Upload
sandy-turner
View
244
Download
5
Embed Size (px)
DESCRIPTION
Â
Citation preview
Transportation Talk: EU-Compliance Law That Will Affect U.S.
New Road Products: ConExpo-Con/Agg Sneak Peek3 23
PAGE PAGE Kirk Landers: Solutions for a Bankrupt Trust Fund 28
PAGE
Road Science Noteworthy Road-ConstructionEquipment Technology atConExpo-Con/Agg Page 5
Contractor Wins $1 Million Case Against Government Page 20
Stringless Pavingin the Fastest Billion-Dollar U.S. Project
Page 13
January 2014 www.BetterRoads.com
Cover_BR0114.indd 1 12/30/13 1:40 PM
You’re on.TM www.JohnDeere.com/graders
Introducing the new Final Tier 4 G-Series Graders. You asked if our
new Final Tier 4 engines could improve total fuid economy, not just
diesel consumption. We answered by incorporating cooled EGR and
our Integrated Emissions Control system. Total fuid consumption —
diesel fuel plus diesel exhaust fuid (DEF) — is lower than diesel fuel
consumption alone on our previous model. Throw in extended ash
service intervals, choice of controls, excellent visibility, and exclusive
Event-Based Shifting, and you have emissions compliance without
compromise. See for yourself at your dealer or on our website.
When IT comeS To emISSIonS and economY, Your IdeaS helped uS make The Grade. and The Grader.
36537_BR_8x10.75.indd 1 12/10/13 11:38 AM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-4 1 12/26/13 9:20 AM
January 2014 Volume 84, Number 1 Contents
Better Roads April 2013 1
ProduCts & serviCe
24 Marketplace 27 Advertiser Index
3 transportation talk: REACH: How this European law will challenge the U.S. equip-ment manufacturing market.
20 in Court: Federal court rejects government’s motion to dismiss a claim for nearly $1 mil-lion based on contract ambiguity.
28 Kirk Landers: Solutions for a bank-rupt Highway Trust Fund: Three fearless forecasts for road funding changes in the next decade.
CoLumns & dePartments
top reads:• Chevy unveils 2015 Colorado pickup, available fall 2014:
betterroads.com/chevy-2015-colorado• Proposed bill would raise federal gas tax by $0.15 for
highway funding: betterroads.com/federal-gas-taxContribute: If your agency or crew has worked on an exceptional project, or if you want to share your thoughts on current transporta-tion issues, email your ideas for a blog or contributed story to Online Managing Editor Amanda Bayhi at [email protected]. com and Editor-at-Large Tina Grady Barbaccia at [email protected].
Contributed: Dowel Bar Retrofit: Where Are We Now? The International Grooving & Grinding Association (IGGA) looks at past and present dowel bar retrofit case studies. betterroads.com/dbr
Contributed: Kandiyohi County uses aggregate base stabilizer on damaged county road. How liquid stabilizer was used to increase the granular equivalency (GE) value of aggregate base. betterroads.com/kandiyohi-county-aggregate
How the use of stringless paving technology on the Utah I-15 Corridor Expansion Project was used to save money, complete the project two years ahead of sched-ule and allow for future expansion plans. It was finished in 35 months, making it the fastest billion-dollar public highway project ever built in the United States.
HIGHwAy CONTRACTOR: No Strings Attached
trending online BetterRoads.com
Subscribe to our newsletter! For daily news updates sent directly to your inbox, subscribe to our free newsletter. Visit betterroads.com to sign up.
5
betterroads.com /BetterRoadsMagazine
@betterroads
13
23
ROAd SCIENCE: Expo Engineering
ConExpo-Con/Agg Products
Hundreds of products new to ConExpo-Con/Agg 2014 will be on display at that triennial exposition this year, but some of them will be distinguished by the advanced science and engineering that has gone into perfecting them. Here is a sneak peak at the most noteworthy.
A sneak peek at the equipment that will be shown at this every-three-year show.
TOC_BR0114.indd 1 1/2/14 8:54 AM
Tensar TriAx Geogrid saves youmoney in more ways than one.
The industry-leader has once again revolutionized the geogrid landscape. Tensar TriAx Geogrid helps save on construction costs by optimizing aggregate requirements, reducing labor costs through quick and simple installation, and even reducing future maintenance costs by improving structural performance. Compare it with conventional Tensar BX Geogrid, and judge the facts for yourself.
Learn the facts about Tensar TriAx Geogrid and how you can save money on your next project.Call 888-827-9737 or visit Triaxfacts.com/BR to request information or schedule a job site demonstration.
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-3 1 12/26/13 9:18 AM
E nforcement for the European Union’s (EU) REACH – the Regulation on Registration, Evaluation, Authorisiation [sic] and Restriction of Chemicals – regulations began on June 1, 2007, to control chemical manufacturing.
Under these new protocols, existing chemicals, when there is evidence of concern, are identifi ed as Substances of Very High Concern (SVHC). These trigger immediate reporting requirements to the European Chemicals Agency (ECHA) and then may be banned until safety is established.
The SVHC list is continuously changing, with new substances added several times per year. More than 1,000 of these SVHCs are expected to be on the list by 2020. EU REACH also has a restrictions list that allows certain substances to be used only for specifi ed purposes. ECHA provides and maintains IUCLID (International Uniform Chemical Information Database), a software application provided free that captures, stores, maintains and exchanges data on intrinsic and hazard properties of chemical substances.
These regulations are far-reaching. As the SVHC list regularly changes, it could become a trade barrier by potentially forcing U.S. equipment manufacturers to redesign their products or be banned from the EU marketplace, according to the Association of Equipment Manufacturers (AEM) EU REACH Equipment Brief.
“In addition, as materials and substances are identifi ed in the EU as SVHCs, this knowledge of their toxicity is now public information,” says John Wagner, AEM director of materials management. “If these substances are used in construction projects, contractors may have potential legal liability for their impact.”
To ensure exports can continue, AEM suggests three important steps: Manufacturers need to become aware what substances are restricted, banned or require notifi cation; identify the substance content of all materials used; and eliminate use of these chemicals through redesign.
REACH is changing the regulatory environment and making it more onerous. Like Tier 4 regulations, these EU regulations may increase manufacturing costs, which will most certainly be passed on to the end-user. This will affect contractor costs and make everything more diffi cult and expensive to buy and use.
We all want to protect the environment. But, we don’t want to be overregulated where it’s going to cost jobs and make it impossible to get the equipment we need. The repercussions from REACH are potentially more damaging than anyone has acknowledged. As the nation is recovering from the severe economic recession, we can’t afford any impairment. (For a glossary of REACH terms, go to page 6 on aem.org/pdf/2013-10_EU-REACH-executive-brief.pdf.)❖
by Tina Grady Barbaccia, Editor-At-Large
Better Roads January 2014 3
The EU’s REACH regs have implica-tions for U.S. equipment market
Editorial Editor-At-Large: Tina Grady Barbaccia
Editorial Director: Marcia Gruver Doyle
Online Editor: Wayne Grayson
Online Managing Editor: Amanda Bayhi
Production Editor: Lauren Heartsill Dowdle
Editor Emeritus: Kirk Landers
Truck Editor: Jack Roberts
Construction Editors: Tom Jackson, Tom Kuennen, Dan Brown
Design & ProductionArt Director: Sandy Turner, Jr.
Production Designer: Timothy Smith
Advertising Production Manager: Linda Hapner
Construction MediaSenior VP of Market Development, Construction
Media: Dan Tidwell
VP of Sales, Construction Media: Joe Donald
CorporateChairman/CEO: Mike Reilly
President: Brent Reilly
Chief Process O� cer: Shane Elmore
Chief Administration O� cer: David Wright
Senior Vice President, Sales: Scott Miller
Senior Vice President, Editorial and Research: Linda Longton
Vice President of Events: Alan Sims
Vice President, Audience Development: Stacy McCants
Vice President, Digital Services: Nick Reid
Director of Marketing: Julie Arsenault
3200 Rice Mine Rd NETuscaloosa, AL 35406800-633-5953 randallreilly.com
For change of address and other subscription inquiries, please contact: [email protected]
Better RoadsTM magazine, (ISSN 0006-0208) founded in 1931 by Alden F. Perrin, is published monthly by Randall-Reilly Publishing Company, LLC.© 2014. Executive and Administrative offices, 3200 Rice Mine Rd. N.E., Tuscaloosa, AL 35406. Qualified subscriptions solicited exclusively from governmental road agencies, contractors, consultants, research organiza-tions, and equipment and materials suppliers. Single copy price $5.00 in U.S. and Canada. Subscription rate for individuals qualified in U.S. and Canada $24.95. Foreign $105.00. Special group rates to companies quali-fied in quantities over five names. We assume no responsibility for the va-lidity of claims of manufacturers in any advertisement or editorial product information or literature offered by them. Publisher reserves the right to refuse non-qualified subscriptions. Periodical circulation postage paid at Tuscaloosa, Alabama and additional entries. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by any means, electronic or mechanical, including photocopying, recording, or by an information storage retrieval system, without written permission of the copyright owner. For quality custom reprints, e-prints, and editorial copyright and licensing services please contact: Linda Hapner, (224) 723-5372 or [email protected]. POSTMASTER: Send all UAA to CFS. (See DMM 707.4.12.5); NON-POSTAL AND MILITARY FACILITIES: send address corrections to Better Roads, 3200 Rice Mine Road N.E., Tuscaloosa, AL 35406.
Correction: In the December 2013 issue of Better Roads’ “Transportation Talk,” Gov. Bob McDonnell was misidentifi ed as governor of Pennsylvania. Gov. Tom Corbett is the current governor of Penn-sylvania. McDonnell is the governor of Virginia. We apologize for the error.
TransportationTalk
TransportationTalk_BR0114.indd 3 1/2/14 8:55 AM
Smart decisions are rare in Vegas. This trip will be different.
Smart works.
Plan now to meet us in Las Vegas for CONEXPO/CON-AGG 2014. Talk with our experts about the latest industry trends, and get an
up-close look at the smart innovations you expect from Volvo. Get a head start — download our app at volvoconexpo.com.
North Hall, Booth 10951 • Gold Lot, Booth 1300Text INFO to 205-289-3789 or visit www.betterroads.com/info
Volvo_BR0114_PG4.indd 1 1/2/14 9:07 AM
Better Roads January 2014 5
RoadScienceby Tom Kuennen, Contributing Editor
H undreds of products new to ConExpo-Con/
Agg 2014 will be on display at that triennial
exposition this year, but some of them will
be distinguished by the advanced science and
engineering that has gone into perfecting them.
This month, Road Science takes a close look at noteworthy
road construction equipment technology at ConExpo-Con/
Agg. In our February issue next month, we’ll examine the
science and technology behind road construction materials to
be exhibited there.
Plan now to attend ConExpo-Con/Agg 2014 in Las Vegas
March 4 to 8. Visit conexpoconagg.com for more information.
Cat track, compaction controlRecent technological improvements that are engineered and
built into Caterpillar’s paving, compaction and cold-planing
products will be on display at ConExpo-Con/Agg 2014.
“Customers tell us they want technology with function —
technology that helps them improve their productivity and
their bottom lines,” says Jim McReynolds, president, Caterpillar
Paving Products. “Our ultimate goal is to provide customers
with solutions that reduce their owning and operating costs.”
The Mobil-Trac undercarriage, available on many new Cat
pavers, provides best-in-class traction, with the high travel
speeds and maneuverability, Caterpillar says. Work is com-
pleted quickly, and pavers can perform under varied and
demanding conditions.
With this undercarriage, an oscillating bogie design
provides multiple pivot points, so the undercarriage easily
overcomes bumps and dips. The tow point is isolated from
the deviations and ride quality is enhanced.
Friction-drive with automatic belt tensioning has always
been part of the system, Cat says. Belts do not slip, while
rubber-coated components prevent the build-up of asphalt
that is common to other belt drive systems, and leads to
Here’s a sneak peek at the technologies behind exceptional equipment for roadbuilding at ConExpo-Con/Agg 2014
Expo EngineeringThe Caterpillar Mobil-Trac undercarriage delivers traction on heavily tacked surfaces, and the large ground-contact area minimizes the base disturbance on soft materials.
Photo courtesy of Caterpillar, Inc.
RoadScience_BR0114.indd 5 12/30/13 1:45 PM
RoadScience
6 January 2014 Better Roads
premature belt failure. Guide lugs keep the belt centered for
maximum performance.
Mobil-Trac undercarriage delivers traction on heavily
tacked surfaces, and the large ground contact area minimizes
base disturbance on soft materials. The operator always has
full control for steering and the ability to push trucks.
Cat Compaction Control is featured on new Cat soil
compactors, tandem vibratory compactors and pneumatic
rollers and is one element of a suite of intelligent compaction
technologies.
For soil compactors, the basic system provides compaction
measurement using either Compaction Meter Value (CMV)
or Machine Drive Power (MDP) technology, with the ability
to boost the system with GPS mapping capability. For tandem
vibratory rollers and pneumatic compactors, the system pro-
vides pass-count information and GPS mapping, enabling the
operators to achieve more homogeneous and effective com-
paction by making sure the right number of passes is made.
Features beyond pass-count information are available,
including infrared sensors on the front and rear to continu-
ously measure asphalt temperatures. The accumulated data
may be stored for later analysis so processes can be examined,
adjusted and archived.
MDP, an exclusive technology, is available on new Cat
B-Series soil compactors, and is unique in that it measures
compaction with the vibe system on or off. MDP measures
rolling resistance as an indication of soil stiffness. It measures
closer to the depth that the machines are able to compact. It
also measures closer to lift thickness. The measurements are
less impacted by the dampening effect of cohesive soils, so it
can be used on padfoot machines.
Cat Compaction Control, whether using CMV or MDP mea-
surement, can also use a Global Navigation Satellite System –
such as GPS – to provide positioning information to map pass
count, coverage and compaction measurement details. This
data can be stored for review at a later time.
Visit Caterpillar Inc. at its indoor booth No. 10915 in the
North Hall and outdoor booth No. 1015 in the Gold Lot or at
cat.com.
The Federal Highway Administration (FHWA) offers intel-
ligent compaction (IC) advice. Along these lines, the FHWA
now offers IC phone and e-mail support as part of its national
effort to deploy IC throughout the US.
The IC Technical Support Service Center (TSSC) will answer
all IC-related questions, including those regarding specifications,
IC workshops/IC equipment demos, Veda data management
software, pilot project selection and IC-related technical docu-
ments.
Phone and email support is available Monday through Fri-
day from 8 a.m. to 5 p.m. CST. Call the IC Support Hotline at
512-659 1231 or email [email protected].
In addition to phone and email support, the IC TSSC also
provides local assistance, workshops, equipment demos, and
an online library of technical documents and other resources.
For more information, visit intelligentcompaction.com.
TanGO with BOMAGBOMAG Americas Inc. will introduce technologically ad-
vanced oscillation technology at ConExpo-Con/Agg at booth
No. 50675.
Oscillation compacts asphalt or soil with a horizontal ef-
fort, without introducing vertical vibrations into adjoining
structures or bridge decks.
BOMAG’s Tangential Oscillation, dubbed TanGO, will be
shown on its new BW161ADO-4 tandem roller. BOMAG
TanGO oscillation makes use of the physical laws of vibration
generation to its best effect, the maker says. The careful coor-
dination of exciter system to drum weight ratios is the basis
for BOMAG’s tangential oscillation. Target applications for
this compaction technology are on bridge structures and for
working in close proximity to buildings. Usage for intermedi-
ate and finish rolling are additional proven applications.
With tangential oscillation always applied horizontally, it
maintains continuous ground contact, and efficient compac-
tion results are often able to be seen immediately after a few
roller passes. The interaction of TanGO oscillation from the
rear drum and traditional vibration power from the front
BOMAG TanGO oscillation makes use of the physical laws of vibration genera-tion to its best effect.
Phot
o co
urte
sy o
f BOM
AG A
MER
ICAS
RoadScience_BR0114.indd 6 12/30/13 1:45 PM
Bobcat® and the Bobcat logo are registered trademarks of Bobcat Company in the United States and various other countries. ©2014 Bobcat Company. All Rights Reserved. | 1204X-0
SEE WHO WINS GOING HEAD-TO-HEAD.Do you want to see how compact excavators perform in head-to-head competitions or watch side-by-side comparisons relating to performance, serviceability and durability? Before you buy your next excavator, watch our video comparisons of excavators. Not only do the videos show you which excavator is best, they explain the small details that increase your performance and reduce your downtime. You can watch all the videos at BobcatAdvantage.com/faceoff1 or scan the code and find out who comes out on top.
ONE VS MANYCOMPACT EXCAVATORS FACE OFF
BobcatAdvantage.com/faceoff1 1.877.745.7813
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-7 1 12/26/13 9:27 AM
ROAD AND MINERAL TECHNOLOGIES
Wirtgen Group, the technology leader in road construction and mineral processing with the market leading brands Wirtgen, Vögele, Hamm and Kleemann. Four brands – One technology leader. Experience it at CONEXPO 2014.
CONEXPO 2014 Las Vegas Convention Center · Central Hall · Booth No. 51021March 4-8, 2014 · Tuesday - Friday: 9 a.m. to 5 p.m., Saturday: 9 a.m. to 3 p.m.www.wirtgenamerica.com
FOUR OF A KIND:THE WIRTGEN GROUP
4ofaKind-ConExpo Ad_7.875x10.5.indd 1 12/6/13 2:02 PM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-1 1 12/23/13 8:56 AM
Better Roads January 2014 9
drum provides practical advantages on difficult-to-compact
asphalt mixes. This directly leads to achieving desirable
smoothness and density results, BOMAG says.
BOMAG is planning future TanGO introductions into other
roller weight classes. For more information, visit go to No.
50675 in the Central Hall or BOMAG.com/us.
Case SCR Exhaust TechnologyCase Construction Equipment introduced an innovative,
low-maintenance, Tier 4 Interim emissions control system on
a new line of dozers in October. The first selective catalytic
reduction (SCR) technologies built into a dozer are part of the
new M Series line of five dozers, which includes models rang-
ing from 92 to 214 hp.
Case is the first heavy equipment manufacturer to build
proven selective catalytic reduction engine technology into
a dozer to meet Tier 4-interim standards. The engines on the
four larger models are built by Fiat Powertrain Technologies
and offer advantages in terms of maintenance (no regenera-
tion or diesel particulate filter to maintain) and fuel efficiency
(some models experience fuel savings up to 14 percent).
One of the greatest advantages of SCR in this application re-
lates to machine performance, Case says. SCR is suited for doz-
ers because it lets the engine run at peak performance under
variable loads without compromising the power or drawbar
pull that achieves the brute force required for earthmoving.
In addition to the SCR technology, key features found on
M Series dozers include best-in-class drawbar
pull, increased horsepower ratings, fuel savings
up to 14 percent, industry leading visibility,
new versatile controls and a pressurized cab for
optimal comfort, according to Case.
The smaller 750M, designed primarily for
the rental market, features a cooled exhaust gas
recirculation engine also produced by Fiat. This
emissions treatment requires diesel particulate
filter maintenance but no end-user involvement
in filling diesel exhaust fluid.
See the line at Case’s indoor exhibit at Booth
No. 11722 in the North Hall and adjacent Booth
No. 12012 or visit casece.com.
Volvo: Fuel Savings via ITSVolvo Construction Equipment manufactures and markets
equipment for the road construction industry, including
wheel loaders, excavators, articulated haulers, motor graders,
asphalt milling machines and pavers, soil and asphalt com-
pactors, backhoe loaders, skid steer loaders, compact wheel
loaders and compact excavators.
Coming to Volvo Construction Equipment will be Intelli-
gent Transport Systems (ITS), which may reduce fuel con-
sumption by up to 30 percent in certain applications while
increasing safety.
Hundreds of engineers at Volvo CE are making equipment as
fuel efficient as possible, the company says. One area of Volvo
technological development is wireless machine-to-machine
(M2M) and machine-to-infrastructure (M2I) communication.
Volvo CE has conducted tests to calculate the potential fuel
savings M2M communication could bring to articulated haul-
ers working in the quarry and aggregates segment.
The project monitored a hauler, loaded with rocks from
an excavator, traveling to the crushing site. The machine was
fitted with an internal measurement system to verify the fuel
consumption. The hauler was operated by different drivers, at
both constant and varied speeds, with different amounts of
idle time and both with and without stops along the way. Tests
showed that when the hauler traveled faster than necessary
to the crusher, and as a result had to wait before unloading,
fuel consumption was up to 30 percent higher compared to
when the hauler traveled at a constant speed and arrived at the
optimum moment.
The first selective catalytic reduction (SCR) technologies built into a dozer are part of Case Construc-tion Equipments’ M-Series line of dozers.
Phot
o co
urte
sy o
f Cas
e Co
nstr
uctio
n Eq
uipm
ent
RoadScience
RoadScience_BR0114.indd 9 12/30/13 1:46 PM
Get the ultimate up-close look at the future of asphalt.CONEXPO-CON/AGG represents an immense unveiling of all the newest equipment, technology and product breakthroughs in asphalt. Bringing you the latest in everything from warm-mix asphalt to making roads smoother, it’s the one show that paves the way to working smarter.
Pre-register to get show updates at conexpoconagg.com
UNCOVER WHAT’S NEWUNCOVER WHAT’S NEWUNCOVER WHAT’S NEW
March 4-8, 2014 | Las Vegas conVention center | Las Vegas, Usa Co-located with ®2014
Untitled-19 1 6/27/13 8:40 AM
Better Roads January 2014 11
Thus, by using M2M communication the operator would
know exactly when to arrive at the crusher and what speed
to travel at to get there. Through reducing machine speed and
idle time, fuel consumption and machine wear and tear are
minimized, and an effi cient fl ow of equipment is facilitated.
The next stage of the project will be to provide the opera-
tor with information – such as target speed and arrival time
– inside the cab. This live information will support and guide
operators to the most fuel effi cient operation and could
be presented in future concepts like heads-up displays and
other innovative approaches.
Volvo will exhibit its line of construction equipment at
booths No. 1300 in the Gold Lot (outdoor), and 10951 in
the North Hall, or visit volvoce.com.
Bergkamp Melds Patchers, SoftwareBergkamp Inc.’s new spray injection pothole patchers
incorporate exclusive engineering technology and will be
introduced at ConExpo-Con/Agg 2014 at Bergkamp’s booth
No. 8202 in the Platinum Lot.
Three new spray injection patchers
complement Bergkamp’s all-in-one FP5
fl ameless pothole patcher, and may be
used with the intelligent InPave pothole
patching management system to provide
users with a technologically advanced
patching program.
In Pave helps a user monitor and
manage pothole-patching performance.
Multiple data reporting sensors are stra-
tegically placed throughout the patcher
that log production, performance and
locations of pothole patcher and crew,
the maker says.
As potholes are repaired, InPave
automatically gathers and reports data
such as quantity of potholes repaired,
location, time and material used for
each repair, and material levels and tem-
peratures. Retrieved from any computer
with internet access, the data can then
be turned into easy-to-read reports that
assist managers and owners in evaluat-
ing current and historic production.
They can also use these data to verify patching performance
and material usage, troubleshoot potential pothole problems
and help reduce ineffi ciencies. No software needs to be
downloaded. Visit bergkampinc.com for more information.
Web Exclusive: Read about Hamm’s Tier 4 dirt roller that transforms into a concrete breaker at betterroads.com/hamm-dirt-roller.
Bergkamp’s InPave pothole patching management system provides users with a technologically advanced patching program.
Phot
o co
urte
sy o
f BER
GKAM
P, In
c.
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Cut foremen entry time in half with HeavyJob Mobile Apps and...�� Reduce payroll processing by as much as 90%�� Know if jobs are profitable with same-day feedback against budget�� Work offline for remote jobs with no internet�� Train foremen quickly with easy-to-use time card�� Low risk—Software comes with a 12-month money back guarantee! So
u th H all #64528
North
Hall #11956
at www.HCSS.com or 800-683-3196Learn More
RoadScience
RoadScience_BR0114.indd 11 12/30/13 1:47 PM
The American Public Works Association (APWA) invites you to attend the 2014 North American Snow Conference in Cincinnati, OH, May 4-7. This unique event offers you an opportunity to experience the most concentrated collection of snow and ice solutions you’ll find under one roof.
From industry-leading snow and ice education sessions to an exhibit floor packed with vendors waiting to show you the latest technologies, equipment and processes to help keep your community safe, the Snow Conference has it all! You’ll even have a chance to participate in a special discussion with leading associations where you can help determine where their dollars are being spent for winter maintenance research!
Don’t wait, register today! register online: apwa.net/snow
2014 APWA North American Snow ConferenceThe Premier Event in Snow & Ice Management
May 4-7, 2014 | Cincinnati, OhioDuke Energy Convention Center | Hosted by the APWA Ohio Chapter | www.apwa.net/snow
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-8 1 12/26/13 9:29 AM
Better Roads January 2014 13
W hen placing concrete, staying within the determined lines is absolutely critical to achieving accurate pavement smoothness and thickness in the proper location. But
the use of total robotic stations with 3-D modeling enables paving with added accuracy without physical stringlines.
This technology, known as stringless paving, is computer-model replacement of stringline guidance using electronic tracking process that controls horizontal and vertical move-ment of slipform pavers.
Conventional concrete-pavement construction uses a physi-cal guidance system with a string or wire – i.e. a stringline – on one or both sides of the paving train of equipment to ensure there is proper pavement thickness and alignment. This method uses both horizontal and vertical control for the
equipment to place the necessary pavement thickness in the required location, according to Iowa Department of Transpor-tation and the Iowa Highway Research Board in the National Concrete Pavement Technology Center at Iowa State Uni-versity’s Stringless Portland Cement Concrete Paving Final Report (Project TR-490).
The placement and verifi cation of the stringline is time in-tensive and can limit access to the area in front of the slipform paver because a space is needed on each side of the paving machine to set the survey control line near the paver.
Stringless control allows the guidance without the need for a physical stringline. The system, which controls the paver through radio signals, depends on robotic station technology. The paving sequence is completed in a controlled environ-ment. The paver is fed information, which enables operators
How the use of stringless paving technology on the Utah I-15 Corridor Expansion Project saved time and money.
Allison’s automatic transmission features fluid drive and a torque converter. Adherents argue these provide 100-percent power and double rim pull, making them ideal for vocational applications.
No Strings Attached
HighwayContractorBy Tina Grady Barbaccia
HighwayContractor_BR0114.indd 13 1/2/14 8:57 AM
HighwayContractor
14 January 2014 Better Roads
to make small adjustments during the paving process.Use of stringless paving technology proved to be impor-
tant with Utah’s 1-15 Corridor Expansion Project, which re-constructed 24 miles of freeway from Lehi, Utah, to Spanish Fork, Utah. The project widened the freeway by two lanes in each direction; replaced the original asphalt with new 40-year concrete pavement; extended the Express Lane from Lehi Main Street to Spanish Fork and rebuilt or replaced 63 bridges and 10 freeway interchanges. The complex project was completed nearly two years ahead of the Utah Depart-ment of Transportation’s (UDOT) original schedule. It was fi nished in 35 months, making it the fastest billion-dollar public highway project ever built in the United States.
Massive job, more effi ciencyThe upfront challenge was the “sheer magnitude” of the project, says Kelly Steeves, concrete paving manager for Provo River Constructors (PRC), the joint-venture paving contractor for the project comprised of Ames, Floure, Ralph L. Wadsworth and Wadsworth Brothers. “The typical concrete paving job let is 150,000 to 200,000 square yards per con-struction season,” says Steeves, who is now paving account manager for Leica Geosystems North America, a manufac-turer of total robotic stations used in stringless paving. “We completed 2.8 million square yards of concrete paving in two years.”
The added effi ciency of us-ing stringless paving technol-ogy enabled the team to com-plete the job ahead of schedule and under budget, he says. “Typically, it takes roughly two days to set up for one paving pass on a project,” he explains. “We had more than 1,000 pave passes. When you do the math, you are automatically out of days to get the job com-pleted in time. The dynamics of this job was pretty much 24/7 for two years.”
But the PRC team man-aged to complete it ahead of schedule and under budget. The $1.5 billion project had a $1.725 billion price tag (in-cluding ROW) in the original
request for proposal. The project, which began Jan. 1, 2010, was completed on Dec. 31, 2012. The original completion date was slated for Dec. 31, 2014. The original length of portland cement concrete pavement was 14 miles, but 22 miles were actually completed.
In 2010, 380,993 total square yards were completed. In 2011, 1,380,061 square yards were completed, and in 2012, 1,038,946 square yards were completed. The last slipform paving day was Aug. 29, 2012.
The labor cost of placing and removing the stringlines and the diffi culty of working around the paving pins and string lines throughout a project is eliminated with stringless pav-ing, which helped speed up the I-15 Corridor Expansion project. “Placing and removing the stringlines is a continu-ous job that occupies a small crew throughout the project,” according to the Stringless Portland Cement Concrete Paving Final Report. The related costs include not only the labor cost, but also the cost of the equipment, such as tractors or trucks, that is needed to haul and distribute the stringlines, as well as the actual hardware that is needed for the stringlines.
“The overall challenges of working around the stakes and stringlines can be eliminated leaving fewer obstructions when moving equipment around and preparing the sub-base for paving,” according to the report. “An increase in effi ciency and productivity is also possible with more direct routes delivering concrete and materials to the site. The need
Provo River Constructors (PRC) reconstructed 24 miles of freeway with two lanes in each direction using stringless paving in the Utah 1-15 Corridor Expansion Project. The project was completed two years ahead of schedule.
HighwayContractor_BR0114.indd 14 1/2/14 1:21 PM
If you want to do more, there are two simple syllables you need to remember. Doosan. Doosan delivers performance, productivity, durability, comfort and easy maintenance in all of its machines. When you look into our products and our committed dealer and support networks, you’ll know that we’re up for your biggest, toughest jobs. And once you experience for yourself what these machines can do, you’ll never forget it.
www.doosanequipment.com/CantIgnore
A NAME YOU CAN’T FORGET. PRODUCTS YOU CAN’T IGNORE.
1.877.613.7970
** NO PURCHASE NECESSARY. THIS IS NOT A CONTEST OR SWEEPSTAKES. OPEN TO LEGAL RESIDENTS 21 YEARS OF AGE AND OLDER OF THE UNITED STATES (INCLUDING D.C.), excluding Hawaii, and CANADA, excluding Quebec. Visit the Doosan booth (Gold Lot, Booth 1501) at CONEXPO-CON/AGG between March 4-8, 2014 to enter. VOID WHERE PROHIBITED. Contest entries must be submitted by 3 pm on March 8, 2014. For Official Rules, prize descriptions and odds disclosure, visit www.doosanequipment.com/conexpo1. Doosan and the Doosan logo are trademarks of Doosan Corp. Doosan and the Doosan logo are registered trademarks of Doosan Corp. in the United States and various other countries around the world. ©2014 Doosan Infracore Construction Equipment America. All rights reserved. | 145E-0
YOU CAN’T IGNORE.
WIN A ONE-YEAR DOOSAN LEASE
Visit us in the Gold Lot, Booth 1501 at CONEXPO-CON/AGG to register
for your chance to win!
For more information, visit www.doosanequipment.com/conexpo1
Doosan Delivers
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-6 1 12/26/13 9:25 AM
ATSSA’S 44Th AnnuAl ConvenTion & TrAffiC expo
20142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014201420142014henry B. Gonzalez Convention Center
San Antonio, TexasConvenTion: february 21–25, 2014
TrAffiC expo: february 23–25, 2014
ENGAGE. Join thousands of your colleagues at this dynamic, annual event that brings together every segment of the roadway safety industry:•Manufacturers •Suppliers •Federal, State and Local public agencies •Legislative advocacy professionals •Contractors
EXPLORE. •Breakthrough products presented by nearly
200 exhibitors during ATSSA’s legendary Traffic Expo
•Solutions to industry challenges •The future of the roadway safety industry
EXPAND.Compare notes with industry experts when you attend workshops and power talk sessions covering all aspects of the roadway safety industry including: •Guardrails •Work Zones •Emergency Response •Signage •Pavement Marking •Traffic Signals • Intelligent Transportation Systems •High Friction Surfacing •and More . . .
for more information, go to www.atssa.com or call 800-272-8772
Sunday, February 23Noon–5:30 p.m.
Monday, February 2411:30 a.m.–5:00 p.m.
Tuesday, February 2510:00 a.m.–1:00 p.m.
Traffic Expo 2014
Exhibit HoursWhere the
Industry Meets
Ad-ATSSA14 BR FP 7875x105 8-13.indd 1 8/26/13 6:42 PM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-5 1 10/29/13 8:50 AM
Better Roads January 2014 17
1. Create a survey control network. “All of this is based off of your existing roadway,” says Kelly Steeves, concrete paving manager for Provo River Constructors (PRC), the contractor on the Utah I-15 Corridor Expansion project and now paving account manager for Leica Geosystems. “You don’t want to cut too much or fill too much of an existing road.” Steeves suggests setting up controls “where you still have a smooth roadway, minimizing dirt excavation and moving the dirt around.” He also advises having benchmarks set up as you move through the project, with each standard tying into specific segments of a project “so there aren’t any dips or humps.”
With the I-15 CORE Project, the project team wanted to leave as much of the roadway as possible in the natural elevation. Some variations had to be done with the new bridges. “Those new benchmarks — i.e. controls points — had to be elevated going into a ver-tical curve and going uphill and back down,” Steeves points out. “All of those had to be smoothed out.”
2. Collect filled survey data of the surface. This requires a great deal of upfront work during the design phase. “Once the design of the roadway is established, this information is used to create the 3-D model,” Steeves explains. “With the existing bridge, we needed to go out and take true elevation shots. Maybe the bridge is off a tenth in elevation or we had to field-fit a section not per design. That is the kind of data manipulation we need to do. Per design, we are at one elevation but the reality is that we may be at another elevation.”
He gives the example of the segment of a slab on the bridge where this was a bump, with one bump being worse in one lane than the other. “Those are
the tie-ins that often need to be manipulated,” Steeves says. “Sometimes you fly right over, and you don’t realize you went over a bridge because they are so smooth. This is how it should be.”
Stringless paving helps achieve this type smooth-ness, Steeves notes, because “with this method, you can see it on a computer screen and can see where the roadway will be. You can really fine tune down to the ‘N’ on the computer and have so much more control over the smoothness without a bunch of wirelines. Tying into a wireline on bridges can be dif-ficult,” Steeves says. There are also major financial in-centives for creating smoother pavement from DOTs.
3. Design the roadway and create a 3-D model. It’s important to work closely with the design team to create a model of the project plan. “When paving stringless, the information being fed into the paver is being compared to the design,” Steeves says. DOTs put out paper plans so the contractor must convert 2-D plans into a 3-D D45 file. “It is advantageous to work directly with the designer on a 3-D model be-cause it makes it easier to note if something doesn’t line up on the roadway and correct it before out on the jobsite,” he says.
4. Transfer 3-D model and begin paving. Down-load the D45 files (similar to a PDF) via a USB stick — i.e. thumb drive—and download to the paver us-ing anon-contact X, Y, Z guidance system. “You just download the file needed for the pave pass,” Steeves says, “and you should be good to go.” On the paver, a computer, software, radios, slope sensors and prisms or GPS and masts are needed to use the 3-D model file and perform stringless paving.
What you need to know about implementing stringless paving
to build wider shoulders on certain projects can be eliminated without the extra width needed for the stringlines.”
Paving in organized chaosAside from the sheer magnitude of the project size, the job team for the I-15 Corridor Expansion faced several other challenges,
particularly traffi c management. The team had to work under conditions based on maintaining the existing traffi c patterns, keeping ramps all ramps open during peak hours and keeping the public traveling through the job while only about 9 feet away and with traffi c 2 feet away.
“It was paving in ‘organized chaos,’” Steeves says. To make
HighwayContractor
HighwayContractor_BR0114.indd 17 1/2/14 1:21 PM
HighwayContractor
18 January 2014 Better Roads
Full service branch offices
AtlantaCharlotte
DallasDenver
Des MoinesIndianapolisKansas City
Little RockMilwaukee
NashvilleNew Orleans
Oklahoma CityPittsburgh
St. LouisSan Antonio
As a contractor, one of the most critical things is to protect your business with the right insurance. You can count on Bituminous for rock-solid protection.
With over 80 years of experience specializing in insurance for contractors, we know and understand your business and needs better than anyone.
By insuring with Bituminous, you’ll get major advantages, including the right coverage, industry knowledge you can trust, and solid financial security. You’ll also get consistent and constructive risk control attention, plus expert and timely responses to any claims. When it comes to getting the right insurance, we’re more than a bit better – we’re a lot better.
Call your agent today and ask about us. You’ll see we’re top-of-the-line at protecting your bottom line.
Home Office: Rock Island, Illinois 61201 ★ 1-800-475-4477 ★ www.bituminousinsurance.com
What YOU do is what WE protect.™
Text INFO to 205-289-3789 or visit www.betterroads.com/info
it work, Steeves says, extensive paving plans that detailed all paving passes as well as daily meetings amongst the paving group to cover new issues that came up each day and coordinate with other work being completed. Some of this work in-cluded side slopes being fi nished; noise wall posts being drilled, set and concreted in place; noise wall panels; sharing the same haul road; barriers being built; curb and gutter work; and drillers for the sign foundation.
Coordinating the paving plans was easier because the planning occurred ahead of time in an offi ce instead of on the jobsite. “You get the design fi les brought over – D45 fi les, a fi le format similar to a PDF – manipulate them to smooth out transitions and then work out the vertical curves,” Steeves says. “When you string point to point, you end up with a straight line.”
However, being able to manipulate a fi le in AUTOCAD and add more points allows a bet-ter radius to be developed, he continues. D45 modeling shows the machine operator a steering
Implementation benefits of stringless pavingStringless paving eliminates the need for stringlines, which provides the following benefits, according to the National Concrete Pavement Technology Center at Iowa State University’s Stringless Portland Cement Concrete Paving (Project TR-490) research findings:• Avoid project delays caused by time-intensive staking of string-
lines.• Reduce contractors’ move in and move out times.• Have shorter construction periods that disrupt traffic.• Reduce labor costs of placing and removing stringlines.• Increase the amount of traffic access along the road, especially on
county roads where the shoulders are limited.• Reduce the need to set stringlines in hazardous areas.• Experience greater work access to the slipform paver and sur-
rounding area.• Eliminate the need for stringline sensors on paving machines.• Decrease the overall width of paving machines by eliminating
need for sensors, making it easier and faster to cross bridges and other tight spots.
For more findings from this report, visit intrans.iastate.edu.
HighwayContractor_BR0114.indd 18 1/2/14 8:58 AM
52
Better Roads January 2014 19
It’s time.topconpositioning.com/mmgps-paving
Smooth as glass.
Untitled-7 1 8/26/13 9:26 AM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
reference line – “virtual stringlines in the project coordinate system” – a reference point and a steering offset. Similar to a stringline, using a rectangular grid with stringless paving is suggested, but surveying is not necessary. The project can be modeled with as many or few details as needed for vertical, horizontal curves, transitions and super elevations. The model can represent existing stringline data, slab edges – i.e. “virtual slabs” – or any arbitrary offset (position and/or height).
The future of stringless pavingSteeves says eliminating the wire line on a jobsite creates safer working conditions for crews because they do not have to constantly step over it or manage the gates for the truck entrances, conventionally set up about every 600 to 800 feet. “Wireless technology allows trucks to come in ahead of the paver safety and back up a minimal distance,” Steeves says.
Minimizing backup increases paving effi ciency, Steeves says. Using stringless technology increases the effi ciency because the contractor can start paving as soon as the subgrade is veri-fi ed instead of waiting for the paving pins to be set and for their own crews to set the stringlines. Such was the case with the Utah 1-15 Corridor Expansion project.
Progressive contractors are more often than not asking counties and DOTs to create 3-D digital designs of their proj-ects to be entered into the paving machine control systems, Steeves says. “In the future, most design work will be done on these digital programs,” he says. “The way technology is advancing so rapidly, contractors are pushing DOTs to provide digital fi les.”
Stringless Paving: How it works• Prisms mounted on paving machine reflect signals
back to total stations, giving them X, Y, Z positions.• Information is transmitted via radio signal from total
stations to computer on the paving machine.• The paving machine computer processes the exact
position in relation to a computer model of the new pavement.
• Onboard computer adjusts evaluation of machine on each of the four corners of the pan to achieve the cor-rect pavement thickness, crossfall (cross-slope control monitored by sensor) and mainfall (forward and back slope control monitored by sensor).
HighwayContractor_BR0114.indd 19 1/2/14 1:38 PM
20 January 2014 Better Roads
InCourtby Brian Morrow, P.E., Esq.
CourtCourt Attorney Brian Morrow is a partner in Newmeyer & Dillion LLP and a licensed civil engineer specializing in construction law, incl. road and heavy [email protected]
I n the recent case of West Bay Builders, Inc. v. Dept. of the Interior (April 29, 2013), the government’s motion to dismiss West Bay Builders’ claim for almost $1 million was denied based on a contract ambiguity
regarding concrete construction joints. The subject of contract interpretation involves interpret-
ing human communications. Construction and contract law are two specialized fields with their own set of jargon and technical language that has developed during time. The language of these areas is common to architects, en-gineers, contractors, subcontractors, material suppliers and attorneys. This language, however, is foreign and often misunderstood by lay people and the courts: courts often with rules of contract interpretation, especially in technical areas like construction law.
Throughout the years, different court approaches have developed to contract interpretation. These include “strict” rules of interpretation that focus on determining a con-tract’s “plain meaning.” In contrast, “liberal” rules of in-terpretation focus on determining the “intention of the parties.”
Ambiguity in contracts occurs when contract language has more than one meaning. If an ambiguity is obvious, it is called “patent.” If there is a hidden ambiguity, it is called “latent.” Since construction contracts typically include numerous documents, including the contract, general and supplementary conditions, specifications, and drawings, the likelihood increases of an ambiguity in the contract. In attempting to interpret ambiguities in contracts, courts often sometimes consider the role of trade custom and us-age, including the parties’ course of performance.
In West Bay Builders, Inc. vs. Dept. of the Interior (2013), the contractor claimed an ambiguity in its contract regard-ing construction joints for a concrete siphon. West Bay
Builders was awarded a contract to construct the Red Bluff Pumping Plant and Fish Screen Landfill Excavation & Canal, Siphon and Access Bridge. The concrete siphon con-sisted of a large concrete structure with a slab-on-grade, walls and a ceiling. Section 3.04 of the specifications, “Joints and Edges,” set forth four joints to be used in con-crete construction, including construction joints, contrac-tion joints, control joints and expansion joints.
On Feb. 2, 2010, West Bay submitted RFI No. 1, re-questing permission to omit the construction joints at the intersection of the walls and top of the siphon because it planned to place the vertical walls and top of the walls monolithically. The government denied the request, stating the construction joints were necessary “at the design loca-tions due to the restrained cracking experienced in similar types of structures, particularly in the thick areas where walls/floors or wall/ceilings are cast together.”
A year later, West Bay asked the government to recon-sider its response. West Bay stated it had based its bid on pouring the siphon walls and soffit monolithically. After its request was denied, West Bay stated it had proceeded with a different form system for Phase I of the siphon, was not as productive as hoped for and incurred substantially more costs than anticipated. To mitigate its losses, West Bay re-quested the government reconsider RFI No. 1 because they said it would save both parties time and money. In April 2011, the government denied West Bay’s request.
West Bay wrote the contracting officer (CO), stating “industry standards” indicate the contractor should decide whether or not to include or eliminate construction. On July 14, 2011, West Bay submitted a proposed change seeking $920,163 from the government’s refusal to elimi-nate the construction joints. On Aug. 1, 2011, West Bay converted its proposal to a certified claim. On Oct. 28,
Ambiguous ContractCourt denies government’s motion to dismiss contractor’s $1 million claim
InCourt_BR0114.indd 20 12/31/13 8:52 AM
Better Roads January 2014 21
2011, the CO denied West Bay’s claim. West Bay appealed to the Civilian Board of Contract Appeals (the board).
In the board proceeding, the government brought a motion to dismiss West Bay’s claim, arguing the “plain meaning” of the specifications was clear and unambiguous regarding the type of joints, how they were shown in the drawings, and the CO’s right to approve (or disapprove) the relocation, addition or elimination of construction joints. The government disagreed that West Bay could de-cide on its own whether to eliminate construction joints because this would render meaningless the contract lan-guage requiring government approval for such changes.
In response, West Bay argued the contract was ambiguous regarding the placement of joints. West Bay stated “control joints” did not require government approval for relocation, addition or elimination. West Bay noted the drawings did not reference “control joints,” though they provided de-tails for other joints, including contraction and expansion joints. West Bay’s project manager noted the government al-lowed West Bay to omit construction joints in the slab-on-grade and elevated decks and argued the government was
inconsistent in interpreting the contract. In its decision, the board stated as West Bay recognized in
its RFI, the joints in question appear to have been required by the specifications. However, based upon the minimal record before the board, they could not determine whether the specifications could be interpreted differently from how they were interpreted by the government. Given the early stage of the proceedings, the board denied the gov-ernment’s motion.
The West Bay Builders decision underscores how ambigui-ties in contract language can arise, including from docu-ments incorporated into the contract and course of per-formance. If a contractor believes that contract language is ambiguous, they should request clarification prior to bid opening so it is clear what they are bidding on. Otherwise, a court or jury — who typically lack technical knowledge and understanding — may decide a critical issue of con-tract interpretation and the contractor’s fate. In West Bay Builders, the board ruled in the contractor’s favor regarding a potential ambiguity, thus keeping alive the contractor’s claim for almost $1 million. v
InCourt_BR0114.indd 21 12/31/13 8:53 AM
REGION ONEInternational Erosion Control Association
Attend the Environmental Connection 2014 Conference and Expo forrelevant education sessions taught by the industry’s top minds;the latest how-to advice from exhibitors in the largest expo hall of its kind;engaging opportunities to forge business relationships through unique networking events.
Learn from the industry’s best!
Learn to identify and evaluate the different types of slope failuresReview remediation systems and proceduresLearn installation techniques and procedures for the integration of remediation systems
NEW! The Integration of Geosynthetics, Mechanical Structures & Vegetation for Stabilization of Slopes and Embankmentswith Jerry Sanders, CPESC
Attendees of this course will:
Register now!www.ieca.org/conference
IECA thanks its 2014
Conference Sponsors
f o r t h e b u s i n e s s o f c i v i l e n g i n e e r i n gceNEWS
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-5 1 12/26/13 9:22 AM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
NewRoadProducts
Better Roads January 2014 23
Allen MSP 450 riding trowelAllen Engineering’s MSP 450 riding trowel features manual steering and mechanical drive. The 4-foot-diameter trowel is designed to provide enough torque for fl oating with pans and high enough speeds for fi nishing. Booth #5024 alleneng.com betterroads.com/allen-msp-450
Bomag Cedarapids CR552 paverBomag says its Cedarapids CR552 mainline paver has the largest in-class rubber tires, the industry’s largest tire drive and a class-high hopper load bearing capacity of 27 tons. Booth #50675 bomag.combetterroads.com/bomag-cedarapids-cr552
Peterbilt Model 567Peterbilt’s Model 567 is designed for use in dump, mixer, heavy-haul and refuse applications. A Paccar MX-13 engine powers the truck, delivering up to 500 horsepower and 1,850 foot-pounds of torque. Booth #63940 peterbilt.combetterroads.com/peterbilt-model-567
American Eagle SHD-60 hydraulic drive air compressorAmerican Eagle has updated its SHD-60 hydraulic drive air compressor. Improvements include a new metal enclosure with a fl ip-up lid and reconfi gured front-mount bulkhead connectors. Booth #61416 americaneagleacc.combetterroads.com/american-eagle-shd-60
Asphalt Drum Mixers EX Series asphalt plants Asphalt Drum Mixers’ compact EX Series asphalt plants produces 100 to 425 tons per hour and feature single-drum counter-fl ow technology for increased heat transfer and fuel effi ciency. Booth #8610 admasphaltplants.combetterroads.com/adm-ex-series
By Amanda Bayhi, Online Managing Editor
Here is a sneak peek of the products that will be featured at the big show.
NewRoadProducts_BR0114.indd 23 1/2/14 9:16 AM
Marketplace
24 January 2014 Better Roads
Text INFO to 205-289-3789 or visit www.betterroads.com/info
BaileyBridge_BR0513_PG14.indd 1 4/23/13 9:32 AM
May Photo - A Cat RD4 crawler and No. 22 pull grader at work. Weighing 3,575 pounds and wielding am eight-foot
blade, the No. 22 was produced from 1936 through 1942, the year that Cat discontinued all pull graders.
(Caterpillar, Inc. image, HCEA Archives)
Featuring 12 full page black & white photographs carefully scanned and restored from rare originals depicting construction equipment from all eras!
The only calendar of this type offered!
Dealers! Contractors! Distributors! See the following page for info about ordering customized imprints!
Order your 2014 HCEA Calendar today!Order online at www.hcea.net or order by phone at 419-352-5616 with your Visa, Discover, or MasterCard, or fill out the form below.
The 2014 HCEA Calendars are available!
May Photo - A Cat RD4 crawler and No. 22 pull grader at work. Weighing 3,575 pounds and wielding am eight-foot
blade, the No. 22 was produced from 1936 through 1942, the year that Cat discontinued all pull graders.
2014 HCEA Calendar Order Form (with HCEA imprint)
Please send _____ copy(s) of the 2014 HCEA Calendar @ $10.00 each. $_________ Total Calendar Cost$_________ 6.5% Sales Tax (Ohio residents only)$_________ Total Enclosed (shipping and handling is included)
Ship To:Contact: Daytime Phone:Address:City/State/Zip: County (Ohio only):
Send this form, along with check or money order (U.S. funds only), to:
HCEA16623 Liberty Hi RoadBowling Green, OH 43402
or order online at www.hcea.net!
Untitled-31 1 9/4/13 4:39 PM
www.mobilebarriers.com303-526-5995
Cold Mix Pugmill Systems
Pugmill Systems, Inc. Columbia, TN USA 931-388-0626 fax 931-380-0319
www.pugmillsystems.com
Single or dual feeder bins200, 300, 500 Tons per hour, and larger Reliable diesel electric powerAutomatic emulsion control
l
l
l
l
pugmill_BR0709.indd 1 5/29/09 8:12 AM
BetterRoads.comBetterRoads.com/digital BetterRoadsMagazine @BetterRoads BetterRoads Better Roads Magazine
Classifieds_BR0114.indd 24 1/2/14 2:08 PM
Call for a Free Quote1-888-375-7905
Find an AgentProgressiveCommercial.com
No matter what kind of truck you drive, you could save with ProgressiveInsurance. To learn more about Progressive, and see why we are the #1Truck Insurer in America, please visit ProgressiveCommercial.com.
Progressive Casualty Ins. Co. & affi liates. Available in most states. No. 1 truck from SNL Financial’s 2011 national written premium data. 09P00560.T (02/13)
Helping Truckers save money, no matter what they drive.
09P00560.T_BetterRoads_7.875x10.50.indd 1 2/19/13 11:18 AM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Progressive_BR0413pg37.indd 1 3/28/13 9:12 PM
Check out the all new BetterRoads.com.
Stay up-to-date with the latest news and products in the road building industry along with insight from our award-winning
editorial team.
Industry News | Business | Technology | Products | Traffic Safety | Better Bridges
/BetterRoadsMagazine @BetterRoads
BRWebsite_BR0413pg22.indd 1 3/27/13 10:30 PM
This index is provided as a service. The publisher does not assume any liability for errors or omissions.
Company Phone/Web Page #
advertiser index
Better Roads January 2014 27
APWA North American Snow Conference ...............www.apwa.net/snow ...................................12
ATSSA Convention & Traffic Expo ............................www.atssa.com ............................................16
Bituminous Insurance Companies ...........................www.bituminousinsurance.com ....................18
Bobcat .....................................................................www.bobcatadvantage.com/faceoff1 .............7
Conexpo-Con/Agg 2014 .........................................www.conexpoconagg.com ...........................10
Doosan Equipment ..................................................www.doosanequipment.com/cantIgnore ......15
Fast Measure ...........................................................www.fast-measure.com ................................24
HCSS .......................................................................www.hcss.com..............................................11
Historical Construction Equipment Assoc. ...............www.hcea.net ..............................................24
IECA Environmental Connection 2014 ....................www.ieca.org/conference .............................22
John Deere Construction Equipment .......................www.johndeere.com/graders ....................... IFC
Mobile Barriers LLC .................................................www.mobilebarriers.com ..............................24
Pioneer Bridges .......................................................www.pioneerbridges.com .............................24
Progressive Commercial Insurance ..........................www.progressivecommercial.com ................25
Pugmill Systems ......................................................www.pugmillsystems.com ............................24
Roadtec an Astec Industries Co. ..............................www.roadtec.com ....................................... BC
Tensar .....................................................................www.triaxfacts.com/br ....................................2
Topcon Positioning Systems ....................................www.topconpositioning.com ........................19
Trinity Highway Products .........................................www.highwayguardrail.com ........................IBC
Volvo Construction Equipment ................................www.volvoconexpo.com .................................4
Wirtgen America, Inc. ..............................................www.wirtgenamerica.com ..............................8
FREE Product info
VISIT
TEXT
SCAN
INFO to 205-289-3789
Text and data rates may apply
betterroads.com/info
Get the free mobile app athttp:/ /gettag.mobi
AdIndex_BR0114.indd 27 1/2/14 1:22 PM
A Republican-dominated Congress under President George W. Bush couldn’t do it. A Democrat-dominated Congress under President Barack Obama couldn’t do it. The current fragmented Congress couldn’t do anything.
America’s federal highway program is crumbling faster than our highways and bridg-es, and the odds against a solution oozing out of the primordial slime that is the current American Congress are oppressive at best.
The Highway Trust Fund (HTF) is on a fast track to insolvency, which is the inevitable result of freezing the federal fuel tax, its sole funding source, at a 20-year-old level, ig-noring two decades of infl ation, and substantial increases in the usage of highways and bridges by our ever-increasing population. The HTF is projected to zero-out at the end of the federal government’s 2014 fi scal year, barring a Congressional intervention.
Not many pundits are forecasting how the failure of the HTF will impact America’s roads and the hard hit industries that maintain them, probably because experience has shown government leaders fi nd a way to patch together temporary solutions to dire crises. Whether that happens again, here are three fearless forecasts for road funding changes in the next decade.
Tolling will take over. In November, we discussed a recent Reason Foundation study that proposed opening the entire Interstate Highway system to tolling as a way to create revenues for its reconstruction. Unless mid-term elections usher in a Congress willing to raise the fuel tax, this seems inevitable and the only rational solution to a mounting crisis in U.S. surface transportation.
One of the hallmarks of nationwide tolling will be a standardization of automatic toll-ing systems so that motorists can pay their taxes without stopping, no matter what state they’re in.
With the cost of replacing bridges ranging from the tens of millions of dollars for small ones to hundreds of millions of dollars for big ones, bridge tolling is going to be the rule, not the exception. It may be that the next generation of motorists will never cross a major river without paying a toll.
Universal tolling will bring in its own problems and challenges. For example, col-lecting $5 or $10 worth of tolls from a scoffl aw in a distant state could be a problem, especially if an emaciated federal bureaucracy is unable to intercede. Another example: If tolls are managed too aggressively, traffi c loads on secondary routes could create safety and maintenance problems.
Most sweeping changes bring unforeseen consequences. In Europe, one potential consequence of national tolling came up for discussion last fall when spokesmen for Germany’s national security forces made a case for monitoring tolling data as a way of tracking suspects and locating criminals. This discussion took place at the time when Germany was abuzz over revelations that America’s NSA was monitoring Chancellor Angela Merkel’s cell phone, among many others, and it had a chilling effect on the pro-posal.
It would have the same effect here. One of the few things that unite Americans of the left and right is a fear of government monitoring, though even that might not outweigh the terrifying specter of an increase in the fuel tax.
Editor Emeritus
Kirk Landers
28 January 2014 Better Roads
Solutions for a Bankrupt Trust Fund
Landers_BR0114.indd 28 1/2/14 9:01 AM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-2 1 12/26/13 9:14 AM
We could tell you about the new innovative features on our paver like hydraulic swing out operator’s stations or how we eliminated all the stacks to give you a clear view across the whole machine. We could talk about how we cut the noise level of the machine in half. But the thing that really separates us from the others is how we backed it up with the industry leading EDGE™ extended warranty. This is a 3 year, 3000 hour unlimited warranty that isn’t prorated. Roadtec will reimburse you for your labor and covers everything but wear parts.
That’s how we DARE TO BE DIFFERENT.
Standard Warranty: 1 YEAR OR 1,000 HOURS
EDGE™ Extended Warranty:3 YEARS OR 3,000 HOURS EDGE™ Engine Warranty: 5 YEARS OR 6,000 HOURS
Roadtec_BetterRaods_July2013_Ad.indd 1 6/26/13 3:07 PM
Text INFO to 205-289-3789 or visit www.betterroads.com/info
Untitled-17 1 6/27/13 8:32 AM