Mohamed REJEB ACAO Air Navigation& Aviation Safety Expert Grand Mogador City Center Casablanca 17-18 March 2019 1 ATFM implementation in the MID Region 18/03/2019 1 Grand Mogador City Center Casablanca 17-18 March 2019 1

ATFM implementation in the MID Region

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ATFM implementation in the MID Region

Mohamed REJEB

ACAO Air Navigation& Aviation Safety Expert

Grand Mogador City Center Casablanca 17-18 March 2019 1

ATFM implementation in the MID Region

18/03/2019 1Grand Mogador City Center Casablanca 17-18 March 2019 1

Page 2: ATFM implementation in the MID Region

Grand Mogador City Center Casablanca 17-18 March 20192

Outline

• History/Background

• The Way Forward – Next Steps

• ATFM Implementation in the MID REGION

18/03/2019 2Grand Mogador City Center Casablanca 17-18 March 2019 2

Page 3: ATFM implementation in the MID Region

Grand Mogador City Center Casablanca 17-18 March 2019 3

History/Background

2003 ACAO signed an

Agreement of Co-operation

with

EUROCONTROL The main purposes of this Agreement of Co-operation are: Co-operation in the field of airspace structure

and ATS route network, including exchange of information on traffic forecast,

Cooperation in matters of Air Traffic Flow Management (ATFM)

Page 4: ATFM implementation in the MID Region

Grand Mogador City Center Casablanca 17-18 March 2019 4

ACAC CNS/ATM Study conducted by Sofréaviain 2005 has pointed the following :

Development and implementation of formal regional and local ATFM capabilities and systems

Creation of three homogenous areas that reflect different fundamental traffic flows and operational air traffic density

History/Background (Cont’d)

2005

Page 5: ATFM implementation in the MID Region

ACAC took a decision to establish an ATFM Unit in Riyadh-SAand an IFPS in Bahrain to support the ATFM Unit which was approved

by the ACAC General Assembly N°26 GA / 8 in 2006

Homogenous areas

History/Background (Cont’d)

Grand Mogador City Center Casablanca 17-18 March 2019 12

Page 6: ATFM implementation in the MID Region

18/03/2019 6Grand Mogador City Center Casablanca 17-18 March 2019 6

2006-2009 The task force created to follow up the

establishment of the ATFM UnitConducted a detailed (Technical and Financial)

study for the establishment of IFPS system in Bahrain (Buckup in KSA)

ATFM unit in KSA

History/Background (Cont’d)

Page 7: ATFM implementation in the MID Region

18/03/2019 7Grand Mogador City Center Casablanca 17-18 March 2019 7

History/Background (Cont’d)

May 2015:EUROCONTROL site visit to Saudi Arabia and Bahrain• Demonstration of IFPS ATFM Prototype for airspaces of Saudi

Arabia and Bahrain

• Meetings with operational and technical experts

• General discussion on possible arrangements to facilitate further cooperation

• Initial discussions on possible arrangements

Page 8: ATFM implementation in the MID Region

18/03/2019 8Grand Mogador City Center Casablanca 17-18 March 2019 8

History/Background (Cont’d)

Capabilities identified during KSA-BAH site visit

Recognition of regional dimension Commitment to build collaborative model Strong technical innovation drive Series of local initiatives that could be leveraged in a

wider context Need for a phased approach Integrated technical and operational solutions

Page 9: ATFM implementation in the MID Region

18/03/2019 9Grand Mogador City Center Casablanca 17-18 March 2019 9

March 2016ACAC organized an ATFM

Workshop in collaboration with

Eurocontrol

History/Background (Cont’d)

Page 10: ATFM implementation in the MID Region

How can EUROCONTROL support ACAC

Choice 1: ACAC builds its own systems and own ops‘White sheet scenario’

• a) EUROCONTROL helps with drafting a specification (to ensure compatibility & interoperability with neighbouring regions, in line with global ATFM concept etc.) OR

• b) EUROCONTROL is helping/partnering with those building the ACAC systems and operations

Choice 2: ACAC uses EUROCONTROL systems to build its own ops - ‘Prototype scenario’

• EUROCONTROL provides ACAC with flight plan processing (IFPS) & flow management (ETFMS) systems AND

• ACAC finds location(s) for ACAC ops centre, recruits and trains ops staffChoice 3: ACAC connects to EUROCONTROL systems and ops - ‘Morocco scenario’

• a) Partially (e.g. ACAC Mediterranean States) OR • b) all ACAC

10

Page 11: ATFM implementation in the MID Region

18/03/2019 11Grand Mogador City Center Casablanca 17-18 March 2019 11

History/Background (Cont’d)

Main Outcomes of the WS ACAC has to continue raise awareness regarding the

Air Traffic Management (Workshops, Seminar and training,…)

A potentially viable ACAC ATFM System Implementation Project would be the following: For the Mediterranean Arab countries:

seek to become part of the EUROCONTROL ATFM area (systems and operations) as members of the ICAO EUR region.

Page 12: ATFM implementation in the MID Region

18/03/2019 12Grand Mogador City Center Casablanca 17-18 March 2019 12

History/Background (Cont’d)

Main Outcomes of the WS ((Cont’d) For Arab countries located in the Middle East the

implementation should be in two phases: Phase 1: Short-term

Implementation of strategic ATFM level which has objectives:

Understand and define sector capacities within the participating states (FIRs) with identification of capacity constraints.

Enable better management of regional disruption, crisis & critical event and presentation of dynamic demand data.

Maintain safe demand/capacity balancing and to monitor the Airspace congestion.

Introduction of a coordinated “traffic orientation scheme” and development the publication of a common format of Route Availability Document

Page 13: ATFM implementation in the MID Region

18/03/2019 13Grand Mogador City Center Casablanca 17-18 March 2019 13

History/Background (Cont’d)

Main Outcomes of the WS (Cont’d)

For Arab countries located in the Middle East the implementation should be in two phases:

Phase 2: Medium and Long Terms

The phase consists as the following:

ACAC seeks to use EUROCONTROL systems to build its own operation

ACAC requests EUROCONTROL to provide ACAC with flight plan processing (IFPS) and flow management (ETFMS) systems, and

ACAC agrees location(s) for ACAC Ops Centre(s) and recruits/trains staff

Page 14: ATFM implementation in the MID Region

18/03/2019 14Grand Mogador City Center Casablanca 17-18 March 2019 14

History/Background (Cont’d)

It was agreed to have a meeting in Ryadh – KSAduring the GMA Summit August 2016,

It was agreed that the ACAC will continue to coordinate with Eurocontrol regarding the implementation of strategic ATFM level for Arab countries located in the Middle East (Phase 1: Short-term)

Page 15: ATFM implementation in the MID Region

18/03/2019 15Grand Mogador City Center Casablanca 17-18 March 2019 15

History/Background (Cont’d)

April 2017, an other letter was sent toEurocontrol regarding the additionalinformation requested,

Page 16: ATFM implementation in the MID Region

The Way Forward – Next Steps

• All options/choices proposed should contribute to Collaborative Global ATFM concept

• Any option/choice – for the Mediterranean Arab countries should be subject to agreement

• Formal discussions EUROCONTROL and ACAO to adopt this approach

• Detailed proposal (technical (ConsOPS) and financial) is needed to enable states to allocate the required resources.

enter your presentation title 16

Page 17: ATFM implementation in the MID Region

18/03/2019 17Grand Mogador City Center Casablanca 17-18 March 2019 17

ATFM in the MID Region

2017-2018ACAO and ICAO started work jointly on th

e ATFM and agreed to establish an ATFM Task Force Mainly to discuss and agree on

recommendations for the implementation of ATFM in the MID Region