Upload
liviudova
View
91
Download
17
Tags:
Embed Size (px)
DESCRIPTION
Welding Procedure Specifications
Citation preview
1 / 17
Rev. Page
Rev.
RC2 – 30 – 00061 – WPS – 000 – 2102 0
Tag Nos and/or Attachements:
COMPANY P.O. Reference: RC2-30-PRCH-CPO-60-000-2105 CONTRACTOR P.O. Reference: 8458U-30-PO-1321-02
COMPANY Req. Reference: RC2-30-PIPE-SRS-60-000-2105 CONTRACTOR Req. Reference: 8458U-30-SR-1321-02
Pages modified under this revision: all
0 Issue of Construction
A First Issue
Rev.
Selections changed in last revision are identified by a vertical line in the right margin
Equip. Cat. Nº
Turnover system
60
NA
Date DD/MONTH/YY
CHECKED BY (name & visa)
01-Aug-06 SukontaSurakamol
Area
APPROVED BY (name & visa)
DOCUMENT REVISIONS
IFR
Doc. Origin
VEN
As-Built Class
LR
WRITTEN BY (name & visa)
Surakamol
STATUS
Welding Book
COMPANY Doc. Nº
RAS LAFFAN OLEFIN PROJECT
Document Attribute Table
PIPE
Discipline
QC2-0007
Issue StatusPrimany Doc. Type
Vendor Number
B1304
COMPANY Job Nº
PR
Secondary Doc. Type
WPS
30 000
Unit Nº
28-Sep-06 Surakamol Surakamol Sukonta
�����
�����