APPENDIX A
Appendix A of the Final Re-evaluation Report
Review of Issues Raised in Written Submissions to An Bord Pleanála and Presentations at the Oral Hearing in
respect of the Previous Application for Approval (An Bord Pleanála Reference VA0006)
Final Re-evaluation ReportAPPENDIX A
North-South 400kV Interconnection
Development
Part Funded by the EU-TEN-E Initiative
Review of Issues Raised in Written Submissions toAn Bord Pleanála and Presentations at the Oral Hearing
in respect of the Previous Application for Approval(An Bord Pleanála Reference VA0006)
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A0 -
1.0 Introduction
A previous application for planning approval for the North-South 400 kV Interconnection
Development (An Bord Pleanála Reference VA0006) was lodged on 18th December 2009. The
details of application were on public display during the period January – March 2010 (for a 10
week period) at the offices of An Bord Pleanála, the offices of the relevant County Councils
(Meath, Cavan and Monaghan), at the Project offices at Navan and Carrickmacross, and on a
dedicated web page.
Stakeholders, the general public and other interested parties had until the 12th March 2010 to
make submissions / observations on:-
• The implications of the proposed development on the proper planning and sustainable
development of the area; and
• The likely effects on the environment of the proposed development if carried out.
In addition, as part of the statutory consultation process, a number of Prescribed Bodies made
observations on the content of the application for approval (including the Environmental Impact
Statement (EIS)) to An Bord Pleanála.
In total, approximately 940 written submissions or observations were received in respect of the
application.
In May 2010, An Bord Pleanála commenced an Oral Hearing in respect of the proposed
development. Both Prescribed Bodies and interested parties (to include new parties to the
application) had the opportunity to make an oral submission to the Hearing.
2.0 Approach to Submissions
A copy of every submission received by An Bord Pleanála was issued to EirGrid. In order to
ensure that all of the submissions were considered by the relevant specialist project team
member, an initial review process was conducted.
This initial review included the identification of the main issues in each submission under a
number of key specialist topic areas. These topic areas related to various aspects of the
proposed development and the contents of its application package (including environmental
topics included in the EIS). These specialist topic areas are identified on Table A1.
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A1 -
The purpose of the review was not an end in itself but rather highlighted to the relevant specialist
project team member when an issue relevant to their particular specialism was raised and to
direct their attention to the need to review the submission in detail.
The output of the initial review process for each submission is detailed in Table A2 located at the
back of this Appendix.
Topics
1 Air Noise and Vibration
2 Application Related
3 Consideration of Alternatives
4 Construction
5 Consultation
6 Cultural Heritage
7 Flora, Fauna and Fisheries
8 Health
9 Landscape and Visual Impact
10 Legal
11 Material Assets
12 Need
13 Operational
14 Planning Context
15 Property
16 Traffic
17 Soils, Water and Geology
Table A1 Topic Headings Used to Review Submissions
An explanatory note on these topics and the types of issues raised is set out below.
• Air, Noise and Vibration – The issues assigned to this topic related to Chapter 10 and 11
of Volume 2A and 2B of the 2009 Environmental Impact Statement. They included
potential impacts arising from noise associated with the proposed pylons, transmission line
and substation.
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A2 -
• Application Related – The issues assigned to this topic related to various aspects of the
application package including inter alia the costs of purchasing the application, queries
relating to mapping, photomontages etc.
• Consideration of Alternatives - The issues assigned to this topic primarily related to
Chapter 4 and 5 of Volume 1 of the 2009 Environmental Impact Statement. They included
issues relating to undergrounding as an alternative to OHL, route alternatives (including
disused railbed and the M3), substation site alternatives, other technology options and
tower design options.
• Construction – The issues assigned to this topic related to Chapter 4 of Volume 2A and
2B of the 2009 Environmental Impact Statement and included issues such as construction
techniques and safety considerations.
• Consultation – The issues assigned to this topic primarily related to Chapter 3 of Volume
1 of the 2009 Environmental Impact Statement. The issues included observations relating
to consultation with the public, stakeholders, landowners and Prescribed Bodies.
• Cultural Heritage – The issues assigned to this topic related to Chapter 14 of Volume 2A
and 2B of the 2009 Environmental Impact Statement. They included potential impacts
relating to archaeology, architectural heritage, demesnes etc.
• Flora, Fauna and Fisheries – The issues assigned to this topic related to Chapter 7 of
Volume 2A and 2B of the 2009 Environmental Impact Statement. They included potential
impacts relating to wildlife, flora, fauna (including Whooper Swans), trees, fisheries, etc.
• Health Effects – The issues assigned to this topic related to Chapter 6 of Volume 2A and
2B of the 2009 Environmental Impact Statement. They included potential impacts relating
to health generally and EMF in particular.
• Landscape and Visual Impact - The issues assigned to this topic related to Chapter 12 of
Volume 2A and 2B of the 2009 Environmental Impact Statement. They included potential
impacts relating to the visual impact of the proposed pylons, transmission line and
substation. It also included observations in respect of particular landscape types (e.g. local
bogs, forestry etc.).
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A3 -
• Legal - The issues assigned to this topic included all observations relating to access rights
for construction, maintenance and survey work, compensation, and owners’ rights. It also
considered observations relating to Strategic Infrastructure and EIA legislation (including
inter alia Appropriate Assessment, the consideration of alternatives, transboundary and
micrositing).
• Material Assets – The issues assigned to this topic related to Chapter 5 of Volume 2A and
2B of the 2009 Environmental Impact Statement. They included potential impacts relating
to the impact of the proposed development on farming practices, the community, tourism
and livelihoods.
• Need – The issues assigned to this topic related to Chapter 2 of Volume 1 of the 2009
Environmental Impact Statement. The issues included demand and policy provisions
relating to the proposed development.
• Operational - Issues assigned to this topic covered those relating to operational issues.
• Planning Context - The issues assigned to this topic related to Chapter 1 and 2 of Volume
1 of the 2009 Environmental Impact Statement and the Planning Context Report submitted
with the planning application. The issues included observations relating to national,
regional, and local development plan policy.
• Property - The issues assigned to this topic related to Chapter 1 and 2 of Volume 1 of the
2009 Environmental Impact Statement and the Planning Context Report submitted with the
planning application.
• Traffic - The issues assigned to this topic related to Chapter 13 of Volume 2A and 2B of
the 2009 Environmental Impact Statement. They included potential impacts relating to the
impact of the proposed development on the road network, access points etc.
• Soils, Geology and Water - The issues assigned to this topic related to Chapter 8 and 9
of Volume 2A and 2B of the 2009 Environmental Impact Statement. They included
potential impacts relating to the impact of the proposed development on geology, soils,
rivers and lakes.
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A4 -
3.0 Response to Submissions
In drafting witness statements for the Oral Hearing, each specialist project team member had
regard to the issues raised in the submissions. Where the submission raised a very specific
issue / query which may not already have been addressed in the application documentation this
was specifically responded to.
Accordingly, the primary means of responding to all issues raised in the written submissions was
during the previous application for planning approval and specifically the witness statements
made by EirGrid and its Project Team to the Oral Hearing.
The primary means of responding to any new issues raised by Prescribed Bodies and interested
parties (to include new parties) that made an oral submission to the Hearing, was through cross
examination (prior to the adjournment of the Oral Hearing).
In June 2010, the EirGrid application was required to be withdrawn due to the discovery of an
inadvertent error in the public notice. As such, the application for approval was not determined by
An Bord Pleanála. Accordingly, the Oral Hearing was never completed including cross
examination.
4.0 Submissions on the Previous Application for Approval and the Re-evaluation
Report
As set out in Chapter 1 of the Final Re-evaluation Report, EirGrid is undertaking “a
comprehensive review of the previous application for planning approval” including but not
restricted to ”the subject matter of that planning application, the EIS and other technical and
environmental studies accompanying the application, alternatives considered in that application,
and third party and other submissions made to An Bord Pleanála in respect of that application.”
As part of the re-evaluation process, therefore, the project team has considered those issues that
arose in all the written and oral submissions made on the previous application. Many of these
issues related to the details of the previous application whereas the scope of the re-evaluation
process is to ensure that there is an understanding of, and confidence in, EirGrid’s conclusions in
respect of comparative evaluation of route corridor options and identification of the indicative line
route based on updated constraints and other information.
North-South 400 kV Interconnection Development Final Re-evaluation Report - Appendix A
- A5 -
In this regard, the re-evaluation stage in the project comprises a process of re-evaluation of the
overall project, and does not concern the detailed routing or design of the proposed OHL and
associated development. In developing its proposal in subsequent phases of design and
environmental assessment, EirGrid and its consultants will consider the potential impact of the
development on inter alia environmental topics. This will be addressed in the EIS that will
accompany a future application for approval.
Accordingly, during the re-evaluation process those issues identified as particularly relevant to the
scope of the re-evaluation process were considered. The issues identified tended to come under
the Topic Headings identified in Table A3.
Topic Headings
1 Consideration of Alternatives
2 Cultural Heritage
3 Flora Fauna and Fisheries
4 Landscape and Visual Impact
5 Need
6 Landscape and Visual Impact
7 Soils, Water and Geology
Table A3 Headings / Sub Headings Particularly Relevant for the Re-evaluation Process
The rationale why some of the issues raised by observers during the 2009 application were not
considered relevant for detailed consideration in the re-evaluation stage (and specifically route
corridor and indicative line route re-evaluation) is included in Chapter 7 of the Final Re-
evaluation Report and includes inter alia issues / criteria that would be generally ‘Neutral’ for the
purpose of the comparative evaluation of route corridor options, in that the results would be
broadly the same for every route corridor option in the overall study area. These issues include
those for which it is reasonably assumed that mitigation measures can and will be implemented
and which will therefore be the same or similar for each identified corridor (e.g., safety and
construction / operational issues) and those issues more appropriately addressed during
subsequent detailed route design, preparation of EIS and planning stages.
However, it must be noted that all issues raised in the submissions on the previous application
will continue to be considered as the project progresses towards a new application.
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
1x
xx
WS-
2x
xx
WS-
3x
xW
S-4
xx
xx
xW
S-5
xW
S-6
xx
xx
WS-
7x
xx
xx
xx
xW
S-8
xx
xx
xW
S-9
xx
WS-
10x
xx
xx
xW
S-11
xW
S-12
xx
xx
WS-
13x
xW
S-14
xx
xx
xW
S-15
WS-
16x
xx
xx
WS-
17x
xx
WS-
18x
xW
S-19
xW
S-20
xx
xx
xW
S-21
xx
xW
S-22
xx
WS-
23x
xx
xx
WS-
24x
xx
xx
WS-
25x
xW
S-26
xx
xW
S-27
xx
xx
xx
WS-
28x
xx
WS-
29x
xx
xW
S-30
xx
xx
WS-
31x
xx
xx
xW
S-32
xW
S-33
xx
xx
xW
S-34
xx
xx
WS-
35x
xx
xW
S-36
xx
xx
WS-
37x
xW
S-38
xx
xW
S-39
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
40x
xx
xx
WS-
41x
xW
S-42
xx
xx
WS-
43x
xx
xx
xx
xW
S-44
xW
S-45
xx
xW
S-46
xW
S-47
xx
xx
WS-
48x
xx
xW
S-49
xx
xx
WS-
50x
xx
xW
S-51
xx
WS-
52x
xW
S-53
xx
xW
S-54
xx
xx
xW
S-55
xx
xx
xx
WS-
56x
xx
xx
WS-
57x
xx
WS-
58x
xx
xW
S-59
xx
xW
S-60
xx
xW
S-61
xx
WS-
62x
xW
S-63
xx
xx
WS-
64W
S-65
xx
xW
S-66
xx
xx
xW
S-67
xx
xx
WS-
68x
xx
xx
WS-
69x
xx
xW
S-70
xx
xx
xx
WS-
71x
xx
xW
S-72
xx
xx
xW
S-73
xx
xx
xx
WS-
74x
xx
xx
WS-
75x
xx
xW
S-76
xx
xx
WS-
77x
xx
xW
S-78
x
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
79x
xx
xW
S-80
xx
xW
S-81
xx
xx
xx
WS-
82x
WS-
83x
xx
xx
WS-
84x
xx
xx
xx
WS-
85x
xx
xW
S-86
xx
WS-
87x
xx
xx
WS-
88x
xx
xx
WS-
89x
xx
xx
xW
S-90
xx
xx
WS-
91x
xx
WS-
92x
xx
xW
S-93
xx
xx
xW
S-94
xx
xx
xx
WS-
95x
xx
xx
WS-
96x
xx
WS-
97x
xx
WS-
98x
xx
WS-
99x
xx
xx
xx
WS-
100
xx
xW
S-10
1x
xx
xx
xW
S-10
2x
xx
xW
S-10
3x
xx
xW
S-10
4x
xx
WS-
105
xW
S-10
6x
xx
WS-
107
WS-
108
WS-
109
WS-
110
WS-
111
xx
WS-
112
WS-
113
WS-
114
xx
xW
S-11
5x
xx
xx
xx
xW
S-11
6x
xx
xW
S-11
7x
xx
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
118
xx
xW
S-11
9x
xW
S-12
0x
xW
S-12
1x
xx
WS-
122
xx
xW
S-12
3x
xW
S-12
4x
xx
xx
WS-
125
xx
xx
xW
S-12
6x
WS-
127
xW
S-12
8x
xx
xx
xW
S-12
9x
xx
xx
xW
S-13
0x
xx
xW
S-13
1x
xx
xx
xx
WS-
132
xx
xx
xW
S-13
3x
xx
xx
xx
WS-
134
xx
xx
WS-
135
xx
WS-
136
xx
xx
xW
S-13
7x
xx
WS-
138
xx
xx
xW
S-13
9x
xx
xW
S-14
0x
xW
S-14
1x
xx
xx
WS-
142
xx
xx
xx
WS-
143
xx
xW
S-14
4x
WS-
145
xx
xW
S-14
6x
xx
xx
WS-
147
xW
S-14
8x
xx
xW
S-14
9x
xx
xx
xW
S-15
0x
WS-
151
xx
xx
xW
S-15
2x
WS-
153
xx
xW
S-15
4x
xx
WS-
155
WS-
156
xx
xx
x
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
157
xx
xW
S-15
8x
xW
S-15
9x
xx
xx
xx
WS-
160
xx
xx
WS-
161
xW
S-16
2x
xx
xx
WS-
163
xx
xx
WS-
164
xx
WS-
165
xx
WS-
166
xx
xx
xx
xW
S-16
7x
xx
xW
S-16
8x
xx
WS-
169
xx
xx
WS-
170
xx
xW
S-17
1x
xx
xW
S-17
2x
xx
WS-
173
xx
xx
WS-
174
xx
xx
WS-
175
xx
xx
xx
WS-
176
xx
xx
xW
S-17
7x
xx
xW
S-17
8x
xx
xW
S-17
9W
S-18
0x
xx
xW
S-18
1W
S-18
2x
xx
WS-
183
WS-
184
xx
xx
xx
xW
S-18
5W
S-18
6W
S-18
7x
xx
WS-
188
WS-
189
WS-
190
WS-
191
WS-
192
WS-
193
WS-
194
WS-
195
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
196
xx
WS-
197
xx
WS-
198
xx
WS-
199
xx
xW
S-20
0x
xx
xx
WS-
201
xx
xx
xW
S-20
2x
xx
WS-
203
xx
xW
S-20
4x
xx
WS-
205
xx
WS-
206
xx
xx
xW
S-20
7x
xx
WS-
208
xx
xW
S-20
9x
xx
WS-
210
xx
xx
WS-
211
xx
xx
xW
S-21
2x
xx
WS-
213
xx
WS-
214
xx
xx
WS-
215
xx
xx
xx
WS-
216
xx
xx
WS-
217
xx
xx
xx
WS-
218
xx
xx
xx
xW
S-21
9x
xx
xx
xW
S-22
0x
xx
xW
S-22
1x
xx
xW
S-22
2x
xx
xx
xW
S-22
3x
xx
xx
xx
WS-
224
xx
xx
xx
WS-
225
xx
xx
WS-
226
xx
xx
WS-
227
xx
xx
xW
S-22
8x
xx
WS-
229
xx
xx
WS-
230
xx
xx
xx
xx
WS-
231
xx
xx
xx
xW
S-23
2x
xx
xx
xx
WS-
233
xx
xx
xW
S-23
4x
xx
xx
x
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
235
xx
xx
xx
WS-
236
xx
xW
S-23
7W
S-23
8x
xx
xW
S-23
9x
xx
xx
xx
WS-
240
xx
xx
WS-
241
xx
xx
xx
WS-
242
xW
S-24
3x
xx
xx
xW
S-24
4x
xx
xW
S-24
5x
xx
xx
WS-
246
xx
xW
S-24
7x
xx
xW
S-24
8W
S-24
9x
xW
S-25
0x
xx
WS-
251
xx
xx
WS-
252
xx
xx
WS-
253
xx
xW
S-25
4x
xx
xx
xW
S-25
5W
S-25
6x
xx
xx
WS-
257
xx
xW
S-25
8x
WS-
259
xx
xx
WS-
260
xx
xW
S-26
1x
xx
xx
xW
S-26
2x
xx
WS-
263
xx
xx
xW
S-26
4x
xW
S-26
5x
xx
xx
WS-
266
xx
xx
WS-
267
xx
xW
S-26
8x
xx
WS-
269
xx
xx
xx
xW
S-27
0x
xx
xW
S-27
1x
xx
xx
WS-
272
xx
xx
WS-
273
xx
xx
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
274
xx
xx
xx
WS-
275
xx
WS-
276
xx
WS-
277
xx
xx
xW
S-27
8x
xx
xW
S-27
9x
xx
xx
xx
WS-
280
xx
xW
S-28
1x
xx
xW
S-28
2W
S-28
3x
xx
xx
WS-
284
xx
xW
S-28
5W
S-28
6x
xx
xW
S-28
7x
xx
WS-
288
xx
xW
S-28
9x
xx
xW
S-29
0x
WS-
291
xx
xx
WS-
292
xx
xx
xW
S-29
3x
xx
xW
S-29
4x
xx
WS-
295
xx
WS-
296
xx
xx
xx
xW
S-29
7x
WS-
298
xx
xx
WS-
299
xx
WS-
300
xW
S-30
1x
xW
S-30
2x
xx
WS-
303
xx
xx
WS-
304
xx
xx
xW
S-30
5x
xx
xx
xx
WS-
306
xW
S-30
7x
xx
WS-
308
xW
S-30
9x
xx
WS-
310
xx
xW
S-31
1x
xx
xW
S-31
2x
x
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
313
xW
S-31
4x
WS-
315
xx
xW
S-31
6x
xW
S-31
7x
xW
S-31
8x
xW
S-31
9x
xx
xx
xW
S-32
0x
xx
WS-
321
xW
S-32
2x
xx
xx
xW
S-32
3x
xx
xW
S-32
4W
S-32
5W
S-32
6x
xx
xx
xx
xW
S-32
7x
xx
xx
xW
S-32
8x
xx
xx
WS-
329
xx
xx
xx
xx
WS-
330
xx
xx
xx
WS-
331
xx
xx
xx
xW
S-33
2x
xx
xW
S-33
3x
xx
xW
S-33
4x
xx
xx
WS-
335
xx
xx
xx
WS-
336
xx
xx
xW
S-33
7x
xx
WS-
338
xx
xx
WS-
339
xx
xx
xW
S-34
0x
xx
xx
xW
S-34
1x
WS-
342
xx
xx
xx
WS-
343
xx
xx
xx
WS-
344
xx
xx
xx
WS-
345
xx
xx
xW
S-34
6x
xx
xx
WS-
347
xx
xx
WS-
348
WS-
349
WS-
350
xx
xx
WS-
351
xx
xx
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
352
xx
xx
WS-
353
xx
xx
xx
xW
S-35
4x
xx
xW
S-35
5x
xx
WS-
356
xx
xx
xW
S-35
7x
xx
WS-
358
xx
xW
S-35
9x
xx
xW
S-36
0x
xW
S-36
1x
xx
xx
WS-
362
xx
xW
S-36
3x
xx
xW
S-36
4W
S-36
5x
xx
xW
S-36
6W
S-36
7W
S-36
8x
xx
xW
S-36
9x
xx
xx
WS-
370
xx
xx
xx
WS-
371
xx
xx
xx
xW
S-37
2x
xx
WS-
373
xx
xx
xx
WS-
374
xx
xx
xW
S-37
5x
xx
xW
S-37
6x
xx
xW
S-37
7x
xx
xx
WS-
378
xx
xx
WS-
379
xx
xx
WS-
380
xx
xx
xW
S-38
1W
S-38
2x
xW
S-38
3W
S-38
4x
xx
xx
xx
xW
S-38
5x
xx
xx
WS-
386
xx
xx
xW
S-38
7x
xx
xx
xW
S-38
8x
xx
xx
WS-
389
WS-
390
xx
xx
x
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
391
xx
xx
WS-
392
xx
xx
xx
xW
S-39
3x
xW
S-39
4x
xx
xW
S-39
5x
xx
xW
S-39
6x
xx
xx
WS-
397
xx
xx
xW
S-39
8x
xx
xW
S-39
9x
xx
xx
WS-
400
xx
xx
WS-
401
xx
xx
WS-
402
xx
xx
xx
xW
S-40
3x
xx
xx
WS-
404
WS-
405
xx
xx
xx
WS-
406
WS-
407
WS-
408
WS-
409
xx
xx
xx
xx
WS-
410
WS-
411
WS-
412
WS-
413
xx
xx
xW
S-41
4x
xx
xW
S-41
5x
xx
xW
S-41
6x
xx
xx
xx
xW
S-41
7W
S-41
8x
xx
xx
xW
S-41
9x
xx
WS-
420
xx
WS-
421
xx
xW
S-42
2x
xx
xW
S-42
3x
xx
xx
WS-
424
xx
xx
xW
S-42
5x
xx
xW
S-42
6x
xx
xx
WS-
427
xx
xx
xW
S-42
8x
WS-
429
xx
xx
xx
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
430
xx
xW
S-43
1x
xx
xx
xW
S-43
2x
xx
xx
xx
xx
WS-
433
xx
xx
xx
WS-
434
xx
xx
xx
xx
WS-
435
xx
xx
WS-
436
xx
xW
S-43
7x
xx
xx
xW
S-43
8x
xW
S-43
9x
WS-
440
xW
S-44
1x
xW
S-44
2x
WS-
443
xW
S-44
4x
WS-
445
xW
S-44
6x
xW
S-44
7x
xx
xW
S-44
8x
xx
WS-
449
xx
xx
xW
S-45
0x
xx
WS-
451
xW
S-45
2x
WS-
453
xx
WS-
454
xx
xx
xW
S-45
5x
xW
S-45
6x
xx
xx
xW
S-45
7x
xx
xW
S-45
8x
xx
xx
WS-
459
xW
S-46
0x
xx
WS-
461
xx
xx
WS-
462
WS-
463
xx
xW
S-46
4x
xx
xx
xx
xW
S-46
5x
xx
xW
S-46
6x
WS-
467
xx
xW
S-46
8x
xx
x
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
469
WS-
470
WS-
471
WS-
472
WS-
473
WS-
474
WS-
475
WS-
476
WS-
477
xx
WS-
478
xx
WS-
479
xx
xW
S-48
0x
xx
xx
xW
S-48
1x
xx
xW
S-48
2x
xx
WS-
483
xx
xx
WS-
484
xx
xx
WS-
485
xx
xW
S-48
6x
xx
xx
WS-
487
xW
S-48
8W
S-48
9x
WS-
490
WS-
491
xW
S-49
2x
xW
S-49
3W
S-49
4x
WS-
495
xx
xW
S-49
6W
S-49
7W
S-49
8W
S-49
9W
S-50
0x
WS-
501
xW
S-50
2x
xx
WS-
503
xx
xW
S-50
4x
xx
xx
xx
xW
S-50
5x
xx
xW
S-50
6W
S-50
7x
xx
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
508
xx
xx
xx
WS-
509
xx
xW
S-51
0W
S-51
1x
xx
WS-
512
xx
xx
WS-
513
xx
WS-
514
xx
xW
S-51
5W
S-51
6x
WS-
517
xx
WS-
518
xx
WS-
519
xW
S-52
0x
xW
S-52
1x
xx
xW
S-52
2x
xW
S-52
3W
S-52
4W
S-52
5W
S-52
6W
S-52
7W
S-52
8x
xx
WS-
529
xx
xx
xx
xW
S-53
0x
xx
xW
S-53
1x
xx
xx
xW
S-53
2x
xx
xW
S-53
3x
xx
xx
xW
S-53
4x
xx
WS-
535
xx
xx
xx
xW
S-53
6x
xx
xW
S-53
7x
xx
xW
S-53
8x
xx
WS-
539
xx
xW
S-54
0W
S-54
1x
xx
xx
xx
xx
xx
xx
xx
xx
WS-
542
xW
S-54
3x
WS-
544
xW
S-54
5W
S-54
6
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
547
xW
S-54
8x
xx
WS-
549
xx
WS-
550
xx
xx
xW
S-55
1x
xW
S-55
2x
xx
xx
WS-
553
xx
xx
WS-
554
WS-
555
xx
WS-
556
xx
WS-
557
xW
S-55
8x
WS-
559
xW
S-56
0x
xW
S-56
1x
WS-
562
xx
WS-
563
xW
S-56
4x
xW
S-56
5x
xx
WS-
566
xx
xx
xx
WS-
567
xx
xx
xW
S-56
8x
xx
xx
xW
S-56
9x
xx
xx
WS-
570
WS-
571
WS-
572
WS-
573
WS-
574
WS-
575
xx
xW
S-57
6x
xx
WS-
577
WS-
578
WS-
579
xx
WS-
580
xx
xx
xW
S-58
1x
xx
WS-
582
xx
xx
xx
WS-
583
xx
xx
WS-
584
xx
xx
xW
S-58
5x
xx
��
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
586
xx
xx
xW
S-58
7x
xx
xx
WS-
588
xx
xx
xx
xW
S-58
9x
xx
xx
xW
S-59
0x
xx
WS-
591
xx
xx
WS-
592
xx
xx
xW
S-59
3x
xx
xx
WS-
594
xx
xW
S-59
5x
xx
xx
WS-
596
xx
xx
xx
WS-
597
xx
xx
WS-
598
xx
xx
xx
WS-
599
xx
xx
xW
S-60
0x
xx
xx
WS-
601
xx
xx
xW
S-60
2x
xx
WS-
603
xx
xx
xW
S-60
4x
xx
xx
xW
S-60
5x
xx
xx
xx
WS-
606
xx
xW
S-60
7x
xx
xx
WS-
608
xx
xx
xx
WS-
609
xx
WS-
610
WS-
611
WS-
612
WS-
613
xx
WS-
614
xx
WS-
615
xx
WS-
616
xx
xx
WS-
617
xW
S-61
8x
WS-
619
xx
WS-
620
xx
xx
xW
S-62
1x
xx
xW
S-62
2x
xx
WS-
623
xx
xW
S-62
4x
xx
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
625
xx
xx
xW
S-62
6x
xx
xx
xW
S-62
7x
xx
xx
WS-
628
xx
xx
WS-
629
xx
xW
S-63
0x
xx
xx
xx
WS-
631
xx
xx
xW
S-63
2x
xx
WS-
633
xx
xx
xW
S-63
4x
xx
xx
xW
S-63
5x
xx
xW
S-63
6x
xx
xW
S-63
7x
xx
xW
S-63
8x
xW
S-63
9x
xx
xx
xW
S-64
0x
xx
xW
S-64
1x
xx
xW
S-64
2x
WS-
643
xx
xx
xx
WS-
644
xx
xx
xx
WS-
645
xx
xx
WS-
646
WS-
647
WS-
648
WS-
649
xW
S-65
0W
S-65
1x
WS-
652
xx
WS-
653
WS-
654
xx
WS-
655
xx
xx
xx
xW
S-65
6x
xW
S-65
7x
WS-
658
xx
xx
WS-
659
xx
xx
WS-
660
xx
xW
S-66
1x
xx
WS-
662
xW
S-66
3x
xx
xx
��
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
664
xx
xx
WS-
665
xW
S-66
6x
xx
xx
WS-
667
xW
S-66
8x
xW
S-66
9x
xx
xx
WS-
670
xx
xW
S-67
1x
xW
S-67
2x
xx
WS-
673
xx
xx
WS-
674
xx
xx
xW
S-67
5x
xx
WS-
676
xx
xW
S-67
7x
xx
xW
S-67
8x
xx
WS-
679
xx
xx
xx
xW
S-68
0x
xx
WS-
681
xx
xx
xW
S-68
2x
xW
S-68
3W
S-68
4W
S-68
5x
WS-
686
xx
xx
xW
S-68
7x
xx
xx
WS-
688
xx
xx
xW
S-68
9x
xx
xx
xW
S-69
0x
xx
xW
S-69
1x
xx
xx
xW
S-69
2x
xx
xW
S-69
3x
xx
xW
S-69
4x
xx
xx
WS-
695
xx
xx
xx
xW
S-69
6x
xx
xx
WS-
697
xx
xW
S-69
8x
xx
WS-
699
xx
WS-
700
xx
xx
WS-
701
xx
WS-
702
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
703
xx
xx
xx
xx
xx
xx
xx
xx
xx
WS-
704
xW
S-70
5x
xW
S-70
6x
WS-
707
xW
S-70
8x
WS-
709
xx
xx
WS-
710
xx
xx
xW
S-71
1x
xx
xx
xW
S-71
2x
WS-
713
xx
xW
S-71
4x
xx
xx
xW
S-71
5x
xW
S-71
6x
xx
WS-
717
xx
xW
S-71
8x
xW
S-71
9x
xW
S-72
0x
xx
xW
S-72
1x
xx
xW
S-72
2x
xW
S-72
3x
xx
WS-
724
xx
xW
S-72
5x
xW
S-72
6x
xx
xW
S-72
7x
xx
xW
S-72
8x
xx
xW
S-72
9x
xW
S-73
0x
xx
WS-
731
xx
xW
S-73
2x
xW
S-73
3x
xW
S-73
4x
xx
xx
WS-
735
xx
xx
WS-
736
xx
xx
WS-
737
xx
xW
S-73
8x
xx
WS-
739
WS-
740
WS-
741
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
742
WS-
743
WS-
744
WS-
745
WS-
746
xx
WS-
747
xx
xx
xW
S-74
8x
xx
xx
WS-
749
xx
xx
xW
S-75
0x
xx
xW
S-75
1x
xW
S-75
2x
xx
WS-
753
xW
S-75
4x
xx
WS-
755
xx
WS-
756
xx
xx
WS-
757
xx
xW
S-75
8x
xx
xx
WS-
759
xx
xW
S-76
0x
xx
xW
S-76
1x
xx
xW
S-76
2x
WS-
763
xx
xx
WS-
764
xx
WS-
765
xW
S-76
6x
xW
S-76
7x
WS-
768
WS-
769
WS-
770
WS-
771
WS-
772
WS-
773
WS-
774
WS-
775
WS-
776
WS-
777
xW
S-77
8x
xx
xx
WS-
779
xx
xx
xW
S-78
0x
xx
xx
x
��
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
781
xx
xx
WS-
782
xW
S-78
3x
xx
WS-
784
xx
xW
S-78
5x
xx
xx
WS-
786
xx
xW
S-78
7x
xx
WS-
788
xx
xx
xx
WS-
789
xx
xx
xx
xW
S-79
0x
xx
xx
WS-
791
xx
xW
S-79
2x
xx
xx
xx
xW
S-79
3x
xx
xW
S-79
4x
xx
xx
xW
S-79
5x
xx
xx
WS-
796
xx
xx
xx
WS-
797
xx
xx
xW
S-79
8x
xx
xx
xW
S-79
9x
xx
xW
S-80
0x
xx
xx
xx
WS-
801
xx
xx
xW
S-80
2x
xx
xW
S-80
3x
xx
WS-
804
xx
xW
S-80
5x
xx
xx
xW
S-80
6x
xx
xx
xW
S-80
7x
xx
xx
WS-
808
WS-
809
xx
WS-
810
xx
xW
S-81
1x
xx
xx
WS-
812
xx
xx
xx
xW
S-81
3x
xx
xx
xW
S-81
4x
xx
WS-
815
xW
S-81
6x
xW
S-81
7x
xx
xW
S-81
8x
WS-
819
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
820
xx
WS-
821
xx
xW
S-82
2x
WS-
823
xx
xx
WS-
824
xx
xW
S-82
5W
S-82
6x
xW
S-82
7x
xx
WS-
828
xx
xW
S-82
9x
xW
S-83
0x
xx
xx
xW
S-83
1x
xx
xx
WS-
832
xx
xx
xx
WS-
833
xx
xW
S-83
4x
xx
xx
WS-
835
xx
xx
WS-
836
xx
WS-
837
xx
xx
xx
xW
S-83
8x
xx
xx
WS-
839
xx
xx
xx
xW
S-84
0x
xW
S-84
1x
xx
xx
xx
WS-
842
xx
xW
S-84
3x
xx
xW
S-84
4x
xx
xx
WS-
845
xx
xx
xW
S-84
6x
xx
xx
WS-
847
xx
xx
WS-
848
xx
xW
S-84
9x
xx
xx
xx
WS-
850
xx
xx
xW
S-85
1x
xx
xx
WS-
852
xx
xx
xW
S-85
3x
xx
xx
WS-
854
xx
xx
xx
WS-
855
xx
xx
WS-
856
xW
S-85
7x
xx
xx
WS-
858
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
859
xx
xx
WS-
860
WS-
861
WS-
862
WS-
863
xx
WS-
864
xx
xx
xW
S-86
5x
WS-
866
xx
xx
xW
S-86
7x
xx
xW
S-86
8x
xx
WS-
869
xx
WS-
870
xx
xx
xW
S-87
1x
xx
WS-
872
xx
xx
xW
S-87
3x
xx
xx
xW
S-87
4x
xx
xx
WS-
875
xx
xx
xx
WS-
876
xx
xx
WS-
877
xx
xx
WS-
878
xx
xW
S-87
9x
xx
xW
S-88
0x
xx
xW
S-88
1x
xx
xx
WS-
882
xx
xx
WS-
883
xW
S-88
4x
WS-
885
xx
xx
WS-
886
xx
xx
xW
S-88
7x
xW
S-88
8x
xW
S-88
9x
xx
WS-
890
xW
S-89
1x
xW
S-89
2x
xx
WS-
893
WS-
894
xx
xW
S-89
5x
xx
xx
xx
WS-
896
xx
WS-
897
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
WS-
898
xx
xx
xW
S-89
9x
xx
xx
xx
WS-
900
xx
xx
WS-
901
xx
WS-
902
xx
xx
WS-
903
xx
xx
WS-
904
WS-
905
WS-
906
WS-
907
WS-
908
WS-
909
xx
xx
xx
xW
S-91
0x
xx
xx
xW
S-91
1x
xx
xx
OS
-1x
OS
-2x
xx
xO
S-3
xx
xx
xx
xO
S-4
xx
OS
-5x
xO
S-6
xx
xO
S-7
xx
xx
xx
xx
xO
S-8
xx
xx
xx
OS
-9x
OS
-10
xx
xx
xx
xx
xx
xx
OS
-11
xx
xx
xO
S-1
2x
xO
S-1
3x
xx
xx
xx
OS
-14
xx
xO
S-1
5x
xx
xO
S-1
6x
OS
-17
xx
xx
xx
xx
xx
xO
S-1
8x
xx
OS
-19
xx
xx
xx
OS
-20
xx
xO
S-2
1x
xx
xO
S-2
2x
xO
S-2
3x
xO
S-2
4x
xx
xO
S-2
5x
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
OS
-26
xx
xx
xx
OS
-27
xx
xx
xx
xx
xx
OS
-28
xO
S-2
9x
xx
OS
-30
xx
OS
-31
xx
xO
S-3
2x
xx
xx
OS
-33
xO
S-3
4x
xx
xx
OS
-35
xO
S-3
6x
xx
OS
-37
xx
OS
-38
xx
xO
S-3
9x
xx
xO
S-4
0x
xx
OS
-41
xx
xO
S-4
2x
OS
-43
xx
xx
xO
S-4
4x
xx
xO
S-4
5x
xx
OS
-46
xO
S-4
7x
OS
-48
xO
S-4
9x
xx
xx
xx
xO
S-5
0x
xx
xx
OS
-51
xx
xx
xO
S-5
2x
xx
xx
xx
xO
S-5
3x
xx
xx
xO
S-5
4x
xx
xO
S-5
5x
xx
OS
-56
xx
xx
xx
xO
S-5
7x
xx
xx
xO
S-5
8x
xx
xx
xx
OS
-59
xx
xx
xx
xx
xO
S-6
0x
xx
xx
xO
S-6
1x
xx
xx
xO
S-6
2x
xx
xx
xO
S-6
3x
xx
xx
xO
S-6
4x
xx
xx
x
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
OS
-65
xx
xx
xx
OS
-66
xx
xx
xx
xO
S-6
7x
xx
OS
-68
xx
xx
xx
OS
-69
xx
xO
S-7
0x
xx
xx
OS
-71
xx
OS
-72
xO
S-7
3x
xx
OS
-74
xx
OS
-75
xx
xO
S-7
6x
xO
S-7
7x
xx
OS
-78
xO
S-7
9x
xx
xO
S-8
0x
xx
xx
xx
xO
S-8
1x
xx
xx
OS
-82
xx
xx
OS
-83
xO
S-8
4x
xx
xO
S-8
5x
OS
-86
xx
OS
-87
xx
xO
S-8
8x
xx
xx
xx
OS
-89
xx
xx
OS
-90
xO
S-9
1x
xx
xx
xx
OS
-92
xO
S-9
3x
xx
OS
-94
xx
xO
S-9
5x
OS
-96
xx
xx
OS
-97
xO
S-9
8x
xx
xx
xx
OS
-99
xx
OS
-100
xx
xx
OS
-101
xx
xx
OS
-102
xx
xx
xx
OS
-103
xx
xx
xx
xx
����
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
OS
-104
xx
xx
OS
-105
xx
xx
xx
OS
-106
xx
xx
xx
OS
-107
xx
xx
xx
xx
xx
xx
OS
-108
xx
xx
xx
xx
xx
OS
-109
xx
xx
xx
OS
-110
xO
S-1
11x
OS
-112
xx
xx
xO
S-1
13x
OS
-114
xx
OS
-115
xx
xx
OS
-116
xx
xO
S-1
17x
xx
OS
-118
xx
xO
S-1
19x
OS
-120
xx
xx
xx
xO
S-1
21x
xx
xx
xx
OS
-122
xx
xx
xx
OS
-123
xx
xx
xx
xO
S-1
24x
xx
xx
xx
xO
S-1
25x
xx
xO
S-1
26x
xx
xx
xx
OS
-127
xx
xx
xx
OS
-128
xx
xx
xx
xx
OS
-129
xx
xO
S-1
30x
xx
xx
OS
-131
xx
xO
S-1
32x
OS
-133
xx
xO
S-1
34x
xO
S-1
35x
xO
S-1
36x
xO
S-1
37x
xx
xO
S-1
38x
xx
xO
S-1
39x
xx
xx
xO
S-1
40x
xO
S-1
41x
OS
-142
xx
���
Nor
th-S
outh
400
kV
Inte
rcon
nect
ion
Dev
elop
men
tTa
ble
A2Fi
nal R
e-ev
alua
tion
Repo
rt -
Appe
ndix
A
Publ
ish
ID
Air Noise and Vibration
Application Related
Construction
Consultation
Consideration of Alternatives
Cultural Heritage
Flora, Fauna and Fisheries
Health
Landscape and Visual Impact
Need
Operational
Legal
Material Assets
Planning Context
Property
Traffic
Soils, Water & Geology
Relevant to all Specialists
OS
-143
xx
OS
-144
xO
S-1
45x
OS
-146
xO
S-1
47x
xx
OS
-148
xx
xx
xO
S-1
49x
OS
-150
xx
xx
xO
S-1
51x
xx
OS
-152
xx
xx
xx
OS
-153
xx
xx
xx
xx
OS
-154
xO
S-1
55x
xx
xx
xx
����