EMCal Meeting Nantes – July 15-17 2008 1 J-F Muraz Grenoble Status Assembly and test Hall.

Assembly and test Hall

Embed Size (px)

DESCRIPTION

Assembly and test Hall. Trigger support structure. Done for Yale and Grenoble assembly sites. Trigger light guides. delivered. Ready to be glued to scintillators produced by Yale. To be delivered. Test bench electronic setup. x32. PMT. Analog splitter. DFC. EMCal FEE. …. VME. - PowerPoint PPT Presentation

Citation preview

Page 1: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 1 J-F Muraz

Grenoble Status

Assembly and test Hall.

Page 2: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 2 J-F Muraz

Grenoble Status

Trigger support structure.

- Done for Yale and Grenoble assembly sites.

Page 3: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 3 J-F Muraz

Grenoble Status

Trigger light guides.

- delivered.

- Ready to be glued to scintillators produced by Yale

Page 4: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 4 J-F Muraz

Grenoble Status

Test bench electronic setup.

PMT DFC

x32

Delay

ADC TDC

VME

NIM

CAMAC

EMCal FEE

…Trigger module

Transl.

CCUSB DAQ/PC

Delay

Analog

splitter

To be delivered

Page 5: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 5 J-F Muraz

Grenoble Status

DAQ.

- DAQ installed by Terry and David last week

Page 6: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 6 J-F Muraz

Grenoble Status

4 SM Platforms:

- Done.

- Successfully load tested and certified.

- Delivery expected next week. (after painting!)

Page 7: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 7 J-F Muraz

Grenoble Status

Strip handling tools.

- By the end of July, I will send to YALE:

- 1 Strip handling tool fully equipped.

- 1 Strip handling tool support frame.

- all trigger scintillator support and positioning structure.

Page 8: Assembly and test Hall

EMCal Meeting Nantes – July 15-17 2008 8 J-F Muraz

Grenoble Status

Strap Foils.

- 3600 precutted (Full EU production : 3 SM)

- 1200 machined and cleaned (1 SM)

Hand precutting station Final cleaning

Wire cutting operation(80 straps stack)