    JINDAL POWER LIMITED

    CHECKLISTS

    Doc. No. TM

    TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS01 / 0

    T$ % BOP MAINTENANCE DEPARTMENT00 / 0

    UNIT :

    W&'()*+ o, LP P)-)*+ *( '&.WORK ORDER NO. : DATE :

    PERMIT NO. : PTW ISSUE DATE : PTW CLOSIN$ DATE :

    Wo23 I*2c)o* F2&6&*c7 R&823

    W&'()*+ o, LP P)-)*+ *( '&.

    1 Taking of proper PTW and ensuring of all isolations.

    2 Cutting of pipe/valve by gas or cutting wheel as instructed by area engineer.

    3 Preparation of edge for welding.

    Preheating of piping where welding to be done! if re"uired.

    # $oot should be welded by the argon and then arc welding will be carried out.

    %

    & 'or each layer of welding grinding will be done to weld another layer if re"uired.

    ( $epair of )oint if re"uired on the basis of $adiography report for *P )oints.

    + $eturning of PTW.

    1,

    11 -ny rework will be attended.

    ignature of Contractor ignature of P0 ngineer ignature of P0 ngineer in ch

    Page o. ,1

    I& No. /D&

    R& No. /

    D&

    S'.No.

    D&)+*'&

    Ac''&

    tress relieving of the lines if thickness is 6ore than 12 66!if re"uired. $adiography or7PT of *P )oints to be done as per re"uire6ent.

    pill over oil / water / grease / cotton waste / etc in surrounding area and floor to becleaned and disposed.

  • 8/17/2019 BD_CL-10_LPWELD

    2/2

    g

    JINDAL POWER LIMITED

    CHECKLISTS

    Doc. No. TMD/CL/045

    TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS01 / 010!"00#

    T$ % BOP MAINTENANCE DEPARTMENT00 / 010!"00#

    UNIT : W&'()*+ o, LP P)-)*+ *( '&.

    WORK ORDER NO. : DATE :

    PERMIT NO. : PTW ISSUE DATE : PTW CLOSIN$ DATE :

    Wo23 I*2c)o* F2&6&*c7 R&823

    I& No. /D&

    R& No. /D&

    S'.No.

    D&)+*'&

    Ac''&