5
CURRICULUM VITAE ASHOK KUMAR TIWARI 17/212, Indra Nagar, Lucknow UP India Cell no. 8423232388 / 8874207608 \ & 05224004040 E-mail: [email protected], [email protected] OBJECTIVE:- To sustain in the industry and to utilize myself as all kind of challenging jobs By upgrading my knowledge &skills from time to time. Skill Summary: Total of 20 Years of Experience in Chief Engineer (technical head in facility management) Electrical Air conditioning HT & LT PANEL. All Type DG Set.AMF.PLC. BMS System Lights & Power.CCTV. Fire Fighting System Laundry. Boiler Hot Water Generator ALL TYPE.PANEL& ELECTROMECHANICAL SERVICE UPS ALL TYPE. FACILITY UTILITIES SYSTEM Should have GOOD knowledge and understanding of PLC, VFD & relay logics (Omron, Mitsubishi & Delta), Servo motor & servo drives, sensors , Ac drives && related instrumentation used for SPMs. Should be able to study existing processes, methods and identify areas of improvements to get better utilization in energy, man power, resources used. Specially with areas relating to Electricity Conservation. Should be able to get junior officers to work as a team. Should have good Execution Capabilities proven in past job done. Salary is no bar for the right candidate. Certification and Training: License 1. License - (IET 1062 Electricity Board Mumbai 1997 No.152127) 2. Diploma in Electrical 2002 3. Air-condition Training Diploma six month 2004 Training in Complete utilities HT/LT & air-condition all Electrical system Tanning in Refrigeration Management system All electro mechanical utility services Pre opening & operational Hotel / Shopping mall Hospital Software call canter factory industrial Project & Factory maintenance Technology &Utilities System: All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and maintain and installation. Complete utility system and new technology .all type project & Operation Electrical Maintenances Facility Engineer all monthly check list Technology &Utilities System: All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and maintain and installation. Complete utility system Was responsible for complete operation and maintenance all the engineering equipment and hotel facilities Like Electrical Substation, Air conditioning, Effluent Treatment, Fire detection & Safety, Kitchen & Laundry Equipment, Boilers, Computerized Dimmers, Swimming Pools & Water Bodies, Civil jobs incl. Painting and Polishing etc. Also responsible for the various renovation, expansions and refurbishments in the Hotel Designed and commissioned new IBR Boilers, Hot water generation system based on steam, New R.O. to cater to complete water supply in the hotel and many more up gradations. Leading a team of trained/semi trained technical staff. Preparing various Preventive maintenance Schedules and ensuring their proper implementation. Proactive measures for the maximum Energy Conservation without hampering the operations, guest comfort and system operating parameters. Preparing the Budgets for energy consumption, Repairs & spares and ensure that deadlines are met.

ashok kumar tiwari resume

Embed Size (px)

Citation preview

Page 1: ashok kumar tiwari resume

CURRICULUM VITAE

ASHOK KUMAR TIWARI 17/212, Indra Nagar, Lucknow UP India Cell no. 8423232388 / 8874207608 \ & 05224004040 E-mail: [email protected], [email protected]

OBJECTIVE:- To sustain in the industry and to utilize myself as all kind of challenging jobs By upgrading my knowledge &skills from time to time. Skill Summary: Total of 20 Years of Experience in Chief Engineer (technical head in facility management) Electrical Air conditioning HT & LT PANEL. All Type DG Set.AMF.PLC. BMS System Lights & Power.CCTV. Fire Fighting System Laundry. Boiler Hot Water Generator ALL TYPE.PANEL& ELECTROMECHANICAL SERVICE UPS ALL TYPE. FACILITY UTILITIES SYSTEM

Should have GOOD knowledge and understanding of PLC, VFD & relay logics (Omron, Mitsubishi & Delta), Servo

motor & servo drives, sensors , Ac drives && related instrumentation used for SPMs.

Should be able to study existing processes, methods and identify areas of improvements to get better utilization in energy, man power, resources used. Specially with areas relating to Electricity Conservation.

Should be able to get junior officers to work as a team.

Should have good Execution Capabilities proven in past job done.

Salary is no bar for the right candidate.

Certification and Training: License

1. License - (IET 1062 Electricity Board Mumbai 1997 No.152127) 2. Diploma in Electrical 2002

3. Air-condition Training Diploma six month 2004

Training in Complete utilities HT/LT & air-condition all Electrical system Tanning in Refrigeration Management

system All electro mechanical utility services

Pre opening & operational Hotel / Shopping mall Hospital Software call canter factory industrial Project &

Factory maintenance

Technology &Utilities System: All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and

maintain and installation. Complete utility system and new technology .all type project & Operation Electrical Maintenances Facility Engineer all monthly check list

Technology &Utilities System: All the technologies, Electrical, mechanical utilities system & Minor electronics systems, operations and maintain and installation. Complete utility system Was responsible for complete operation and maintenance all the engineering equipment and hotel facilities Like Electrical Substation, Air conditioning, Effluent Treatment, Fire detection & Safety, Kitchen & Laundry Equipment, Boilers, Computerized

Dimmers, Swimming Pools & Water Bodies, Civil jobs incl. Painting and Polishing etc.

Also responsible for the various renovation, expansions and refurbishments in the Hotel Designed and commissioned new IBR

Boilers, Hot water generation system based on steam, New R.O. to cater to complete water supply in the hotel and many more up

gradations. Leading a team of trained/semi trained technical staff.

Preparing various Preventive maintenance Schedules and ensuring their proper implementation.

Proactive measures for the maximum Energy Conservation without hampering the operations, guest comfort and system

operating parameters. Preparing the Budgets for energy consumption, Repairs & spares and ensure that deadlines are met.

Page 2: ashok kumar tiwari resume

Modifications to bring down the power consumption

overhauling of the major equipment. Implementation of various maintenance schedules for the upkeep of the property.

Present assignment: March 2008 to Till Date Company SAROVAR PORTICO (A Sarovar Hotels) Lucknow

Company Profile:

Sarovar Hotels & Resorts

Hotels & Resorts is a privately owned hotel chain in India. It is the 4th largest hotel chain in India with 36 hotels

across India and overseas. The company is affiliated with Carlson Hospitality Worldwide. Carlson is active in

hospitality services, comprising more than 1,570 hotels, resorts restaurants, and cruis e ship operations in 81

countries. The association with Carlson Hospitality makes Sarovar Hotels the master franchisor [clarification needed] for

the Park Plaza and the Park Inn hotel brands in India. The Company has also launched the domestic brands: Sarovar

Premiere, Sarovar Portico and Hometel.

Sarovar Premier and Park Plaza - upscale (5 star) segment

Sarovar Portico and Park Inn - mid-market (3-4 star) segment

Hometel - 3 star segment with cheaper rooms. Sarovar currently has 6 budget hotels.

Work Profile: I Am Working as a Chief Engineer in the company. My job included maintenance and

execution of electrical, Mechanical, plumbing STP plant, Tele-communication systems and civil area of the Hotel. My Job Includes Execution of Project and operational works of

hotel. I was handling team of technicians and other technical people of different contractors. I My Job also included planning and management of work force for completions of jobs within the time

Past Assignment: May.2005 to March 2008

Company Profile:

Jones Lang LaSalle

Saharaganj Mall

Lucknow went through a transformation in its lifestyle with Sahara Infrastructure & Housing generating ample avenues. Be it residential or commercial Sahara Ganj, opened in November 2005 to provide the city with the best entertainment arena. A brand Super Mall, it is self sufficient in its offerings & specifications of the highest order. The built up area of approx 525 Thousand sq. ft. matching international

standards & having the best value additions.

Work profile : I was designated as Shift Engineer in the company.

My job included maintenance and execution of Electrical, Mechanical, plumbing swimming pool, STP plant, Tele-communication systems and civil

area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of

technicians and other technical people of different contractors. I used to work in Shifts and open for pressure environment. My Job also included planning and management of work force for completions of jobs within the time frame given by superiors I was designated as Shift Engineer

Page 3: ashok kumar tiwari resume

Past Assignment: ( Facility Engineer )

Company Birla Soft

Company Profile:

Founded in 1995, Birla soft is an IT Services provider, with a global workforce of over 6000 employees and has a

footprint in 5 continents & delivery centers in China & India. Birla soft sells its stuff to the Banking, Financial ices,

Insurance and Manufacturing industries. Starting out as Birla Horizons International, the company was rejuvenated

and renamed as Birla soft Inc in 1998, when GE Capital joined the company as a strategic investor. The company

now has several offices across multiple global locations with dedicated software centers,

Work Profile: I was designated as As whole sole In charge in the company. My job includes maintenance and

execution of electrical, Mechanical, plumbing, civil, in company. I was handling team of technicians and other technical people of different contractors I was reporting to Chief Engineer of company.

Past assignment: ( Shift Engineer ).

Company : mansingh Hotels & Resorts

Company Profile: Keeping the age-old traditions alive, the Mansingh at Agra, Ajmer and Jaipur provides a glorious example of

hotels. The group's hotel business started in 1980, when Indo Continental Hotels & Resorts Ltd. was taken over by the family. The first Hotel of the group, `Mansingh', Jaipur gave the hotel group its present name - The Mansingh Group

Work profile : I was designated as Shift Engineer in the company. My job included maintenance and

execution of Electrical, Mechanical, plumbing swimming pool, STP plant, Tele-communication systems and civil area of the Hotel. My Job Includes Execution of Project and operational works of hotel. I was handling team of technicians and other technical people of different contractors. I used to work in Shifts and open for pressure

environment. My Job also included planning and management of work force for completions of jobs within the time frame given by superiors I was designated as Shift Engineer

Past Assignment: Facility Engineer (From Jan 97 to Jan 2002 )

Company HST Enterprises, Gautam Nagar New-Delhi

Company Profile: For handling All types of Electro-Mechanical Services for various Telephonic

Exchanges at T.E Yamuna Nagar T.E Ambala and T.E Hisser .all A/C, L/T, H/T ,POWERPLANT Rapier all type electro maniacal All haryana India check and execute all activities of his department to ensure guest safety and comfort. These activities include ensuring smooth and appropriate functioning of air conditioning/heating systems, water supply, heat, light and power and all equipment in the hotel, while keeping a control on energy Work Profile: I was designated Supervisor in the company. My job includes maintenance and execution of

electrical, Mechanical, plumbing, civil, in company. I was handling team of technicians and other technical people of different contractors I was reporting to Chief Engineer of company

Page 4: ashok kumar tiwari resume

Past Assignment: Asst. Engineer (From Jun 1994 to July 1997)

Company M/S DELIP VIDYUT BOMBAY (GOVT. Contractor ) Mumbai

Company Profile: Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel

cable mcb mccb acb& ocb installation work Work Profile: I was designated Supervisor in the company. My job includes maintenance and execution of

electrical, Mechanical, plumbing, civil, in company. I was handling team of technicians and other technical people of different contractors I was reporting to Chief Engineer of company Past Assignment: Asst. Technical Service (from Jan 1993 to Nov 1995)

Company M/S Western Engineering Company, New Delhi

Company Profile: Maintaining all types of Controls & Consoles of panel Boards and DG sets D C Motor Panel

cable mcb mccb acb& ocb installation work Panel manufacturing

Work Profile. As Electrical Asst. for H.V.A.C Project handling all types of Electro-Mechanical Services all A/C,

L/T, H/T, Power plant Rapier all type Electro, mechanical jobs

Past Assignment: Air-condition & Electrical Engineer ( C.N. Center) (From July 1997 to Jan 1999)

Company

All India Institute of Medical Sciences

Company Profile: AIIMS was inaugurated in 1956, and was built with a grant from the Government of New

Zealand under the Colombo Plan. AIIMS was established in New Delhi after former Indian prime minister

Jawaharlal Nehru's initial proposal to set up the institute in Calcutta was turned down by the then Chief Minister of

West Bengal Bidhan Chandra Roy.[8] It was the vision of Rajkumari Amrit Kaur, the first Health Minister of India,

to establish an institute of such nature in India.

Work Profile: As whole sole in charge CN Center for AC Plant for 5+120 tan Voltas capacity 600 tan ahu stardalta

starter total capacity 2000 amp. Including all electrical & maintenance All CN canter AIIMS new Delhi Voltas C.N Center in AllMS New Delhi. check and execute all activities of his department to ensure guest safety and comfort. These activities include ensuring smooth and appropriate functioning of air conditioning/heating systems, water supply, heat, light and power and all equipment in the hotel, while keeping a control on energy costs Professional Knowledge: - :

Energy Saving Cost Below In all Departments in 20 % joins the company

H.T supply :ACB O.C.B & V.C.B & G/O Sw itches & All Types HT Sw itch Repair & Maintenance .Control & Console System, HT Cable testing ,Earth testing w ith Attach transformer HT ,High Voltage AVR LT Supply: LT Panel Manual System, LT Panel w ith Auto System & Equipment Know ledge, AMF panel UPS system

PLC .AMF & BMS attached Synchronizing Panel w ith DC Control Panel System (24V) & DG Panel Selection Manually & Auto Change Over Type. All types Motors AC & DC

Page 5: ashok kumar tiwari resume

HVAC :*("heating, ventilating, and air conditioning.")

Like centralized plant. Window AC Split. Tower centrifugal plant VRF & VRV Systems

Water (WTP.RO.Softner Plant)

Aggressively managing a hotel's water consumption is very cost-effective because it pays three ways. Conserving

water:

1. Reduces the number of gallons of water purchased

2. Reduces the amount the hotel will pay for sewage (water disposal)

3. In the case of hot water, reduces water-hearing costs because less hot water must be produced

Waste water treatment

STP WTP

PM (Preventative Maintenance) Program: A specific inspection and activities schedule designed to minimize maintenance-related costs and to prolong the life of equipment by preventing small problems

before they become larger ones.

Checking the bills of electrical, Low current & HVAC contractors

Checking the bills of electrical, Low current fire detection and fire fighting systems

Checking the specifications and contact of Electrical, (HT & LT). H.V.A.C.fire fighting. IBMS. Security,

fire detection & Alarm, P.A.lift & Escalator, ETP etc

Negotiations & Finalization of tenders with different contractors

Installation Testing &Commissioning of E.T.P.

Installation Testing &Commissioning of water Softener Plant

Installation testing & commissioning of Elevators & Escalators

Software Known : Dos 6.22 Window 95, 98 xp window 8 and NT MS office, Internet Explorer

Hardware : Hardware Assembling. Maintenance & Troubleshooting.

Installation of Modem. Multimedia & various software.

Academic Qualification : 10+2th Passed. 1993

Tec. Qualification... Diploma in electrical 2002 Air-condition six month training diploma

Electrical licance in Bombay HT & LT 1997 IER 1062

Permanent Address : Village .Tiwaripur, P.O. Khajurgawa. Campierganj

Distt. Gorakhpur (U.P) India PIN.273158

Res. mo.no. 09336450047

Personal Details:

Father’s Name : Shri Sant Kumar Tiwari Date of Birth 05/01/1975 Nationality : Indian Language : Hindi & English

Date:

Place: (Ashok Kumar Tiwari) Notice Period one month