SAP IMPLEMENTATION PHASE II (COST ESTIMATION)
INSTALLATION BOM EXTRACTION BUSINESS BLUEPRINT DOCUMENT
Version 1.0
for
Mitsubishi Elevator ETA India Pvt. Ltd(Formerly ETA MELCO Engineering Co. Pvt. Ltd)
This is a hardcopy of document maintained on electronic media. It is the latest version.
June 2013
8/13/2019 BBP - Installation BOM Extraction V1.0
2/36
Business Blueprint Installation BOM Extraction
DOCUMENT RELEASE NOTICE
Notice No. :
Client: Mitsubishi Elevator ETA India Pvt Ltd
Project: SAP Implementation Phase II (Cost Estimation)
Document details: - Installation BOM Extraction Business Blueprint Document
Prepared By: Sateesh S
Name Version No. Description
Installation BOM
ExtractionBusiness
Blueprint Document
1.0 Document for sign off includes As Is & To Be
Business Processes
Revision details:
Action
taken
(add/del/ch
Preceding
Page No.
New
Page No.
Revision
Description
The documents or revised pages are subject to document control.
Please keep them up-to-date using the release notices from the distributor of the document.
These are confidential documents. Unauthorized access or copying is prohibited.
Authorized by: Mr. Chellavelu V (TCS) Date: 03/07/2013
Reviewed by: Mr. Vijayananda Sana (TCS) Date: 22/07/2013
Approved by: Mr. Nagarajan R Date:
8/13/2019 BBP - Installation BOM Extraction V1.0
3/36
Business Blueprint Installation BOM Extraction
3
DOCUMENT REVISION LIST
Notice No. :
Client: Mitsubishi Elevator ETA India Pvt Ltd
Project: SAP Implementation Phase II (Cost estimation)
Document details: Ver. 1.0
Release Notice Reference (for release):
Rev.
No
Revision
Date
Revision
description
Page
No.
Prev
page
No
Action
Taken
Addenda/New
page
Release
Notice reference
8/13/2019 BBP - Installation BOM Extraction V1.0
4/36
Business Blueprint Installation BOM Extraction
4
PREFACE
Purpose of this Document
The purpose of this document is to determine the business process requirements for the SAP
Implementation Project Phase II (Cost Estimation) at Mitsubishi Elevator ETA India Pvt Ltd and to
provide the required functions in SAP.
This document summarizes the findings of the SAP implementation partner TCS consulting team that
has conducted requirement analysis of product development process of Mitsubishi Elevator ETA India
Pvt. Ltd for the SAP ECC 6.0 system.
The information was gathered through a series of As Is study and documents, To be process
discussion, SAP Best Practices and TCS consulting experience. Inputs from Business Core Team in
terms of As Is document, requirement sharing and Business Process walkthrough were key
contributing factors for authoring this document. Any critical change requirement post this blueprintphase needs to be presented as a separate annexure to this document and after the development phase it
will not be considered as part of this implementation in order to avoid impact in project duration.
This document is the base for understanding the To be business processes. The information will
include Processes to be implemented in SAP. The document covers inherent assumptions, governing
factors, output and reporting requirements for a particular business process. The gaps identified in the
business process are documented.
This document would be used by TCS consultants to define, synchronize & implement the required
solution in the SAP system. Mitsubishi Elevator ETA India Pvt. Ltd would use the document to
understand the coverage of their business process and also to trace it to the requirements given. This
document would also be the base for creating test case scenarios for User Acceptance Testing (UAT)
and formal sign off.
This is not an end user document and the intended usage of this document presupposes basic
understanding of To be solution in SAP.
Intended Audience
This document is intended for the usage of the Cost estimation team of Mitsubishi Elevator ETA India
Pvt Ltd & TCS Consulting team involved in the Project.
Related Documents / References
No. Title Version Author
1 AS-IS Process DocumentInstallation AS-IS 1.0 Mr. Nagarajan R
8/13/2019 BBP - Installation BOM Extraction V1.0
5/36
Business Blueprint Installation BOM Extraction
5
Contents
1.0 INTRODUCTION .......................................................... .................................................................... .......................... 6
1.1 DESCRIPTION .............................................................................................................................................................. 6
1.2 ABBREVIATIONS.......................................................................................................................................................... 61.3 REFERENCES............................................................................................................................................................... 71.4 ORGANIZATION OF THIS DOCUMENT.......................................................................................................................... 71.5 OVERVIEW.................................................................................................................................................................. 7
1.5.1 Objective:..............................................................................................................................................................................7 1.5.2 Scope .....................................................................................................................................................................................8
1.6 INTEGRATION IN SAP ................................................................ ................................................................. ................. 81.6.1 Material management ..........................................................................................................................................................81.6.2 Production Planning ............................................................................................................................................................81.6.3 Project Systems ....................................................................................................................................................................9
2.0 ORGANIZATION STRUCTURE ........................................................................................................................ .....10
2.1 DESCRIPTION .............................................................................................................................................................102.2 CHANGES TO EXISTING ORGANIZATION:....................................................................................................................13 2.3 SPECIAL CONSIDERATIONS: .......................................................................................................................................13
3.0 MASTER DATA .........................................................................................................................................................14
3.1 INTRODUCTION ..........................................................................................................................................................143.2 EXPECTATIONS...........................................................................................................................................................14 3.3 DESCRIPTION .............................................................................................................................................................143.4 SPECIAL CONSIDERATIONS.........................................................................................................................................16 3.5 CHANGES TO EXISTING ORGANIZATIONS...................................................................................................................163.6 SOLUTION IN SAP ......................................................................................................................................................173.7 GAPS.........................................................................................................................................................................17 3.8 WORKAROUND SOLUTIONS................................................................. .................................................................. .....173.9 AUTHORIZATION REQUIREMENTS..............................................................................................................................17
3.10
MIGRATION
REQUIREMENTS
: .....................................................................................................................................17
4.0 BUSINESS PROCESSES ...........................................................................................................................................18
4.1 EXPECTATIONS...........................................................................................................................................................18 4.2 DESCRIPTION............................................................................................................................................................184.3 SOLUTION IN SAP.....................................................................................................................................................194.4 GAPS ..........................................................................................................................................................................204.5 SPECIAL CONSIDERATIONS.........................................................................................................................................20 4.6 CHANGES TO EXISTING PROCESSES ...........................................................................................................................204.7 WORKAROUND SOLUTIONS................................................................. .................................................................. .....204.8 SYSTEM CONFIGURATION CONSIDERATIONS .............................................................................................................204.9 AUTHORIZATION REQUIREMENTS..............................................................................................................................214.10 MIGRATION REQUIREMENTS......................................................................................................................................21
5.0 REPORTS & INFORMATION SYSTEM ................................................................ ................................................22
5.1 DESCRIPTION .............................................................................................................................................................22
6.0 ANNEXURE ................................................................................................................................................................23
8/13/2019 BBP - Installation BOM Extraction V1.0
6/36
Business Blueprint Installation BOM Extraction
6
1.0INTRODUCTION
1.1 Description
This document depicts the SAP enabled To beversion of the business process of Mitsubishi Elevator
ETA India Pvt. Ltd. The document contains how the business processes will be handled in the Tobe
SAP scenario along with the business benefits and organizational changes required for implementingthe SAP enabled business processes.
The document also highlights the reporting requirements of Mitsubishi Elevator ETA India Pvt. Ltd
with respect to the process under reference. The solution is evolved based on the detailed study of the
business processes and functions of Mitsubishi Elevator ETA India Pvt. Ltd and with the inputs from
the series of discussions conducted for this purpose.
1.2 Abbreviations
Abbreviations
UsedDescription
ASAP Accelerated SAP
CO Controlling
ECC ERP Central Component
FI Financial Accounting
G/L General Ledger
GI Goods Issue
GR Goods Receipt
MM Material Management
NA Not Applicable
SE Sales Engineer
PO Purchase Order
PR Purchase Requisition
PS Project Systems
SD Sales and Distribution
SAP Systems Applications and Products in Data Processing
CS Customer Service
WBS Work Breakdown Structure
8/13/2019 BBP - Installation BOM Extraction V1.0
7/36
Business Blueprint Installation BOM Extraction
7
Abbreviations
UsedDescription
SED Sales Engineering Department
DARWIN A legacy system
1.3References
SAPSystems Applications and Products in Data Processing
Blue Print DocumentSales & Distribution (SD)
Blue Print DocumentProject systems (PS)
Common Business Framework
1.4 Organization of This Document
This document consists of five sections -
Section 1 - Introduction:
Description about the contents of the document
Section 2 - Organization Structure:
Organization Structure consists of sales related organization structure.
Section 3 - Master data:Customized tables created for installation material, man hours, and steel material details maintained by
Mitsubishi Elevator ETA India Pvt Ltd.
Section 4 - Business Process:
Inquiry
Quotation
Easy Estimator Transaction
Section 5
Reports and Information Systems:
1.5Overview
1.5.1 Objective:
The objectives of the SAP Implementation project Phase II are as follows:
To conceptualize, develop and seamlessly integrate the Cost Estimation Process and functions of
Mitsubishi Elevators ETA India Pvt Ltd operations in the SAP system.
8/13/2019 BBP - Installation BOM Extraction V1.0
8/36
Business Blueprint Installation BOM Extraction
8
To conceptualize and create a centralized architecture to provide an online transactional and
information system, for decision making for personnel at various levels
To streamline the business processes and also usher in standardization for most of the
processes, with the basic objective of maximizing business benefitsTo adopt the best business practices built into SAP ECC 6.0.
To integrate SAP ECC 6.0 applications with the other systems indicated in the IT blueprint
To try and bring down the transactional costs of doing business and also better utilize
resources of all types.
1.5.2 Scope
The scope of the SAP Implementation Phase II includes the following modules:
PS (Project Systems)
SD (Sales & Distribution)
ABAP (Custom Developments)
[MM (Material Management) and FICO (Finance and Controlling) will be considered only for
referring the required datas on the process]
1.6Integration in SAP
The Cost Estimation transaction is fully integrated with SD \ CS modules of SAP ECC 6.0. The
continuous exchange of information with other application areas in the ECC 6.0 System ensures a real
time database. Fully integrated processing helps us to minimize the use of Non-SAP systems &
optimize maintenance operations within the company. The broad level integration areas with Cost
estimation transaction are mentioned below.
1.6.1 Material management
By Assignment of sales organization / distribution channel to plants customers can be serviced from
desired plants for a particular sales organization, through the distribution channel.
Logistics part of the sales and distribution mainly involves material management. Route and shipping
point are mainly derived based on the parameters of material master.
1.6.2 Production Planning
MRP
8/13/2019 BBP - Installation BOM Extraction V1.0
9/36
Business Blueprint Installation BOM Extraction
9
1.6.3 Project Systems
Line item of the Sales contract will have a project created automatically based on the WBS and network
and this will take care of all the activities of the project right from the placing the order of the
components to the factory till the end of installation.
8/13/2019 BBP - Installation BOM Extraction V1.0
10/36
Business Blueprint Installation BOM Extraction
10
2.0ORGANIZATION STRUCTURE
2.1 Description
A proper organization structure for IMEC is required to ensure ease of use of sales and
distribution module and system scalability to incorporate future changes to the organization structure.
DEFINITION OF ORGANIZATIONAL UNITS
The organization structure in the Sales and distribution module of SAP includes the following
Organizational Units:
Sales organization
Distribution channel
Division
Sales office
Sales district
Sales group
Sales Organization:
Sales Organization
Highest Organizationunit of sales
Responsible fordistribution of goodsand services
It is highest level ofsales at whichstatistics can be
generated.
Code Description
1000 Mitsubishi ETA Sales Org.
Distribution Channel:
It is the channel through which goods or services reach customers.
Code Description
01 Dist Channel Sales
02 Service Distribution Channel
8/13/2019 BBP - Installation BOM Extraction V1.0
11/36
Business Blueprint Installation BOM Extraction
11
Division:
It represents a product line or spectrum of products. A division is used to group materials or services
which belong to a product line.
Code Description
01 ELEVATORS DIVISION
02 ESCALATORS DIVISION
Sales Area:
Sales area is combination of sales organization, distribution channel and division.
Sales areas Description
1000+01+01 Mitsubishi ETA S.Org + Dist Channel Sales + Elevators Division
1000+01+02 Mitsubishi ETA S.Org + Dist Channel Sales + Escalators Division
1000+02+01 Mitsubishi ETA S.Org + Service Distribution Channel + Elevators Division
1000+02+02 Mitsubishi ETA S.Org + Service Distribution Channel + Escalators Division
Sales Offices:
Sales office = Area office
Codes of sales offices are mapped similar to plant codes.
New sales offices can be added in future if required.
Sales Office Description
CH01 Corporate Office
TN01 Chennai Sales Office
AP01 Hyderabad Sales Office
KA01 Bangalore Sales Office
MH01 Mumbai Sales Office
DL01 Delhi Sales Office
WB01 Kolkata Sales Office
8/13/2019 BBP - Installation BOM Extraction V1.0
12/36
Business Blueprint Installation BOM Extraction
12
Sales Districts:
Sales district = branch office.
New sales districts can be added in future if required.
Branch Office Description
TN02 Coimbatore Branch Office
KL01 Cochin Branch Office
KA02 Mysore Branch Office
MH02 Pune Branch Office
RJ01 Jaipur Branch Office
CG01 Chandigarh Branch Office
Sales Group:
Sales groups are directly linked to offices, and consists of sales personal
New sales groups can be created in future if required.
Sales Group Description
AP1 Hyderabad Sales group
CG1 Chandigarh sales group
DD1 Diu & Daman Sales group
DL1 Delhi sales group
GA1 Goa sales group
GJ1 Ahmadabad Sales group
HR1 Gurgaon sales group
JH1 Ranchi Sales group
KA1 Bangalore Sales group
KA2 Mysore sales group
KL1 Trivandrum Sales Group
KL2 Cochin sales group
MH1 Mumbai sales group
MH2 Pune sales groupMP1 Bhopal sales group
OR1 Bhubaneswar Sales group
PB1 Mohali Sales group
PY1 Pondicherry sales group
RJ1 Raipur sales group
TN1 Chennai Sales group
TN2 Coimbatore Sales grip
TN3 Madurai sales group
UK1 Hardwar sales group
UP1 Naiad Sales group
WB1 Kolkata sales group
8/13/2019 BBP - Installation BOM Extraction V1.0
13/36
Business Blueprint Installation BOM Extraction
13
Enterprise Structure
Note:The new process will also be applicable to Plants GA01 & GJ01.
2.2 Changes to Existing Organization:
None
2.3 Special Considerations:
None
8/13/2019 BBP - Installation BOM Extraction V1.0
14/36
Business Blueprint Installation BOM Extraction
14
3.0MASTER DATA
3.1 Introduction
Master data is the set of data which is commonly used across the entire organization and all business
processes. Information about Installation material, steel material, and men hours required in order to
execute the project, does not change frequently & the users do not have to re-enter those information
instead the same data flows from the repository previously created. Hence it is efficient to store the
information in the system and can be called and accessed whenever required.
Installation Master Matrix
Materials Master Matrix
(Electrical, Mechanical and
Steel Materials)Base Man Hours Matrix
Four kinds of material are required for installation of a unit, like Electrical, Mechanical, Steel and Man
efforts.
3.2 Expectations
The purposes of maintainingthe customized table for Installation BOM extractionare as follows:
To fetch the Installation material with quantity
To fetch the Steel material along with size, quantity details
To fetch the planned man hour required and
Automatic upload of the obtained output to respective projects
3.3 Description
Materials Master Matrix:
Various proportions \ combination of Electrical / Mechanical / Steel materials are required for
installation of a unit, based on the installation parameters i.e) Shaft size, No. of stops, Equipment.etc.
The logic for the proportion \ combination and the list of Electrical / Mechanical / Steel materialrequirements for the installation parameters are maintained as master data table maintenance.
8/13/2019 BBP - Installation BOM Extraction V1.0
15/36
Business Blueprint Installation BOM Extraction
15
Electrical, Mechanical and Steel Materials:
Materials Master
Matrix
(Electrical, Mechanical,
and Steel materials.)
Fields Maintained
Equipment Type,
Equipment Code,
Equipment Category,
Material Type,
Material Description,
Unit of Measurement,
Store/Purchase,
Fixed / Variable Quantity,
Quantity Per Unit.
Example:
Equipment Name
EquipmentCode
EquipmentCategory
Materialtype
MaterialDescription
Unit ofMeasurement
Quantity
Fixed/Variable
Quantity perUnit
Store/Purchase
GPQ4LA ELENESSA-
AP2
MRL Electrical
PitSwitch
nos F 2 P
HOMEELE(SED200S)
HomeEle
HE Mechanical
L Clit nos Va V2 P
ELENESSA
ELENESSA-
AP2
MRL Steel Type-1WallBracket
nos Va Form2 P
*Note: Steel material Logic received for Nexway n Elenessa Categories others to be received
Base Man Hours details received for Elevators, others yet to be received.
Determination of Fixed Quantity: The fixed quantities of materials are maintained in Installation
material master matrix, so they can be picked directly from the matrix.
Determination of Variable Quantity:
Values for materials with variable quantity are determined based on some formulae (Find Annexure
A, B and C). These formulae are maintained for different materials with naming convention V1 to
V25, Va, Vaa, Form 1 Form 2 etc.., where they represents the formula used to derive the quantity of
a material.
These formulae are programmed to run in the background.
8/13/2019 BBP - Installation BOM Extraction V1.0
16/36
Business Blueprint Installation BOM Extraction
16
Each equipment category has its own combination of materials to be fetched, so considering this
Equipment Category as key field the list of electrical and mechanical materials is pulled from the
matrix.
For the list pulled, on reading the field Quantity Fixed/Variable, quantity is determined either from
matrix directly or on executing the formulae in case of variable quantity.
Base Man Hours Matrix:
Man efforts are calculated in terms of hours, based on number of stops per unit, man hours are pre-
estimated and the same is maintained in Base Man Hours matrix table.
This table contains number of stops, base hours for various activities, and total hours.
Base Man Hours
Matrix
Fields Maintained
Number of Stops
Base hours for each of
7 activities
Base hours for each
additional activities
Total Hours
Upon the inputs provided, number of total man hours required are directly pulled from this matrix.
3.4 Special Considerations
Items in materials matrices to be modifiable based on the changes in future and the history of
modifications to be captured over the period of time.
3.5 Changes to Existing Organizations
New Master data to be maintained for material matrices within the SAP system
8/13/2019 BBP - Installation BOM Extraction V1.0
17/36
Business Blueprint Installation BOM Extraction
17
3.6 Solution in SAP
Master Data
The data captured in the Maintenance master is as follows:
Required Details Fields Maintained Expected Results
Materials Master
Matrix.
(Installation Electrical,
Mechanical and Steel
Materials)
(Table 1)
Equipment Type
Equipment Code
Equipment Category
Material Type
Material
Units of Measurement
Store / Purchase
Fixed/Variable
Quantity
Quantity per unit
Pre defined Installation electrical,
mechanical and steel material with
pre defined or variable quantity
details.
Base Man Hours
Matrix
(Table 2)
Number of Stops
Total number of Man
hours
Pre defined Man hours.
3.7 GAPS
N/A
3.8 Workaround Solutions
Customized data table will be created for maintaining the list of Installation MaterialsLocal Material &Steel Materials and for Man hour tablebased on Activity type.
3.9 Authorization Requirements
Role Name Role Description Transaction Name Nature of
authorizations
required
To be decided Person responsible for
maintaining Installation
material Matrices.
Create, Change, Display
3.10 MigrationRequirements:
None
8/13/2019 BBP - Installation BOM Extraction V1.0
18/36
Business Blueprint Installation BOM Extraction
18
4.0BUSINESS PROCESSES
Introduction
Extraction of Installation BOM involves pulling of electrical, mechanical, steel material and man hours
required for performing execution of an Installation.
4.1 Expectations
Installation BOM of electrical, mechanical and steel materials form Look-up matrix withquantity.
Pre defined Man hours form Look-up matrix. Automatic Upload of Installation BOM and Base man hours to respective Projects.
Expected Process:
Quotation
Input Installation
parameters like
Shaft details,
Span etc., and
system will
calculate for
output
Sales ContractProject Builder
(CJ20N)
Initiate Installation BOM Extraction from
Easy estimation tool Installation Materials & Base Man Hours are automatically
updated in Project network
Installation Materials Price
Installation BOM Extraction
Quantity Calculated for Variable values
on execution of formulae in background.
Installation Material List Electrical
& Mechanical Steel Materials List
Base Man Hours based on activity
type
4.2 Description
To describe the process in detail, it is classified into two stages mainly
Extraction of Installation BOM Automatic Upload of the output to SAP Project Systems (PS)
Extraction of Installation BOM:It involves following steps
Electrical, Mechanical and Steel materials:
A Lookup matrix is maintained as master data in customized tables, which maintains the electrical
mechanical and steel materials.
Based on the Equipment Category the respective set of electrical and mechanical andsteel materials list is pulled from Installation materials matrix table.
These materials may have fixedor variable quantities, fixed values are directly pulledfrom matrix table where as the variable values are determined upon the execution of
formulae in back-end of the transaction.
8/13/2019 BBP - Installation BOM Extraction V1.0
19/36
Business Blueprint Installation BOM Extraction
19
Provision for entry of Materials manual for upload to WBS network.Man Hours:
A look - up matrix is maintained in customized table (Man Hours Master Matrix) that maintains the pre
defined man hours required for respective number of stops.
Based on the number of stops, the respective total man hour for each activity type would beupdated from the Man Hours Master data.
Automatic Upload of the Installation BOM to Project:
After creation of Sales Contract, Installation BOM (Bill of Material) can be generated via Easy
Estimator upon feeding the required inputs like contract number, equipment type and
equipment code etc.., and by pulling the data from look up tables/logics/formulae.
Provision for addition of Materials to network from the Easy estimation tool
The same will be updated in pre - defined templates (Annexure C) in background that is to be pushed to
PS module and will be automatically updated to respective project.
4.3 Solution in SAP
8/13/2019 BBP - Installation BOM Extraction V1.0
20/36
Business Blueprint Installation BOM Extraction
20
INSTALLTION MATERIAL - BOM EXTRACTION PROCESS
EasyEstimator
T
ransaction
Output
Integration
Input
MasterData
Installation MaterialMatrix
(Electrical
Mechanical)
Base Man HourMatrix
Manual entry of
installation
parameters like
Shaft & span
details.
Installation BOMExtraction
Electrical &
MechanicalMaterial
Steel Material Man Hours
Formulae/Logics
run in the
background to
determine thevariable
quantities
Installation
Material withQuantity
Steel Material
With Quantity
Base ManHour
Project Systems.
Quantum of
materials
updated
automatically
in Project
networks
Installation Material
Matrix
(Steel)
4.4 Gaps
None
4.5 Special Considerations
None
4.6 Changes to Existing Processes
The Sales transactions during Quotation creation will include SAP Easy estimation transaction.
4.7 Workaround Solutions
None
4.8 System Configuration Considerations
None
8/13/2019 BBP - Installation BOM Extraction V1.0
21/36
Business Blueprint Installation BOM Extraction
21
4.9 Authorization Requirements
Role Name Role Description Transaction Name Nature of
authorizations
required
To be decided Person responsible for
Extracting Installation
BOM.
Easy Estimator Create, Change, Display
4.10 Migration Requirements
None
8/13/2019 BBP - Installation BOM Extraction V1.0
22/36
Business Blueprint Installation BOM Extraction
22
5.0REPORTS & INFORMATION SYSTEM
5.1 Description
Additional reports will be developed in the system based on the requirements confined to the scope
mentioned in the proposal documents
8/13/2019 BBP - Installation BOM Extraction V1.0
23/36
Business Blueprint Installation BOM Extraction
23
6.0 ANNEXURE
A. Formulae for Electrical and Mechanical Materials Quantity Calculation:
Formulae for Material with variable Quantity (Nexway and Elenessa)
8/13/2019 BBP - Installation BOM Extraction V1.0
24/36
Business Blueprint Installation BOM Extraction
24
8/13/2019 BBP - Installation BOM Extraction V1.0
25/36
Business Blueprint Installation BOM Extraction
25
8/13/2019 BBP - Installation BOM Extraction V1.0
26/36
Business Blueprint Installation BOM Extraction
26
8/13/2019 BBP - Installation BOM Extraction V1.0
27/36
Business Blueprint Installation BOM Extraction
27
8/13/2019 BBP - Installation BOM Extraction V1.0
28/36
Business Blueprint Installation BOM Extraction
28
Where V1..V25 are the Electrical/Mechanical materials, and
X1Xn are the input parameterspulled from contract and are used in the formulae.
Formula Description of Material for which variable quantity is derived.
V1Tube light 2 ft, Spot Light Fitting, Spot Light Bulb
V2Lug 2.5sqmm Pin type, Lug 2.5sqmm Ring type
V3 Lug 6sqmm Pin type, Lug 6sqmm Ring type ( hole 8mm )
Lug 10sqmm Pin type, Lug 10sqmm Ring type ( hole 8mm )
Lug 16sqmm Pin Type, Lug 16sqmm Ring Type (hole 8mm )
V4 Rawal Plug( 1pkt 100 nos ), Wire tie 200mm, Wire tie 100mm
Wood Screws (1 pkt 100 nos ) (size 35x8 ), Blind Rivet (AL 4 X10) ( 1 pkt
100 nos )
8/13/2019 BBP - Installation BOM Extraction V1.0
29/36
Business Blueprint Installation BOM Extraction
29
V5 Thermo Small, Thermo big
V6 Truff
V7 Anchor bolts 16mm, Anchor bolts 16mm
V8 Piano wire
V9 Drill bit 6mm RCC
V10 Hand gloves
V11 Masking tape 2"
V12 GI wire cable guard(3.25mm 12swg)
V13 GI wire plumb
V14 Bunion waste
V15 Polythene sheet
V16 Paint grey, Thinner
V17 Paint Red oxide
V18 Welding Rod 3.2mm (5.2 kg )
V19 Batteries Exide SMF 7 AH, Batteries Exide SMF 17 AH, Batteries NS40Z
V20 Welding Fastener 10mm
V21 2.5 sqmm cable Red ,2.5 sqmm cable Black
V22 6 sqmm cable green,10 sqmm cable red,10 sqmm cable blue,
10 sqmm cable yellow,16 sqmm cable red,16 sqmm cable blue
16 sqmm cable yellow
V23 Bare copper wire( for earth 8 SWG),Bare GI wire (8swg), Bare GI strip (25x3 mm )
V24 Trunking Big( 2.4mt length)
V25 Counter Weight 40Kgs,Counter Weight 60Kgs
X1,X2Xn Parameters (or their values) used in the formulae to derive the quantity values.
8/13/2019 BBP - Installation BOM Extraction V1.0
30/36
Business Blueprint Installation BOM Extraction
30
Formulae for Material with Variable Quantity (Home Elevators)
Formulae for material with variable quantity (Dumbwaiters Category)
8/13/2019 BBP - Installation BOM Extraction V1.0
31/36
Business Blueprint Installation BOM Extraction
31
B. Steel MaterialsSl.NO Steel Material Description
1 Wall bracket
2 Car rail bracket3 Combination rail bracket
4 CWT rail bracket
5 Additional support angle for CWT rail bracket
6 Bearing plate
7 Template support angle
8 Cleat for template angle support
9 Cleat for separator beam10 Separator beam
11 SILL angle
12 Cleat for SILL angle
13 Cleat for fixing header
14 Pit screen
15 Pit ladder
I FORM I ( NEXWAY-S (AW) & (AP )
1)Wall bracket Type I
a) CWT on rear side
Number of wall brackets= Span nos x 4
or
b) CWT on car side
Number of wall brackets= Span nos x 1
+
Number of separator beam cleats = span nos x 2
or
c) CWT on side with deep cabin
Number of wall brackets= Span nos x 3
2) Car bracket Type II,Type III & Type IV
Number of car brackets =Span nos x 2
8/13/2019 BBP - Installation BOM Extraction V1.0
32/36
Business Blueprint Installation BOM Extraction
32
3) Combination Bracket Type V
Number of Bracket = Span nos x 1
With CWT Bracket Type VI = 0
4) CWT Brackets Type VI
Number of CWT brackets = Span nos x 2
5) Bearing Plate--- 4 Nos
6) Sill Angle --- No of Openings x 1
7) Template Support Angle --- 2 Nos
8) Additional Support Angle for CWT rail bracket --- Span Nos x1
9) Cleat for Template --- 4 Nos
10) Cleat for Sill Angle --- No of Openings x 4
11) Cleat for Header --- No of Openings x 2
12) Cleat for Separator Beam --- Span Nos x 2
13) Separator Beam --- Span Nos x 1
14) Pit Screen ---- One number
15) Pit Ladder ---- One number
16) Governor guard ---- One number
Items 5 to 16 can be selected as :-- required or not requiredwhen request is first made.
II FORM 2 ( ELENESSA )
1) Wall brackets Type I
Number of wall brackets =Span nos x 3
2) Car brackets Type II , Type III & Type VIII
Number of car brackets = Span nos x 1
8/13/2019 BBP - Installation BOM Extraction V1.0
33/36
Business Blueprint Installation BOM Extraction
33
3) Combination bracket Type IV,Type V,Type VI & Type VII
Number of combination brackets = Span nos x 1
4) CWT brackets Type VII or VIII
Number of CWT brackets = Span nos x 1
5) Sill Angle --- No of Openings x 1
6) Template Support Angle --- 2 Nos
7) Cleat for Template --- 4 Nos
8) Cleat for Sill Angle --- No of Openings x 4
9) Cleat for Header --- No of Openings x 2
10) Cleat for Separator Beam --- Span Nos x 2
11) Separator Beam --- Span Nos x 1
12) Pit Screen ---- One number
13) Pit Ladder ---- One number
Items 5 to 13 can be selected as :-- required or not required
when request is first made.
III FORM 3 (ELENESSA EXTENDED SERIES )
1) Wall bracket Type I
a) CWT on the rear side
Number of wall brackets = Span nos x 4
or
b) CWT on car side
Number of wall brackets = Span nos x 3
2) Car bracket Type II,Type III & Type IV
a) CWT on rear side
8/13/2019 BBP - Installation BOM Extraction V1.0
34/36
Business Blueprint Installation BOM Extraction
34
Number of car brackets = Span nos x 2
or
b) CWT on car side
Number of car brackets = Span nos x 1
3) Combination bracket Type V
( To be able to order in addition type II car bracket one number per span )
CWT on car side
Number of combination bracket = Span nos x 1
4) CWT bracket Type VI , VII & VIII
a) CWT on rear side
Number of CWT brackets = Span nos x 2
b) CWT on car side
Number of CWT bracket = Span Nos x 1
5) Sill Angle --- No of Openings x 1
6) Template Support Angle --- 2 Nos
7) Additional Support Angle for CWT rail bracket --- Span Nos x1
8) Cleat for Template --- 4 Nos
9) Cleat for Sill Angle --- No of Openings x 4
10) Cleat for Header --- No of Openings x 2
11) Cleat for Separator Beam --- Span Nos x 2
12) Separator Beam --- Span Nos x 1
13) Pit Screen ---- One number
14) Pit Ladder ---- One number
Items 5 to 14 can be selected as :-- required or not required
when request is first made.IV FORM 5 - NEXWAY (GPM 4M)
8/13/2019 BBP - Installation BOM Extraction V1.0
35/36
Business Blueprint Installation BOM Extraction
35
1)Wall bracket Type I
a) CWT on rear side
Number of wall brackets= Span nos x 4
Or
b) CWT on car side
Number of wall brackets= Span nos x 1
+
Number of separator beam cleats = span nos x 2
2) Car bracket Type II,Type III & Type IV
Number of car brackets =Span nos x 2
3) CWT Brackets Type V
Number of CWT brackets = Span nos x 2
4) Bearing Plate--- 4 Nos
5) Sill Angle --- No of Openings x 1
6) Template Support Angle --- 2 Nos
7) Additional Support Angle for CWT rail bracket --- Span Nos x1
8) Cleat for Template --- 4 Nos
9) Cleat for Sill Angle --- No of Openings x 4
10) Cleat for Header --- No of Openings x 2
11) Cleat for Separator Beam --- Span Nos x 2
12) Separator Beam --- Span Nos x 1
13) Pit Screen ---- One number
14) Pit Ladder ---- One number
Items 5 to 14 can be selected as :-- required or not required
when request is first made.
8/13/2019 BBP - Installation BOM Extraction V1.0
36/36
Business Blueprint Installation BOM Extraction
C. TemplatesTemplate for Upload of Installation Material:
Template for upload of Planned Man Hours: