12
AssetWORKS: Beyond Space & Condition Assessment - SUNY PPAA Winter Conference January 25, 2017

AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

  • Upload
    others

  • View
    13

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

AssetWORKS: Beyond Space & Condition Assessment

-

SUNY PPAA Winter ConferenceJanuary 25, 2017

Page 2: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

2

SESSION AGENDA

AssetWORKS Update: Kelly Buchalski, SUCF Project Manager for AssetWORKS Implementation

• Building and space data

• Condition assessment data

Other Modules:John Mitchell, AssetWORKS Account Executive Randy Walsh, AssetWORKS Director of Solution Engineering

• Focus on Operations & Maintenance modules

Page 3: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

3

WHY ASSETWORKS?

Multiple SystemsLimited Access Federal Standards not usedNo life cycle modeling

Old SUNY Systems New System - AiM

Multiple systems (BCI, PSI, BCAS) One system of record

Limited access Real-time data

Federal standards not used Conversion to federal standards

Snapshot of asset condition Full life cycle modeling

Page 4: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

4

MOVING FORWARD WITH AIM

AiM – Integrated Work Management System

Modules Purchased:

• Property Management (replace BCI)

• Space Management (replace PSI)

• Asset Management (NEW)

• Planning and Needs Analysis (replace BCAS)

Page 5: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

5

PROPERTY & SPACE MANAGEMENT

Key Updates:

• Campus user trainings are complete

• “Go Live” is scheduled for this month

• Help is available

Page 6: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

6

ASSET MANAGEMENT:LIFE CYCLE MODELING

Key Updates:

• Asset Data Collection – almost complete!

• “Go Live” is scheduled for end of March

• Trainings will be scheduled for campus users

Page 7: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

7

Identify critical investment needs, with real-time information

Align with FMP program updates to validate and further inform suggested projects

Full Inventory – Optional at later date for serialized assets

Work Order Management – Option for campuses to buy in to

Asset Management: The Benefits

Page 8: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

8

ASSET MANAGEMENT

AiM Asset Hierarchy

SUNY Definition

SUNY Example

Property Building Science Building

Asset Type System HVAC

Asset Group Sub-system Boiler

Serialized Component Pump

Condition Assessments

Page 9: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

9

AiM Asset Example

1

2

4 3

Page 10: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

10

Asset Data Collection:Next Steps

Apply cost models to generate renewal costs

Generate renewal schedules• Support requests for capital funding

• Identify and prioritize capital projects

Year: 2017CAMPUS ABC

Needs Identified

Page 11: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

11

Asset Life Cycle

Page 12: AssetWORKS: Beyond Space & Condition Assessment...AssetWORKS: Beyond Space & Condition Assessment-SUNY PPAA Winter Conference January 25, 2017 2 SESSION AGENDA AssetWORKS Update: Kelly

12

Today’s Focus: Operations & Maintenance

Next Informational Session: February 28th

System Administration (Albany), 9am – 12pm

Purchase options will become available in near future

Additional Modules