JINDAL POWER LIMITEDCHECKLISTS
Doc. No. TMD/CL/038
TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS 01 / 01-09-2008
TG & BOP MAINTENANCE DEPARTMENT 00 / 01-09-2008
UNIT :
WORK ORDER NO. : DATE :
PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :
Work Instructions Frequency Remarks
Renewal / Servicing / Replacement of Booster Pump Drive End Mechanical Seal
1 Taking of proper PTW and ensuring of all isolations.2 Allow the pump to cool down to 50 °C.3 Decoupling of the pump and check rotor freeness.
4 Disconnecting of associated water and oil pipelines.
5 Measuring of axial float with and without NDE side thrust pad
6 Removal of the coupling hub.
7 Removal of the DE bearing & Bearing housing.
8 Removal of the Mechanical seal.
9 Assembly of the new mechanical seal.
10 Assembly of the bearing & bearing housing.
11 Assembly of the coupling hub.
12 Measuring of axial float with and without NDE side thrust pad.
13 Alignment of Booster Pump and Motor
14 Coupling of the Booster Pump and Motor
15 Assembly of all dismantled piping.
16 Returning of PTW and take trail run of pump.
Issue No. / Date
Rev No. / Date
EQUIPMENT : Renewal / Servicing / Replacement of Booster Pump Drive End Mechanical Seal
Sl. No.
Design Value
Actual Value
JINDAL POWER LIMITEDCHECKLISTS
Doc. No. TMD/CL/038
TITLE : CHECKLIST FOR BREAKDOWN JOBS OF EQUIPMENTS 01 / 01-09-2008
TG & BOP MAINTENANCE DEPARTMENT 00 / 01-09-2008
UNIT :
WORK ORDER NO. : DATE :
PERMIT NO. : PTW ISSUE DATE : PTW CLOSING DATE :
Work Instructions Frequency Remarks
Issue No. / Date
Rev No. / Date
EQUIPMENT : Renewal / Servicing / Replacement of Booster Pump Drive End Mechanical Seal
Sl. No.
Design Value
Actual Value
17
18 Any rework will be attended.
Signature of Contractor Signature of JPL Engineer Signature of JPL Engineer in charge
Page No. : 01
Prepared By : Reviewed & Approved By :
Spill over oil / water / grease / cotton waste / etc in surrounding area and floor to be cleaned and disposed.