18
Bakken Economics Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Bakken Economics

Full Slide Deck

March 22, 2017

Justin J Kringstad Geological Engineer

Director

North Dakota Pipeline Authority

Page 2: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Objective

Define where the Bakken/Three Forks system may be economic in the

current oil price environment.

Method

Analyze past well performance across the region and estimate well

economics for various production levels.

Disclaimer

The goal of this work is not to imply individual company actions or

intentions. All view expressed are strictly that of Justin J. Kringstad.

Neither the State of North Dakota, nor any agency, officer, or employee

of the State of North Dakota warrants the accuracy or reliability of this

product and shall not be held responsible for any losses related to its

use.

JJ Kringstad - North Dakota Pipeline Authority 2

Page 3: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

North Dakota Oil Differential

3

3 3 JJ Kringstad - North Dakota Pipeline Authority

Based on EIA Data

Page 4: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Key Economic Assumptions

• $6-$8 Million Well Costs

• $40/BBL & $2.00/MCF Wellhead Pricing

• 1/6 Royalty

• Zero Flaring

• Assumed 10-20% IRR to drill (calculated after

production taxes and royalties)

• No Tax Incentives Included

• Production rate is 30-day average

• All Bakken/Three Forks wells drilled in 2008+

JJ Kringstad - North Dakota Pipeline Authority 4

Page 5: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 5

Peak Month Minimum 400 BOPD

$40 Wellhead

6,817 Wells

Page 6: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 6

Peak Month Minimum 500 BOPD

5,155 Wells

$40 Wellhead

Page 7: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 7

Peak Month Minimum 600 BOPD

3,690 Wells

$40 Wellhead

Page 8: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 8

Peak Month Minimum 700 BOPD

2,452 Wells

$40 Wellhead

Page 9: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 9

Peak Month Minimum 800 BOPD

1,613 Wells

$40 Wellhead

Page 10: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 10

Peak Month Minimum 900 BOPD

1,015 Wells

$40 Wellhead

Page 11: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 11

Peak Month Minimum 1,000 BOPD

645 Wells

$40 Wellhead

Page 12: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 12

Peak Month Minimum 1,250 BOPD

227 Wells

$40 Wellhead

Page 13: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 13

Peak Month Minimum 1,500 BOPD

72 Wells

$40 Wellhead

Page 14: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

JJ Kringstad - North Dakota Pipeline Authority 14

Summary of $40 Wellhead Oil

Page 15: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

JJ Kringstad - North Dakota Pipeline Authority 15

Breakeven Summary

Page 16: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 16

© OpenStreetMap contributors

Spud 2008-2011 Spud 2012-2017

Peak Month Minimum: 800 BOPD

Understanding “The Core” Footprint

Page 17: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

© OpenStreetMap contributors

JJ Kringstad - North Dakota Pipeline Authority 17

© OpenStreetMap contributors

Spud 2008-2011 Spud 2012-2017

Peak Month Minimum: 1,250 BOPD

Understanding “The Core” Footprint

Page 18: Bakken Economics Full Slide Deck - ND Pipeline Authority · 2017-03-22 · Full Slide Deck March 22, 2017 Justin J Kringstad Geological Engineer Director North Dakota Pipeline Authority

Justin J. Kringstad, Director North Dakota Pipeline Authority

600 E. Boulevard Ave. Dept. 405 Bismarck, ND 58505-0840

Phone: (701)220-6227

Fax: (701)328-2820 E-mail: [email protected]

Websites:

www.pipeline.nd.gov www.northdakotapipelines.com

18 JJ Kringstad - North Dakota Pipeline Authority

Contact Information

18