Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
APPENDIX 8.4 Hydrology/Water Quality Documentation
PRELIMINARY HYDROLOGY STUDY Vesting Tentative Tract Map 17980 929 Baker Street Costa Mesa, California Prepared For:
Contact: Alan Toffoli Prepared By:
6 Orchard, Suite 200 Lake Forest, California 92630 Contact: Dane McDougall, P.E. (949) 916-3800 November 13th, 2015
i
TABLE OF CONTENTS
Acknowledgement and Signature Page……………………………..ii I. Introduction……………………….………………………………….....1 II. Methodology…………………………………………………………....1 III. Design Parameters...…………………………………………………..2 IV. Conclusion……………………………………………………………....2 V. References……………………………………………………………...3
APPENDICES
A. Soils Map
B. Hydrology Study
1. Pre-Developed Condition
i. 100-Yr Storm Event Study Form
ii. 25-Yr Storm Event Study Form
2. Post-Developed Condition
i. 100-Yr Storm Event Study Form
ii. 25-Yr Storm Event Study Form
Exhibits: 1. Existing Hydrology Map 2. Developed Hydrology Map 3. As-Built Plans
ii
PRELIMINARY HYDROLOGY STUDY Vesting Tentative Tract Map 17980
929 Baker St. Costa Mesa, California
ACKNOWLEDGEMENT AND SIGNATURE PAGE This Hydrology Study prepared by C&V Consulting, Inc. under the supervision of Dane McDougall, P.E. License ___________________________________ __________ Dane McDougall, PE 80705 Date C&V Consulting, Inc.
1
INTRODUCTION The proposed project consists of development of 56 two -story condominium units as part of Tract 17980. The site is currently comprised of Baker Security Self Storage facility containing one commercial building and associated parking lot. In the existing condition, the project site is relatively flat with an overall slope ranging approximately from 0.5% - 2%. Surface flow is conveyed to an existing concrete gutters which run south to north on each side of the building to private storm drain inlets adjacent to Baker Street. Flows are conveyed offsite to the existing storm drain system located at the approximate centerline of Baker Street. Underground storm facilities will be proposed for the site. Storm water runoff in the project’s proposed state will surface flow to onsite catch basins prior to being conveyed to the existing 72-inch RCP storm drain pipe within Baker Street. VICINITY MAP
2
METHODOLOGY / RATIONALE The proposed drainage area was analyzed by utilizing the County of Orange Hydrology Manual modified rational method (1986). In the Pre and Post development conditions, the site drains to the same storm drain system in Baker Street. Therefore, only one drainage area is proposed for the site. During future engineering efforts additional proposed hydrologic boundaries may be defined to assist in the hydraulic design of inlets and pipe sizes. In accordance with County and City requirements, the 25-year and 100-year storm events were analyzed. The flows, expressed in cubic feet per second (cfs), were totaled at points where they will flow over the right-of-way in a major storm event. On-site flows will travel through swales and gutters to catch basins that drain to the proposed on-site storm drain system. This storm drain is conveyed to the existing storm drain system in Baker Street. DESIGN PARAMETERS
1. The onsite drainage area was analyzed for 25 and 100-year storm events using Rational Method Analysis per the County of Orange Hydrology Manual.
2. The drainage area is located in Soil Groups D. Refer to Appendices for reference.
3. The rainfall intensity for all of the storm events varies according to Figure B-3 (page B-7) of the Hydrology Manual.
4. The infiltration rate for the pervious area, Fp, is 0.20 inches/hour per Table C.2 in Section C.6.4. of the Orange County Hydrology Manual.
5. The proposed drainage condition will match the existing drainage condition being conveyed to existing storm drain system within Baker Street. Nuisance flows will be captured and treated as outlined in the proposed WQMP with pipes sized to accommodate the 25-year event, but major storm events will spill over into the right-of-way eventually draining to existing storm drain pipe.
6. All flows are based on the complete future development of land and roads.
7. The Hydrology Maps attached to the back of this study are made a part of the study.
8. No pre-existing or post-development off-tract flow is being directed toward the proposed storm drain.
3
CONCLUSIONS The results from this hydrology and hydraulic analysis demonstrate the following:
The drainage design for the Site has been designed to meet the County of Orange Flood Control Standards.
The proposed site design is capable of managing runoff from a 100-year storm.
The decrease in flow rate between Pre & Post Development is a 10% decrease (1.37 cfs).
Total Area (Acres)
25‐Yr Storm Event (CFS)
100‐Yr Storm Event (CFS)
Existing 4.63 11.40 14.82
Proposed 4.63 10.30 13.45
4
REFERENCES
1. County of Orange, “Hydrology Manual” dated January 1999.
2. Orange County Public Works Land Records, 2015.
http://landrecords.ocpublicworks.com/ocsl/
3. Advanced Engineering Systems. HydroWIN 7 Version 2011.
APPENDIX “A” - SOILS MAP
APPENDIX “B” – Hydrology Calculations
RATIONAL METHOD STUDY FORM
Orange County STUDY NAME: Baker Costa Mesa CALCULATED BY: JC DATE: November 2015
25/100 YEAR STORM RATIONAL METHOD STUDY CHECKED BY: DPM DATE: November 2015
HYDROLOGY MANUAL PAGE 1 OF 1
CONC. PT. AREA (ACRES) SOIL DEV. Tt Tc I Fm Q FLOW SLOPE V HYDRAULICS AND
(MAP AREA) SUBAREA TOTAL TYPE (Ap) MIN. MIN. in/hr in/hr TOTAL PATH, FT FT/FT FT/SEC NOTES
Proposed Area
A1 4.63 4.63 D 0.35 15 2.54 0.070 10.30 501 0.004 25 year
A1 4.63 4.63 D 0.35 15 3.30 0.070 13.45 501 0.004 100 year
Existing Area
X1 4.63 4.63 D 0.11 13 2.76 0.022 11.40 275 0.0036 25 year
X1 4.63 4.63 D 0.11 13 3.58 0.022 14.82 275 0.0036 100 year
NOTES: I(t) = at^b a=11.995,15.560, b=-0.573; C = 0.90 ; Q = C*(I - Fm)*A; Fm=Ap*Fp; Fp=0.20 (Soil D, OC Soils Map)
Pre-Development Time of Concentration Nomograph
Post-Development Time of Concentration Nomograph
EXHIBITS – Hydrology Maps (Pre & Post Development)
PRE-DEVELOPMENT
CITY OF COSTA MESA
VTTM 17980 HYDROLOGY STUDY
SCALE: 1"=60'
LEGEND:
POST-DEVELOPMENT
CITY OF COSTA MESA
VTTM 17980 HYDROLOGY STUDY
SCALE: 1"=60'
LEGEND:
910111213141578
56 3 241
WQ XX-XXXX
Preliminary Water Quality Management
Plan (WQMP)
Project Name:
VTTM 17980
929 Baker Street
Costa Mesa, California
Prepared for:
DeNova Homes, Inc.
Three Hughes
Irvine, CA 92618
(949) 762-2535
Prepared by:
Engineer _Dane P. McDougall_ Registration No._C 80705_
6 Orchard Suite 200
Lake Forest, CA 92630
(949) 916-3800
Date Prepared: November 2015
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Owner’s Certification Page i
This Water Quality Management Plan (WQMP) has been prepared for DeNova Homes, Inc. by C&V Consulting, Inc.. The WQMP is intended to comply with the requirements of the County of Orange NPDES Stormwater Program requiring the preparation of the plan.
The undersigned, while it owns the subject property, is responsible for the implementation of the provisions of this plan , including the ongoing operation and maintenance of all best management practices (BMPs), and will ensure that this plan is amended as appropriate to reflect up-to-date conditions on the site consistent with the current Orange County Drainage Area Management Plan (DAMP) and the intent of the non-point source NPDES Permit for Waste Discharge Requirements for the County of Orange, Orange County Flood Control District and the incorporated Cities of Orange County within the Santa Ana Region. Once the undersigned transfers its interest in the property, its successors-in-interest shall bear the aforementioned responsibility to implement and amend the WQMP. An appropriate number of approved and signed copies of this document shall be available on the subject site in perpetuity.
Owner: Alan Toffoli
Title SoCal Division President
Company DeNova Homes, Inc.
Address Three Hughes, Irvine, CA 92618
Email [email protected]
Telephone # 949-762-2535
I understand my responsibility to implement the provisions of this WQMP including the ongoing operation and maintenance of the best management practices (BMPs) described herein.
Owner Signature
Date
Project Owner’s Certification Planning Application No. (If applicable)
TBD Grading Permit No. TBD
Tract/Parcel Map and Lot(s) No.
VTTM 17980 Building Permit No. TBD
Address of Project Site and APN (If no address, specify Tract/Parcel Map and Lot Numbers)
APN: 141‐242‐03
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Owner’s Certification Page ii
Preparer (Engineer): Dane McDougall
Title Project Manager PE Registration # C 80705
Company C&V Consulting, Inc.
Address 6 Orchard, Lake Forest, CA 92630
Email [email protected]
Telephone # (949) 916-3800
I hereby certify that this Water Quality Management Plan is in compliance with, and meets the requirements set forth in, Order No. R8-2009-0030/NPDES No. CAS618030, of the Santa Ana Regional Water Quality Control Board.
Preparer Signature
Date
Place
Stamp
Here
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Table of Contents Page iii
Contents Page No.
Section I Permit(s) and Water Quality Conditions of Approval or Issuance .......... 1
Section II Project Description .................................................................................. 3
Section III Site Description ........................................................................................ 9
Section IV Best Management Practices (BMPs) ...................................................... 13 Section V Inspection/Maintenance Responsibility for BMPs ................................. 25 Section VI BMP Exhibit (Site Plan) .......................................................................... 27 Section VII Educational Materials ............................................................................. 28
Attachments Attachment A . .................................................................................. Educational Materials
Attachment B….. ............................................................................. Site and Drainage Plan
Attachment C…. .................................................. Worksheets from County of Orange TGD
Attachment D…. ......................... Reference Exhibits/Figures from County of Orange TGD
Attachment E…. ........................................................................ BMP Fact Sheets & Details
Attachment F…. ......................................................................... 2-Year HCOC Calculations
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section I Page 1
Section I Permit(s) and Water Quality Conditions of Approval or Issuance
Provide discretionary or grading/building permit information and water quality conditions of approval, or permit issuance, applied to the project. If conditions are unknown, please request applicable conditions from staff. Refer to Section 2.1 in the Technical Guidance Document (TGD) available on the OC Planning website (ocplanning.net).
Project Infomation
Permit/Application No. (If applicable)
TBD Grading or Building Permit No. (If applicable)
TBD
Address of Project Site (or Tract Map and Lot Number if no address) and APN
929 Baker St Costa Mesa, CA APN: 141-242-03
Water Quality Conditions of Approval or Issuance
Water Quality Conditions of Approval or Issuance applied to this project. (Please list verbatim.)
Conditions of Approval are not available at this time. This section will be
completed as part of final engineering
Conceptual WQMP
Was a Conceptual Water Quality Management Plan previously approved for this project?
N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section I Page 2
Watershed-Based Plan Conditions
Provide applicable conditions from watershed - based plans including WIHMPs and TMDLS.
N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 3
Section II Project Description
II.1 Project Description
Provide a detailed project description including:
Project areas;
Land uses;
Land cover;
Design elements;
A general description not broken down by drainage management areas (DMAs).
Include attributes relevant to determining applicable source controls. Refer to Section 2.2 in the Technical Guidance Document (TGD) for information that must be included in the project description.
Description of Proposed Project
Development Category (From Model WQMP, Table 7.11-2; or -3):
All significant redevelopment projects, where significant redevelopment is defined as the addition or replacement of 5,000 or more square feet of impervious surface on an already developed site. Redevelopment does not include routine maintenance activities that are conducted to maintain original line and grade, hydraulic capacity, original purpose of the facility, or emergency redevelopment activity required to protect public health and safety.
If the redevelopment results in the addition or replacement of less than 50% of the impervious area on-site and the existing development was not subject to WQMP requirement, the numeric sizing criteria discussed in Section 7.11-2.0 only applies to the addition or replacement area. If addition or replacement accounts for 50 percent or more of the impervious area, the Project WQMP requirements apply to the entire development.
Project Area (ft2): 201,683 Number of Dwelling Units: 56 SIC Code: N/A
Project Area Pervious Impervious
Area (acres or sq ft)
Percentage Area
(acres or sq ft) Percentage
Pre-Project Conditions 0 ac 0% 4.63 ac 100%
Post-Project Conditions 1.44 ac 31% 3.20 ac 69%
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 4
Drainage Patterns/Connections
In its existing condition, the project site is relatively flat with site elevations
ranging from 41.9 feet above mean sea level to about 39.3 feet above mean sea
level. Surface flow from the site is directed into 2 ft wide concrete gutters that
run south to north. Flows are conveyed into 2 grate inlets at the end of those
gutters, which then are piped offsite into the existing 66” RCP storm drain pipe
in Baker Street, which flows from west to east. That 66” RCP joins a junction
structure then up‐scales to a 72” RCP pipe. This transition occurs along our
project frontage.
In its proposed condition, underground storm facilities will be installed onsite.
The street slopes onsite will convey the flows to 5 separate areas. Surface flows
will be directed into an area drain piping system or into onsite curb and gutters
which will convey the flow to 5 separate Filterra Biofiltration vaults. From each
vault, the flows are conveyed into a single storm drain pipe that runs from south
to north through our proposed main street. This single pipe will run out into
Baker street and connect to the existing 72” RCP storm drain pipe. From there it
will follow the existing flow path to the east down Baker Street.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 5
Narrative Project Description:
(Use as much space as necessary.)
At the time of the preparation of this Preliminary WQMP report, the City only
required a Tentative Tract Map, Preliminary Grading & Utility Plan, Preliminary
Fire Access Plan, and Preliminary Hydrology Report to support the Planning
Application of the Tentative Tract Map subdivision. The information detailed in
this report is based on preliminary engineering design only. The total site
acreage consists of approximately 4.63 acres of a residential detached
condominium development.
The existing site is currently occupied by a self‐storage facility with 1 one‐story
storage building with an asphalt parking lot surrounding the building. All
related buildings, improvements, and utilities will be removed during demolition
of the site.
The proposed residential development will consist of 56 detached condominium
units. Each residential condo unit is 2 stories.
The proposed residential development proposes among three plan types for each
individual unit. Each unit will be equipped with water and sewer services. Also
attributed to each unit will be a washer/dryer connections and 2‐car garage.
Trash services are individually picked up as there are no trash enclosure areas
located on site. In addition to the garage parking, there will be an additional 2‐
car parking spaces in each driveway and 8 more outdoor parking spaces are
proposed. Building, walkway and driveway coverage is approximately 41%.
Streets and alley coverage is approximately 20% with approximately 80,016
square feet of open space. There is a designated 0.23 acre open area proposed on
the project site.
The improvements which this residential project proposes include private drive
aisles, parking areas, hardscaped and landscaped areas. The site shall be
accessed by one main entrance located at the north frontage of the site at Baker
Street. Drive aisles and parking areas will consist of asphalt pavement and
portland concrete cement (PCC) sidewalks. Landscaping will be incorporated in
open space areas including vegetation and street trees. The project site will be
serviced by an on‐site “public” domestic water and on‐site “public” sanitary sewer
system. The water system will be looped with connections within Baker Street
and Post Road at the south‐west side of the site. The sewer system will also
connect within Post Road.
BMP selection for storm water runoff treatment has been described in Section IV
of this report. Implementation of BMPs will be consistent with the addressing of
pollutants of concern generated by residential use. No car washing, outdoor
storage, or pool/spa will be incorporated on this project. At this time, long term
maintenance is planned to be handled by a Homeowner’s Association (HOA)
During entitlement, these details may change per the City’s request and will be
re‐addressed during final engineering.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 6
II.2 Potential Stormwater Pollutants
Determine and list expected stormwater pollutants based on land uses and site activities. Refer to Section 2.2.2 and Table 2.1 in the Technical Guidance Document (TGD) for guidance.
Pollutants of Concern
Pollutant
Check One for each:
E=Expected to be of concern
N=Not Expected to be of concern
Additional Information and Comments
Suspended-Solid/ Sediment E N
Nutrients E N
Heavy Metals E N
Pathogens (Bacteria/Virus) E N
Pesticides E N
Oil and Grease E N
Toxic Organic Compounds E N
Trash and Debris E N
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 7
II.3 Hydrologic Conditions of Concern
Determine if streams located downstream from the project area are potentially susceptible to hydromodification impacts. Refer to Section 2.2.3.1 in the Technical Guidance Document (TGD) for North Orange County or Section 2.2.3.2 for South Orange County.
No – Show map
Yes – Describe applicable hydrologic conditions of concern below. Refer to Section 2.2.3 in the Technical Guidance Document (TGD).
Per Section 5.3.1 of the Technical Guidance Document, the following calculations were developed:
1. (V 2-year, post/V 2-year, pre) ≤ 1.05
(13,068 cf/30,928 cf) = 0.42 ≤ 1.05*
2. (Tc 2-year, pre / Tc 2-year, post) ≤ 1.05
(13 min/15 min) = 0.87 ≤ 1.05*
*Reference Attachment F for time of concentration and volume information for the 2-year storm event.
The project site does not consider HCOCs as supported by the calculations above.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section II Page 8
II.4 Post Development Drainage Characteristics
Describe post development drainage characteristics. Refer to Section 2.2.4 in the Technical Guidance Document (TGD).
In its proposed condition, underground storm facilities will be installed onsite. The street slopes onsite will
convey the flows to 5 separate areas. Surface flows will be directed into an area drain piping system or into
onsite curb and gutters which will convey the flow to 5 separate Filterra Biofiltration vaults. From each vault,
the flows are conveyed into a single storm drain pipe that runs from south to north through our proposed main
street. This single pipe will run out into Baker street and connect to the existing 72” RCP storm drain pipe.
From there it will follow the existing flow path to the east down Baker Street.
II.5 Property Ownership/Management
Describe property ownership/management. Refer to Section 2.2.5 in the Technical Guidance Document (TGD).
The property is owned by DeNova Homes, Inc. A homeowners association will be formed to be responsible for
the long term maintenance of the project’s Best Management Practices and all common areas.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section III Page 9
Section III Site Description
III.1 Physical Setting
Fill out table with relevant information. Refer to Section 2.3.1 in the Technical Guidance Document (TGD).
Name of Planned Community/Planning Area (if applicable)
City of Costa Mesa
Location/Address 929 Baker St
Costa Mesa, CA 92626
General Plan Land Use Designation
Existing land use: Self-Storage
Proposed land use: Residential
Zoning R2-MD Multiple Family Residential (Medium Density)
Acreage of Project Site 4.63 ac
Predominant Soil Type Per TGD, Figure XVI-2a, NRCS Hydrologic Soils Groups the site is located within soil type D.
III.2 Site Characteristics
Fill out table with relevant information and include information regarding BMP sizing, suitability, and feasibility, as applicable. Refer to Section 2.3.2 in the Technical Guidance Document (TGD).
Site Characteristics
Precipitation Zone The site falls under the 0.75” zone per the TGD, Figure XVI-1, Rainfall Zones map.
Topography The site topography is fairly flat and sheet flows from south to north. The elevation ranges from approximately 41.9 to 39.3 above mean sea level.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section III Page 10
Drainage Patterns/Connections
The existing site is flat in nature with the site sheet flowing overland from south to north.
In its proposed condition, underground storm facilities will be installed onsite.
The street slopes onsite will convey the flows to 5 separate areas. Surface flows
will be directed into an area drain piping system or into onsite curb and
gutters which will convey the flow to 5 separate Filterra Biofiltration vaults.
From each vault, the flows are conveyed into a single storm drain pipe that
runs from south to north through our proposed main street. This single pipe
will run out into Baker street and connect to the existing 72” RCP storm drain
pipe. From there it will follow the existing flow path to the east down Baker
Street.
Soil Type, Geology, and Infiltration Properties
Per the Orange County Soil Survey (NRCS, CA678, 1978), Figure XVI-2a in Appendix XVI of the Model WQMP Technical Guidance Document, the Soil Type for this project site is Type D. Group D soils are typically clay loams, silty clay loams, sandy clays, silty clays, or clays. They have very low infiltration rates when thoroughly wetted and consist chiefly of clay soils with high swelling potential, permanent high water table, claypan or clay layer at or near the surface, and/or shallow soils over nearly impervious material.
A Geotechnical soils report is not available at this time. This section will be finalized as part of final engineering.
Hydrogeologic (Groundwater) Conditions
Per Figure XVI-2e – North Orange County Mapped Shallow Groundwater in Appendix VIII of the Model WQMP Technical Guidance Document, this project site is not located in an area with groundwater less than or equal to 10 feet. Per Figure XVI-2d – North Orange County Mapped Depth To First Groundwater, the depth of groundwater at this project site is historically about 30’ below surface elevation.
A Geotechnical soils report is not available at this time. This section will be finalized as part of final engineering.
Geotechnical Conditions (relevant to infiltration)
A Geotechnical soils report is not available at this time. This section will be completed as part of final engineering.
Off-Site Drainage
In the existing condition, no off‐site drainage enters the property as the
property boundary to the east, west and south is walled off, while the north is
bordered with curb and gutter. Flows along the north boundary slope from
west to east through the curb and gutters on Baker Street. In its proposed
state, the project will mimic these conditions.
Utility and Infrastructure Information
Utilities are proposed to be underground. The proposed development is
designed to convey runoff mostly via surface drainage to the catch basins
located in the center drive aisle. Additional runoff in landscape areas will be
conveyed via small area drain systems which will direct flows to either the
private drive aisles or directly into the catch basin system. The catch basin
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section III Page 11
will then outlet to a proposed storm drain system which will convey flows out
to the 72” storm drain pipe located in Baker Street located north of the project
site. Proposed water and sewer utilities will connect to the respective
mainlines located within Baker Street.
III.3 Watershed Description
Fill out table with relevant information and include information regarding BMP sizing, suitability, and feasibility, as applicable. Refer to Section 2.3.3 in the Technical Guidance Document (TGD).
Receiving Waters
Onsite flows are conveyed east via Baker Street Storm Drain line then turns
and flows south east and into the Paularino Channel, which then directs the
flow east until it converges with the Santa Ana Delphi Channel, which then
outlets into Upper Newport Bay, then ultimately into the Pacific Ocean.
303(d) Listed Impairments
Santa Ana Delphi Channel is listed for Indicator Bacteria.
Upper Newport Bay is listed for Chlordane, Copper, DDT, Metals, Nutrients,
PCBs, Pesticides, Sediment Toxicity, and Sedimentation/Siltation.
Applicable TMDLs TMDLs listed for the Upper Newport Bay include Copper, Indicator Bacteria,
Nutrients, Pesticides, and Sedimentation/Siltation.
Pollutants of Concern for the Project
Anticipated and Potential Pollutants of Concern for Attached Residential
Development is Suspended Solid/Sediments, Pathogens (Bacteria/Virus),
Nutrients (Oxygen Demanding Substances), Pesticides, Oil & Grease and
Trash & Debris.
Environmentally Sensitive and Special Biological Significant Areas
The project is not located within any known Environmentally Sensitive Areas
(ESA) or Areas of Special Biological Significance (ASBS).
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 12
Section IV Best Management Practices (BMPs)
IV. 1 Project Performance Criteria
Describe project performance criteria. Several steps must be followed in order to determine what performance criteria will apply to a project. These steps include:
If the project has an approved WIHMP or equivalent, then any watershed specific criteria must be used and the project can evaluate participation in the approved regional or sub-regional opportunities. (Please ask your assigned planner or plan checker regarding whether your project is part of an approved WIHMP or equivalent.)
Determine applicable hydromodification control performance criteria. Refer to Section 7.II-2.4.2.2 of the Model WQMP.
Determine applicable LID performance criteria. Refer to Section 7.II-2.4.3 of the Model WQMP. Determine applicable treatment control BMP performance criteria. Refer to Section 7.II-3.2.2 of
the Model WQMP. Calculate the LID design storm capture volume for the project. Refer to Section 7.II-2.4.3 of the
Model WQMP.
(NOC Permit Area only) Is there an approved WIHMP or equivalent for the project area that includes more stringent LID feasibility criteria or if there are opportunities identified for implementing LID on regional or sub-regional basis?
YES NO
If yes, describe WIHMP feasibility criteria or regional/sub-regional LID opportunities.
N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 13
Project Performance Criteria
If HCOC exists, list applicable hydromodification control performance criteria (Section 7.II-2.4.2.2 in MWQMP)
Per Section II.3 of this WQMP, HCOCs are not considered.
List applicable LID performance criteria (Section 7.II-2.4.3 from MWQMP)
Per 7.II‐2.4.3 of the Model WQMP, the available LID Treatment BMPs to be utilized in
reducing the post‐development impacts include shallow infiltration, harvest and use,
evapotranspiration, or biotreat/biofilter, of the 85th percentile of a 24‐hour storm
event.
List applicable treatment control BMP performance criteria (Section 7.II-3.2.2 from MWQMP)
Per 7.II‐3.2.2 of the Model WQMP, if the LID performance criteria is not feasibly met
by retention and/or biotreatment, then sizing of onsite treatment control BMPs are
required. Sizing of these treatment control BMPs will include, if applicable, any Water
Quality credits as calculated per the Technical Guidance Document. If the additional
required volume can be met, and has a medium to high effectiveness for reducing the
primary POCs, the project is considered to be in compliance; a waiver application and
participation in an alternative program is not required.
If the cost of providing treatment control BMPs greatly outweighs the pollution
control benefits, a waiver of treatment control and LID requirements can be requested.
Calculate LID design storm capture volume for Project.
N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 14
IV.2. Site Design and Drainage
Describe site design and drainage including A narrative of site design practices utilized or rationale for not using practices; A narrative of how site is designed to allow BMPs to be incorporated to the MEP A table of DMA characteristics and list of LID BMPs proposed in each DMA. Reference to the WQMP “BMP Exhibit.” Calculation of Design Capture Volume (DCV) for each drainage area. A listing of GIS coordinates for LID and Treatment Control BMPs (unless not required by
local jurisdiction).
Refer to Section 2.4.2 in the Technical Guidance Document (TGD).
In its proposed condition, underground storm facilities will be installed onsite. The street slopes onsite will
convey the flows to 5 separate areas. Surface flows will be directed into an area drain piping system or into
onsite curb and gutters which will convey the flow to 5 separate Filterra Biofiltration vaults. From each vault,
the flows are conveyed into a single storm drain pipe that runs from south to north through our proposed main
street. This single pipe will run out into Baker street and connect to the existing 72” RCP storm drain pipe.
From there it will follow the existing flow path to the east down Baker Street.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 15
IV.3 LID BMP Selection and Project Conformance Analysis
Each sub-section below documents that the proposed design features conform to the applicable project performance criteria via check boxes, tables, calculations, narratives, and/or references to worksheets. Refer to Section 2.4.2.3 in the Technical Guidance Document (TGD) for selecting LID BMPs and Section 2.4.3 in the Technical Guidance Document (TGD) for conducting conformance analysis with project performance criteria.
IV.3.1 Hydrologic Source Controls (HSCs)
If required HSCs are included, fill out applicable check box forms. If the retention criteria are otherwise met with other LID BMPs, include a statement indicating HSCs not required.
Name Included?
Localized on-lot infiltration
Impervious area dispersion (e.g. roof top disconnection)
Street trees (canopy interception)
Residential rain barrels (not actively managed)
Green roofs/Brown roofs
Blue roofs
Impervious area reduction (e.g. permeable pavers, site design)
Other:
Other:
Other:
Other:
Other:
Other:
Other:
Other:
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 16
IV.3.2 Infiltration BMPs
Identify infiltration BMPs to be used in project. If design volume cannot be met, state why.
Name Included?
Bioretention without underdrains
Rain gardens
Porous landscaping
Infiltration planters
Retention swales
Infiltration trenches
Infiltration basins
Drywells
Subsurface infiltration galleries
French drains
Permeable asphalt
Permeable concrete
Permeable concrete pavers
Other:
Other:
Show calculations below to demonstrate if the LID Design Strom Capture Volume can be met with infiltration BMPs. If not, document how much can be met with infiltration and document why it is not feasible to meet the full volume with infiltration BMPs.
No infiltration BMP’s will be utilized for this project as infiltration is not feasible for this site.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 17
IV.3.3 Evapotranspiration, Rainwater Harvesting BMPs
If the full Design Storm Capture Volume cannot be met with infiltration BMPs, describe any evapotranspiration and/or rainwater harvesting BMPs included.
Name Included?
All HSCs; See Section IV.3.1
Surface-based infiltration BMPs
Biotreatment BMPs
Above-ground cisterns and basins
Underground detention
Other:
Other:
Other:
Show calculations below to demonstrate if the LID Design Storm Capture Volume can be met with evapotranspiration and/or rainwater harvesting BMPs in combination with infiltration BMPs. If not, document below how much can be met with either infiltration BMPs, evapotranspiration, rainwater harvesting BMPs, or a combination, and document why it is not feasible to meet the full volume with these BMP categories.
Evapotranspiration, Rainwater Harvesting BMPs are not applicable to this project. Required treatment volume
is met with utilization of other BMPs.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 18
IV.3.4 Biotreatment BMPs
If the full Design Storm Capture Volume cannot be met with infiltration BMPs, and/or evapotranspiration and rainwater harvesting BMPs, describe biotreatment BMPs included. Include sections for selection, suitability, sizing, and infeasibility, as applicable.
Name Included?
Bioretention with underdrains
Stormwater planter boxes with underdrains
Rain gardens with underdrains
Constructed wetlands
Vegetated swales
Vegetated filter strips
Proprietary vegetated biotreatment systems
Wet extended detention basin
Dry extended detention basins
Other: Filterra Bio-filtration System
Other:
Show calculations below to demonstrate if the LID Design Storm Capture Volume can be met with infiltration, evapotranspiration, rainwater harvesting and/or biotreatment BMPs. If not, document how much can be met with either infiltration BMPs, evapotranspiration, rainwater harvesting BMPs, or a combination, and document why it is not feasible to meet the full volume with these BMP categories.
Five Filterra Biofiltration Systems (biofiltration chamber system) will be employed for treatment of required
runoff flowrates. The vaults will be in line with the proposed storm drain system and will be located prior to
where the onsite storm drain system enters the existing storm drain system. See calculations in Attachment B:
Worksheet A and D.
Drainage
Management
Area (DMA)
Area (ac)
Design
Flow Rate
(cfs)
BMP Size/Model Treatment Capacity
(cfs)
A1 0.52 0.086 (1) Filterra Bioretention System
4’x10’ FTST 0.093
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 19
A2 085 0.157 (1) Filterra Bioretention System
12’x6’ FTST 0.167
A3 0.85 0.157 (1) Filterra Bioretention System
12’x6’ FTST 0.167
A4 0.85 0.159 (1) Filterra Bioretention System
12’x6’ FTST 0.167
A5 1.56 0.243 (1) Filterra Bioretention System
16’x8’ FTST 0.296
∑ 4.63 0.804
IV.3.5 Hydromodification Control BMPs
Describe hydromodification control BMPs. See Section 5 of the Technical Guidance Document (TGD). Include sections for selection, suitability, sizing, and infeasibility, as applicable. Detail compliance with Prior Conditions of Approval (if applicable).
Hydromodification Control BMPs
BMP Name BMP Description
N/A N/A
IV.3.6 Regional/Sub-Regional LID BMPs
Describe regional/sub-regional LID BMPs in which the project will participate. Refer to Section 7.II-2.4.3.2 of the Model WQMP.
Regional/Sub-Regional LID BMPs
N/A
IV.3.7 Treatment Control BMPs
Treatment control BMPs can only be considered if the project conformance analysis indicates that it is not feasible to retain the full design capture volume with LID BMPs. Describe treatment control BMPs including sections for selection, sizing, and infeasibility, as applicable.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 20
Treatment Control BMPs
BMP Name BMP Description
N/A N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 21
IV.3.8 Non-structural Source Control BMPs
Fill out non-structural source control check box forms or provide a brief narrative explaining if non-structural source controls were not used.
Non-Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
N1 Education for Property Owners, Tenants and Occupants
N2 Activity Restrictions
N3 Common Area Landscape Management
N4 BMP Maintenance
N5 Title 22 CCR Compliance (How development will comply)
N6 Local Industrial Permit Compliance Residential project
N7 Spill Contingency Plan
No hazardous materials expected onsite
N8 Underground Storage Tank Compliance
No storage tanks onsite
N9 Hazardous Materials Disclosure Compliance
No hazardous materials expected onsite
N10 Uniform Fire Code Implementation
N11 Common Area Litter Control
N12 Employee Training
N13 Housekeeping of Loading Docks
Residential project; no loading docks onsite
N14 Common Area Catch Basin Inspection
N15 Street Sweeping Private Streets and Parking Lots
N16 Retail Gasoline Outlets No proposed gasoline outlet
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 22
IV.3.9 Structural Source Control BMPs
Fill out structural source control check box forms or provide a brief narrative explaining if structural source controls were not used.
Structural Source Control BMPs
Identifier Name
Check One If not applicable, state brief
reason Included Not
Applicable
S1 Provide storm drain system stenciling and signage
S2 Design and construct outdoor material storage areas to reduce pollution introduction
No proposed outdoor storage areas
S3 Design and construct trash and waste storage areas to reduce pollution introduction
Individual unit trash collection
S4 Use efficient irrigation systems & landscape design, water conservation, smart controllers, and source control
S5 Protect slopes and channels and provide energy dissipation
No slopes/channels proposed.
Incorporate requirements applicable to individual priority project categories (from SDRWQCB NPDES Permit)
S6 Dock areas Residential project; No docks
S7 Maintenance bays Residential project; No maintenance bays
S8 Vehicle wash areas No proposed vehicle wash areas
S9 Outdoor processing areas No proposed outdoor processing areas
S10 Equipment wash areas No proposed equipment wash areas
S11 Fueling areas Residential project. No proposed fueling areas
S12 Hillside landscaping Project not located within hillside area.
S13 Wash water control for food preparation areas
No proposed food preparation areas.
S14 Community car wash racks No proposed community car wash areas.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 23
IV.4 Alternative Compliance Plan (If Applicable)
IV.4.1 Water Quality Credits
Determine if water quality credits are applicable for the project. Refer to Section 3.1 of the Model WQMP for description of credits and Appendix VI of the Technical Guidance Document (TGD) for calculation methods for applying water quality credits.
Description of Proposed Project Project Types that Qualify for Water Quality Credits (Select all that apply):
Redevelopment projects that reduce the overall impervious footprint of the project site.
Brownfield redevelopment, meaning redevelopment, expansion, or reuse of real property which may be complicated by the presence or potential presence of hazardous substances, pollutants or contaminants, and which have the potential to contribute to adverse ground or surface WQ if not redeveloped.
Higher density development projects which include two distinct categories (credits can only be taken for one category): those with more than seven units per acre of development (lower credit allowance); vertical density developments, for example, those with a Floor to Area Ratio (FAR) of 2 or those having more than 18 units per acre (greater credit allowance).
Mixed use development, such as a combination of residential, commercial, industrial, office, institutional, or other land uses which incorporate design principles that can demonstrate environmental benefits that would not be realized through single use projects (e.g. reduced vehicle trip traffic with the potential to reduce sources of water or air pollution).
Transit-oriented developments, such as a mixed use residential or commercial area designed to maximize access to public transportation; similar to above criterion, but where the development center is within one half mile of a mass transit center (e.g. bus, rail, light rail or commuter train station). Such projects would not be able to take credit for both categories, but may have greater credit assigned
Redevelopment projects in an established historic district, historic preservation area, or similar significant city area including core City Center areas (to be defined through mapping).
Developments with dedication of undeveloped portions to parks, preservation areas and other pervious uses.
Developments in a city center area.
Developments in historic districts or historic preservation areas.
Live-work developments, a variety of developments designed to support residential and vocational needs together – similar to criteria to mixed use development; would not be able to take credit for both categories.
In-fill projects, the conversion of empty lots and other underused spaces into more beneficially used spaces, such as residential or commercial areas.
Calculation of Water Quality Credits
(if applicable)
The entire DCV for the project is being treated by a LID BMP. Water quality credits will not be used.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section IV Page 24
IV.4.2 Alternative Compliance Plan Information
Describe an alternative compliance plan (if applicable). Include alternative compliance obligations (i.e., gallons, pounds) and describe proposed alternative compliance measures. Refer to Section 7.II 3.0 in the Model WQMP.
N/A
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section V Page 25
Section V Inspection/Maintenance Responsibility for BMPs
Fill out information in table below. Prepare and attach an Operation and Maintenance Plan. Identify the funding mechanism through which BMPs will be maintained. Inspection and maintenance records must be kept for a minimum of five years for inspection by the regulatory agencies. Refer to Section 7.II 4.0 in the Model WQMP.
BMP Inspection/Maintenance
BMP Reponsible
Party(s)
Inspection/ Maintenance
Activities Required
Minimum Frequency of
Activities
EducationforPropertyOwners,Tenants,&Occupants(N1)and
(N12)
HOAandindividualhomeowners
WQMPtobeapartofTitleDocumentsaspartofpurchase.HOAtogive
yearlyreporttoresidents.
Asneededforpropertysalesandonceayearforreportingtoresidents.
ActivityRestrictions(N2)
HOA
CC&Rsprovidedattimeofsaleandwillidentifyactivityrestrictionsfor
propertyandtheneighbourhood.
CC&Rsprovidedwithpropertysales.Issue
lettersofnon‐compliance,asneeded
byHOA.
CommonAreaLandscape
Management(N3)HOA
HOAorappointedPropertymanagementcompanytoprovidemaintenanceoflandscapingtomeet
currentwaterefficiencyandkeepplantshealthyandbioareasmaintained
withpropersoilamendments.
Regularmaintenanceonceaweekand
monthlyinspectionstodeterminedeficiencies.
BMPMaintenance(N4) HOA
HOAorappointedPropertymanagementcompanytoprovide
maintenanceofBMPspertherequirementsofthe
WQMP.
Regularmaintenanceonceaweekand
monthlyinspectionstodeterminedeficiencies
CommonAreaLitterControl(N11)
HOA
HOAorappointedPropertyManagementCompanytoprovide
maintenanceandtoemptycommonareatrashcans.
Regularmaintenanceonceaweek.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section V Page 26
CommonAreaCatchBasinInspection(N14)
HOA
HOAorappointedPropertyManagementCompanytoprovidemaintenanceandto
inspectforobstructionandbuildup
Implementedasneeded.
StreetSweepingPrivateStreetsandParkingLots(N15)
HOA
HOAorappointedPropertyManagementCompanytoprovidemaintenanceofPrivate
Streets.
Regularstreetsweepingoncea
month.
EfficientIrrigationSystems&Landscape
Design(S4)HOA
HOAorappointedPropertyManagementCompanytoprovidemaintenanceof
landscapingtomeetcurrentwaterefficiencystandards,andkeepplants
healthy.
Regularmaintenanceonceaweekand
monthlyinspectiontodeterminedeficiencies.
FilterraBioretentionSystem
HOA
HOAtocontractwithmaintenancecompanytoinspect,repairandcleanWetFilterraBioretentionSystem.Alldebris,trashandloosesediment/siltshallberemovedpermanufacturer’sspecifications.
Replacementofmediaand/orplantingmaterialpermanufacturer’s
specificationsbyapprovedmaintenancecompany.
Permanufacturer’sspecifications.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section VI Page 27
Section VI BMP Exhibit (Site Plan)
VI.1 BMP Exhibit (Site Plan)
*See WQMP Exhibit in Attachment B
VI.2 Submittal and Recordation of Water Quality Management Plan
Following approval of the Final Project-Specific WQMP, three copies of the approved WQMP (including BMP Exhibit, Operations and Maintenance (O&M) Plan, and Appendices) shall be submitted. In addition, these documents shall be submitted in a PDF format.
Each approved WQMP (including BMP Exhibit, Operations and Maintenance (O&M) Plan, and Appendices) shall be recorded in the Orange County Clerk-Recorder’s Office, prior to close-out of grading and/or building permit. Educational Materials are not required to be included.
Water Quality Management Plan (WQMP) 929 Baker Street
DeNova Homes, Inc. Section VII Page 28
Section VII Educational Materials
Refer to the Orange County Stormwater Program (ocwatersheds.com) for a library of materials available. Please only attach the educational materials specifically applicable to this project. Other materials specific to the project may be included as well and must be attached.
Education Materials
Residential Material
(http://www.ocwatersheds.com)
Check If
Applicable
Business Material
(http://www.ocwatersheds.com)
Check If
Applicable
The Ocean Begins at Your Front Door Tips for the Automotive Industry
Tips for Car Wash Fund-raisers Tips for Using Concrete and Mortar
Tips for the Home Mechanic Tips for the Food Service Industry
Homeowners Guide for Sustainable Water Use
Proper Maintenance Practices for Your Business
Household Tips
Other Material Check If
Attached Proper Disposal of Household Hazardous Waste
Recycle at Your Local Used Oil Collection Center (North County)
Recycle at Your Local Used Oil Collection Center (Central County)
Recycle at Your Local Used Oil Collection Center (South County)
Tips for Maintaining a Septic Tank System
Responsible Pest Control
Sewer Spill
Tips for the Home Improvement Projects
Tips for Horse Care
Tips for Landscaping and Gardening
Tips for Pet Care
Tips for Pool Maintenance
Tips for Residential Pool, Landscape and Hardscape Drains
Tips for Projects Using Paint
Attachment A
For Education Materials, please visit Orange County Public Works website below:
https://cms.ocgov.com/gov/pw/watersheds/publiced
Attachment B
929 BAKER STREET
CITY OF COSTA MESA
PRELIMINARY WQMP EXHIBIT
SCALE: 1"=60'
LOT 1
Attachment C
Worksheet D: Capture Efficiency Method for Flow-Based BMPs
Step 1: Determine the design capture storm depth used for calculating volume
1 Enter the time of concentration, Tc (min) (See Appendix IV.2) Tc= 5.0
2
Using Figure III.4, determine the design intensity at which the estimated time of concentration (Tc) achieves 80% capture efficiency, I1
I1= 0.26 in/hr
3 Enter the effect depth of provided HSCs upstream, dHSC (inches) (Worksheet A)
dHSC= 0 inches
4 Enter capture efficiency corresponding to dHSC, Y2
(Worksheet A) Y2= 0 %
5 Using Figure III.4, determine the design intensity at which the time of concentration (Tc) achieves the upstream capture efficiency(Y2), I2
I2= 0
6 Determine the design intensity that must be provided by BMP, Idesign= I1-I2
Idesign= 0.26
Step 2: Calculate the design flowrate
1 Enter Project area tributary to BMP (s), A (acres) A= 4.63 acres
2 Enter Project Imperviousness, imp (unitless) imp= 0.69
3 Calculate runoff coefficient, C= (0.75 x imp) + 0.15 C= 0.668
4 Calculate design flowrate, Qdesign= (C x idesign x A) Qdesign= 0.804 cfs
Supporting Calculations
Describe system:
Provide time of concentration assumptions:
Worksheets from Orange County Technical Guidance Document (5-19-2011) See TGD for instructions and/or examples related to these worksheets
www.ocwatersheds.com/WQMP.aspx
Worksheet D: Capture Efficiency Method for Flow-Based BMPs
Graphical Operations
Provide supporting graphical operations. See Example III.7.
VTTM 17980 ‐ 929 BAKER ST.
DESIGN FLOWRATE CALCULATIONS
BMP
ID**
TRIBUTARY
AREA (AC)
%
IMPERVIOUS
IMPERVIOUS
AREA (AC)
%
PERVIOUS
PERVIOUS
AREA (AC) Idesign
A
(acres)
imp
(unitless) C Qdesign (cfs)
1 0.52 65% 0.34 35% 0.18 0.26 0.52 65% 0.638 0.086
2 0.85 75% 0.64 25% 0.21 0.26 0.85 75% 0.713 0.157
3 0.85 75% 0.64 25% 0.21 0.26 0.85 75% 0.713 0.157
4 0.85 76% 0.65 24% 0.20 0.26 0.85 76% 0.720 0.159
5 1.56 60% 0.94 40% 0.62 0.26 1.56 60% 0.600 0.243
TOTAL 4.63 69% 3.20 31% 1.44 0.26 4.63 69% 0.668 0.804
**SEE WQMP EXHIBIT (ATTACHMENT B) FOR BMP LOCATIONS
Date Prepared: 11/16/2015 P:\D\DENO‐001\Admin\Reports\WQMP\
Attachment D
TEC
HN
ICA
L G
UID
AN
CE
DO
CU
MEN
T
2-
7 M
ay 1
9, 2
011
Tabl
e 2.
1: A
ntic
ipat
ed a
nd P
oten
tial P
ollu
tant
s G
ener
ated
by
Land
Use
Typ
e
Prio
rity
Pro
ject
C
ateg
orie
s an
d/or
Pro
ject
Fea
ture
s
Gen
eral
Pol
luta
nt C
ateg
orie
s
Susp
ende
d So
lid/
Sedi
men
ts
Nut
rien
ts
Hea
vy
Met
als
Path
ogen
s (B
acte
ria/
V
irus
) Pe
stic
ides
O
il &
G
reas
e
Toxi
c O
rgan
ic
Com
poun
ds
Tras
h &
D
ebri
s
Det
ache
d R
esid
entia
l D
evel
opm
ent
E E
N
E E
E N
E
Atta
ched
Res
iden
tial
Dev
elop
men
t E
E N
E
E E(
2)
N
E
Com
mer
cial
/ Ind
ustr
ial
Dev
elop
men
t E(
1)
E(1)
E(
5)
E(3)
E(
1)
E E
E
Aut
omot
ive
Rep
air
Shop
s N
N
E
N
N
E E
E
Res
taur
ants
E(
1)(2
) E(
1)
E(2)
E
E(1)
E
N
E
Hill
side
Dev
elop
men
t >5
,000
ft2
E E
N
E E
E N
E
Park
ing
Lots
E
E(1)
E
E(4)
E(
1)
E E
E St
reet
s, H
ighw
ays,
&
Free
way
s E
E (1
) E
E(4)
E(
1)
E E
E
Ret
ail G
asol
ine
Out
lets
N
N
E
N
N
E E
E
E =
expe
cted
to b
e of
con
cern
N
= n
ot e
xpec
ted
to b
e of
con
cern
(1
)Ex
pect
ed p
ollu
tant
if la
ndsc
apin
g ex
ists
on-
site
, oth
erw
ise
not e
xpec
ted.
(2
)Ex
pect
ed p
ollu
tant
if th
e pr
ojec
t inc
lude
s un
cove
red
park
ing
area
s,
othe
rwis
e no
t exp
ecte
d.
(3)
Expe
cted
pol
luta
nt if
land
use
invo
lves
food
or a
nim
al w
aste
pro
duct
s,
othe
rwis
e no
t exp
ecte
d.
(4)
Bact
eria
l ind
icat
ors
are
rout
inel
y de
tect
ed in
pav
emen
t run
off.
(5)
Expe
cted
if o
utdo
or s
tora
ge o
r met
al ro
ofs,
oth
erw
ise
not e
xpec
ted.
OR
AN
GE C
OU
NTY
OR
AN
GE C
OU
NTY
RIVER
SIDE C
OU
NTY
RIVER
SIDE C
OU
NTY
ORANGE COUNTY
ORANGE COUNTY
SAN BERNARDINO COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTYORANGE COUNTY
LOS ANGELES COUNTYLOS ANGELES COUNTY
OR
AN
GE C
OU
NTY
OR
AN
GE C
OU
NTY
LOS
AN
GEL
ES C
OU
NTY
LOS
AN
GEL
ES C
OU
NTY
1.05
0.7
10.950.90.850.80.750.70.65
0.95
0.7
0.9
0.9
0.75
P:\9
526E
\6-G
IS\M
xds\
Rep
orts
\Inf
iltra
tionF
easa
bilit
y_20
1102
15\9
526E
_Fig
ureX
VI-1
_Ra
infa
llZon
es_2
0110
215.
mxd
FIGURE
JOB
TIT
LE
SC
AL
E1"
= 1
.8 m
iles
DE
SIG
NE
D
DR
AW
ING
CH
EC
KE
DB
MP
04/2
2/10
DA
TE
JOB
NO
.95
26-E
TH
TH
OR
AN
GE
CO
UN
TY
TE
CH
NIC
AL
GU
IDA
NC
ED
OC
UM
EN
TO
RA
NG
E C
O.
CA
RA
INFA
LL
ZO
NE
S
SUBJECT TO FURTHER REVISION
0 3.6 7.21.8Miles
0 6 123
Kilometers
LEGEND
Orange County Precipitation Stations
24 Hour, 85th Percentile Rainfall (Inches)
24 Hour, 85th Percentile Rainfall (Inches) - Extrapolated
City Boundaries
Rainfall Zones
Design Capture Storm Depth (inches)
0.65"
0.7
0.75
0.80
0.85
0.90
0.95
1.00
1.10"
Note: Events defined as 24-hour periods (calendar days) with greater than 0.1 inches of rainfall. For areas outside of available data coverage, professional judgment shall be applied.
XVI-1
OR
AN
GE C
OU
NTY
OR
AN
GE C
OU
NTY
RIVER
SIDE C
OU
NTY
RIVER
SIDE C
OU
NTY
ORANGE COUNTY
ORANGE COUNTY
SAN BERNARDINO COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTYORANGE COUNTY
LOS ANGELES COUNTYLOS ANGELES COUNTY
OR
AN
GE C
OU
NTY
OR
AN
GE C
OU
NTY
LOS
AN
GEL
ES C
OU
NTY
LOS
AN
GEL
ES C
OU
NTY
P:\9
526E
\6-G
IS\M
xds\
Rep
orts
\Inf
iltra
tionF
easa
bilit
y_20
1102
15\9
526E
_Fig
ureX
VI-2
a_H
ydro
Soils
_201
1021
5.m
xd
FIGURE
XVI-2a
JOB
TIT
LE
SC
AL
E1"
= 1
.8 m
iles
DE
SIG
NE
D
DR
AW
ING
CH
EC
KE
DB
MP
02/0
9/11
DA
TE
JOB
NO
.95
26-E
TH
TH
OR
AN
GE
CO
UN
TY
INF
ILT
RA
TIO
N S
TU
DY
OR
AN
GE
CO
.C
A
NR
CS
HY
DR
OLO
GIC
SO
ILS
GR
OU
PS
SUBJECT TO FURTHER REVISION
Source: Soils: Natural Resources Conservation Service (NRCS)Soil Survey - soil_ca678, Orange County & Western RiversideDate of publication: 2006-02-08
!I0 3.6 7.21.8
Miles
0 5 102.5
Kilometers
LEGEND
City Boundaries
Hydrologic Soil Groups
A Soils
B Soils
C Soils
D Soils
http://websoilsurvey.nrcs.usda.gov/app/HomePage.htm
ORANGE COUNTY
ORANGE COUNTY
RIVERSIDE COUNTY
RIVERSIDE COUNTY
ORANGE COUNTY
ORANGE COUNTY
SAN BERNARDINO COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTYORANGE COUNTYLOS ANGELES COUNTYLOS ANGELES COUNTY
ORANGE COUNTY
ORANGE COUNTY
LOS A
NGELES
COUNTY
LOS A
NGELES
COUNTY
10
10
3 5
10
30
10
30
10
20
10
10
5
50
3
30
30
30
30205
10
20
30
50
10
3020
P:\9
526E
\6-G
IS\M
xds\
Rep
orts
\Inf
iltra
tionF
easa
bilit
y_20
1102
15\9
526E
_Fig
ureX
VI-2
d_D
epth
ToG
roun
dw
ate
rOve
rvie
w_2
0110
215.
mxd
FIGURE
XVI-2d
JOB
TIT
LE
SC
AL
E1"
= 1.25
mile
sD
ES
IGN
ED
DR
AW
ING
CH
EC
KE
DBM
P02
/09/11
DA
TE
JOB
NO
.95
26-E
THTHOR
ANGE
COUN
TYINF
ILTRA
TION S
TUDY
OR
AN
GE
CO
.C
A
NORT
H ORA
NGE C
OUNT
YMA
PPED
DEPT
H TO F
IRST
GROU
NDWA
TER
SUBJECT TO FURTHER REVISION
Note: Data are not available for South Orange County at this time.
Source:Sprotte, Fuller and Greenwood, 1980.California Division of Mines and Geology;California Geological Survey
!I0 2.5 51.25
Miles
0 4 82
Kilometers
LEGENDDepth To First Groundwater Contours
City Boundaries
OCWD Groundwater Basin Protection Boundary
ORANGE COUNTY
ORANGE COUNTY
RIVERSIDE COUNTY
RIVERSIDE COUNTY
ORANGE COUNTY
ORANGE COUNTY
SAN BERNARDINO COUNTY
SAN BERNARDINO COUNTY
ORANGE COUNTYORANGE COUNTYLOS ANGELES COUNTYLOS ANGELES COUNTY
ORANGE COUNTY
ORANGE COUNTY
LOS A
NGELES
COUNTY
LOS A
NGELES
COUNTY
P:\9
526E
\6-G
IS\M
xds\
Rep
orts
\Inf
iltra
tionF
easa
bilit
y_20
1102
15\9
526E
_Fig
ureX
VI-2
e_D
epth
ToG
roun
dw
ate
rLt5
ft_20
1102
15.m
xd
FIGURE
XVI-2e
JOB
TIT
LE
SC
AL
E1"
= 1.25
mile
sD
ES
IGN
ED
DR
AW
ING
CH
EC
KE
DBM
P02
/09/11
DA
TE
JOB
NO
.95
26-E
THTHOR
ANGE
COUN
TYINF
ILTRA
TION S
TUDY
OR
AN
GE
CO
.C
A
NORT
H ORA
NGE C
OUNT
YMA
PPED
SHAL
LOW
GROU
NDWA
TERSUBJECT TO FURTHER REVISION
Note: Data are not available for South Orange County at this time.
Source:Sprotte, Fuller and Greenwood, 1980.California Division of Mines and Geology;California Geological Survey
!I0 2.5 51.25
Miles
0 4 82
Kilometers
LEGENDCity Boundaries
OCWD Groundwater Basin Protection Boundary
Depth To Groundwater<= 5'
5-10'
P:\9
526E
\6-G
IS\M
xds\
Suce
pta
bilit
yMa
ps_
2010
0505
\952
6E_S
ant
aA
naRi
verS
usce
ptib
ility_
2010
0430
.mxd
ClevelandNational Forest
San BernardinoCounty
Riverside County
South OrangeCounty
Newport BayWatershed
Stabilized byGrade Control
Structure
San Gabriel-Coyote CreekWatershed
Anaheim Bay-Huntington Harbor
Watershed
PetersCanyon
Reservoir
OliveHills
KraemerBasin
CarbonCanyon
WalnutCanyon
Reservoir
IrvineLake
AnaheimLake
WarnerBasin
MillerRetarding
Basin
BartlettRetarding
Basin
FletcherRetarding
Basin
SOUTHPARKPUMP
STATION
VillaPark Dam
Yorba LindaReservoir
Sources: Esri, DeLorme, NAVTEQ, USGS, Intermap, iPC, NRCAN, Esri Japan, METI, Esri China (Hong Kong), Esri (Thailand), TomTom, 2012
FIGURE
3
JOB
TIT
LES
CA
LE
1" =
120
00'
DE
SIG
NE
D
DR
AW
ING
CH
EC
KE
DB
MP
04/3
0/10
DA
TE
JOB
NO
.95
26-E
TH
TH
OR
AN
GE
CO
UN
TY
WA
TE
RS
HE
DM
AS
TE
R P
LA
NN
ING
OR
AN
GE
CO
.C
A
SU
SC
EP
TIB
ILIT
Y A
NA
LYIS
SA
NTA
AN
A R
IVE
R
!I 0 12,000 24,000Feet
Susceptibility
Potential Areas of Erosion, Habitat, &Physical Structure Susceptibility
Channel Type
Earth (Unstable)
Earth (Stabilized)
Stabilized
Tidel Influence
<= Mean High Water Line (4.28')
Water Body
Basin
Dam
Lake
Reservoir
Forest Areas
Cleveland National Forest
Federal Lands
Amarus Salt Marsh
Sources: Esri, DeLorme, NAVTEQ,USGS, Intermap, iPC, NRCAN, EsriJapan, METI, Esri China (HongKong), Esri (Thailand), TomTom,2012
Attachment E
Filterra Infiltration Rate = 100 (in/hr)Filterra Flow per Square Foot = 0.0023 (ft3/sec/ft2)
Filterra Flow Rate, Q = 0.0023 ft3/sec x Filterra Surface AreaRational Method, Q = C x I x A
Site Flowrate, Q = (C x DI x DA x 43560) / (12 x3600)OR DA = (12 x 3600 x Q) / (C x 43560 x DI)
where Q = Flow (ft3/sec)DA = Drainage Area (acres)DI = Design Intensity (in/hr)C = Runoff coefficient (dimensionless)
DI C C C0.2 1.00 0.85 0.50
Filterra 100% Commercial ResidentialL W Filterra Surface Area Flow Rate, Q Imperv. DA max DA max DA
(ft) (ft) (ft2) (ft3/sec) (acres) (acres) (acres)
4 4 16 0.0370 0.184 0.216 0.3676 4 24 0.0556 0.275 0.324 0.551
6.5 4 26 0.0602 0.298 0.351 0.5978 4 32 0.0741 0.367 0.432 0.7356 6 36 0.0833 0.413 0.486 0.8268 6 48 0.1111 0.551 0.648 1.102
10 6 60 0.1389 0.689 0.810 1.37712 6 72 0.1667 0.826 0.972 1.65316 4 64 0.1481 0.735 0.864 1.46916 8 128 0.2963 1.469 1.729 2.93818 8 144 0.3333 1.653 1.945 3.30620 8 160 0.3704 1.837 2.161 3.673
Available Filterra Box Sizes
Filterra Sizing SpreadsheetUniform Intensity ApproachStorm Intensity = 0.20 in/hr
2/16/2015
Filterra® Stormwater Bioretention Filtration System
toll free: 800-579-8819 | fax: 707-524-8186 | drainageprotection.com | kristar.com
Operation & Maintenance
(OM) Manual v01
A Division of:
by KRISTAR
03/22/11 kristar.com toll free: 800-579-8819
by KRISTARTable of Contents Overview
Filterra® General Description Filterra® Schematic Basic Operations Design
Maintenance
Maintenance Overview Why Maintain? When to Maintain? Exclusion of Services Maintenance Visit Summary Maintenance Tools, Safety Equipment and Supplies Maintenance Visit Procedure Maintenance Checklist Mulch Specifications
Resources
Example Filterra Project Maintenance Report Sheet Example Filterra Structure Maintenance Report Sheet Filterra® Warranty Drawing FTST-2: Filterra Standard Configuration Detail Drawing FTNL-3: Filterra Narrow Length Configuration Detail Drawing FTNW-3: Filterra Narrow Width Configuration Detail
03/22/11 kristar.com toll free: 800-579-8819
by KRISTARGeneral Description The following general specifications describe the general operations and maintenance requirements for the Americast stormwater bioretention filtration system, the Filterra®. The system utilizes physical, chemical and biological mechanisms of a soil, plant and microbe complex to remove pollutants typically found in urban stormwater runoff. The treatment system is a fully equipped, pre-constructed drop-in place unit designed for applications in the urban landscape to treat contaminated runoff.
Stormwater flows through a specially designed filter media mixture contained in a landscaped concrete container. The mixture immobilizes pollutants which are then decomposed, volatilized and incorporated into the biomass of the Filterra® system’s micro/macro fauna and flora. Stormwater runoff flows through the media and into an underdrain system at the bottom of the container, where the treated water is discharged. Higher flows bypass the Filterra® to a downstream inlet or outfall. Maintenance is a simple, inexpensive and safe operation that does not require confined space access, pumping or vacuum equipment or specialized tools. Properly trained landscape personnel can effectively maintain Filterra® Stormwater systems by following instructions in this manual.
03/22/11 kristar.com toll free: 800-579-8819
by KRISTARBasic Operations Filterra® is a bioretention system in a concrete box. Contaminated stormwater runoff enters the filter box through the curb inlet spreading over the 3-inch layer of mulch on the surface of the filter media. As the water passes through the mulch layer, most of the larger sediment particles and heavy metals are removed through sedimentation and chemical reactions with the organic material in the mulch. Water passes through the soil media where the finer particles are removed and other chemical reactions take place to immobilize and capture pollutants in the soil media. The cleansed water passes into an underdrain and flows to a pipe system or other appropriate discharge point. Once the pollutants are in the soil, the bacteria begin to break down and metabolize the materials and the plants begin to uptake and metabolize the pollutants. Some pollutants such as heavy metals, which are chemically bound to organic particles in the mulch, are released over time as the organic matter decomposes to release the metals to the feeder roots of the plants and the cells of the bacteria in the soil where they remain and are recycled. Other pollutants such as phosphorus are chemically bound to the soil particles and released slowly back to the plants and bacteria and used in their metabolic processes. Nitrogen goes through a very complex variety of biochemical processes where it can ultimately end up in the plant/bacteria biomass, turned to nitrogen gas or dissolves back into the water column as nitrates depending on soil temperature, pH and the availability of oxygen. The pollutants ultimately are retained in the mulch, soil and biomass with some passing out of the system into the air or back into the water. Design and Installation Each project presents different scopes for the use of Filterra® systems. To ensure the safe and specified function of the stormwater BMP, Americast reviews each application before supply. Information and help may be provided to the design engineer during the planning process. Correct Filterra® box sizing (by rainfall region) is essential to predict pollutant removal rates for a given area. The engineer shall submit calculations for approval by the local jurisdiction. The contractor is responsible for the correct installation of Filterra units as shown in approved plans. A comprehensive installation manual is available at filterra.com. Maintenance Why Maintain? All stormwater treatment systems require maintenance for effective operation. This necessity is often incorporated in your property’s permitting process as a legally binding BMP maintenance agreement.
Avoid legal challenges from your jurisdiction’s maintenance enforcement program. Prolong the expected lifespan of your Filterra media. Avoid more costly media replacement. Help reduce pollutant loads leaving your property.
Simple maintenance of the Filterra® is required to continue effective pollutant removal from stormwater runoff before discharge into downstream waters. This procedure will also extend the longevity of the living biofilter system. The unit will recycle and accumulate pollutants within the biomass, but is also subjected to other materials entering the throat. This may include trash, silt and leaves etc. which will be contained within the void below the top grate and above the mulch layer. Too much silt may inhibit the Filterra’s® flow rate, which is the reason for site stabilization before activation. Regular replacement of the mulch stops accumulation of such sediment.
03/22/11 kristar.com toll free: 800-579-8819
by KRISTARWhen to Maintain? Americast includes a 1-year maintenance plan with each system purchase. Annual included maintenance consists of a maximum of two (2) scheduled visits. Additional maintenance may be necessary depending on sediment and trash loading (by Owner or at additional cost). The start of the maintenance plan begins when the system is activated for full operation. Full operation is defined as the unit installed, curb and gutter and transitions in place and activation (by Supplier) when mulch and plant are added and temporary throat protection removed. Activation cannot be carried out until the site is fully stabilized (full landscaping, grass cover, final paving and street sweeping completed). Maintenance visits are scheduled seasonally; the spring visit aims to clean up after winter loads including salts and sands. The fall visit helps the system by removing excessive leaf litter. A first inspection to determine if maintenance is necessary should be performed at least twice annually after every major storm event of greater than (1) one inch total depth (subject to regional climate). Please refer to the maintenance checklist for specific conditions that indicate if maintenance is necessary. It has been found that in regions which receive between 30-50 inches of annual rainfall, (2) two visits are generally required. Regions with less rainfall often only require (1) one visit per annum. Varying land uses can affect maintenance frequency; e.g. some fast food restaurants require more frequent trash removal. Contributing drainage areas which are subject to new development wherein the recommended erosion and sediment control measures have not been implemented require additional maintenance visits. Some sites may be subjected to extreme sediment or trash loads, requiring more frequent maintenance visits. This is the reason for detailed notes of maintenance actions per unit, helping the Supplier and Owner predict future maintenance frequencies, reflecting individual site conditions. Owners must promptly notify the (maintenance) Supplier of any damage to the plant(s), which constitute(s) an integral part of the bioretention technology. Owners should also advise other landscape or maintenance contractors to leave all maintenance to the Supplier (i.e. no pruning or fertilizing). Exclusion of Services It is the responsibility of the owner to provide adequate irrigation when necessary to the plant of the Filterra® system. Clean up due to major contamination such as oils, chemicals, toxic spills, etc. will result in additional costs and are not covered under the Supplier maintenance contract. Should a major contamination event occur, the Owner must block off the outlet pipe of the Filterra® (where the cleaned runoff drains to, such as drop-inlet) and block off the throat of the Filterra®. The Supplier should be informed immediately.
03/22/11 kristar.com toll free: 800-579-8819
by KRISTARMaintenance Visit Summary Each maintenance visit consists of the following simple tasks (detailed instructions below). 1. Inspection of Filterra® and surrounding area 2. Removal of tree grate and erosion control stones 3. Removal of debris, trash and mulch 4. Mulch replacement 5. Plant health evaluation and pruning or replacement as necessary 6. Clean area around Filterra® 7. Complete paperwork Maintenance Tools, Safety Equipment and Supplies Ideal tools include: camera, bucket, shovel, broom, pruners, hoe/rake, and tape measure. Appropriate Personal Protective Equipment (PPE) should be used in accordance with local or company procedures. This may include impervious gloves where the type of trash is unknown, high visibility clothing and barricades when working in close proximity to traffic and also safety hats and shoes. A T-Bar or crowbar should be used for moving the tree grates (up to 170 lbs ea.). Most visits require only replacement mulch. Three bags of double shredded mulch are used per unit (on a standard 6x6’ size). Some visits may require additional Filterra® engineered soil media available from the Supplier.
Filterra® Stormwater Bioretention Filtration System
toll free: 800-579-8819 | fax: 707-524-8186 | drainageprotection.com | kristar.com
Maintenance Visit Procedure
1. Inspection of Filterra® and surrounding area
Record individual unit before maintenance with photograph (numbered). Record on Maintenance Report (see example in this document) the following:
Record on Maintenance Report the following: Standing Water Damage to Box Structure Damage to Grate Is Bypass Clear
yes | no yes | no yes | no yes | no
If yes answered to any of these observations, record with close-up photograph (numbered).
2. Removal of tree grate and erosion control stones
Remove metal grates for access into Filterra® box. Dig out silt (if any) and mulch and remove trash & foreign
items.
Record on Maintenance Report the following:
Silt/Clay Cups/ Bags Leaves # of Buckets Removed
yes | no yes | no yes | no
3. Removal of debris, trash and mulch
After removal of mulch and debris, measure distance from the top of the Filterra® engineered media soil to the bottom of the top slab. If this distance is greater than 12”, add Filterra® media (not top soil or other) to recharge to a 9” distance.
Record on Maintenance Report the following:
Distance to Bottom of Top Slab (inches) # of Buckets of Media Added
03/22/11 kristar.com toll free: 800-579-8819
by KRISTAR
4. Mulch replacement
Please see mulch specifications. Add double shredded mulch evenly across the entire unit to a
depth of 3”. Ensure correct repositioning of erosion control stones by the
Filterra® inlet to allow for entry of trash during a storm event. Replace Filterra® grates correctly using appropriate lifting or
moving tools, taking care not to damage the plant.
5. Plant health evaluation and pruning or replacement as necessary
Examine the plant’s health and replace if dead. Prune as necessary to encourage growth in the correct
directions
Record on Maintenance Report the following:
Height above Grate Width at Widest Point Health Damage to Plant Plant Replaced
(feet) (feet) alive | dead yes | no yes | no
6. Clean area around Filterra®
Clean area around unit and remove all refuse to be disposed of appropriately.
7. Complete paperwork
Deliver Maintenance Report and photographs to appropriate location (normally Americast during maintenance contract period).
Some jurisdictions may require submission of maintenance reports in accordance with approvals. It is the responsibility of the Owner to comply with local regulations.
Filterra® Stormwater Bioretention Filtration System
toll free: 800-579-8819 | fax: 707-524-8186 | drainageprotection.com | kristar.com
Maintenance Checklist
Drainage System Failure
Problem Conditions to Check
For Conditions That
Should Exist Actions
Inlet
Excessive sediment or trash accumulation
Accumulated sediments or trash impair free flow of water into Filterra
Inlet should be free of obstructions allowing free distributed flow of water into Filterra.
Sediments and/or trash should be removed.
Mulch Cover
Trash and floatable debris accumulation
Excessive trash and/or debris accumulation.
Minimal trash or other debris on mulch cover.
Trash and debris should be removed and mulch cover raked level. Ensure bark nugget mulch is not used.
Mulch Cover
“Ponding” of water on mulch cover.
“Ponding” in unit could be indicative of clogging due to excessive fine sediment accumulation or spill of petroleum oils.
Stormwater should drain freely and evenly through mulch cover.
Recommend contact manufacturer and replace mulch as a minimum.
Vegetation
Plants not growing or in poor condition.
Soil/mulch too wet, evidence of spill. Incorrect plant selection. Pest infestation. Vandalism to plants.
Plants should be healthy and pest free.
Contact manufacturer for advice.
Vegetation
Plant growth excessive
Plants should be appropriate to the species and location of Filterra.
Trim/prune plants in accordance with typical landscaping and safety needs.
Structure
Structure has visible cracks
Cracks wider than ½ inch or evidence of soil particles entering the structure through the cracks.
Vault should be repaired.
Maintenance is ideally to be performed twice annually. Inspection to be performed after every major storm event >1 inch total depth, subject to climate.
Filterra® Project Maintenance Order
Project
Address
Directions
Project
Owner
Filterra Units on this Order
Total Units on this Project
Date of Maintenance
Arrival Time
Departure Time
# of Workers
Notes on Project
Maintenance Supervisor
Note : All maintenance debris, trash and mulch must go to landfill.
03/22/11
Filterra® Structure Maintenance Report
Project Structure Number
Plant Type Structure Size
Date GPS
Pre Mtce Photo #
Initial Observations
Standing Water Y N Damage to Grate Y N
IF Yes, STOP NOW & call 888-950-8826 Is Bypass Clear Y N
Notes
Damage to Box Structure Y N
If YES to any observation take close up photo
Waste
Silt / Clay Y N Buckets Removed (# of)
Cups/Bags Y N Notes
Leaves Y N
Other
Media
Distance to Bottom of Top Slab (in.) Notes
Buckets of Media Added (# of)
Mulch
Netting Replaced Y N Bags of Mulch Added (# of)
Stones Replaced Y N Notes
Plant #1 (#2) #1 (#2)
Height above Grate (ft., in.) Plant Replaced Y / N Y / N
Stem diameter/Caliper (in.)
Width at Widest Point (ft., in.) Notes
Health Alive/Dead Alive/Dead
Damage to Plant Y / N Y / N
If YES to plant damage take close up photo
Other Notes
(use back if necessary)
03/22/11
03/22/11 kristar.com toll free: 800-579-8819
by KRISTAR
Filterra® Warranty Seller warrants goods sold hereunder against defects in materials and workmanship only, for a period of (1) year from date the Seller activates the system into service. Seller makes no other warranties, expressed or implied. Seller’s liability hereunder shall be conditioned upon the Buyer’s installation, maintenance, and service of the goods in strict compliance with the written instructions and specifications provided by the Seller. Any deviation from Seller’s instructions and specifications or any abuse or neglect shall void all warranties. In the event of any claim upon Seller’s warranty, the burden shall be upon the buyer to prove strict compliance with all instructions and specifications provided by the Seller. Seller’s liability hereunder shall be limited only to the cost or replacement of the goods. Buyer agrees that Seller shall not be liable for any consequential losses arising from the purchase, installation, and/or use of the goods.
TECHNICAL GUIDANCE DOCUMENT APPENDICES
XIV-5 May 19, 2011
HSC-2: Impervious Area Dispersion
Impervious area dispersion refers to the practice of routing
runoff from impervious areas, such as rooftops, walkways,
and patios onto the surface of adjacent pervious areas.
Runoff is dispersed uniformly via splash block or dispersion
trench and soaks into the ground as it move slowly across the
surface of pervious areas. Minor ponding may occur, but it is
not the intent of this practice to actively promote localized
on-lot storage (See HSC-1: Localized On-Lot Infiltration).
Feasibility Screening Considerations
Impervious area dispersion can be used where infiltration would otherwise be infeasible, however dispersion depth over landscaped areas should be limited by site-specific conditions to prevent standing water or geotechnical issues.
Opportunity Criteria
Rooftops and other low traffic impervious surface present in drainage area.
Soils are adequate for infiltration. If not, soils can be amended to improve capacity to absorb dispersed water (see MISC-2: Amended Soils).
Significant pervious area present in drainage area with shallow slope
Overflow from pervious area can be safely managed.
OC-Specific Design Criteria and Considerations
□ Soils should be preserved from their natural condition or restored via soil amendments to meet minimum criteria described in Section .
□ A minimum of 1 part pervious area capable of receiving flow should be provided for every 2 parts of impervious area disconnected.
□
The pervious area receiving flow should have a slope ≤ 2 percent and path lengths of ≥ 20 feet per 1000 sf of impervious area.
□ Dispersion areas should be maintained to remove trash and debris, loose vegetation, and protect any areas of bare soil from erosion.
□ Velocity of dispersed flow should not be greater than 0.5 ft per second to avoid scour.
Calculating HSC Retention Volume
The retention volume provided by downspout dispersion is a function of the ratio of impervious to pervious area and the condition of soils in the pervious area.
Determine flow patterns in pervious area and estimate footprint of pervious area receiving dispersed flow. Calculate the ratio of pervious to impervious area.
Check soil conditions using the soil condition design criteria below; amend if necessary.
Look up the storm retention depth, dHSC from the chart below.
Simple Downspout Dispersion
Source:
toronto.ca/environment/water.htm
Also known as:
Downspout disconnection
Impervious area disconnection
Sheet flow dispersion
TECHNICAL GUIDANCE DOCUMENT APPENDICES
XIV-6 May 19, 2011
The max dHSC is equal to the design storm depth for the project site.
Soil Condition Design Criteria
□ Maximum slope of 2 percent
□ Well-established lawn or landscaping
□ Minimum soil amendments per criteria in MISC-2: Amended Soils.
Configuration for Use in a Treatment Train
Impervious area disconnection is an HSC that may be used as the first element in any treatment train
The use of impervious area disconnection reduces the sizing requirement for downstream LID and/or treatment control BMPs
Additional References for Design Guidance
SMC LID Manual (pp 131) http://www.lowimpactdevelopment.org/guest75/pub/All_Projects/SoCal_LID_Manual/SoCalLID_Manual_FINAL_040910.pdf
City of Portland Bureau of Environmental Services. 2010. How to manage stormwater – Disconnect Downspouts. http://www.portlandonline.com/bes/index.cfm?c=43081&a=177702
Seattle Public Utility: http://www.cityofseattle.org/util/stellent/groups/public/@spu/@usm/documents/webcontent/spu01_006395.pdf
Thurston County, Washington State (pp 10): http://www.co.thurston.wa.us/stormwater/manual/docs-faqs/DG-5-Roof-Runoff-Control_Rev11Jan24.pdf
1 Pervious area used in calculation should
only include the pervious area receiving flow, not pervious area receiving only direct rainfall or upslope pervious drainage.
TECHNICAL GUIDANCE DOCUMENT APPENDICES
XIV-69 May 19, 2011
BIO-7: Proprietary Biotreatment
Proprietary biotreatment devices are devices that are manufactured to mimic natural systems such as bioretention areas by incorporating plants, soil, and microbes engineered to provide treatment at higher flow rates or volumes and with smaller footprints than their natural counterparts. Incoming flows are typically filtered through a planting media (mulch, compost, soil, plants, microbes, etc.) and either infiltrated or collected by an underdrain and delivered to the storm water conveyance system. Tree box filters are an increasingly common type of proprietary biotreatment device that are installed at curb level and filled with a bioretention type soil. For low to moderate flows they operate similarly to bioretention systems and are bypassed during high flows. Tree box filters are highly adaptable solutions that can be used in all types of development and in all types of soils but are especially applicable to dense urban parking lots, street, and roadways.
Feasibility Screening Considerations
� Proprietary biotreatment devices that are unlined may cause incidental infiltration. Therefore, an evaluation of site conditions should be conducted to evaluate whether the BMP should include an impermeable liner to avoid infiltration into the subsurface.
Opportunity Criteria
� Drainage areas of 0.25 to 1.0 acres.
� Land use may include commercial, residential, mixed use, institutional, and subdivisions. Proprietary biotreatment facilities may also be applied in parking lot islands, traffic circles, road shoulders, and road medians.
� Must not adversely affect the level of flood protection provided by the drainage system.
OC-Specific Design Criteria and Considerations
� Frequent maintenance and the use of screens and grates to keep trash out may decrease the likelihood of clogging and prevent obstruction and bypass of incoming flows.
� Consult proprietors for specific criteria concerning the design and performance.
� Proprietary biotreatment may include specific media to address pollutants of concern. However, for proprietary device to be considered a biotreatment device the media must be capable of supporting rigorous growth of vegetation.
�Proprietary systems must be acceptable to the reviewing agency. Reviewing agencies shall have the discretion to request performance information. Reviewing agencies shall have the discretion to deny the use of a proprietary BMP on the grounds of performance, maintenance considerations, or other relevant factors.
Also known as: � Catch basin planter box � Bioretention vault � Tree box filter
Proprietary biotreatment Source: http://www.americastusa.com /index.php/filterra/
TECHNICAL GUIDANCE DOCUMENT APPENDICES
XIV-70 May 19, 2011
� In right of way areas, plant selection should not impair traffic lines of site. Local jurisdictions may also limit plant selection in keeping with landscaping themes.
Computing Sizing Criteria for Proprietary Biotreatment Device
� Proprietary biotreatment devices can be volume based or flow-based BMPs.
� Volume-based proprietary devices should be sized using the Simple Design Capture Volume Sizing Method described in Appendix III.3.1 or the Capture Efficiency Method for Volume-Based, Constant Drawdown BMPs described in Appendix III.3.2.
� The required design flowrate for flow-based proprietary devices should be computed using the Capture Efficiency Method for Flow-based BMPs described in Appendix III.3.3).
Additional References for Design Guidance
� Los Angeles Unified School District (LAUSD) Stormwater Technical Manual, Chapter 4: http://www.laschools.org/employee/design/fs-studies-and-reports/download/white_paper_report_material/Storm_Water_Technical_Manual_2009-opt-red.pdf?version_id=76975850
� Los Angeles County Stormwater BMP Design and Maintenance Manual, Chapter 9: http://dpw.lacounty.gov/DES/design_manuals/StormwaterBMPDesignandMaintenance.pdf
� Santa Barbara BMP Guidance Manual, Chapter 6: http://www.santabarbaraca.gov/NR/rdonlyres/91D1FA75-C185-491E-A882-49EE17789DF8/0/Manual_071008_Final.pdf
Attachment F
EXISTING HCOC CALCS.txt ____________________________________________________________________________ **************************************************************************** SMALL AREA UNIT HYDROGRAPH MODEL ============================================================================ (C) Copyright 1989-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1580
Analysis prepared by:
**************************************************************************** ----------------------------------------------------------------------------
Problem Descriptions: DENO-001 EXISTING CONDITIONS 2-YEAR HCOC CALCS ----------------------------------------------------------------------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90 TOTAL CATCHMENT AREA(ACRES) = 4.63 SOIL-LOSS RATE, Fm,(INCH/HR) = 0.000 LOW LOSS FRACTION = 0.990 TIME OF CONCENTRATION(MIN.) = 13.00 SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED RETURN FREQUENCY(YEARS) = 2 5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19 30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40 1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53 3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89 6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22 24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
----------------------------------------------------------------------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.71 TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.08
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0 (HOURS) (AF) (CFS) ---------------------------------------------------------------------------- 0.18 0.0010 0.13 Q . . . . 0.40 0.0034 0.13 Q . . . . 0.62 0.0058 0.14 Q . . . . 0.83 0.0083 0.14 Q . . . . 1.05 0.0107 0.14 Q . . . . 1.27 0.0132 0.14 Q . . . . 1.48 0.0157 0.14 Q . . . . 1.70 0.0182 0.14 Q . . . . 1.92 0.0208 0.14 Q . . . . 2.13 0.0234 0.14 Q . . . . 2.35 0.0260 0.15 Q . . . . 2.57 0.0286 0.15 Q . . . . 2.78 0.0312 0.15 Q . . . . 3.00 0.0339 0.15 Q . . . . 3.22 0.0366 0.15 Q . . . .
Page 1
EXISTING HCOC CALCS.txt 3.43 0.0394 0.15 Q . . . . 3.65 0.0421 0.16 Q . . . . 3.87 0.0449 0.16 Q . . . . 4.08 0.0478 0.16 Q . . . . 4.30 0.0506 0.16 Q . . . . 4.52 0.0535 0.16 Q . . . . 4.73 0.0564 0.16 Q . . . . 4.95 0.0594 0.17 Q . . . . 5.17 0.0624 0.17 Q . . . . 5.38 0.0654 0.17 Q . . . . 5.60 0.0685 0.17 Q . . . . 5.82 0.0716 0.18 Q . . . . 6.03 0.0748 0.18 Q . . . . 6.25 0.0780 0.18 Q . . . . 6.47 0.0812 0.18 Q . . . . 6.68 0.0845 0.19 Q . . . . 6.90 0.0878 0.19 Q . . . . 7.12 0.0912 0.19 Q . . . . 7.33 0.0946 0.19 Q . . . . 7.55 0.0981 0.20 Q . . . . 7.77 0.1016 0.20 Q . . . . 7.98 0.1052 0.20 Q . . . . 8.20 0.1089 0.21 Q . . . . 8.42 0.1126 0.21 Q . . . . 8.63 0.1164 0.21 Q . . . . 8.85 0.1202 0.22 Q . . . . 9.07 0.1242 0.22 Q . . . . 9.28 0.1282 0.23 Q . . . . 9.50 0.1323 0.23 Q . . . . 9.72 0.1364 0.24 Q . . . . 9.93 0.1407 0.24 Q . . . . 10.15 0.1450 0.25 Q . . . . 10.37 0.1495 0.25 .Q . . . . 10.58 0.1540 0.26 .Q . . . . 10.80 0.1587 0.26 .Q . . . . 11.02 0.1634 0.27 .Q . . . . 11.23 0.1684 0.28 .Q . . . . 11.45 0.1734 0.29 .Q . . . . 11.67 0.1786 0.29 .Q . . . . 11.88 0.1839 0.30 .Q . . . . 12.10 0.1895 0.31 .Q . . . . 12.32 0.1958 0.39 .Q . . . . 12.53 0.2029 0.40 .Q . . . . 12.75 0.2103 0.42 .Q . . . . 12.97 0.2180 0.43 .Q . . . . 13.18 0.2259 0.45 .Q . . . . 13.40 0.2341 0.47 .Q . . . . 13.62 0.2427 0.50 .Q . . . . 13.83 0.2518 0.51 . Q . . . . 14.05 0.2612 0.55 . Q . . . . 14.27 0.2714 0.59 . Q . . . . 14.48 0.2824 0.64 . Q . . . . 14.70 0.2943 0.68 . Q . . . . 14.92 0.3071 0.76 . Q . . . . 15.13 0.3210 0.81 . Q . . . . 15.35 0.3368 0.95 . Q . . . . 15.57 0.3540 0.97 . Q . . . . 15.78 0.3743 1.31 . Q . . . . 16.00 0.4023 1.81 . Q . . . . 16.22 0.4672 5.43 . . .Q . . 16.43 0.5254 1.06 . Q . . . . 16.65 0.5426 0.87 . Q . . . . 16.87 0.5568 0.71 . Q . . . .
Page 2
EXISTING HCOC CALCS.txt 17.08 0.5687 0.62 . Q . . . . 17.30 0.5789 0.53 . Q . . . . 17.52 0.5880 0.48 .Q . . . . 17.73 0.5962 0.44 .Q . . . . 17.95 0.6039 0.41 .Q . . . . 18.17 0.6109 0.37 .Q . . . . 18.38 0.6168 0.30 .Q . . . . 18.60 0.6220 0.28 .Q . . . . 18.82 0.6269 0.27 .Q . . . . 19.03 0.6316 0.25 .Q . . . . 19.25 0.6360 0.24 Q . . . . 19.47 0.6403 0.23 Q . . . . 19.68 0.6444 0.22 Q . . . . 19.90 0.6483 0.22 Q . . . . 20.12 0.6521 0.21 Q . . . . 20.33 0.6557 0.20 Q . . . . 20.55 0.6593 0.19 Q . . . . 20.77 0.6627 0.19 Q . . . . 20.98 0.6660 0.18 Q . . . . 21.20 0.6693 0.18 Q . . . . 21.42 0.6724 0.17 Q . . . . 21.63 0.6755 0.17 Q . . . . 21.85 0.6785 0.17 Q . . . . 22.07 0.6814 0.16 Q . . . . 22.28 0.6843 0.16 Q . . . . 22.50 0.6871 0.15 Q . . . . 22.72 0.6898 0.15 Q . . . . 22.93 0.6925 0.15 Q . . . . 23.15 0.6951 0.15 Q . . . . 23.37 0.6977 0.14 Q . . . . 23.58 0.7002 0.14 Q . . . . 23.80 0.7027 0.14 Q . . . . 24.02 0.7051 0.13 Q . . . . 24.23 0.7063 0.00 Q . . . . ------------------------------------------------------------------------------------------------------------------------------------------------------------ TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE: (Note: 100% of Peak Flow Rate estimate assumed to have an instantaneous time duration)
Percentile of Estimated Duration Peak Flow Rate (minutes) ======================= ========= 0% 1443.0 10% 195.0 20% 39.0 30% 26.0 40% 13.0 50% 13.0 60% 13.0 70% 13.0 80% 13.0 90% 13.0
Page 3
PROPOSED HCOC CALCS.txt ____________________________________________________________________________ **************************************************************************** SMALL AREA UNIT HYDROGRAPH MODEL ============================================================================ (C) Copyright 1989-2014 Advanced Engineering Software (aes) Ver. 21.0 Release Date: 06/01/2014 License ID 1580
Analysis prepared by:
**************************************************************************** ----------------------------------------------------------------------------
Problem Descriptions: DENO-001 PROPOSED CONDITIONS 2-YEAR HCOC CALCS ----------------------------------------------------------------------------
RATIONAL METHOD CALIBRATION COEFFICIENT = 0.90 TOTAL CATCHMENT AREA(ACRES) = 4.63 SOIL-LOSS RATE, Fm,(INCH/HR) = 0.062 LOW LOSS FRACTION = 0.990 TIME OF CONCENTRATION(MIN.) = 15.00 SMALL AREA PEAK Q COMPUTED USING PEAK FLOW RATE FORMULA ORANGE COUNTY "VALLEY" RAINFALL VALUES ARE USED RETURN FREQUENCY(YEARS) = 2 5-MINUTE POINT RAINFALL VALUE(INCHES) = 0.19 30-MINUTE POINT RAINFALL VALUE(INCHES) = 0.40 1-HOUR POINT RAINFALL VALUE(INCHES) = 0.53 3-HOUR POINT RAINFALL VALUE(INCHES) = 0.89 6-HOUR POINT RAINFALL VALUE(INCHES) = 1.22 24-HOUR POINT RAINFALL VALUE(INCHES) = 2.05
----------------------------------------------------------------------------
TOTAL CATCHMENT RUNOFF VOLUME(ACRE-FEET) = 0.30 TOTAL CATCHMENT SOIL-LOSS VOLUME(ACRE-FEET) = 0.49
**************************************************************************** TIME VOLUME Q 0. 2.5 5.0 7.5 10.0 (HOURS) (AF) (CFS) ---------------------------------------------------------------------------- 0.25 0.0000 0.00 Q . . . . 0.50 0.0000 0.00 Q . . . . 0.75 0.0001 0.00 Q . . . . 1.00 0.0001 0.00 Q . . . . 1.25 0.0001 0.00 Q . . . . 1.50 0.0002 0.00 Q . . . . 1.75 0.0002 0.00 Q . . . . 2.00 0.0002 0.00 Q . . . . 2.25 0.0002 0.00 Q . . . . 2.50 0.0003 0.00 Q . . . . 2.75 0.0003 0.00 Q . . . . 3.00 0.0003 0.00 Q . . . . 3.25 0.0004 0.00 Q . . . . 3.50 0.0004 0.00 Q . . . . 3.75 0.0004 0.00 Q . . . .
Page 1
PROPOSED HCOC CALCS.txt 4.00 0.0005 0.00 Q . . . . 4.25 0.0005 0.00 Q . . . . 4.50 0.0005 0.00 Q . . . . 4.75 0.0006 0.00 Q . . . . 5.00 0.0006 0.00 Q . . . . 5.25 0.0006 0.00 Q . . . . 5.50 0.0007 0.00 Q . . . . 5.75 0.0007 0.00 Q . . . . 6.00 0.0007 0.00 Q . . . . 6.25 0.0008 0.00 Q . . . . 6.50 0.0008 0.00 Q . . . . 6.75 0.0009 0.00 Q . . . . 7.00 0.0009 0.00 Q . . . . 7.25 0.0009 0.00 Q . . . . 7.50 0.0010 0.00 Q . . . . 7.75 0.0010 0.00 Q . . . . 8.00 0.0010 0.00 Q . . . . 8.25 0.0011 0.00 Q . . . . 8.50 0.0011 0.00 Q . . . . 8.75 0.0012 0.00 Q . . . . 9.00 0.0012 0.00 Q . . . . 9.25 0.0013 0.00 Q . . . . 9.50 0.0013 0.00 Q . . . . 9.75 0.0014 0.00 Q . . . . 10.00 0.0014 0.00 Q . . . . 10.25 0.0015 0.00 Q . . . . 10.50 0.0015 0.00 Q . . . . 10.75 0.0016 0.00 Q . . . . 11.00 0.0017 0.01 Q . . . . 11.25 0.0020 0.02 Q . . . . 11.50 0.0025 0.03 Q . . . . 11.75 0.0032 0.04 Q . . . . 12.00 0.0041 0.05 Q . . . . 12.25 0.0059 0.13 Q . . . . 12.50 0.0088 0.14 Q . . . . 12.75 0.0119 0.16 Q . . . . 13.00 0.0153 0.17 Q . . . . 13.25 0.0192 0.20 Q . . . . 13.50 0.0235 0.21 Q . . . . 13.75 0.0283 0.25 Q . . . . 14.00 0.0336 0.27 .Q . . . . 14.25 0.0399 0.34 .Q . . . . 14.50 0.0472 0.37 .Q . . . . 14.75 0.0556 0.44 .Q . . . . 15.00 0.0652 0.49 .Q . . . . 15.25 0.0767 0.62 . Q . . . . 15.50 0.0906 0.72 . Q . . . . 15.75 0.1077 0.93 . Q . . . . 16.00 0.1319 1.41 . Q . . . . 16.25 0.1955 4.74 . . Q . . . 16.50 0.2518 0.72 . Q . . . . 16.75 0.2649 0.55 . Q . . . . 17.00 0.2747 0.40 .Q . . . . 17.25 0.2819 0.29 .Q . . . . 17.50 0.2873 0.23 Q . . . . 17.75 0.2916 0.19 Q . . . . 18.00 0.2951 0.15 Q . . . . 18.25 0.2972 0.05 Q . . . . 18.50 0.2981 0.03 Q . . . . 18.75 0.2986 0.01 Q . . . . 19.00 0.2988 0.00 Q . . . . 19.25 0.2988 0.00 Q . . . . 19.50 0.2989 0.00 Q . . . .
Page 2
PROPOSED HCOC CALCS.txt 19.75 0.2989 0.00 Q . . . . 20.00 0.2990 0.00 Q . . . . 20.25 0.2990 0.00 Q . . . . 20.50 0.2990 0.00 Q . . . . 20.75 0.2991 0.00 Q . . . . 21.00 0.2991 0.00 Q . . . . 21.25 0.2992 0.00 Q . . . . 21.50 0.2992 0.00 Q . . . . 21.75 0.2992 0.00 Q . . . . 22.00 0.2993 0.00 Q . . . . 22.25 0.2993 0.00 Q . . . . 22.50 0.2993 0.00 Q . . . . 22.75 0.2994 0.00 Q . . . . 23.00 0.2994 0.00 Q . . . . 23.25 0.2994 0.00 Q . . . . 23.50 0.2994 0.00 Q . . . . 23.75 0.2995 0.00 Q . . . . 24.00 0.2995 0.00 Q . . . . 24.25 0.2995 0.00 Q . . . . ------------------------------------------------------------------------------------------------------------------------------------------------------------ TIME DURATION(minutes) OF PERCENTILES OF ESTIMATED PEAK FLOW RATE: (Note: 100% of Peak Flow Rate estimate assumed to have an instantaneous time duration)
Percentile of Estimated Duration Peak Flow Rate (minutes) ======================= ========= 0% 1440.0 10% 120.0 20% 30.0 30% 15.0 40% 15.0 50% 15.0 60% 15.0 70% 15.0 80% 15.0 90% 15.0
Page 3
Pre-Development Time of Concentration Nomograph
Post-Development Time of Concentration Nomograph