38
APPENDIX A Appendix A of the Final Re-evaluation Report Review of Issues Raised in Written Submissions to An Bord Pleanála and Presentations at the Oral Hearing in respect of the Previous Application for Approval (An Bord Pleanála Reference VA0006)

APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

APPENDIX A

Appendix A of the Final Re-evaluation Report

Review of Issues Raised in Written Submissions to An Bord Pleanála and Presentations at the Oral Hearing in

respect of the Previous Application for Approval (An Bord Pleanála Reference VA0006)

Page 2: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the
Page 3: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Final Re-evaluation ReportAPPENDIX A

North-South 400kV Interconnection

Development

Part Funded by the EU-TEN-E Initiative

Review of Issues Raised in Written Submissions toAn Bord Pleanála and Presentations at the Oral Hearing

in respect of the Previous Application for Approval(An Bord Pleanála Reference VA0006)

Page 4: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A0 -

1.0 Introduction

A previous application for planning approval for the North-South 400 kV Interconnection

Development (An Bord Pleanála Reference VA0006) was lodged on 18th December 2009. The

details of application were on public display during the period January – March 2010 (for a 10

week period) at the offices of An Bord Pleanála, the offices of the relevant County Councils

(Meath, Cavan and Monaghan), at the Project offices at Navan and Carrickmacross, and on a

dedicated web page.

Stakeholders, the general public and other interested parties had until the 12th March 2010 to

make submissions / observations on:-

• The implications of the proposed development on the proper planning and sustainable

development of the area; and

• The likely effects on the environment of the proposed development if carried out.

In addition, as part of the statutory consultation process, a number of Prescribed Bodies made

observations on the content of the application for approval (including the Environmental Impact

Statement (EIS)) to An Bord Pleanála.

In total, approximately 940 written submissions or observations were received in respect of the

application.

In May 2010, An Bord Pleanála commenced an Oral Hearing in respect of the proposed

development. Both Prescribed Bodies and interested parties (to include new parties to the

application) had the opportunity to make an oral submission to the Hearing.

2.0 Approach to Submissions

A copy of every submission received by An Bord Pleanála was issued to EirGrid. In order to

ensure that all of the submissions were considered by the relevant specialist project team

member, an initial review process was conducted.

This initial review included the identification of the main issues in each submission under a

number of key specialist topic areas. These topic areas related to various aspects of the

proposed development and the contents of its application package (including environmental

topics included in the EIS). These specialist topic areas are identified on Table A1.

Page 5: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A1 -

The purpose of the review was not an end in itself but rather highlighted to the relevant specialist

project team member when an issue relevant to their particular specialism was raised and to

direct their attention to the need to review the submission in detail.

The output of the initial review process for each submission is detailed in Table A2 located at the

back of this Appendix.

Topics

1 Air Noise and Vibration

2 Application Related

3 Consideration of Alternatives

4 Construction

5 Consultation

6 Cultural Heritage

7 Flora, Fauna and Fisheries

8 Health

9 Landscape and Visual Impact

10 Legal

11 Material Assets

12 Need

13 Operational

14 Planning Context

15 Property

16 Traffic

17 Soils, Water and Geology

Table A1 Topic Headings Used to Review Submissions

An explanatory note on these topics and the types of issues raised is set out below.

• Air, Noise and Vibration – The issues assigned to this topic related to Chapter 10 and 11

of Volume 2A and 2B of the 2009 Environmental Impact Statement. They included

potential impacts arising from noise associated with the proposed pylons, transmission line

and substation.

Page 6: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A2 -

• Application Related – The issues assigned to this topic related to various aspects of the

application package including inter alia the costs of purchasing the application, queries

relating to mapping, photomontages etc.

• Consideration of Alternatives - The issues assigned to this topic primarily related to

Chapter 4 and 5 of Volume 1 of the 2009 Environmental Impact Statement. They included

issues relating to undergrounding as an alternative to OHL, route alternatives (including

disused railbed and the M3), substation site alternatives, other technology options and

tower design options.

• Construction – The issues assigned to this topic related to Chapter 4 of Volume 2A and

2B of the 2009 Environmental Impact Statement and included issues such as construction

techniques and safety considerations.

• Consultation – The issues assigned to this topic primarily related to Chapter 3 of Volume

1 of the 2009 Environmental Impact Statement. The issues included observations relating

to consultation with the public, stakeholders, landowners and Prescribed Bodies.

• Cultural Heritage – The issues assigned to this topic related to Chapter 14 of Volume 2A

and 2B of the 2009 Environmental Impact Statement. They included potential impacts

relating to archaeology, architectural heritage, demesnes etc.

• Flora, Fauna and Fisheries – The issues assigned to this topic related to Chapter 7 of

Volume 2A and 2B of the 2009 Environmental Impact Statement. They included potential

impacts relating to wildlife, flora, fauna (including Whooper Swans), trees, fisheries, etc.

• Health Effects – The issues assigned to this topic related to Chapter 6 of Volume 2A and

2B of the 2009 Environmental Impact Statement. They included potential impacts relating

to health generally and EMF in particular.

• Landscape and Visual Impact - The issues assigned to this topic related to Chapter 12 of

Volume 2A and 2B of the 2009 Environmental Impact Statement. They included potential

impacts relating to the visual impact of the proposed pylons, transmission line and

substation. It also included observations in respect of particular landscape types (e.g. local

bogs, forestry etc.).

Page 7: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A3 -

• Legal - The issues assigned to this topic included all observations relating to access rights

for construction, maintenance and survey work, compensation, and owners’ rights. It also

considered observations relating to Strategic Infrastructure and EIA legislation (including

inter alia Appropriate Assessment, the consideration of alternatives, transboundary and

micrositing).

• Material Assets – The issues assigned to this topic related to Chapter 5 of Volume 2A and

2B of the 2009 Environmental Impact Statement. They included potential impacts relating

to the impact of the proposed development on farming practices, the community, tourism

and livelihoods.

• Need – The issues assigned to this topic related to Chapter 2 of Volume 1 of the 2009

Environmental Impact Statement. The issues included demand and policy provisions

relating to the proposed development.

• Operational - Issues assigned to this topic covered those relating to operational issues.

• Planning Context - The issues assigned to this topic related to Chapter 1 and 2 of Volume

1 of the 2009 Environmental Impact Statement and the Planning Context Report submitted

with the planning application. The issues included observations relating to national,

regional, and local development plan policy.

• Property - The issues assigned to this topic related to Chapter 1 and 2 of Volume 1 of the

2009 Environmental Impact Statement and the Planning Context Report submitted with the

planning application.

• Traffic - The issues assigned to this topic related to Chapter 13 of Volume 2A and 2B of

the 2009 Environmental Impact Statement. They included potential impacts relating to the

impact of the proposed development on the road network, access points etc.

• Soils, Geology and Water - The issues assigned to this topic related to Chapter 8 and 9

of Volume 2A and 2B of the 2009 Environmental Impact Statement. They included

potential impacts relating to the impact of the proposed development on geology, soils,

rivers and lakes.

Page 8: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A4 -

3.0 Response to Submissions

In drafting witness statements for the Oral Hearing, each specialist project team member had

regard to the issues raised in the submissions. Where the submission raised a very specific

issue / query which may not already have been addressed in the application documentation this

was specifically responded to.

Accordingly, the primary means of responding to all issues raised in the written submissions was

during the previous application for planning approval and specifically the witness statements

made by EirGrid and its Project Team to the Oral Hearing.

The primary means of responding to any new issues raised by Prescribed Bodies and interested

parties (to include new parties) that made an oral submission to the Hearing, was through cross

examination (prior to the adjournment of the Oral Hearing).

In June 2010, the EirGrid application was required to be withdrawn due to the discovery of an

inadvertent error in the public notice. As such, the application for approval was not determined by

An Bord Pleanála. Accordingly, the Oral Hearing was never completed including cross

examination.

4.0 Submissions on the Previous Application for Approval and the Re-evaluation

Report

As set out in Chapter 1 of the Final Re-evaluation Report, EirGrid is undertaking “a

comprehensive review of the previous application for planning approval” including but not

restricted to ”the subject matter of that planning application, the EIS and other technical and

environmental studies accompanying the application, alternatives considered in that application,

and third party and other submissions made to An Bord Pleanála in respect of that application.”

As part of the re-evaluation process, therefore, the project team has considered those issues that

arose in all the written and oral submissions made on the previous application. Many of these

issues related to the details of the previous application whereas the scope of the re-evaluation

process is to ensure that there is an understanding of, and confidence in, EirGrid’s conclusions in

respect of comparative evaluation of route corridor options and identification of the indicative line

route based on updated constraints and other information.

Page 9: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A

- A5 -

In this regard, the re-evaluation stage in the project comprises a process of re-evaluation of the

overall project, and does not concern the detailed routing or design of the proposed OHL and

associated development. In developing its proposal in subsequent phases of design and

environmental assessment, EirGrid and its consultants will consider the potential impact of the

development on inter alia environmental topics. This will be addressed in the EIS that will

accompany a future application for approval.

Accordingly, during the re-evaluation process those issues identified as particularly relevant to the

scope of the re-evaluation process were considered. The issues identified tended to come under

the Topic Headings identified in Table A3.

Topic Headings

1 Consideration of Alternatives

2 Cultural Heritage

3 Flora Fauna and Fisheries

4 Landscape and Visual Impact

5 Need

6 Landscape and Visual Impact

7 Soils, Water and Geology

Table A3 Headings / Sub Headings Particularly Relevant for the Re-evaluation Process

The rationale why some of the issues raised by observers during the 2009 application were not

considered relevant for detailed consideration in the re-evaluation stage (and specifically route

corridor and indicative line route re-evaluation) is included in Chapter 7 of the Final Re-

evaluation Report and includes inter alia issues / criteria that would be generally ‘Neutral’ for the

purpose of the comparative evaluation of route corridor options, in that the results would be

broadly the same for every route corridor option in the overall study area. These issues include

those for which it is reasonably assumed that mitigation measures can and will be implemented

and which will therefore be the same or similar for each identified corridor (e.g., safety and

construction / operational issues) and those issues more appropriately addressed during

subsequent detailed route design, preparation of EIS and planning stages.

However, it must be noted that all issues raised in the submissions on the previous application

will continue to be considered as the project progresses towards a new application.

Page 10: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

1x

xx

WS-

2x

xx

WS-

3x

xW

S-4

xx

xx

xW

S-5

xW

S-6

xx

xx

WS-

7x

xx

xx

xx

xW

S-8

xx

xx

xW

S-9

xx

WS-

10x

xx

xx

xW

S-11

xW

S-12

xx

xx

WS-

13x

xW

S-14

xx

xx

xW

S-15

WS-

16x

xx

xx

WS-

17x

xx

WS-

18x

xW

S-19

xW

S-20

xx

xx

xW

S-21

xx

xW

S-22

xx

WS-

23x

xx

xx

WS-

24x

xx

xx

WS-

25x

xW

S-26

xx

xW

S-27

xx

xx

xx

WS-

28x

xx

WS-

29x

xx

xW

S-30

xx

xx

WS-

31x

xx

xx

xW

S-32

xW

S-33

xx

xx

xW

S-34

xx

xx

WS-

35x

xx

xW

S-36

xx

xx

WS-

37x

xW

S-38

xx

xW

S-39

xx

���

Page 11: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

40x

xx

xx

WS-

41x

xW

S-42

xx

xx

WS-

43x

xx

xx

xx

xW

S-44

xW

S-45

xx

xW

S-46

xW

S-47

xx

xx

WS-

48x

xx

xW

S-49

xx

xx

WS-

50x

xx

xW

S-51

xx

WS-

52x

xW

S-53

xx

xW

S-54

xx

xx

xW

S-55

xx

xx

xx

WS-

56x

xx

xx

WS-

57x

xx

WS-

58x

xx

xW

S-59

xx

xW

S-60

xx

xW

S-61

xx

WS-

62x

xW

S-63

xx

xx

WS-

64W

S-65

xx

xW

S-66

xx

xx

xW

S-67

xx

xx

WS-

68x

xx

xx

WS-

69x

xx

xW

S-70

xx

xx

xx

WS-

71x

xx

xW

S-72

xx

xx

xW

S-73

xx

xx

xx

WS-

74x

xx

xx

WS-

75x

xx

xW

S-76

xx

xx

WS-

77x

xx

xW

S-78

x

���

Page 12: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

79x

xx

xW

S-80

xx

xW

S-81

xx

xx

xx

WS-

82x

WS-

83x

xx

xx

WS-

84x

xx

xx

xx

WS-

85x

xx

xW

S-86

xx

WS-

87x

xx

xx

WS-

88x

xx

xx

WS-

89x

xx

xx

xW

S-90

xx

xx

WS-

91x

xx

WS-

92x

xx

xW

S-93

xx

xx

xW

S-94

xx

xx

xx

WS-

95x

xx

xx

WS-

96x

xx

WS-

97x

xx

WS-

98x

xx

WS-

99x

xx

xx

xx

WS-

100

xx

xW

S-10

1x

xx

xx

xW

S-10

2x

xx

xW

S-10

3x

xx

xW

S-10

4x

xx

WS-

105

xW

S-10

6x

xx

WS-

107

WS-

108

WS-

109

WS-

110

WS-

111

xx

WS-

112

WS-

113

WS-

114

xx

xW

S-11

5x

xx

xx

xx

xW

S-11

6x

xx

xW

S-11

7x

xx

xx

���

Page 13: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

118

xx

xW

S-11

9x

xW

S-12

0x

xW

S-12

1x

xx

WS-

122

xx

xW

S-12

3x

xW

S-12

4x

xx

xx

WS-

125

xx

xx

xW

S-12

6x

WS-

127

xW

S-12

8x

xx

xx

xW

S-12

9x

xx

xx

xW

S-13

0x

xx

xW

S-13

1x

xx

xx

xx

WS-

132

xx

xx

xW

S-13

3x

xx

xx

xx

WS-

134

xx

xx

WS-

135

xx

WS-

136

xx

xx

xW

S-13

7x

xx

WS-

138

xx

xx

xW

S-13

9x

xx

xW

S-14

0x

xW

S-14

1x

xx

xx

WS-

142

xx

xx

xx

WS-

143

xx

xW

S-14

4x

WS-

145

xx

xW

S-14

6x

xx

xx

WS-

147

xW

S-14

8x

xx

xW

S-14

9x

xx

xx

xW

S-15

0x

WS-

151

xx

xx

xW

S-15

2x

WS-

153

xx

xW

S-15

4x

xx

WS-

155

WS-

156

xx

xx

x

���

Page 14: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

157

xx

xW

S-15

8x

xW

S-15

9x

xx

xx

xx

WS-

160

xx

xx

WS-

161

xW

S-16

2x

xx

xx

WS-

163

xx

xx

WS-

164

xx

WS-

165

xx

WS-

166

xx

xx

xx

xW

S-16

7x

xx

xW

S-16

8x

xx

WS-

169

xx

xx

WS-

170

xx

xW

S-17

1x

xx

xW

S-17

2x

xx

WS-

173

xx

xx

WS-

174

xx

xx

WS-

175

xx

xx

xx

WS-

176

xx

xx

xW

S-17

7x

xx

xW

S-17

8x

xx

xW

S-17

9W

S-18

0x

xx

xW

S-18

1W

S-18

2x

xx

WS-

183

WS-

184

xx

xx

xx

xW

S-18

5W

S-18

6W

S-18

7x

xx

WS-

188

WS-

189

WS-

190

WS-

191

WS-

192

WS-

193

WS-

194

WS-

195

���

Page 15: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

196

xx

WS-

197

xx

WS-

198

xx

WS-

199

xx

xW

S-20

0x

xx

xx

WS-

201

xx

xx

xW

S-20

2x

xx

WS-

203

xx

xW

S-20

4x

xx

WS-

205

xx

WS-

206

xx

xx

xW

S-20

7x

xx

WS-

208

xx

xW

S-20

9x

xx

WS-

210

xx

xx

WS-

211

xx

xx

xW

S-21

2x

xx

WS-

213

xx

WS-

214

xx

xx

WS-

215

xx

xx

xx

WS-

216

xx

xx

WS-

217

xx

xx

xx

WS-

218

xx

xx

xx

xW

S-21

9x

xx

xx

xW

S-22

0x

xx

xW

S-22

1x

xx

xW

S-22

2x

xx

xx

xW

S-22

3x

xx

xx

xx

WS-

224

xx

xx

xx

WS-

225

xx

xx

WS-

226

xx

xx

WS-

227

xx

xx

xW

S-22

8x

xx

WS-

229

xx

xx

WS-

230

xx

xx

xx

xx

WS-

231

xx

xx

xx

xW

S-23

2x

xx

xx

xx

WS-

233

xx

xx

xW

S-23

4x

xx

xx

x

����

Page 16: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

235

xx

xx

xx

WS-

236

xx

xW

S-23

7W

S-23

8x

xx

xW

S-23

9x

xx

xx

xx

WS-

240

xx

xx

WS-

241

xx

xx

xx

WS-

242

xW

S-24

3x

xx

xx

xW

S-24

4x

xx

xW

S-24

5x

xx

xx

WS-

246

xx

xW

S-24

7x

xx

xW

S-24

8W

S-24

9x

xW

S-25

0x

xx

WS-

251

xx

xx

WS-

252

xx

xx

WS-

253

xx

xW

S-25

4x

xx

xx

xW

S-25

5W

S-25

6x

xx

xx

WS-

257

xx

xW

S-25

8x

WS-

259

xx

xx

WS-

260

xx

xW

S-26

1x

xx

xx

xW

S-26

2x

xx

WS-

263

xx

xx

xW

S-26

4x

xW

S-26

5x

xx

xx

WS-

266

xx

xx

WS-

267

xx

xW

S-26

8x

xx

WS-

269

xx

xx

xx

xW

S-27

0x

xx

xW

S-27

1x

xx

xx

WS-

272

xx

xx

WS-

273

xx

xx

xx

���

Page 17: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

274

xx

xx

xx

WS-

275

xx

WS-

276

xx

WS-

277

xx

xx

xW

S-27

8x

xx

xW

S-27

9x

xx

xx

xx

WS-

280

xx

xW

S-28

1x

xx

xW

S-28

2W

S-28

3x

xx

xx

WS-

284

xx

xW

S-28

5W

S-28

6x

xx

xW

S-28

7x

xx

WS-

288

xx

xW

S-28

9x

xx

xW

S-29

0x

WS-

291

xx

xx

WS-

292

xx

xx

xW

S-29

3x

xx

xW

S-29

4x

xx

WS-

295

xx

WS-

296

xx

xx

xx

xW

S-29

7x

WS-

298

xx

xx

WS-

299

xx

WS-

300

xW

S-30

1x

xW

S-30

2x

xx

WS-

303

xx

xx

WS-

304

xx

xx

xW

S-30

5x

xx

xx

xx

WS-

306

xW

S-30

7x

xx

WS-

308

xW

S-30

9x

xx

WS-

310

xx

xW

S-31

1x

xx

xW

S-31

2x

x

����

Page 18: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

313

xW

S-31

4x

WS-

315

xx

xW

S-31

6x

xW

S-31

7x

xW

S-31

8x

xW

S-31

9x

xx

xx

xW

S-32

0x

xx

WS-

321

xW

S-32

2x

xx

xx

xW

S-32

3x

xx

xW

S-32

4W

S-32

5W

S-32

6x

xx

xx

xx

xW

S-32

7x

xx

xx

xW

S-32

8x

xx

xx

WS-

329

xx

xx

xx

xx

WS-

330

xx

xx

xx

WS-

331

xx

xx

xx

xW

S-33

2x

xx

xW

S-33

3x

xx

xW

S-33

4x

xx

xx

WS-

335

xx

xx

xx

WS-

336

xx

xx

xW

S-33

7x

xx

WS-

338

xx

xx

WS-

339

xx

xx

xW

S-34

0x

xx

xx

xW

S-34

1x

WS-

342

xx

xx

xx

WS-

343

xx

xx

xx

WS-

344

xx

xx

xx

WS-

345

xx

xx

xW

S-34

6x

xx

xx

WS-

347

xx

xx

WS-

348

WS-

349

WS-

350

xx

xx

WS-

351

xx

xx

����

Page 19: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

352

xx

xx

WS-

353

xx

xx

xx

xW

S-35

4x

xx

xW

S-35

5x

xx

WS-

356

xx

xx

xW

S-35

7x

xx

WS-

358

xx

xW

S-35

9x

xx

xW

S-36

0x

xW

S-36

1x

xx

xx

WS-

362

xx

xW

S-36

3x

xx

xW

S-36

4W

S-36

5x

xx

xW

S-36

6W

S-36

7W

S-36

8x

xx

xW

S-36

9x

xx

xx

WS-

370

xx

xx

xx

WS-

371

xx

xx

xx

xW

S-37

2x

xx

WS-

373

xx

xx

xx

WS-

374

xx

xx

xW

S-37

5x

xx

xW

S-37

6x

xx

xW

S-37

7x

xx

xx

WS-

378

xx

xx

WS-

379

xx

xx

WS-

380

xx

xx

xW

S-38

1W

S-38

2x

xW

S-38

3W

S-38

4x

xx

xx

xx

xW

S-38

5x

xx

xx

WS-

386

xx

xx

xW

S-38

7x

xx

xx

xW

S-38

8x

xx

xx

WS-

389

WS-

390

xx

xx

x

���

Page 20: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

391

xx

xx

WS-

392

xx

xx

xx

xW

S-39

3x

xW

S-39

4x

xx

xW

S-39

5x

xx

xW

S-39

6x

xx

xx

WS-

397

xx

xx

xW

S-39

8x

xx

xW

S-39

9x

xx

xx

WS-

400

xx

xx

WS-

401

xx

xx

WS-

402

xx

xx

xx

xW

S-40

3x

xx

xx

WS-

404

WS-

405

xx

xx

xx

WS-

406

WS-

407

WS-

408

WS-

409

xx

xx

xx

xx

WS-

410

WS-

411

WS-

412

WS-

413

xx

xx

xW

S-41

4x

xx

xW

S-41

5x

xx

xW

S-41

6x

xx

xx

xx

xW

S-41

7W

S-41

8x

xx

xx

xW

S-41

9x

xx

WS-

420

xx

WS-

421

xx

xW

S-42

2x

xx

xW

S-42

3x

xx

xx

WS-

424

xx

xx

xW

S-42

5x

xx

xW

S-42

6x

xx

xx

WS-

427

xx

xx

xW

S-42

8x

WS-

429

xx

xx

xx

����

Page 21: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

430

xx

xW

S-43

1x

xx

xx

xW

S-43

2x

xx

xx

xx

xx

WS-

433

xx

xx

xx

WS-

434

xx

xx

xx

xx

WS-

435

xx

xx

WS-

436

xx

xW

S-43

7x

xx

xx

xW

S-43

8x

xW

S-43

9x

WS-

440

xW

S-44

1x

xW

S-44

2x

WS-

443

xW

S-44

4x

WS-

445

xW

S-44

6x

xW

S-44

7x

xx

xW

S-44

8x

xx

WS-

449

xx

xx

xW

S-45

0x

xx

WS-

451

xW

S-45

2x

WS-

453

xx

WS-

454

xx

xx

xW

S-45

5x

xW

S-45

6x

xx

xx

xW

S-45

7x

xx

xW

S-45

8x

xx

xx

WS-

459

xW

S-46

0x

xx

WS-

461

xx

xx

WS-

462

WS-

463

xx

xW

S-46

4x

xx

xx

xx

xW

S-46

5x

xx

xW

S-46

6x

WS-

467

xx

xW

S-46

8x

xx

x

����

Page 22: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

469

WS-

470

WS-

471

WS-

472

WS-

473

WS-

474

WS-

475

WS-

476

WS-

477

xx

WS-

478

xx

WS-

479

xx

xW

S-48

0x

xx

xx

xW

S-48

1x

xx

xW

S-48

2x

xx

WS-

483

xx

xx

WS-

484

xx

xx

WS-

485

xx

xW

S-48

6x

xx

xx

WS-

487

xW

S-48

8W

S-48

9x

WS-

490

WS-

491

xW

S-49

2x

xW

S-49

3W

S-49

4x

WS-

495

xx

xW

S-49

6W

S-49

7W

S-49

8W

S-49

9W

S-50

0x

WS-

501

xW

S-50

2x

xx

WS-

503

xx

xW

S-50

4x

xx

xx

xx

xW

S-50

5x

xx

xW

S-50

6W

S-50

7x

xx

����

Page 23: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

508

xx

xx

xx

WS-

509

xx

xW

S-51

0W

S-51

1x

xx

WS-

512

xx

xx

WS-

513

xx

WS-

514

xx

xW

S-51

5W

S-51

6x

WS-

517

xx

WS-

518

xx

WS-

519

xW

S-52

0x

xW

S-52

1x

xx

xW

S-52

2x

xW

S-52

3W

S-52

4W

S-52

5W

S-52

6W

S-52

7W

S-52

8x

xx

WS-

529

xx

xx

xx

xW

S-53

0x

xx

xW

S-53

1x

xx

xx

xW

S-53

2x

xx

xW

S-53

3x

xx

xx

xW

S-53

4x

xx

WS-

535

xx

xx

xx

xW

S-53

6x

xx

xW

S-53

7x

xx

xW

S-53

8x

xx

WS-

539

xx

xW

S-54

0W

S-54

1x

xx

xx

xx

xx

xx

xx

xx

xx

WS-

542

xW

S-54

3x

WS-

544

xW

S-54

5W

S-54

6

����

Page 24: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

547

xW

S-54

8x

xx

WS-

549

xx

WS-

550

xx

xx

xW

S-55

1x

xW

S-55

2x

xx

xx

WS-

553

xx

xx

WS-

554

WS-

555

xx

WS-

556

xx

WS-

557

xW

S-55

8x

WS-

559

xW

S-56

0x

xW

S-56

1x

WS-

562

xx

WS-

563

xW

S-56

4x

xW

S-56

5x

xx

WS-

566

xx

xx

xx

WS-

567

xx

xx

xW

S-56

8x

xx

xx

xW

S-56

9x

xx

xx

WS-

570

WS-

571

WS-

572

WS-

573

WS-

574

WS-

575

xx

xW

S-57

6x

xx

WS-

577

WS-

578

WS-

579

xx

WS-

580

xx

xx

xW

S-58

1x

xx

WS-

582

xx

xx

xx

WS-

583

xx

xx

WS-

584

xx

xx

xW

S-58

5x

xx

��

Page 25: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

586

xx

xx

xW

S-58

7x

xx

xx

WS-

588

xx

xx

xx

xW

S-58

9x

xx

xx

xW

S-59

0x

xx

WS-

591

xx

xx

WS-

592

xx

xx

xW

S-59

3x

xx

xx

WS-

594

xx

xW

S-59

5x

xx

xx

WS-

596

xx

xx

xx

WS-

597

xx

xx

WS-

598

xx

xx

xx

WS-

599

xx

xx

xW

S-60

0x

xx

xx

WS-

601

xx

xx

xW

S-60

2x

xx

WS-

603

xx

xx

xW

S-60

4x

xx

xx

xW

S-60

5x

xx

xx

xx

WS-

606

xx

xW

S-60

7x

xx

xx

WS-

608

xx

xx

xx

WS-

609

xx

WS-

610

WS-

611

WS-

612

WS-

613

xx

WS-

614

xx

WS-

615

xx

WS-

616

xx

xx

WS-

617

xW

S-61

8x

WS-

619

xx

WS-

620

xx

xx

xW

S-62

1x

xx

xW

S-62

2x

xx

WS-

623

xx

xW

S-62

4x

xx

xx

���

Page 26: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

625

xx

xx

xW

S-62

6x

xx

xx

xW

S-62

7x

xx

xx

WS-

628

xx

xx

WS-

629

xx

xW

S-63

0x

xx

xx

xx

WS-

631

xx

xx

xW

S-63

2x

xx

WS-

633

xx

xx

xW

S-63

4x

xx

xx

xW

S-63

5x

xx

xW

S-63

6x

xx

xW

S-63

7x

xx

xW

S-63

8x

xW

S-63

9x

xx

xx

xW

S-64

0x

xx

xW

S-64

1x

xx

xW

S-64

2x

WS-

643

xx

xx

xx

WS-

644

xx

xx

xx

WS-

645

xx

xx

WS-

646

WS-

647

WS-

648

WS-

649

xW

S-65

0W

S-65

1x

WS-

652

xx

WS-

653

WS-

654

xx

WS-

655

xx

xx

xx

xW

S-65

6x

xW

S-65

7x

WS-

658

xx

xx

WS-

659

xx

xx

WS-

660

xx

xW

S-66

1x

xx

WS-

662

xW

S-66

3x

xx

xx

��

Page 27: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

664

xx

xx

WS-

665

xW

S-66

6x

xx

xx

WS-

667

xW

S-66

8x

xW

S-66

9x

xx

xx

WS-

670

xx

xW

S-67

1x

xW

S-67

2x

xx

WS-

673

xx

xx

WS-

674

xx

xx

xW

S-67

5x

xx

WS-

676

xx

xW

S-67

7x

xx

xW

S-67

8x

xx

WS-

679

xx

xx

xx

xW

S-68

0x

xx

WS-

681

xx

xx

xW

S-68

2x

xW

S-68

3W

S-68

4W

S-68

5x

WS-

686

xx

xx

xW

S-68

7x

xx

xx

WS-

688

xx

xx

xW

S-68

9x

xx

xx

xW

S-69

0x

xx

xW

S-69

1x

xx

xx

xW

S-69

2x

xx

xW

S-69

3x

xx

xW

S-69

4x

xx

xx

WS-

695

xx

xx

xx

xW

S-69

6x

xx

xx

WS-

697

xx

xW

S-69

8x

xx

WS-

699

xx

WS-

700

xx

xx

WS-

701

xx

WS-

702

xx

���

Page 28: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

703

xx

xx

xx

xx

xx

xx

xx

xx

xx

WS-

704

xW

S-70

5x

xW

S-70

6x

WS-

707

xW

S-70

8x

WS-

709

xx

xx

WS-

710

xx

xx

xW

S-71

1x

xx

xx

xW

S-71

2x

WS-

713

xx

xW

S-71

4x

xx

xx

xW

S-71

5x

xW

S-71

6x

xx

WS-

717

xx

xW

S-71

8x

xW

S-71

9x

xW

S-72

0x

xx

xW

S-72

1x

xx

xW

S-72

2x

xW

S-72

3x

xx

WS-

724

xx

xW

S-72

5x

xW

S-72

6x

xx

xW

S-72

7x

xx

xW

S-72

8x

xx

xW

S-72

9x

xW

S-73

0x

xx

WS-

731

xx

xW

S-73

2x

xW

S-73

3x

xW

S-73

4x

xx

xx

WS-

735

xx

xx

WS-

736

xx

xx

WS-

737

xx

xW

S-73

8x

xx

WS-

739

WS-

740

WS-

741

���

Page 29: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

742

WS-

743

WS-

744

WS-

745

WS-

746

xx

WS-

747

xx

xx

xW

S-74

8x

xx

xx

WS-

749

xx

xx

xW

S-75

0x

xx

xW

S-75

1x

xW

S-75

2x

xx

WS-

753

xW

S-75

4x

xx

WS-

755

xx

WS-

756

xx

xx

WS-

757

xx

xW

S-75

8x

xx

xx

WS-

759

xx

xW

S-76

0x

xx

xW

S-76

1x

xx

xW

S-76

2x

WS-

763

xx

xx

WS-

764

xx

WS-

765

xW

S-76

6x

xW

S-76

7x

WS-

768

WS-

769

WS-

770

WS-

771

WS-

772

WS-

773

WS-

774

WS-

775

WS-

776

WS-

777

xW

S-77

8x

xx

xx

WS-

779

xx

xx

xW

S-78

0x

xx

xx

x

��

Page 30: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

781

xx

xx

WS-

782

xW

S-78

3x

xx

WS-

784

xx

xW

S-78

5x

xx

xx

WS-

786

xx

xW

S-78

7x

xx

WS-

788

xx

xx

xx

WS-

789

xx

xx

xx

xW

S-79

0x

xx

xx

WS-

791

xx

xW

S-79

2x

xx

xx

xx

xW

S-79

3x

xx

xW

S-79

4x

xx

xx

xW

S-79

5x

xx

xx

WS-

796

xx

xx

xx

WS-

797

xx

xx

xW

S-79

8x

xx

xx

xW

S-79

9x

xx

xW

S-80

0x

xx

xx

xx

WS-

801

xx

xx

xW

S-80

2x

xx

xW

S-80

3x

xx

WS-

804

xx

xW

S-80

5x

xx

xx

xW

S-80

6x

xx

xx

xW

S-80

7x

xx

xx

WS-

808

WS-

809

xx

WS-

810

xx

xW

S-81

1x

xx

xx

WS-

812

xx

xx

xx

xW

S-81

3x

xx

xx

xW

S-81

4x

xx

WS-

815

xW

S-81

6x

xW

S-81

7x

xx

xW

S-81

8x

WS-

819

xx

���

Page 31: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

820

xx

WS-

821

xx

xW

S-82

2x

WS-

823

xx

xx

WS-

824

xx

xW

S-82

5W

S-82

6x

xW

S-82

7x

xx

WS-

828

xx

xW

S-82

9x

xW

S-83

0x

xx

xx

xW

S-83

1x

xx

xx

WS-

832

xx

xx

xx

WS-

833

xx

xW

S-83

4x

xx

xx

WS-

835

xx

xx

WS-

836

xx

WS-

837

xx

xx

xx

xW

S-83

8x

xx

xx

WS-

839

xx

xx

xx

xW

S-84

0x

xW

S-84

1x

xx

xx

xx

WS-

842

xx

xW

S-84

3x

xx

xW

S-84

4x

xx

xx

WS-

845

xx

xx

xW

S-84

6x

xx

xx

WS-

847

xx

xx

WS-

848

xx

xW

S-84

9x

xx

xx

xx

WS-

850

xx

xx

xW

S-85

1x

xx

xx

WS-

852

xx

xx

xW

S-85

3x

xx

xx

WS-

854

xx

xx

xx

WS-

855

xx

xx

WS-

856

xW

S-85

7x

xx

xx

WS-

858

xx

���

Page 32: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

859

xx

xx

WS-

860

WS-

861

WS-

862

WS-

863

xx

WS-

864

xx

xx

xW

S-86

5x

WS-

866

xx

xx

xW

S-86

7x

xx

xW

S-86

8x

xx

WS-

869

xx

WS-

870

xx

xx

xW

S-87

1x

xx

WS-

872

xx

xx

xW

S-87

3x

xx

xx

xW

S-87

4x

xx

xx

WS-

875

xx

xx

xx

WS-

876

xx

xx

WS-

877

xx

xx

WS-

878

xx

xW

S-87

9x

xx

xW

S-88

0x

xx

xW

S-88

1x

xx

xx

WS-

882

xx

xx

WS-

883

xW

S-88

4x

WS-

885

xx

xx

WS-

886

xx

xx

xW

S-88

7x

xW

S-88

8x

xW

S-88

9x

xx

WS-

890

xW

S-89

1x

xW

S-89

2x

xx

WS-

893

WS-

894

xx

xW

S-89

5x

xx

xx

xx

WS-

896

xx

WS-

897

xx

���

Page 33: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

WS-

898

xx

xx

xW

S-89

9x

xx

xx

xx

WS-

900

xx

xx

WS-

901

xx

WS-

902

xx

xx

WS-

903

xx

xx

WS-

904

WS-

905

WS-

906

WS-

907

WS-

908

WS-

909

xx

xx

xx

xW

S-91

0x

xx

xx

xW

S-91

1x

xx

xx

OS

-1x

OS

-2x

xx

xO

S-3

xx

xx

xx

xO

S-4

xx

OS

-5x

xO

S-6

xx

xO

S-7

xx

xx

xx

xx

xO

S-8

xx

xx

xx

OS

-9x

OS

-10

xx

xx

xx

xx

xx

xx

OS

-11

xx

xx

xO

S-1

2x

xO

S-1

3x

xx

xx

xx

OS

-14

xx

xO

S-1

5x

xx

xO

S-1

6x

OS

-17

xx

xx

xx

xx

xx

xO

S-1

8x

xx

OS

-19

xx

xx

xx

OS

-20

xx

xO

S-2

1x

xx

xO

S-2

2x

xO

S-2

3x

xO

S-2

4x

xx

xO

S-2

5x

xx

���

Page 34: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

OS

-26

xx

xx

xx

OS

-27

xx

xx

xx

xx

xx

OS

-28

xO

S-2

9x

xx

OS

-30

xx

OS

-31

xx

xO

S-3

2x

xx

xx

OS

-33

xO

S-3

4x

xx

xx

OS

-35

xO

S-3

6x

xx

OS

-37

xx

OS

-38

xx

xO

S-3

9x

xx

xO

S-4

0x

xx

OS

-41

xx

xO

S-4

2x

OS

-43

xx

xx

xO

S-4

4x

xx

xO

S-4

5x

xx

OS

-46

xO

S-4

7x

OS

-48

xO

S-4

9x

xx

xx

xx

xO

S-5

0x

xx

xx

OS

-51

xx

xx

xO

S-5

2x

xx

xx

xx

xO

S-5

3x

xx

xx

xO

S-5

4x

xx

xO

S-5

5x

xx

OS

-56

xx

xx

xx

xO

S-5

7x

xx

xx

xO

S-5

8x

xx

xx

xx

OS

-59

xx

xx

xx

xx

xO

S-6

0x

xx

xx

xO

S-6

1x

xx

xx

xO

S-6

2x

xx

xx

xO

S-6

3x

xx

xx

xO

S-6

4x

xx

xx

x

���

Page 35: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

OS

-65

xx

xx

xx

OS

-66

xx

xx

xx

xO

S-6

7x

xx

OS

-68

xx

xx

xx

OS

-69

xx

xO

S-7

0x

xx

xx

OS

-71

xx

OS

-72

xO

S-7

3x

xx

OS

-74

xx

OS

-75

xx

xO

S-7

6x

xO

S-7

7x

xx

OS

-78

xO

S-7

9x

xx

xO

S-8

0x

xx

xx

xx

xO

S-8

1x

xx

xx

OS

-82

xx

xx

OS

-83

xO

S-8

4x

xx

xO

S-8

5x

OS

-86

xx

OS

-87

xx

xO

S-8

8x

xx

xx

xx

OS

-89

xx

xx

OS

-90

xO

S-9

1x

xx

xx

xx

OS

-92

xO

S-9

3x

xx

OS

-94

xx

xO

S-9

5x

OS

-96

xx

xx

OS

-97

xO

S-9

8x

xx

xx

xx

OS

-99

xx

OS

-100

xx

xx

OS

-101

xx

xx

OS

-102

xx

xx

xx

OS

-103

xx

xx

xx

xx

����

Page 36: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

OS

-104

xx

xx

OS

-105

xx

xx

xx

OS

-106

xx

xx

xx

OS

-107

xx

xx

xx

xx

xx

xx

OS

-108

xx

xx

xx

xx

xx

OS

-109

xx

xx

xx

OS

-110

xO

S-1

11x

OS

-112

xx

xx

xO

S-1

13x

OS

-114

xx

OS

-115

xx

xx

OS

-116

xx

xO

S-1

17x

xx

OS

-118

xx

xO

S-1

19x

OS

-120

xx

xx

xx

xO

S-1

21x

xx

xx

xx

OS

-122

xx

xx

xx

OS

-123

xx

xx

xx

xO

S-1

24x

xx

xx

xx

xO

S-1

25x

xx

xO

S-1

26x

xx

xx

xx

OS

-127

xx

xx

xx

OS

-128

xx

xx

xx

xx

OS

-129

xx

xO

S-1

30x

xx

xx

OS

-131

xx

xO

S-1

32x

OS

-133

xx

xO

S-1

34x

xO

S-1

35x

xO

S-1

36x

xO

S-1

37x

xx

xO

S-1

38x

xx

xO

S-1

39x

xx

xx

xO

S-1

40x

xO

S-1

41x

OS

-142

xx

���

Page 37: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the

Nor

th-S

outh

400

kV

Inte

rcon

nect

ion

Dev

elop

men

tTa

ble

A2Fi

nal R

e-ev

alua

tion

Repo

rt -

Appe

ndix

A

Publ

ish

ID

Air Noise and Vibration

Application Related

Construction

Consultation

Consideration of Alternatives

Cultural Heritage

Flora, Fauna and Fisheries

Health

Landscape and Visual Impact

Need

Operational

Legal

Material Assets

Planning Context

Property

Traffic

Soils, Water & Geology

Relevant to all Specialists

OS

-143

xx

OS

-144

xO

S-1

45x

OS

-146

xO

S-1

47x

xx

OS

-148

xx

xx

xO

S-1

49x

OS

-150

xx

xx

xO

S-1

51x

xx

OS

-152

xx

xx

xx

OS

-153

xx

xx

xx

xx

OS

-154

xO

S-1

55x

xx

xx

xx

����

Page 38: APPENDIX A Appendix A of the Final Re-evaluation Report ...€¦ · North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A - A5 - In this regard, the