Base Case Basics
Jon JensenAssociate Staff Engineer
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
2
“People who work together will win, whether it be against complex football defenses, or the problems of modern society.”
-Vince Lombardie
“If everyone is moving forward together, then success takes care of itself.”
-Henry Ford
Purpose
3
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
From the WECC Staff:
Doug Tucker [email protected]
Enoch Davies [email protected]
Jon Jensen [email protected]
Nick Hatton [email protected]
Introductions
4
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
•WECC Base Case Building Procedure• Reporting Data Anomalies
Discussion Outline
5
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Base Case compilation Schedule
CASE DATE DATAREQUESTMAILED
DATE DATA DUE TO
SUB COORDDATE L&R
INFO DUE TOSUB COORD
DATE DATADUE TO
AREA COORD
DATE DATADUE TOSTAFF
STAFF SEND CASE FOR REVIEW
DATE COMMENTS
DUE TO AREA COORD
DATE AREA COORDINATOR
COMMENTSDUE TO
STAFF
STAFFFINALIZE
DATE
2015 HS4-OP 07/18/14 08/01/14 08/08/14 09/12/14 09/26/14 10/10/14 10/17/14 10/31/142015 LS1-OP 07/18/14 08/15/14 08/22/14 09/26/14 10/10/14 10/24/14 10/31/14 11/14/14
2024-25 HW1 09/12/14 09/26/14 10/03/14 11/07/14 11/21/14 11/28/14 12/05/14 12/19/142025 HS1 10/17/14 10/31/14 11/07/14 12/12/14 12/26/14 01/02/15 01/09/15 01/23/15
2015-16 HW3-OP 11/21/14 12/05/14 12/12/14 01/16/15 01/30/15 02/13/15 02/20/15 03/06/152015-16 LW1-OP 11/21/14 12/19/14 12/26/14 01/30/15 02/13/15 02/27/15 03/06/15 03/20/15
2016 HSP1-OP 01/16/15 01/30/15 02/06/15 03/13/15 03/27/15 04/10/15 04/17/15 05/01/152020-21 HW1 02/27/15 03/13/15 03/20/15 04/24/15 05/08/15 05/15/15 05/22/15 06/05/15
2021 HS2 04/03/15 04/17/15 04/24/15 05/29/15 06/12/15 06/19/15 06/26/15 07/10/152016 HS3-OP 05/08/15 05/22/15 05/29/15 07/03/15 07/17/15 07/24/15 07/31/15 08/14/152016 LS1-OP 05/08/15 06/05/15 06/12/15 07/17/15 07/24/15 07/31/15 08/14/15 08/28/152018 HS1-S 07/03/15 07/17/15 07/24/15 08/28/15 09/11/15 09/25/15 10/02/15 10/16/15
20XX-Regional 08/07/15 08/21/15 08/28/15 10/02/15 10/16/15 10/30/15 11/06/15 11/20/152025-26 HW1 09/11/15 09/25/15 10/02/15 11/06/15 11/20/15 11/27/15 12/04/15 12/18/15
2026 HS1 10/16/15 10/30/15 11/06/15 12/11/15 12/25/15 01/01/16 01/08/16 01/22/16
6
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
From each AC we should receive the following:
1. Area Specific power flow data2. L&R spreadsheet3. Any dynamic model changes/updates4. Any tie line changes (must be coordinated!!!)5. List of significant changes6. Any additional info that will help with base case
compilation
Base Case Building Power flow
7
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Creating a Raw Case
8
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Contains raw data for the following:
1. Branches2. Transformers3. Line connected shunts4. DC lines (Bus, Line, DCC)5. Transformer impedance tables6. Interface data (Paths)7. Branch interface data8. Zones9. Owners10. Area Interchange
The Master Tie Line File
9
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Tying It All Together
10
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Area Interchange SchedulesBC Hydro
Interchange with Northwest2300 MW
Northwest Interchange with
BC Hydro-2300 MW
11
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Power Flow Solution and Data Checking
• Island check• Tie line check• Edit table checks
– Mustfix.p– Checks.p– svdsnap.p– Pathmoni.p– Tappfixer.p– Dchk– Baseloader.p– InsertTurbine.p
• Overload check (Line & Path)• Solution check
– InsertLID.p– InsertGENID.p– FillRatingsPSSe.p– DCINTMT.p
• Replog– PowerWorld
• PTI Conversion
12
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Questions About Power Flow Compilation?
13
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
The Master Dynamics File (MDF)
1. Models2. Updates in PSLF format3. Temporary vs. permanent changes4. Motor load modeling 5. Condenser and pump check6. Unused models7. Composition load models
Base Case Building - Dynamics
14
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
• Reading in the MDFMissing data
Duplicate models• Modstat.p
Built into PSLF 17.0• Initialization
Governor errors/warningsExciter errors
Initializing Dynamics Data
15
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Running and Plotting
• A no-disturbance run• The alldyns.p
disturbance routine– Ringdown– Double Palo Verde
Outage– Loss of PDCI– Post-transient solution
– Disturbances• Metcalf-Moss landing,
Tesla-Metcalf• Comanche-Daniels Park• Colorado River – Red
Bluff• Hells Canyon –
Brownlee
• N-0 Overloads-Operating cases
16
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Plotting
• Plotting the channel file
1. Searching for the largest deviation (spread)
2. Plotting parameters
17
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
• Types• Submitted in EPCL, EPC, .m, or by list• MUST be made to review case• Changes to tie lines must be coordinated• Extensive data changes
Base Case Building - Comments
18
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Questions about Dynamics and Comment Submission?
19
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
• Master Tie Line File Data• Series Compensation• New Phase Shifters• Additional Solution Tools• Any Area Substitution Data• PSS Exemptions • Dynamics Data • Study Report Suggestions
Reporting Data Anomalies
20
W E S T E R N E L E C T R I C I T Y C O O R D I N A T I N G C OU N C I L
Questions