July 24, 2020
North Dakota’s Shut-In Production
May 2020
Justin J. KringstadGeological Engineer
Director
North Dakota Pipeline Authority
2
Monthly Oil & Gas Production Change
JJ Kringstad - North Dakota Pipeline Authority 2
3
Base Decline Challenges
JJ Kringstad - North Dakota Pipeline Authority 3
Slide Source:
April 28, 2020 - NDIC Update
4
March to May 75+% Oil Drop
JJ Kringstad - North Dakota Pipeline Authority 4(Non-Confidential Wells Only)
5
March to May 75+% Oil Drop
JJ Kringstad - North Dakota Pipeline Authority 5(Non-Confidential Wells Only)
6
March to May 75+% Oil Drop
JJ Kringstad - North Dakota Pipeline Authority 6(Non-Confidential Wells Only)
15 Operators With Highest Curtailment
7
Vintage Year of Shut-In Wells – May 2020
JJ Kringstad - North Dakota Pipeline Authority 7(Non-Confidential Wells Only)
8
Vintage Year of Not Shut-In Wells – May 2020
JJ Kringstad - North Dakota Pipeline Authority 8(Non-Confidential Wells Only)
9
Days on Production
JJ Kringstad - North Dakota Pipeline Authority 9(Non-Confidential Wells Only)
10
Shut-In Well Selection: Bakken/Three Forks
JJ Kringstad - North Dakota Pipeline Authority 10(Non-Confidential Wells Only)
11
Shut-In Well Selection: Non-Bakken/Three Forks
JJ Kringstad - North Dakota Pipeline Authority 11(Non-Confidential Wells Only)
12
Wells Most Likely to Return Quickly?
JJ Kringstad - North Dakota Pipeline Authority 12
1,881 Wells (28%)
WOR: 2 or Lower
BOPD: 50+
Total: 356,816 BOPD (70+%)
Shut-In
Justin J. Kringstad, Director
North Dakota Pipeline Authority
600 E. Boulevard Ave. Dept. 405Bismarck, ND 58505-0840
Phone: (701)220-6227E-mail: [email protected]
Websites:
www.pipeline.nd.gov
www.northdakotapipelines.com
Contact Information
JJ Kringstad - North Dakota Pipeline Authority 13