Application of Risk Tree in enhancing Transportation Safety Nelson Ng General Manager – Safety & Quality 31 August 2012 1 September 2012 Page 1 MTR Corporation MTR Corporation caring for life’s journeys

Application of Risk Tree in enhancing Transportation Safety

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Application of Risk Tree in enhancing Transportation Safety

Application of Risk Tree in enhancing Transportation Safetyy

Nelson NgGeneral Manager – Safety & Quality31 August 2012g

1 September 2012 Page 1MTR CorporationMTR Corporation caring for life’s journeys

Page 2: Application of Risk Tree in enhancing Transportation Safety

What is a Tree ?

1 September 2012 Page 2MTR Corporation

Page 3: Application of Risk Tree in enhancing Transportation Safety

Younger Trees

1 September 2012 Page 3MTR Corporation

Page 4: Application of Risk Tree in enhancing Transportation Safety

Older Trees

1 September 2012 Page 4MTR Corporation

Page 5: Application of Risk Tree in enhancing Transportation Safety

Tree with Fruits

1 September 2012 Page 5MTR Corporation

Page 6: Application of Risk Tree in enhancing Transportation Safety

Fallen Tree

1 September 2012 Page 6MTR Corporation

Page 7: Application of Risk Tree in enhancing Transportation Safety

The Most Adaptive Tree

1 September 2012 Page 7MTR Corporation

Page 8: Application of Risk Tree in enhancing Transportation Safety

Characteristics of Trees

It grows day by day, and year by yearand year by year

It grows with theIt grows with the same structure

It responds and adapts to penvironment

However, it fails without proper care

1 September 2012 Page 8MTR Corporation

Page 9: Application of Risk Tree in enhancing Transportation Safety

A Tree of Life

1 September 2012 Page 9MTR Corporation

http://www.zazzle.com/tree_of_life_poster-228417147164427097

Page 10: Application of Risk Tree in enhancing Transportation Safety

A Family Tree

1 September 2012 Page 10MTR Corporation

Page 11: Application of Risk Tree in enhancing Transportation Safety

A Fault Tree

Top Event

AllAll

possible

causes

1 September 2012 Page 11MTR Corporation

Page 12: Application of Risk Tree in enhancing Transportation Safety

An Event Tree

All possible subsequent events

Frequency of Equipment failure

Consequence Event frequency per

year

(A) (B) (C) (D)(A) (B) (C) (D)0.26 0.11 0.93

4.54E-02Y Minimal 4.54E-02

Top Event1.34E-02

From FTA 1.44E-02 Y Minimal 1.34E-02Y

1.03E-03N

1 03E-03

Train Collision

1.03E-03

N1.30E-01

Minimal 1.15E-01N

1.15E-01

1 September 2012 Page 12MTR Corporation

Consequence types

Page 13: Application of Risk Tree in enhancing Transportation Safety

Our Journey to Building

H

Risk Trees

Our Risk

ChallengesBenefits

How risk tree

Risk + Mindset

Risk

TreeRisk

ghelps

Tree

1 September 2012 Page 13MTR CorporationMTR CorporationPage 139/1/2012

Page 14: Application of Risk Tree in enhancing Transportation Safety

RiskRisk

A hazard with a consequenceq

Measurement

• Frequency (/year) + Severity (injuries/fatalities)

• i e rate of occurrence of the hazard resulting in that• i.e. rate of occurrence of the hazard resulting in that consequence

1 September 2012 Page 14MTR Corporation

Page 15: Application of Risk Tree in enhancing Transportation Safety

What is Safety ? Accidents

Zero Fatality

What is Safety ?Injuries

Near missesHazards

Risks

Hazards

Human errors

U f t / ditiWhat is Risk Risks Unsafe acts/conditions

System failures

What is Risk Management ?

Unknown Risks

g

1 September 2012 Page 15MTR Corporation

Driving for Continuous Improvement (ALARP)

Page 16: Application of Risk Tree in enhancing Transportation Safety

How Safety Management System prevents Incidents

Threats

RiskManagement

Incidents/Accidents

1 September 2012 Page 16MTR Corporation

Page 17: Application of Risk Tree in enhancing Transportation Safety

TheThe MTRMTR BusinessBusinessTheThe MTRMTR BusinessBusiness

Heavy Rail Airport ExpressHeavy Rail Airport Express

Light Rail BI t it Light Rail BusIntercity

1 September 2012 Page 17MTR Corporation

Disneyland Resort Line NP360 Cable Car

Page 18: Application of Risk Tree in enhancing Transportation Safety

MTR Network 2012 in Hong KongMTR Network 2012 in Hong KongMTR Network 2012 in Hong KongMTR Network 2012 in Hong KongHeavy Rail

10 lines ( incl AEL )10 lines ( incl. AEL ) Route length: 218.2 km84 railway stations1,786 train cars (+new trains)8 d t8 depots

Light Rail

11 routesRoute length : 36.2 km68 stops + 1 depot141 li ht il hi l141 light rail vehicles(+ new vehicles)

Bus

MTR keeps 4.9 million people on the move every weekday

14 routes143 busesFeeder service to the metro network

1 September 2012 Page 18MTR Corporation

MTR services run for 19 hours a day (19.5 hours for EAL and MOL)

Page 19: Application of Risk Tree in enhancing Transportation Safety

Growth in China & Abroad

Mainland ChinaB iji M t Li 4 d S t 2009Beijing Metro Line 4 – opened Sept 2009

Shenzhen Metro Line 4 – took over Phase 1 in July 2010, opened Phase 2 in June 1 in July 2010, opened Phase 2 in June 2011

InternationalLondon Overground: since November 2007

Melbourne train network – since November 2009 BJ (2009)

(2009)(2007)

2009

Stockholm Metro: since November 2009

(operations and/or maintenance

BJ (2009)

SZ (2010)HZ (2012)

1 September 2012 Page 19MTR Corporation

( pfranchises)

Page 19

(2009)

Page 20: Application of Risk Tree in enhancing Transportation Safety

What are the changes to MTR (from 2000 to 2012)In Hong Kong

• From 2M to 4.9M passenger journeys per dayday

• From 541 to 979 escalators

S / G• From no PSD/APG on MTR stations to only 20 stations on East Rail Line and Ma On Shan Line to be fitted

From a Hong Kong based company to a multi-national company with presence in Mainland China and Overseas

StockholmLondon Melbourne ShenzhenBeijing

1 September 2012 Page 20MTR Corporation

Page 21: Application of Risk Tree in enhancing Transportation Safety

Our Safety and Reliability performance is among the y y p gvery best in the world

Safety Train ReliabilitySafety

Total Fatalities / Billion Passenger Journeys

Train Reliability

Million Car km between incidentsMillion Car km between incidents

30

35

40g y

3.0

3.5

3.0

3.5

↑Better

20

25

30

2000‐2009

2001‐2010

1 5

2.0

2.5

2

21 5

2.0

2.5

2

2

Better

5

10

15

0 5

1.0

1.5 2

0 5

1.0

1.5 2

0

As MTR As SA SA* Eu Eu Eu Eu Eu NA Eu NA

Source : CoMET 2000‐2010 Data

0.0

0.5

As MTR As Eu SA SA NA Eu Eu Eu Eu NA Eu

0.0

0.5

As MTR As Eu SA SA NA Eu Eu Eu Eu NA Eu

1 September 2012 Page 21MTR Corporation

Source : CoMET 2000‐2010 DataOnly metros with data are listed (* 2009 result)

As ‐ Asian Metros                   NA ‐ North American MetrosEu ‐ European Metros           SA ‐ South American Metros

Page 22: Application of Risk Tree in enhancing Transportation Safety

MTR Risk Management Challenges

Increasing number and complexity within an expanding networkexpanding network

Too many types – Safety, Financial, Reputation, Legal Business Environmental etcLegal, Business, Environmental, etc.

Multiple dimensions – system, people, location, t l/i t l t t i / ti l/ j texternal/internal, strategic/operational/projects

Different culture - sharing risks across all business units

Different mindsets – matured workforce and new joiners

Lack of new ideas to improve-

1 September 2012 Page 22MTR Corporation

p

Page 23: Application of Risk Tree in enhancing Transportation Safety

Emerging Risk - Changing Passenger Demographics

More elderly passengers and people with disabilitiesp p

Additi l t ti f ilitiAdditional station facilities, better signage and station manpowermanpower

i i d diListening and Responding Programme

1 September 2012 Page 23MTR Corporation 23

Page 24: Application of Risk Tree in enhancing Transportation Safety

~3000 Railway Operations Safety Risks

Staff

Risk 8

Risk 9Risk 9

DerailmentRisk 23Precursor

5SCO2

Train Door Nippin

Error

Collision Risk 9Risk 5SCI 2

Fire

Risk 5SCI 2 Risk 12

Risk 15

Risk 16

SCI 2

SCO2

Escalator Slip Trip Fall

Risk 8

Platform Train Interface Risk 5

SCI 2

Passenger / Public Behaviour

Risk 12Risk 6

SCI 2Risk 12Risk 6

SCO3SCO1

Risk 1

Slip, Trip Fall

SCI 3

Risk 2

Equipment

Foreign Object

Risk 9Risk 11 Risk 4

SCI 1

Risk 12Risk 6

Risk 5

Risk 6

Step Condition

Precursor1

SCI 2

Risk 3 Equipment Failure

Risk 4

Precursor2

Risk 71 Risk 4

SCI 1

SCI 1

Precursor Precursor

Risk Risk Item

1 September 2012 Page 24MTR Corporation

SCISafety CriticalItem

SCO

Safety CriticalOperations

Page 25: Application of Risk Tree in enhancing Transportation Safety

New Lines, New RisksShatin to Cent

Shatin to Cent

56 kmto our network

5 New Railway

Central LinkExpress Rail Link

Central LinkExpress Rail Link

Staff E

Risk 8

Risk 9Risk 9

to our networkin Hong Kong

by 2020

Projects will be added

SCO2

l LinkKwun Tong Line Extensi

South I

l LinkKwun Tong Line Extensi

South I

Train DoorNipping

Error

Collision Risk 9Risk 5SCI 2

Fire

Risk 5

Ri k

SCI 2

ensionuth Island Line (East)West Isl

ensionuth Island Line (East)West Isl

Escalator Slip Trip Fall

Risk 8

Platform Train Interface Risk 5

Ri k 6

SCI 2

Passenger / Public Behaviour

Risk 12Risk 6

SCI 2Risk 12Risk 6

SCO3SCO1st Island Line

st Island Line

Risk 1

Slip, Trip Fall

SCI 3

Risk 2

Equipment

Foreign Object

Risk 9Risk 11 Risk 4

SCI 1

Risk 12Risk 6

DerailmentRisk 23

Risk 5

Risk 6

Step Condition

Precursor1

SCI 2

Risk 3 Equipment Failure

Risk 4

Precursor2 Risk 15

Ri k 16

SCI 2

1 September 2012 Page 25MTR Corporation

1

SCI 1

SCI 1Risk 12Risk 16

Page 26: Application of Risk Tree in enhancing Transportation Safety

I need a risk management tool which can help me:

Read across

Intelligence

SensitivitySensitivity

K hKnow-how

1 September 2012 Page 26MTR Corporation

Page 27: Application of Risk Tree in enhancing Transportation Safety

Risk Modelling vs Risk TreeUK RSSB Safety Risk Model (SRM)

Risk quantification (based onRisk quantification (based on ETA/FTA)

V lid t d ith id t fiValidated with accident figures

Well-established structure for benchmarking by operators

1 September 2012 Page 27MTR Corporation

RSSB: Rail Safety and Standards Board

Page 28: Application of Risk Tree in enhancing Transportation Safety

UK RSSB Safety Risk (SRM) Modely ( )

1 September 2012 Page 28MTR Corporation

Page 29: Application of Risk Tree in enhancing Transportation Safety

Risk TreeRisk Tree “Tree” applications in safety industry

Analysis of causes (Fault Tree)

Analysis of consequences (Event y q (Tree)

A Risk TreeA Risk Tree

Focused on one major risk scenario (an event)(an event)

Looks at all underlying causes

Depicts risks interrelationship and relevant information Twelve Major Risk Scenarios

1 September 2012 Page 29MTR Corporation

Page 30: Application of Risk Tree in enhancing Transportation Safety

MTR Risk Tree ApproachMTR Risk Tree ApproachA thinking tool for systematic risk management

Highly structured – consistent hierarchy

Multi-dimensional – expandable branches

Systematic visual analysis by:

Type / Line / Risk Rating / etcType / Line / Risk Rating / etc.

Hot RxRy

1 September 2012 Page 30MTR Corporation

Page 31: Application of Risk Tree in enhancing Transportation Safety

Risk Tree of Major Risk ScenariosEscalator Accident

Train Doors

Nipping

Passenger BehaviourPassenger

Platform/TrainInterface

Risk 1 Risk 3

Behaviour

Risk 2Risk 1

Ri k 3

Behaviour

Risk 2Risk 1

Passenger Behaviour

Risk 2

Risk 5

Equipment Failure

StaffError

Precursor1

Risk 3

Risk 6

Equipment FailureRisk 4

StaffError

Risk 3

Equipment Failure

ExternalSCO3 Ri k 2

Risk 5Risk 6

Failure

Risk 4

Factors

Risk 7

SCI 1

Precursor1

Precursor2

SCO3

SCO1

Risk 2

SCO4

SCI 1

Safety Safety C iti l

1 September 2012 Page 31MTR Corporation

SCIy

CriticalItem

SCO CriticalOperations

Page 32: Application of Risk Tree in enhancing Transportation Safety

Benefits of Risk TreeEnriching the risk management PDCA process

Risk IdentificationANTICIPATING SHAPINGRisk Identification S G

Risk Monitoring & Reporting

Risk Analysis & Evaluation

R1, R2, R3, R4

Risk TreatmentRisk Treatment

OPTIMISING

1 September 2012 Page 32MTR Corporation

OPTIMISING

Page 33: Application of Risk Tree in enhancing Transportation Safety

SHAPING

Depicting the risk elements –i t l d

Escalator Accident

equipment, people, process and external factors

Passenger Behaviour

HotShowing the big picture and risk exposure by aggregating similar risks

Risk 3

Equipment Failure

ExternalFactors

Hot

risks

Showing risk dynamics - where are the hotspots and trends

Risk 5Risk 4

Staff errorthe hotspots and trends

Allowing risk integration in a str ct red and coherent manner

Staff error

structured and coherent manner

1 September 2012 Page 33MTR Corporation

Page 34: Application of Risk Tree in enhancing Transportation Safety

SHAPING

Risk Tree

Major Risk Scenarios Hot Spots Derailment

The image cannot be displayed. Your computer may not have enough memory to open the image, or the image may have been corrupted. Restart your computer, and then open the file again. If the red x still appears, you may have to delete the image and then insert it again.

SCI

Staff Behaviour

Track Failure

Train Failure

Object on / near track

Signalling Coupler Brake Pantograph

Bogie

SCI

SCOSCO

SCO

New SCIBogie

Derailment due to XX

rail (Rx)

Derailment due to structural damage of

bogie frame (Rx)

Derailment due to XX

unloading (Rx)

Derailment due to damage of

coil sxxs (Ry)

SCO

SCI Root Causes

HighHighConsequenceConsequence

RisksRisksHighHigh

FrequencyFrequencyRi kRi k

1 September 2012 Page 34MTR Corporation

RisksRisks ASRISKASRISK

Page 35: Application of Risk Tree in enhancing Transportation Safety

OPTIMISING Benchmarking of risks and controls across lines

Passenger / Public BehaviourPassenger

Passenger

Platform/TrainInterface

Platform/TrainInterface

Platform/TrainInterface

Risk 1 Risk 3

Behaviour

Risk 2Risk 1

Ri k 3

Behaviour

Risk 2Risk 1

Ri k 3

Passenger Behaviour

Risk 2

Risk 5

Equipment Failure

Stafferror

Precursor1

Risk 3

Risk 6

Equipment Failure

Ri k 4

Staff error

Risk 3

Ri k

Equipment Failure

Risk 4

Stafferror

Risk 5

Risk 4

Risk 5Risk 6

Risk 4

Risk 7SCI 1

SCI 1

Precursor1

Precursor2

SCO3

Risk 5Risk 7

Precursor2

Risk 7SCI 1

Precursor2

EAL WRL

1 September 2012 Page 35MTR Corporation

TWL/KTL/ISL/TKL( KTE/WIL)

TCL/AELEAL, WRL( SCL)

Page 36: Application of Risk Tree in enhancing Transportation Safety

OPTIMISING Benchmarking of controls across business units

Passenger / Public BehaviourPassenger

Passenger

Risk 1 Risk 3

Behaviour

Risk 2Risk 1

Behaviour

Risk 2Risk 1

Ri k 3

Passenger Behaviour

Risk 2

Risk 5

Equipment Failure

PlatformGap

Precursor1

Risk 6

Equipment FailureRisk 4

Platformgap

Risk 3

Ri k

Equipment Failure

PlatformGap

Risk 7SCI 1

Risk 5Risk 6Risk 4

Risk 7

SCI 1SCI 2

Precursor1

Precursor2

SCO3

SCO3

SCI 1

SCO3

1 September 2012 Page 36MTR Corporation

London ShenzhenHong Kong

Page 37: Application of Risk Tree in enhancing Transportation Safety

OPTIMISING –Cont’dApplying Fit-for-purpose Risk Strategy

Separate treatments for High Frequency or High consequence risk

High High

Separate treatments for High Frequency or High consequence risk

ConsequenceFrequency

Influence passengerpassenger behaviours

Review robustness of control measures

1 September 2012 Page 37MTR Corporation

measures

Page 38: Application of Risk Tree in enhancing Transportation Safety

–Cont’dOPTIMISING

Risk TreeSlips / Trips / Falls on Escalator

cena

rio) Slips / Trips / Falls

Maj

or R

isk

Sc(M

RS) Slips / Trips / Falls

on Escalator

ario

M

E i t F il Staff / Contractor Passenger / Public Sli C diti

Ris

k Sc

en(R

S1) Equipment Failure Staff / Contractor

Error / Misbehaviour

Passenger / Public Error /

Misbehaviour

Slippery Condition

1 September 2012 Page 38MTR Corporation

Page 39: Application of Risk Tree in enhancing Transportation Safety

To– Cont’dOPTIMISING

From

Influencing Passenger Behaviours

1 September 2012 Page 39MTR Corporation

Page 40: Application of Risk Tree in enhancing Transportation Safety

– Cont’dOPTIMISING

Vigorously reviewing the effectiveness of risk control measuresmeasures

Facilitate questioning of risk controls adequacy and effectivenesseffectiveness

Review critical processes (check and balance)

Minimise duplicated processes

Strengthen robustness of controls – use engineeringStrengthen robustness of controls use engineering measure instead of procedure to prevent accident

1 September 2012 Page 40MTR Corporation

Page 41: Application of Risk Tree in enhancing Transportation Safety

ANTICIPATING

Hindsight + Insight = ForesightEmerging risks

g g g

Responding to new groups of passengers and their behaviours

from SARS to pandemics and business “You don’t know what you don’t know. You know what you don’t know when you know more”p

continuityknow when you know more”

from engineering system risks to human factors

1 September 2012 Page 41MTR Corporation

factors

Page 42: Application of Risk Tree in enhancing Transportation Safety

Risk Ownership

1 September 2012 Page 42MTR Corporation

Page 43: Application of Risk Tree in enhancing Transportation Safety

Risk Management Organisation

Risk oversight by Safety Committee (OSMC-HK)

Risk Control & Analysis Committee (RCAC) reviews the risk controls and oversees the change in risk profile

Hazard Review Committee (HRC) of each departmentreviews all related risks trees and controls

Promoting Risk Tree ownership

Each Risk Tree and major risk scenario is championedEach Risk Tree and major risk scenario is championed by a Department Head

Lead the review of risk control measures with relatedLead the review of risk control measures with related parties and explore better solutions

1 September 2012 Page 43MTR Corporation

Page 44: Application of Risk Tree in enhancing Transportation Safety

Sharpen the Saw

From Excel spreadsheet to Risk Tree diagramTree diagram

Risk IT System (ASRISK) – tree view of risksview of risks

Further application - OSSA –l i i k t t ileveraging risk tree to examine the robustness of risk controls using a bowtie approachusing a bowtie approach

Train Door Opened

Inadvertently

Hazard Consequence

ConsequenceHazard

Scen

ario

RS0

)

Train Door Opened

Inadvertently

Hazard Consequence

ConsequenceHazardTrain Door

Opened Inadvertently

Hazard Consequence

ConsequenceHazard

Scen

ario

RS0

)

ConsequenceHazard

Ris

k S (R

ConsequenceHazard ConsequenceHazard

Ris

k S (R

1 September 2012 Page 44MTR Corporation

Page 45: Application of Risk Tree in enhancing Transportation Safety

1 September 2012 Page 45MTR Corporation

Page 46: Application of Risk Tree in enhancing Transportation Safety

Greatest Challenge in Risk Management

The risks that I don’t know ?

1 September 2012 Page 46MTR Corporation

Page 47: Application of Risk Tree in enhancing Transportation Safety

Risk Tree can enhance your risk intelligenceRisk Tree can enhance your risk intelligenceRead across – what is happening elsewhere ? will this happen to meelsewhere ? will this happen to me and my situations ?

Intelligence synergize knowledgeIntelligence – synergize knowledge and facilitate sharing

S iti it ti i t i i kSensitivity – anticipate emerging risk from new strategy and external changeschanges

Know-how – know how the risk occurred and manifested and how tooccurred and manifested and how to prevent it effectively

1 September 2012 Page 47MTR Corporation

Page 48: Application of Risk Tree in enhancing Transportation Safety

Thank You

1 September 2012 Page 48MTR Corporation