ASBESTOS SURVEY REPORT
Location: BIN 1095550 Paul Road Bridge over Interstate 490 (Eastbound)
Town of Chili, New York PIN SABP.04.101
Prepared for: New York State Department of Transportation
Prepared By:
175 Sully’s Trail, Suite 202 Corporate Crossings Office Park
Pittsford, New York 14534
February 2012 Lu Project # 9920-40
ASBESTOS SURVEY REPORT
Location: BIN 1095550 Paul Road Bridge over Interstate 490 (Eastbound)
Town of Chili, New York PIN SABP.04.101
TABLE OF CONTENTS
Page
1.0 Project Summary .................................................................................................. 1 2.0 Site Description .................................................................................................... 1 3.0 Inspection Procedures ......................................................................................... 1 4.0 Results .................................................................................................................. 2 Certification .................................................................................................................. 3
Figures and Tables Figure 1 Site Location Map Figure 2 Asbestos Bulk Sample Location Plan Table 1 Bulk Sample Results Appendices Appendix A Asbestos Survey Fact Sheet Appendix B Licenses and Certifications Appendix C Laboratory Analysis Report and Chain of Custody
Paul Road Bridge over Interstate 490 (Eastbound) Town of Chili, New York February 2012
1
1.0 Project Summary In accordance with conditions of Term Agreement D030924, Lu Engineers conducted an asbestos sampling survey on the Paul Road Bridge over Interstate 490 (Eastbound) (BIN 1095550). Based on information obtained using the procedures described in Section 3.0 Inspection Procedures, the following summarizes the results of this investigation.
BIN 1095550 – Paul Road Bridge over Interstate 490 (Eastbound) Confirmed Asbestos-Containing Materials (ACMs) Based on laboratory analyses of bulk samples collected, the following materials were determined to contain asbestos: Confirmed ACMs
Type of Material Typical Location Estimated Amount Friability Condition
Black Fibrous Sheet Packing
In Joint Between Deck and Abutment
90 SF Non-Friable Good
LF = Linear Feet SF = Square Feet
Inaccessible/Assumed ACMs No other inaccessible/assumed ACMs were identified. 2.0 Site Description The Site is located in the Town of Chili, New York. For the purpose of this report, the Site consists of BIN 1095550 – Paul Road Bridge over Interstate 490. The site is indicated on the attached Figure 1 – Site Location Map. 3.0 Inspection Procedures The following procedures were used to obtain the data for this Report:
A. A review of record drawings supplied by Region 4 personnel and a visual inspection of the subject structure were conducted to identify potential visible/accessible sources of asbestos-containing materials. Observations and notes were made to provide a description of the structure, and an estimate of the approximate amount, length, or area of ACM present.
Paul Road Bridge over Interstate 490 (Eastbound) Town of Chili, New York February 2012
2
B. Physical or operational constraints, which might affect the removal of the ACM, were identified and reported.
C. Bulk samples of suspected ACMs were collected during the site inspection of the
subject structure. Samples were taken from each homogeneous area that may contain ACM, including the paint system. The investigation was limited to areas of the bridge that could be accessed from the bridge itself or reached from the ground and/or by use of a ladder from below. The approximate location of bulk samples is indicated on Figure 2, Asbestos Bulk Sample Location Plan.
D. Samples were submitted for analysis. Preliminary polarized light microscopy (PLM)
analyses of non-friable, organically bound (NOB) materials were performed by Paradigm Environmental Services, a NYSDOH approved laboratory, to determine the presence and percentage of asbestos in each sample. Transmission electron microscopy (TEM) analyses of NOB materials, if necessary, were performed by Paradigm Environmental Services.
E. Lab results were used to determine the approximate location, type, and amount of
the verified ACM. Only accessible areas were inspected. Inaccessible areas, such as areas within the bridge or the approaches to the bridge were not included in this inspection. No investigation was conducted by Lu Engineers to determine the presence of underground utilities on or in the immediate vicinity of the Site.
4.0 Results
BIN 1095550 – Paul Road Bridge over Interstate 490 (Eastbound) Confirmed Asbestos-Containing Materials (ACMs) Sheet Packing Asbestos-containing black sheet packing is located in the horizontal joint between the abutment and the bridge deck slab at both ends of the bridge. Most of this material is presently covered by the bridge deck, although the edges of this sheet packing are exposed and visible at various locations. It is estimated that the total amount of this asbestos-containing sheet packing material on the bridge is approximately 90 square feet. The approximate locations of this asbestos-containing sheet packing are shown in Figure 2. Inaccessible/Assumed ACMs No other inaccessible/assumed ACMs were identified.
Paul Road Bridge over Interstate 490 (Eastbound) Town of Chili, New York February 2012
3
Certification Lu Engineers certifies the accuracy of this report, to the best of our knowledge, based on the information collected as described in the Inspection Procedures Section of this report.
Figures and Table
SAMPLE RESULTS
Paul Road Bridge over Interstate 490 (Eastbound) Town of Chili, New York
BIN 1095550
Sample #
Sample Location
Type of Material Results % Asbestos
Amount of Material
Specification Item
1-A
Northeast Corner of Bridge on
Inside of North Girder
Green/Orange Paint No Asbestos
Detected NA NA
1-B
Southwest Corner of Bridge on
outside of South Girder
Green/Orange Paint No Asbestos
Detected NA NA
1-C East Side of
Bridge Green/Orange Paint
No Asbestos Detected
NA NA
2-A
Northwest Corner of Bridge Between Deck and Abutment
Black Fibrous Sheet Packing
18% Chrysotile
90 SF 210.3312
2-B
Southwest Corner of Bridge Between Deck and Abutment
Black Fibrous Sheet Packing
Refer to Sample 2-A
Refer to Sample 2-A
Refer to Sample 2-A
2-C
Northeast Corner of Bridge
Between Deck and Abutment
Black Fibrous Sheet Packing
Refer to Sample 2-A
Refer to Sample 2-A
Refer to Sample 2-A
3-A
Northwest Corner of Bridge
Between Bridge Deck and Abutment
Grey Caulk No Asbestos
Detected NA NA
3-B
Northwest Corner of Bridge Between
Sidewalk and Metal Curb
Grey Caulk No Asbestos
Detected NA NA
SAMPLE RESULTS
Paul Road Bridge over Interstate 490 (Eastbound) Town of Chili, New York
BIN 1095550
Sample #
Sample Location
Type of Material Results % Asbestos
Amount of Material
Specification Item
3-C
Northeast Corner of Bridge Between
Sidewalk and Metal Curb
Grey Caulk No Asbestos
Detected NA NA
4-A West Side of
Bridge on Bearing Support
Tan Masonry Coating No Asbestos
Detected NA NA
4-B West Side of
Bridge on Bearing Support
Tan Masonry Coating No Asbestos
Detected NA NA
4-C East Side of
Bridge on Bearing Support
Tan Masonry Coating No Asbestos
Detected NA NA
SF – Square Feet LF – Linear Feet
APPENDIX A
Asbestos Survey Fact Sheet
Asbestos Survey Fact Sheet Name and Address of Building/Structure: Paul Road Bridge over Interstate 490 (Eastbound) (BIN 1095550) Town of Chili, New York Name and Address of Building/Structure Owner: New York State Department of Transportation 50 Wolf Road Albany, New York 12232 Name and Address of Owner’s Agent: Lu Engineer’s 175 Sully’s Trail, Suite 202 Pittsford, New York Name of the Firm & Persons Conducting the Survey: Lu Engineers
Mitchell C. Smith (NYSDOL Cert. #97-15393)
Date Survey Was Conducted: January 24, 2012 List of Homogeneous Areas (Items in Bold Confirmed ACM) Green/Orange Paint Black Fibrous Sheet Packing Grey Caulk Tan Masonry Coating
APPENDIX B
License and Certifications
APPENDIX C
Laboratory Analysis Report and Chain of Custody