 Injection Area 2004 Shutdown Work Shutdown Work August 2, 2004

AP2-Debuncher Injection Area 2004 Shutdown Work

  • Upload
    tuan

  • View
    31

  • Download
    0

Embed Size (px)

DESCRIPTION

AP2-Debuncher Injection Area 2004 Shutdown Work. August 2, 2004. What’s Today For?. Will the modifications reduce the beam steering hazards and ease injection tuning? What rare the physical risks to the Debuncher components? - PowerPoint PPT Presentation

Citation preview

Page 1: AP2-Debuncher Injection Area 2004 Shutdown Work

AP2-Debuncher Injection AP2-Debuncher Injection Area 2004 Shutdown WorkArea 2004 Shutdown Work

August 2, 2004

Page 2: AP2-Debuncher Injection Area 2004 Shutdown Work

What’s Today For?What’s Today For?

• Will the modifications reduce the beam steering hazards and ease injection tuning?

• What rare the physical risks to the Debuncher components?

• Do the modifications allow for easy/quick retreat if there are problems after attempting beam?

Page 3: AP2-Debuncher Injection Area 2004 Shutdown Work

What’s happening?What’s happening?• Injection Septum

– Modification of removing material between Closed Orbit and Injection Channel

• Decreases amount of closed orbit bump • Common vacuum eliminates air gap and vacuum

windows

– Vertical motion of stand • Will use to center injection channel on beam

• D4Q4 SQC replacement with 2 LQBs– Injection orbit path designed to skim top of

extended lobe star beam tube inside SQC– LQBs allow larger beam tube.

Page 4: AP2-Debuncher Injection Area 2004 Shutdown Work

What’s happening?What’s happening?• D4Q4 BPM

– Injection orbit path designed to skim large BPM.– Move BPM downstream where injection orbit is

closer to closed orbit.

• Injection Kicker– Motorizing stand to center upon beam

• Larger beam tube through LQs (4Q5 and new 4Q4 pair)– Replacing two separate pipes thru D4Q5– New pipe will nestle up into coils as far as

possible

Page 5: AP2-Debuncher Injection Area 2004 Shutdown Work

Beam Pipes into D4Q5

Page 6: AP2-Debuncher Injection Area 2004 Shutdown Work

Separate Pipes into D4Q5

Page 7: AP2-Debuncher Injection Area 2004 Shutdown Work

Two pipes out of D4Q5

Page 8: AP2-Debuncher Injection Area 2004 Shutdown Work

Two pipes in D4Q5

Page 9: AP2-Debuncher Injection Area 2004 Shutdown Work

Current ISEP

Page 10: AP2-Debuncher Injection Area 2004 Shutdown Work

Modified ISEP with Beam Tube

Page 11: AP2-Debuncher Injection Area 2004 Shutdown Work

Modified ISEP & Characters

Page 12: AP2-Debuncher Injection Area 2004 Shutdown Work

ISEP-Gap-Bellows-BPM-SQC Quad

Page 13: AP2-Debuncher Injection Area 2004 Shutdown Work

Current BPM & SQC Star Chamber

Page 14: AP2-Debuncher Injection Area 2004 Shutdown Work

SQC & LQB marks on floor

Page 15: AP2-Debuncher Injection Area 2004 Shutdown Work

SQC & VT403; more LQB marks

Page 16: AP2-Debuncher Injection Area 2004 Shutdown Work

D4Q3 & IKIK

Page 17: AP2-Debuncher Injection Area 2004 Shutdown Work

Latt

ice

with

LQ

Bs

C

urre

nt L

attic

e

505.3220

Sun Aug 01 18:40:59 2004 OptiM - MAIN: - Z:\TakeHome\AP2_Deb_2004Jul\DEB.opt

25

0

50

BE

TA

_X

&Y

[m]

DIS

P_

X&

Y[m

]

BETA_X BETA_Y DISP_X DISP_Y

Debuncher

505.3220

Sun Aug 01 19:07:45 2004 OptiM - MAIN: - Z:\TakeHome\AP2_Deb_LQB\DEB.opt

25

0

50

BE

TA_

X&

Y[m

]

DIS

P_

X&

Y[m

]

BETA_X BETA_Y DISP_X DISP_Y

Page 18: AP2-Debuncher Injection Area 2004 Shutdown Work

Latt

ice

with

LQ

Bs

C

urre

nt L

attic

e

290.3420

Sun Aug 01 18:45:36 2004 OptiM - MAIN: - Z:\TakeHome\AP2_Deb_2004Jul\AP2.opt

10

00

3-3

BE

TA_

X&

Y[m

]

DIS

P_

X&

Y[m

]

BETA_X BETA_Y DISP_X DISP_Y

290.3420

Sun Aug 01 18:51:23 2004 OptiM - MAIN: - Z:\TakeHome\AP2_Deb_LQB\AP2.opt

10

00

3-3

BE

TA

_X

&Y

[m]

DIS

P_

X&

Y[m

]

BETA_X BETA_Y DISP_X DISP_Y

AP2

Page 19: AP2-Debuncher Injection Area 2004 Shutdown Work

Non-Mechanical Tunnel WorkNon-Mechanical Tunnel Work• Power Supply

– 1200A PS available; ready to move to AP50

• Cable Pulls and Terminations– LQBs power, – Stand motors, – new BPM, – moving BPM(?), – ion pumps, – gate valve

• Water (LCW)– Power supply– LQBs

From D. VanderMeulen

Page 20: AP2-Debuncher Injection Area 2004 Shutdown Work

Non-Tunnel WorkNon-Tunnel Work• Controls/ACNET

– LQBs: Setting & Readback– ISEP motion control by old CAMAC interface– IKIK motion control by PLC

• Console Applications/ Software– LQBs

• P102: Modify bus cycling software• P60: Modify tune mults that currently uses D4Q4 shunt

– New Ion Pumps & Gate Valve• Add to P17 & P18

– LQB, VT403, & Debuncher BPM positions• P144: Debuncher orbit correction program

– New BPM and moved SEM• Yet to be written AP2 BPM DAQ and orbit correction program

From D. VanderMeulen