7/31/2019 BASIL - Risk List v1.0
1/5
NYSS Software Solutions
< Barcoded Assessment System for IndependentLearning (BASIL).>
Risk List
Version
7/31/2019 BASIL - Risk List v1.0
2/5
Barcoded Assessment System for Independent Learning (BASIL) Version:
Risk List Date: 20/Nov/10
BASIL_RUP_Risk List_v1.0
NYSS Software Solutions, 2012 Page 2 of 5
Revision HistoryDate Version Description Author
20/Nov/10 Risk List Saud Aljaloud
Mehmet Yavuz ERDEM
7/31/2019 BASIL - Risk List v1.0
3/5
Barcoded Assessment System for Independent Learning (BASIL) Version:
Risk List Date: 20/Nov/10
BASIL_RUP_Risk List_v1.0
NYSS Software Solutions, 2012 Page 3 of 5
Table of Contents
1. Introduction 4
1.1 Purpose 41.2 Scope 41.3 Definitions, Acronyms, and Abbreviations 41.4 References 41.5 Overview 4
2. Risks 4
2.1 42.1.1Risk Magnitude or Ranking 4,52.1.2Description 52.1.3Impacts 52.1.4Indicators 52.1.5Mitigation Strategy 5
2.1.6Contingency Plan 52.2 5
7/31/2019 BASIL - Risk List v1.0
4/5
Barcoded Assessment System for Independent Learning (BASIL) Version:
Risk List Date: 20/Nov/10
BASIL_RUP_Risk List_v1.0
NYSS Software Solutions, 2012 Page 4 of 5
Risk List1. Introduction
Barcoded Assessment System for Independent Learning is a new project from Coventry University created
to streamline the assessment for learning process. In addition to the use of barcode technology to keep trackof all assessments. The Risk list document will identify the list of risk that threatens the success of the
project. Also the Risk list document will identify the list of risk that threatens the success of the project.
Also assess the impact of risks on the project.
1.1 Purpose
The list of risks has been designed in order to detect potential risks that may face the project. As well as to
support the Risk Management Plan (RMP), and therefore sure there is no failure of the project. And
avoiding the negative consequences that may occur.
1.2 Scope
BASIL system is a new venture from Coventry University associated with risk list to manage the
problem of tracking assessments and check the status of the assessments, and delivered it to thestudent on time. This Risk List document will be used at the stage of completion of the project and
that by the project team members. The aim is to find appropriate solutions to the risks before theyoccur.
1.3 Definitions, Acronyms, and Abbreviations
BASIL: Barcoded Assessment System for Independent Learning.
RMP: Risk Management Plan
1.4 References
Risk Management Plan (RMP).
1.5 Overview
This document will produce the organised version and detail of the risks identified in BASIL. The aim is
how to clarify the specific risk. Risks are identified in advance and how to deal with it, which may affect
the entire project. Accordingly, the Risk Management Plan document will be created.
2. Risks
2.1 Risk Identifiera descriptive name or number
For each risk from risk list in BASIL system has a unique id to identifier the risk.
2.1.1 Risk Magnitude or Ranking
2.1.2 Description
Risk means that an obstacle affects the success of the project and is incompatible with the objectives of the
project, in any form, whether in effect on the schedule or the date of delivery. Description of risk in this
7/31/2019 BASIL - Risk List v1.0
5/5
Barcoded Assessment System for Independent Learning (BASIL) Version:
Risk List Date: 20/Nov/10
BASIL_RUP_Risk List_v1.0
NYSS Software Solutions, 2012 Page 5 of 5
document supports the division of risk according to the severity of their impact, and probability of their
occurrence.
2.1.3 Impacts
Risk Description Impact on project
1 The development team is comparatively inexperienced with the Rational UnifiedProcess for (BASIL) system. This could definitely affect the quality of the
product.
3
2 Interdependence of the (BASIL) system with the main university site, and the
problems resulting from the merger.2
3 Stakeholders may have different opinion about the developers, , in
certain points, or on the entire project5
4 Security breaches that can occur in the project 2
2.1.4 Indicators
There is no case at inception phase of the project.
2.1.5 Mitigation StrategyRisk Description Mitigation Plan
1 The development team is comparatively inexperienced with the Rational Unified
Process for (BASIL) system. This could definitely affect the quality of the
product.
Ensure the readiness of the
team work and the extent o
their understanding of the
processes and that Before
the start of the project.
2 Interdependence of the (BASIL) system with the main university site, and the
problems resulting from the merger.
Solution can be reached by
discussing the Department
of Information Technology
with the developers of the
(BAISL)
3 Stakeholders may have different opinion about the developers, , incertain points, or on the entire project
Start the project with the
stakeholders representativ
to discuss the vision
together.
4 Security breaches that can occur in the project Discussion with the
Department of Information
Technology to provide the
required protection
2.1.6 Contingency Plan
Contingency plan is very important in order to achieve the goals of the project, a task from one of the tasks
of preparing a plan. Plan and implement emergency in the event of an emergency. Contingency Plan used
by developers to complete the project in case something wrong. Meeting must be held with the team and
stakeholders so as to minimize the risks effect.
2.2
In the further iterations will discuss this section.