Bethune St Project - Issues and Opportunities Map

Embed Size (px)

Citation preview

  • 8/16/2019 Bethune St Project - Issues and Opportunities Map

    1/2

    Provide pedestrian friendly intersections, and create anambiance conducive to people walking, or using mobilityaids, including resting points, accessible pedestrian signals,tactile walking surfaces, shade and landscaping

    The vast majority of cyclists, of all skill levels, areto be comfortable using the corridor

    Commemorative/interpretivemarkers, or public art features e.g.railway station, RR, Jackson Creek,original topography and urban form

    The Central Area Master Plan is to use Bethune Streetto link the TCT to the Crawford Trail. Bethune Street isthe key to creating a truly city-wide trail and cyclingnetwork in Peterborough. Together with TownsendStreet, at least 7 existing or future cycling facilities willbe connected.

    Trans-CanadaTrail (O.R.T.)

    O. R. T.

    Trans-CanadaTrail

    Trans-Canada Trail(on-road connection)

    RotaryGreenwayTrail Link

    FutureTrail

    Major cross streets: enhancedbike/ped crossings required

    ApprovedMcDonnell St.bike lanes

    Library expansion plans, which include repurposingoutdoor spaces, renovation, and barrier free access

    RRX’ing

    Current zoning does not provide

    a comprehensive vision inkeeping with the Official Plan

    The relationship between publicspaces and private propertyrequires careful considerationof the interplay between streetdesign, land use and built form.

    Create positive urbanspaces and transitions tosurrounding areas

    Celebrate industrialarchaeology

    Issues and Opportunities Map:Active Transportation, Public Realm, Culture, Heritage, Urban Planning and Design

    The City of Peterborough has designated anumber of properties adjacent to the StudyArea. Only one property in the Study Area isbeing advanced by the City, 413 BethuneStreet. Its character contributions are style,scale and being a good example of theworkers ’ cottage.

    The Urban Park Design

    Charlotte Street Design

    Celebrate JacksonCreek and provideaccess for publicenjoyment

    Provide a catalyst for theredevelopment of properties, helpingthe City to realize its residential densitytargets in the Central Area Core.

  • 8/16/2019 Bethune St Project - Issues and Opportunities Map

    2/2

    Bethune Street must become afriendlier zone to spend time or topass through

    Gateway treatmfuture southern

    Investigate impconnection alon

    part of revampe

    Effective traffic diversistreet narrow and providimproved landscaping a

    Opportunities for traffic diversions

    Trenchless Construction of 900mm TSS under JacksonCreek and the Bethune St bridge

    Outlet Structures to be physically modeled to confirm capacity. Confliwith hydro poles and u/g utilities to be investigated.

    Trenchless Construction of 3m x 1.8m Box Culvert

    under CPR Tracks

    Early utility / services relocation in advance of Culvert /TSS construction key project objective

    Level Crossing Warning Signal /Traffic Signal Inter-connectionneeds to be investigated

    Physical modeling of inlet structure toconfirm capture capacity. Inlet grating toaddress capacity & public safety needs

    Managing existing sanitary loadings and waterdemands during construction of new services is a keyproject objective

    Incorporate green infrastructure into the corridor, as well as variousapproaches to localized stormwater treatment/management

    Existing and new infrastructureshould be optimized for LID andpassive management in order tooptimize urban resiliency

    Issues and Opportunities Map:Low Impact Development, Green Infrastructure, Complete Streets and Livability

    Gateway treatment atCharlotte & Park Streets

    Opportunities for traffic diversions

    Explore the concept of “LivingStreets” (as in “living room”— theshared space to gather and/or quietlywatch the world go by)

    Maximize “creative placemaking”,integrating public art and ongoingcommunity programs that fostercreativity .

    Use infrastru“lost ecologygardens and measures, lik

    Use the corridor to create equitableaccess to landscapes and nature aspart of everyday life.

    Consider the Stewart Street A.N.C.project and integrate the communityvoice in project planning.