Page 1: ARROWHEAD RESOURCES Ltd. Report

ARROWHEAD RESOURCES Ltd. (N.PL.)

Assessment Report

JANUARY 1981 V.CUKOR, RENG. rn NVC ENGINEERING LTD. VANCOUVER, B.C.

Page 2: ARROWHEAD RESOURCES Ltd. Report

TABLE OF CONTENTS

1. INTRODUCTION

2. REVIEW 2.1 SUMMARY 2.2 CONCLUSIONS and RECOMMENDATIONS 2.3 COST ESTIMATE

3. PROPERTY 3.1 CLAIMS 3.2 LOCATION 3.3 ACCESS

4. PREVIOUS WORK

5. GEOCHEMICAL SURVEY 5.1 SAMPLING 5.2 LABORATORY PROCEDURE 5.3 DATA PRESENTATION 5.4 DISCUSSION OF RESULTS

APPENDIX "A"

COSTS INCURRED DURING PROGRAM

ILLUSTRATIONS

FIGURE 1 LOCATION MAP

FIGURE 2 CLAIM MAP

FIGURE 3 FREQUENCY DISTRIBUTION DIAGRAM

FIGURE 4 GEOCHEMICAL SURVEY PLAN: GOLD PLOT

* 1

2 2 - 3 3

4 4 5

6

7 7 8 8 - 10

!I engineering lld

Page 3: ARROWHEAD RESOURCES Ltd. Report

ARROWHEAD RESOURCES LTD. (N. P. L.)

SNOW CLAIM

CLINTON, B. C. AREA

1. INTRODUCTION

This assessment report is prepared at

request of Mr. J. Billingsley, the owner of the

Claims.

The work consisted of extensive g och

the

Snow

mica1

gold-silver soil survey. It was performed on behalf of

Arrowhead Resources Ltd. (N. P. L.) of Vancouver, B. C.

by Canadian Field Services Ltd., under the supervision

of J. R. Glass, P. Eng. All samples were delivered to

Bondar-Clegg E Company Ltd. for assays.

Results were processed and the report prepared

by V. Cukor, P. Eng.

1 engineering ltd

Page 4: ARROWHEAD RESOURCES Ltd. Report

- 2 -

2 . REVIEW

2 . 1 SUMMARY

The Snow C l a i m , s t a k e d i n t h e Maiden Creek

Va l l ey , i s u n d e r l a i n by t h e Coldwater Conglomerate

d e p o s i t s , i n which f i n e metall ic gold w a s a l l e g e d l y

found d u r i n g 1 9 0 1 .

I n 1973, 1 9 7 8 and 1 9 8 0 t h e geochemical s o i l

su rveys encountered moderately h i g h and h i g h gold

a s s a y s i n a background o f about 1 0 ppb go ld . L a s t

y e a r ' s survey w a s by far t h e most e x t e n s i v e . The

h i g h v a l u e s , a l though somewhat errat ic i n some

l o c a l i t i e s , g a t h e r i n t o l a r g e enough zones t o

war ran t f u r t h e r f o l l o w up work.

2 . 2 CONCLUSIONS and RECOMMENDATIONS

I n 1 9 0 1 a s s a y s o f up t o . 2 2 o z / t go ld were

o b t a i n e d from t h e conglomerate , and t h e d e p o s i t w a s

c l a s s i f i e d as v e r y l a r g e d e p o s i t , up t o t e n s of

feet t h i c k " . The geochemical programs, a l though i n -

c o n c l u s i v e , d e f i n i t e l y proved t h e presence o f gold

i n t h e conglomerate . However, so fa r v i s u a l p ros -

p e c t i n g h a s f a i l e d t o encounter any gold and a l l

a s s a y s of r o c k samples assayed on ly t race Au.

The l a s t program o u t l i n e d a t least t h r e e areas,

which war ran t fo l low up o f ve ry d e t a i l e d p r o s p e c t i n g

1 engineering lid

Page 5: ARROWHEAD RESOURCES Ltd. Report

- 3 -

2. REVIEW (CONT'D)

2.2 CONCLUSIONS and RECOMMENDATIONS (CONT'D)

and rock sampling. Since the conglomerate layers

cover a large area, the geochemical soil survey

should be expanded farther and more ground should be

acquired.

2.3 COST ESTIMATE

The following costs are estimated to be

necessary to complete the recommended program:

Prospecting and rock sampling; geologist and helper, one month and assays $ 8,000.00

Geochemical soil survey, 1,500 samples 12,000.00

Staking additional claims 3,000.00

Room, board, transportation 5,000.00

Data processing and report 3,000.00

Sub-Total $ 31,000.00

Contingencies $ 3,000.00

TOTAL $ 34,000.00

1 engineering ltd.

Page 6: ARROWHEAD RESOURCES Ltd. Report

- 4 -

3 . PROPERTY

3 . 1 CLAIMS

The p rope r ty c o n s i s t s of the Snow Mineral C l a i m

l o c a t e d on modified g r i d system. The c l a i m , record

number and ann ive r sa ry d a t e are as fo l lows :

C l a i m Record No. Anniversary Date

SNOW (12 u n i t s ) 1 3 5 December 1 8

The p rope r ty i s 1 0 0 % owned by J . B i l l i n g s l e y of

Vancouver, B . C .

3 . 2 LOCATION

The Snow C l a i m l i e s i n t h e Maiden Creek Val ley ,

1 5 Km. due sou th of t h e community of C l i n t o n , B. C .

The p rope r ty i s approximately 3 Km. west of P r o v i n c i a l

Highway No. 9 7 and it s t r a d d l e s a boundary between t h e

Cl in ton and Kamloops mining d i v i s i o n s , w i t h t h e l e g a l

co rne r pos t being l o c a t e d i n t h e C l in ton M . D . The

Snow C l a i m i s on t h e Map 9 1 I / 1 3 , E N . T . S . a t t h e

approximate w e s t l o n g i t u d e 121' 3 1 ' and n o r t h l a t i t u d e

. 50° 5 9 ' . The e l e v a t i o n of t h e p rope r ty is between

2 , 8 0 0 ' and 4 , 0 0 0 ' above sea l e v e l .

Water and good t imber f o r e x p l o r a t i o n purposes

are p l e n t i f u l on t h e p rope r ty .

1 engineering ltd.

Page 7: ARROWHEAD RESOURCES Ltd. Report

120. I 115.

ARROWHEAD RESOURCES LTD. (N.E!L.)

SNOW CLAIM LOCATION MAP

CLINTON Y.D. 92 1/13 E

I V-CUKOR, REng- NVC ENGINEERING Ltd. VANCOUVER, B.C. t 1 I'

Page 8: ARROWHEAD RESOURCES Ltd. Report

I

ARROWHEAD RESOURCES LTD. (N-EL.)

SNOW CLAIM CLAIM MAP

CLJNTON Y.D. 92 1/13 C - U.CUKOR, F? Eng. NVC ENGINEERING Ltd, VANCOUVER, B.C.

0 lkm DATE: Jan. 1981 1 SCALE: t-=---i I FIG. 2

Page 9: ARROWHEAD RESOURCES Ltd. Report

- 5 -

3 . PROPERTY (CONT'D)

3 . 3 ACCESS

The p rope r ty i s a c c e s s i b l e by a t h r e e k i l o -

m e t e r long d i r t road which branches o f f P r o v i n c i a l

Highway N o . 97 a t t h e Dougherty Ranch. A f t e r

c r o s s i n g t h e ranch t h e road fo l lows Maiden Creek

a long i t ' s n o r t h s i d e u n t i l it reaches t h e c l a i m s .

The Dougherty Ranch i s on t h e Highway, about

halfway between C l in ton and Cache Creek.

1 engineering Itd.

Page 10: ARROWHEAD RESOURCES Ltd. Report

- 6 -

4 . PREVIOUS WORK

The f i n e metall ic gold w a s first d i scove red i n

t h e Maiden Creek area i n 1 9 0 1 . A f t e r some i n i t i a l exp lo ra -

t i o n t h e p r o p e r t y w a s dormant u n t i l 1973.

J . McGoran had l o c a t e d t h e Au. mine ra l claims i n

1 9 7 3 and performed a l i m i t e d geochemical s o i l survey. Al-

though a s s a y s of up t o 5 7 0 ppb gold were o b t a i n e d , no f o l l o w

up work w a s r eco rded and claims l apsed .

I n 1 9 7 7 t h e a u t h o r l o c a t e d t h e Snow C l a i m and per-

formed a geochemical survey on beha l f of Seymour Resources

Inco rpora t ed . A number o f samples r e t u r n e d h i g h l y anomalous,

bu t somewhat e r r a t i c a s s a y s . The peak v a l u e was 1 4 0 0 ppb

go ld . I n s p e c t i o n of t h e anomalous area d i d n o t revea l any

gold and t h e c o l l e c t e d samples o f t h e rock outcropping

assayed trace amounts of go ld .

1 engineering ltd

Page 11: ARROWHEAD RESOURCES Ltd. Report

- 7 -

5. GEOCHEMICAL SURVEY

5 . 1 SAMPLING

A t o t a l o f 7 1 8 s o i l samples w e r e c o l l e c t e d a long

t h e 6 0 meter spaced nor th-south l i n e s a t 30 meter sta-

t i o n s .

I n g e n e r a l , on t h e s t e e p h i l l s i d e s , v e r y poor

s o i l i s developed, and t h e overburden u s u a l l y c o n s i s t s

o f c o a r s e material d e r i v e d from t h e conglomerate . How-

e v e r , i n t h e c r e e k v a l l e y and on t h e more l e v e l ground

t h e "B" ho r i zon i s w e l l d e f i n e d .

A l l samples were c o l l e c t e d from sha l low h o l e s ,

e x t r a c t e d from t h e I'B" h o r i z o n , wherever developed.

They were packed i n t h e s t anda rd k r a f t enve lopes ,

marked, p a r t i a l l y d r i e d and t h e n shipped t o Bondar-Clegg

E Company Ltd. t o be assayed f o r gold and s i l v e r .

5 . 2 LABORATORY PROCEDURE

Bondar-Clegg E Company Ltd. , North Vancouver,

B. C . r e p o r t e d t o have processed t h e samples as

f o l l o w s :

1) Samples s i f t e d t o : -80 mesh

2 ) Weight of sample used 2 0 grams

3 ) Bead produced by f i r e a s s a y d i s s o l v e d i n t h e h o t aqua r e g i o n .

4 ) Volume of d i l u t i o n used 5 m i l .

5 ) Method of a n a l y s i s Atomic a b s o r p t i o n spec t romet ry

6 ) Ins t rument Techtron

I! engineering ltd.

Page 12: ARROWHEAD RESOURCES Ltd. Report

- a -

5. GEOCHEMICAL SURVEY (CONT'D)

5.3 DATA PRESENTATION

Survey data is presented on figures 4 and 5,

and all assay results are appended at the end of the

report.

Most of the silver values are low and uniform

and no statistical evaluation was deemed necessary.

Gold values showed more relief. They were

plotted on the Geochemical Survey Plan (figure 4 ) ,

scale 1:3,000 with anomalous readings of over 20 ppb

Au. contoured and shaded. A Frequency Distribution

Diagram for gold was also constructed and appended

to the report as figure 3.

5.4 DISCUSSION OF RESULTS

As mentioned before, most of the silver values

are low, with only several samples exceeding . 2 ppm

Ag. Almost all of these accompanied also high gold

values. Conversely most of the samples with high

gold readings returned only . 2 ppm Ag.

Gold assays returned some high values in fairly

low background. Statistical calculations of 718 samples

revealed the background value as being 10 ppb Au., the

anomalous threshold 20 ppb and the definitely anomalous,

all readings of over 30 ppb gold.

il engineering ltd

Page 13: ARROWHEAD RESOURCES Ltd. Report

FREQUENCY DISTRIBUTION DIAGRAM

GOLD

Anomalous

ppu Gold 0 5 K) 15 30 25 30 35 40 45 50 55 60 65 70 75 80 85 g0 95 100

SNOW CLAIM

CLINTON M.D. 92 1/13 E

V. CUKOR, F! Eng. - NVC ENGINEERING Ltd. - VANCOUVER, B.C.

DATE: Jan. 1981 FIG. 3

Page 14: ARROWHEAD RESOURCES Ltd. Report

- 9 -

5. GEOCHEMICAL SURVEY ( C O N T ' D )

5 . 4 D I S C U S S I O N OF RESULTS ( C O N T ' D )

A s shown on f i g u r e 4 , most of t h e anomalous and

h i g h l y anomalous va lues are s c a t t e r e d throughout t h e

g r i d area, t h e p a t t e r n a l r e a d y noted du r ing previous

surveys . Seve ra l areas, however, s t and o u t and should

be examined more c l o s e l y . A 350 meter long and 6 0 t o

1 0 0 meter wide zone on l i n e s 1 2 t o 2 2 around s t a t i o n s

1 7 S , d e f i n i t e l y war ran t s fo l low up work. A l l ou tc rops

i n t h i s zone should be in spec ted and a d e t a i l e d sampling

program should be e x e r c i s e d . S o i l sampling should be

extended westward, s i n a e t h e anomaly i s s t i l l opened

i n t h a t d i r e c t i o n . Another anomalous zone is on l i n e s

1 6 t o 2 2 around s t a t i o n s 4 N. This zone i s a l s o opened

westward. The t h i r d i n t e r e s t i n g zone i s a t l i n e s 0 t o 6

a t about 1 0 - 1 7 N wi th o t h e r i s o l a t e d h igh r e a d i n g s

grouped in t h i s area. These zones could extend east-

ward off t h e g r i d and expanding g r i d i n t h a t d i r e c t i o n

i s warranted. Also i n t r i g u i n g i s a f a i r l y l a r g e zone

a t l i n e s 10-18 from 6-18 N , which i s surrounded by a

r i n g of anomalous r e a d i n g s . The c o r e of t h i s zone i s

i n t h e outcropping area, where no s o i l samples could

be c o l l e c t e d . This zone should be prospected and

sampled wi th g r e a t e s t care as w e l l .

1 engineering lid

Page 15: ARROWHEAD RESOURCES Ltd. Report

- 10 -

5 . GEOCHEMICAL SURVEY ( C O N T ' D )

5 . 4 DISCUSSION OF RESULTS ( C O N T ' D )

S ince , i n my op in ion geochemical survey and v i s u a l

p rospec t ing are t h e on ly e x p l o r a t o r y methods a v a i l a b l e ,

t h e y should be cont inued and expanded i n t o a wider area

u n t i l t h e gold i n t h e bedrock i s d e t e c t e d .

R e s p e c t f u l l y submi t ted ,

V . Cukor, P. Eng. NVC Engineer ing Ltd.

January , 1 9 8 1

i! engineering ltd

Page 16: ARROWHEAD RESOURCES Ltd. Report

APPENDIX "A"

COSTS INCURRED DURING THE PROGRAM

a) Field Work

Canadian Field Services Ltd. Soil sampling

J. R. Glass, P. Eng. Grid construction, supervision, rock sampling

Field expenses

$ 2,000.00

1,900.00

176.05

Bondar-Clegg E Company Ltd., assays

NVC Engineering Ltd. Data processing and drafting

b) Office

4,590.95

300.00

TOTAL $ 8,967.00

I! engineering lid

Page 17: ARROWHEAD RESOURCES Ltd. Report

AFF IDAV IT

I, VLADIMIR CUKOR, of 2 8 3 0 West 37th Avenue,

Vancouver, British Columbia, do hereby declare:

In the matter of Arrowhead Resources Ltd.

( N . P. L.) Assessment Report and the personnel employed

and costs incurred, as listed in Appendix "A" of this

Report, that I have reviewed all field data and invoices

submitted to me by the Company and that the information

contained in Appendix "A" is true and accurate to the best

of my knowledge and belief.

V. Cukor, P. Eng.

El engineering ltd

Page 18: ARROWHEAD RESOURCES Ltd. Report

CERTIFICATE

I , V L A D I M I R CUKOR, of 2830 West 37th Avenue,

Vancouver, B r i t i s h Columbia, DO HEREBY CERTIFY t h a t :

1. I a m a Consul t ing Geologica l Engineer w i t h b u s i n e s s a d d r e s s as above;

2 . I graduated from t h e U n i v e r s i t y o f Zagreb,

3 . I a m a Reg i s t e red P r o f e s s i o n a l Engineer i n

Yugoslavia i n 1963;

t h e Geologica l S e c t i o n o f t h e A s s o c i a t i o n of P r o f e s s i o n a l Engineers i n t h e Province o f B r i t i s h Columbia;

4 . I have p r a c t i c e d my p r o f e s s i o n as a Geological Engineer f o r t h e p a s t 1 8 y e a r s , b o t h i n Yugo- s l a v i a and Canada;

5 . I have reviewed a l l t h e in fo rma t ion on t h e geochemical survey submi t ted t o m e by Arrow- head Resources Ltd. (N. P. L . ) ;

6 . I have no i n t e r e s t d i r e c t or i n d i r e c t i n t h e p r o p e r t y d e s c r i b e d i n t h i s Report .

V. Cukor, P. Eng.

January , 1 9 8 1

1 engineering ltd.

Page 19: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTD.

130 PEMBERTON AVE., NORTH VANCOUVER, B.C. PHONE: 985-0681 T E L E ) G Q : e - 7 _ _ , _ , I

8 -

Geochemical Lab Report E x t r a c t i o n - A /-TZ'L /- - J- 4$$- A;-*%. Report No.

Method __-_ 64- - :,,,' __- -

Fraction Used __

-GZ-& z%/ From - __-- Date

*

SAMPLE NO. $i P$ SAMPLE NO. PA,8 ,% LO BASE LINE 0.2 5 LO- 30N 0.2 5

0.2 < 5 LO - ZN 0.2 < 5 1s

0.2 < 5 2N 0.2 < 5 2s

m 0.2 15 3s 0.2 < 5

4N 0.2 20 4s 0.2 < 5

5N 0.2 < 5 5s 0.2 < 5

6N 0.2 10 6s 0.2 5

7N 0.2 210 7s 0.2 10

8N 0.2 < 5 8s 0.2 < 5

- ---

-- -I-_--_ - - - -- __ __ ___. __

--- - . - - . - __ ~ - - - I- -- --- -_ -- - -_-- - -

9N 0.2 5 9s 0.2 155

1 ON 0.2 c 5 10s 0.2 145

11N 0.2 35 11s 0.2 < 5 L 2 N 0.2 < 5 12s 0.2 < 5

13N 0.2 30 13s 0.2 < 5

14N 0.2 215 14s 0.2 < 5 1 5N 0.2 < 5 15s 0.2 5

l6N 0.2 5 16s 0.2 < 5

17N 0.2 20 17 S 0.2 < 5

18N 0.2 < 5 18s 0.2 < 5

19N 0.2 75* 19s 0.2 < 5

20s 0.2 < 5 20N 0.2 105*

2 -~ 1N 0.2 ----____--- I.S. 21s 0.2 < 5 22N 0.2 13W 22s 0.2 < 5

23N 0.2 < 5 23s '0.2 < 5

- 24N 0.2 5 24s 0.2 < 5

-- 25N 0.2 < 5 25s 0.2 < 5 2 6s - -?A? --< 5- - ~ ~ - - 26N 0.2 < 5

27N

- --_- 0.2 < 5 27 s 0.2 < 5 '

28N 0.2 < 5 28s 0.2 < 5 I

Page 20: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTD.

m

aJ 7N

8ri

9N

1 ON

1lN

2 Geochemical Lab Report

Page No. 20 - 2087

' ReportNo.

0.2 < 5 10s 0.2 65

0.2 30 11s 0.2 < 5

5 12s 0.2 5

0.2 < 5 13s 0.2 < 5

0.2 < 5 14s 0.7 < 5

0.2 < 5 16s 0.2 5

0.2

0 - 7 c 5 15.. n-2 < 5

--,-- --I__-

5 12N 0.2

0.2 255 13N

14N 0.7 / s

0.2 70 15N

16N 0.2 5

0.2 < 5 171

18N 0.2 < 5

19N 0.2 < 5

0.2 < 5 20N

71N 0-2 < 5

22N 0.2 10

23N 0.2 c 5

2m 0.2 15 2% 0.2 < 5

26N 0.2 35

27N 0.2 25 0.2 c 5 28N

29N 0.2 20

0.2 < 5 3 ON 1s 0.2 < 5

2s 0.2 < 5

3s 0.2 < 5

17s 0.2 5

188 0.2 5

19s 0 - 7 / 5

20s 0.2 < 5

21s 0.2 5

< 5 23s 0.2 < 5

24s 0.2 < 5

25s 0 .2 < 5

7 6. 0 - 7 r T

0.2

275 0.2 < 5

28s 0.2 < 5

7Q.c 0 - 7 < s 30s 0.2 5

L 4 BASELINE 0.2 5

L 6 1B 0 - 7 50

---- 0.2 < 5 214

3N 0.2 < 5

4N 0.2

___--

5

5N 0.2 < 5

6N 0.2 < 5

7N 0.2 < 5

Page 21: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY' LTD.

1lN

12N

131

14N 15N

Geochemical Lab Report ReportNo. 2o - 2087 Page NO.?

---- 0.2 < 5 16s 0-2 5

0.2 5 17s 0.2 5

0.2 45 18s 0.2 < 5

5 20s 0-2 < 5 0.2 10 19s 5

0.2

16N 0.2 35 21s

17N 0.2 474 22s 0.2

18N 0 9 6 5 7 1 s 0-2

19N 0.2 < 5 24s 0.2

20M 0.2 < 5 2 5s 0.2

21N 0.2 < ,5 26s 0.2

7m (1-2 e 5 77s 0 9

23N 0.2 < 5 28s 0.2

24N 0.2 < 5 29s 0.2

0.2 r T 70s 0.7,

26N 0.2 5 L6 BASEL= 0.2

27N 0.2 < 5 L6 . lI!? 0.2

0.2 t T 2N 0.2

291 0.2 < 5 3N 0.2

30N 0.2 45 4N 0.2

1s 0.2 105 5N 0.2

2s 0.2 C T 6N 0.2

0.2 c 5 8N 0.2

3s 0.2 < 5 719 0.2

4s

< 5

40

/ < - < 5

< 5

< 5

5 -

< 5

< 5

5

< 5

5

< 5

< 5

< 5

5

10

30

35

5s

a 7s

8s

QS

10s

11s

0.2 < 5 9N 0.2 170

0 - 7 / c 1 ON n- 3 3 5n

0.2 < 5 12N 0.2 5

0 - 2 e s 1 7U n-3 5

0.2 < 5 14N 0.2 5

0.2 < 5 l!iN 0.2 50

0 - 2 < 5 0 - 7 60

- 0.2 < 5 1 l N 0.2 510

I

Page 22: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTD.

4 Geochemical Lab Report

Page No. 20 - 2087 Report No.

12s 0.2 < 5 16N 0.2 < 5

0-7. 4

0.2 < 5 1819 0.2 < 5

, 15s 0.2 < 5 19N 0.2 < 5

0.2 5 21N 0.2 < 5

12s n- 7 < s 14s

1 6s n - 7 5

17s

18s 0.2 5

7nN 0 - 7 d ej

- -- 22N 0.2

19s 0.2 5 7?N 0- 7 4

-- 0.2 < 5 25N 0.2 < 5 21s

t

Page 23: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTB.

18s

19s

20s

22s

23s

24s 25s

26s

Geochemical Lab Report Page ~ 0 . 5

20 - 2087 . Report No.

0 - 7 / 5 - 3 3 u n 3 5

--- 0.2 < s 23N 0.2 < s --- 0.2 < 5 24N 0 -2 5

0.2 5 2SN 0.2 0.2 5

0.2 5

0.2 5 5 0.2

0.2 5

10

26N 0.2 20

27N 0.2 15

n. 3 25

29N 0.2 60

308 0.2 11s

711N

1s

2s

27s 0.2 S

28s 0.2 5

29s 0.2 < 5 7s

30s 0.2 < 5

0.2 35

0.2 < 5

0-2 c 5

2 ce;

Page 24: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTD.

11s

12s

13s

14s 15s

16s

Geochemical Lab Report Repon No.- Page N 0 . L

0 - 7 5 211 0.2 5 0.2 5 22N 0.2 < 5

0.2 < 5 23N 0.2 < 5 0-2 < 5 24Es 0.4 < 5 0.2 < 5 2% 0.2 < 5 0.2 < 5 2W 0.2 < 5

17s 0- 7-

18s 0.2

0.2 19s

20s 0.2

21s 0.2

2 2s 0 - 2

235 0.2

245 0.2

725 0 - 2

265 0.2

27s 0.2

7RS 0-2

29s 0.2

30s 0.2

~ 0.7 < 5 < 5

< 5 . 281 0.2 < 5

< 5 29N 0.2 < 5

< 5 3019 0.2 15

5 1s 0.2 < 5 2s 0.2 e 5

< 5 3s 0.8 240

< 5 4s 0.2 15

5s 0.2 15

< 5 6s 0.2 10

< 5 7s 0.2 < 5

85 0.2 < s 5 9s 0.2 < 5

< 5 10s 0.2 < 5

5

4 5

< 5

LIZ BASE LINE 0.2 < 5

0 03 5 L12 lN

0.2 20 2N

3N 0.4 45

4Es 0.2

11s 0.2 5 12s 0.2 15

l3S 0.2 < 5

-- 14s 0.2 < 5 < 5

5N 0.6 < 5

0.2 55

20

0.3 < 5

6N

7N 0.2 8N

15s 0.2 16s 0.2 10

175 0.2 < 5

18s 0.2 19s 0.2 < 5

< 5

Page 25: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG & COMPANY LTD.

7 Geochemical Lab Report

Page No. 20 - 2087 Report No.

24# 0.2 < 5 295 0.2 ___ < 5

2!a 0.2 < 5 3 0s 0.2 <-5

26# 0 .2 5 L16 BASE LINE 0.2 5

27N 0.2 5 L16 m 0.2 - . -5- .

2m 0.2 < 5 I 1

2N 0.4 25

* I -_ t-

Page 26: ARROWHEAD RESOURCES Ltd. Report

BONDAR-CLEGG lS COMPANY LTD.

6s

7s

8s

9s

8 Geochemical Lab Report

20 - 2087 Report No. Page No.

0.2 < 5 10n 0.2 165

0.2 5 1%

5 13N 0.2 5

10 14b1 0.2 5

n 3 5 0.2

0.2

Page 27: ARROWHEAD RESOURCES Ltd. Report
Page 28: ARROWHEAD RESOURCES Ltd. Report
Page 29: ARROWHEAD RESOURCES Ltd. Report
Page 30: ARROWHEAD RESOURCES Ltd. Report