Bexhill Down Leisure Hub

Masterplan Feasibility Report

Revision C

September 2014

Page 2: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

2

Jersey Waterfront is a combined community leisure and

commercial development and is seen as a benchmark facility

for the Bexhill Down Leisure Hub.

Page 3: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

3

Contents

Executive Summary

The Existing Facilities

1. The Site

1.1 Site Location and Area

1.2 Site Zones and Ownership

1.3 Site Analysis and Opportunities

1.4 Site Planning and Highways

1.5 Site Issues and Constraints

2. Sport Evaluation

2.1 Facility Models

2.2 Swimming and Sports Hall

2.3 Schedule of Accommodation

2.4 Operational Cost

2.5 Quality Benchmark Rates

2.6 Preliminary Budget Costs

2.7 Supplementary Accommodation

2.8 Consultations

3. Commercial Evaluation

3.1 Commercial Value

3.2 Commercial Opportunities

4. Site Masterplanning

4.0 Site Options

4.1 Option 1 Layout Testing

4.2 Option 2 Layout Testing

4.3 Option 3 Layout Testing

4.4 Recommended Masterplan Solutions

5. Design Principles

5.0 Leisure Centre layout Principles

5.1 Option 1

5.2 Option 2

5.3 Option 3

6. Financial Appraisal and Delivery Options

6.1 Financial Summary

6.2 Procurement options and recommendations

Appendices

1 Leisure Centre Operational Financial Business Report

2 Environmental Agency Site Advice

3 Feedback from User Groups

4 Retaining the Drill Hall in the Masterplan

Page 4: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

4

VISION

Leisure Destination

Regeneration, Participation, Iconic, Social etc

LEISURE CENTRE

Target

Operational Proit less Rye Deicit= Revenue Proit

COMMERCIAL

Target

Site Value + Grants

= Total Available Capital = Sports Centre Project cost

Project Balance

This report compiled by FaulknerBrowns Architects, FMG (leisure consultants) and Wrenbridge Sport

(development advisors) reviews the feasibility of a new Leisure Centre and Masterplan Development at Bexhill

Down together with associated outline inancial advice.

The report includes our advice and recommendations in response to the brief set by RDC to include:

• Options evaluation on the nature and extent of facilities that could be provided

• Site Masterplanning to establish development options and layout principles

• Sketch scheme preparation and outline budget costs

• Financial Appraisal and delivery options

The report provides a summary of the project options and associated costs for a development which maximises the potential site value in balance with creating a ‘leisure destination’ by identifying:

• Optional facility mixes for the leisure centre with their associated varying range of project costs.

• Potential different commercial demand mixes for the site noting that at this early stage it is impossible to tie

down deinitive commercial demand.

• Optional masterplan solutions which acknowledge the site constraints and provide options dependent on the

commercial mix that the site and project may attract.

Executive Summary

A key requirement of the report was to explore the

potential vision to combines a new leisure centre with

potential commercial leisure, hotel and restaurant

developments to create a true leisure destination at the

site in a balance with exploring the feasibility to create a

facility which:

1. Explores the potential to deliver the leisure centre

cost neutrally by being inanced by the commercial development.

2. Operates cost neutrally or creates a net operational

proit to the Council taking into account the operating deicit of Rye Sports Centre.

In summary the report identiies that it is feasible to accommodate a new leisure centre on the Bexhill Down

site and that the vision to create a ‘destination’ may be

possible though to a greater or lesser extent dependant

on commercial demand and dependent on the balance of

maximising value oppose to destination vision.

Page 5: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

5

However, the key overriding decisions at this stage are inancial. In summary the report suggests the following in regard to the two key project requirements:

1. Potential to deliver the leisure centre cost neutrally by being inanced by the commercial development:

• The project cost for the leisure centre would vary between £11 - £16m dependant on the facility mix

• The commercial value that could be delivered on the site varies between £5m - £7m dependant on demand (not incorporating any overage)*

Therefore there will be a funding gap of at least £6m for a basic scheme though more realistically, to achieve the

core scheme, approximately £8m and the overriding decision for the Council is how, and what level of, additional

grant funding, inancing and capital contribution can be secured.

2. Operates cost neutrally or creates a net operational proit to the Council taking into account the operating deicit of Rye Sports Centre:

• A new combined wet and dry leisure facility should create a net revenue proit to the Council of a minimum £145k up to £225k for an core facility model.

• It is understood from RDC Oficers that the Rye Sports Centre deicit could potentially be removed by placing the facility in a trust.

Therefore the Council could consider whether the facility revenue proit can be inanced to meet some of the capital contribution that will be required and as the proit increases with the facility mix whether this can be used to deliver the aspirational set of requirements.

* see page 17 for detail of potential overage.

Page 6: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

6

To move the project forward it is advised that the following areas of additional study and

conirmation are required:-

Capital Contribution - to deine level of capital contribution possible which together with the commercial value will conirm the affordable facility mix and building size to include:

• Progress funding opportunities (Sport England, Other sports / regeneration funding)

• Negotiation with Land Securities PLC on Bexhill Swimming Pool site early redemption

• Other Council receipts (North East Bexhill housing contribution, etc)

• Financing of sports facility operational proit

Operation – to conirm potential operational proit

• Removal of Rye Sports Centre deicit• Review of operational business options

• Implications and options to cover temporary loss of the existing dry sport facility and

Drill Hall

Site Acquisition

• Agreement with ESCC on high school site acquisition principles including any overage

and any speciic requirements to be provided by RDC such as carparking for King Offa Primary School.

• Seek an ‘agreement in principle’ for the Drill Hall site acquisition including the exact

requirements for a replacement facility and any associated operational/maintenance

agreements.

Site Costs and Due Diligence - conirm the site costs and constraints to development

• Feasibility and cost (if possible) of moving the existing Egerton Brook culvert which

runs below part of the site which will conirm viable masterplan solutions.• Conirm exact location of culvert, size, depth and construction.• Explore and negotiate easement distances / options with the Environmental Agency.

• Feasibility and cost of relocating the existing sub-station on the SW site corner.• Agree with the Skills Centre ammendments to car park access, fencing removal and

potential to amalgamate car parking.

• Quotations on site clearance / demolitions

• Topographic and Ground investigation surveys of the site

• Other high level reviews to establish any further investigative surveys required

including Ecology and Asbestos

Procurement and Legals

• Agree the preferred procurement route.

• Establish the Council liabilities for VAT in regard to the procurement method and

commercial development.

Page 7: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

7

The following aspects could be conirmed by procuring a detailed project study which takes the feasibility study forward once the above actions have been conirmed:-

Stakeholder and Public Engagement

• Start formal discussions and engagement with Sport England, the ASA and other

interested stakeholders.

• Commence detailed public and user group engagement to deine detailed project requirements.

New Leisure Centre

• Agreement to preferred facility mix (subject to capital contribution)• Conirm supplementary accommodation to be provided.• Conirmation of skate/bmx park requirement

Commercial / Destination

• Conirm the extent and type of commercial leisure demand and associated car parking requirements which will conirm masterplan solution.• Detailed assessment of commercial demand (will assist in deining preferred masterplan solution)

• Review of preferred mix in regard to value and destination vision

Car Parking

• Detailed transport assessment of car parking requirements based upon site

development options.

Detailed Masterplan and Speciication

From above a detailed masterplan could be more conidently set which conirms the Council’s project parameters and requirements for a tender in regard to the sports facility, commercial mix and design (layout, appearance and quality) together with

speciications outlining required inishes, services and sustainablity approaches.

Page 8: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

8

Sports HallReception

Fitness Gym

Entrance

Spin Studio Wet Health Suite

Page 9: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

9

Existing Facilities

The feasibility study requirement is centred around providing a new combined wet and

dry facility to replace both Bexhill Leisure Centre and Swimming Pool. Both facilities are

currently operated under contract by Freedom Leisure on behalf of RDC.

Bexhill Leisure Centre

The existing dry sports centre opened in 1990 and is now 24 years old. The facility is well

used though is now reaching the end of its natural lifespan having been heavily modiied during its life with the many compromises this brings.

The facility provides the following activities:-

• 4-Court Sports Hall c.18 x 32m with viewing gallery• 3no Squash Courts with viewing gallery

• Fitness Gym c.200sqm (suficient for 40 stations)• A Wet Health area with sauna, changing and relaxation area

• Spin Studio (training room)

• 2no Studio Spaces (provided adhoc as part of former bar and meeting room space)

A small climbing wall is located next to the itness area though this is insuficient in size to satisfy current safety regulations and is now unusable.

Externally the sports facility has a 60 space car park and a formal skateboard park.

Refurbishment and Extend Potential

An option for the site is to remodel and refurbish the Bexhill Leisure Centre to provide

the dry accommodation and extend to provide the swimming pool and any additional

requirements.

For the following key reasons this option has been discounted:

• The building design and layout does not readily lend itself to being modiied or extended to encompass a swimming pool facility particularly the central location of the

foyer and proximity of adjacent site boundaries.

• The building design is unattractive in appearance and the internal accommodation is of

a poor standard in comparison with modern quality expectations of a public facility.

• The internal activity spaces are not to current sporting standards and requirements and

could not be re-modelled to provide these cost effectively.

• The extent of refurbishment and remodelling required would be signiicant and would require the facility to satisfy current building regulations including adopting

current accessibility (part M) and energy eficiency regulations (Part L) which would be challenging and not cost effective..

In summary with the extent of changes required it would be more cost effective and offer

better value-for-money to replace the existing facility with a new modern facility which provides the level of quality, lexibility and eficiency expected.

Page 10: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

10

Fun area and FlumeBexhill Leisure Pool

Shallow Water Toddler and Beach AreaLane Pool

350sqm Water Area

Bexhill Leisure Pool Layout Plan

Page 11: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

11

Bexhill Leisure Pool

A new leisure facility would replace Bexhill Leisure Pool at Ravenside Retail Park. The

facility beneits from ease of access, a large car park and links to the commercial retail and food offers at Ravenside.

Bexhill Leisure Pool is c.1600sqm and has a 350sqm of water area conigured as a 25m 4-lane L shaped pool leading to a beached shallow toddler area. The pool has a wave machine and a separate lume.

Whilst the existing facility is very well used, and has a variety of water features, it is not to

current user expectations or sporting standards including:

• Pool surrounds are very narrow with numerous changes in level which do not satisfy

current accessibility regulations.

• The pool has raised channel edges oppose to the modern deck level access and transfer

channel arrangement.

• Changing is inadequately small and inlexible to effectively accommodate different user groups.

• The pool is undersized (4 lanes) to satisfy the user demand - particularly for learn-to-swim classes.

• The itness mezzanine level is under used and unattractive which is relected in the operational feedback on use.

Ownership

Bexhill Leisure Pool is occupied by RDC under a lease from Land Securities Group plc who

own the freehold of Ravenside Retail Park. The lease is for a term of 105 years from June

1989 at a peppercorn rent, with mutual break clauses at the 35th and 70th years, the irst break date therefore falling in June 2014.

If the break is exercised by the landlord, then the tenant will have the option of either:

a) relocating elsewhere on the development in a new facility built to a similar speciication at the landlord’s expense; or

b) receiving compensation from the landlord equivalent to the cost of constructing a new

facility elsewhere, built to a similar speciication

If the break is exercised by the tenant, no compensation is payable.

If the Council were to surrender the lease this may enable the Council to negotiate a

sharing of the potential increased value of the site that would be created by facilitating an

alternative use at that location, subject to planning considerations.

Page 12: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

12

Aerial view of the Masterplan site. King Offa Primary School, the Drill

Hall and the existing Dry Sports Centre form the existing frontage to

the A259.

Page 13: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

13

The Site

Page 14: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

14

Site Location

Extent of Masterplan Development Site

A259

Bexhill Down

Ro

ute

of

BH

LR

Lo

nd

on

Rd

High SchoolRefectory

Dow

n Road

The Site

De La Warr Pavilion and Seafront Esplanade

Town Centre

High SchoolSite

SkillsCentre

Nursery

King OffaPrimary School

Playing Field

Dry SportsCentre

DrillHall

Ba

nc

roft

Ro

ad

SkatePark

Newlands Road

Bexhill Down

to west Bexhill /

Eastbourne

BHLR to

Hastings

to east Bexhill

Little Common Road

Belle Hill

Page 15: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

15

Site Location1.1The proposed development site for the masterplan and new leisure facility is located to

the east of Bexhill Down at the key prominent junction of Little Common Road (A259) and the new BHLR (Bexhill Hasting Link Road).

The key aspects of the masterplan area are:

• The developable area consists of the previous High School site, the existing Dry Sports

Centre and the MoD’s Drill Hall.

• To the east of the site centre is the new Skills Centre and to the western edge King Offa Primary Academy, a new Nursery building and the school playing ield all of which are to remain and should be fully integrated into the masterplan principles.

• To the NW corner the High School Refectory building still exists which will be

demolished as part of the masterplan.

• Westwards the masterplan area has strong connections to Bexhill Down and could be

perceived as an extension of the parkland.

• The north and east is bounded by residential districts and to the south the town centre.

• The central High School site is currently rented as a motorcycle training area.

• A formal skate board park is located to the NW corner of the dry sports facility.

• The site has only one vehicular entrance off Down Road which serves the Dry Sports

Centre car park, located to the south and east of the building; the Drill Hall car park area

to it southern frontage; and the primary school car park area to the rear of the Drill Hall.

• The Skills Centre is accessed from the site and has dedicated car parking within its site

boundary.

• The site is axially to the end of the vista up London Road from the town centre and, in

the context of the overall town, is a clear northern counterpoint to the town centre with

the De La Warr Pavilion and the seafront esplanade to the south.

The masterplan area is approximately 5.83 acres.

Page 16: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

16

Page 17: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

17

Site Zones and Ownership1.2The masterplan developable area has 3 principle zones identiied by the drawing opposite provided by RDC. For the purposes of this report the zones are referred to as follows:

Zone 1 – is the ‘frontage zone’

Zone 2 – is a linear ‘central zone’ set between the skills centre and the nurseryZone 3 – is a modest area to the ‘NW corner site’.

Site Ownership

The masterplan area is currently under three ownerships as identiied on the drawing below.

1. RDC own the existing Leisure Centre site (pink area to SE)2. The MoD own the Drill Hall site (blue frontage area)3. The remainder of the site, previously the High School, is currently owned by ESCC but RDC have an agreement in principle to take ownership (remainder of pink area)

The current agreement principles of acquisition of the High School site are subject to an overage agreement between Rother District Council and East Sussex County Council. Presently it is suggested that this agreement may be subject to 50% overage for any value development of the site creates above the agreed loor value of £865k.

It is understood that the MoD are prepared to relinquish their site if an appropriate replacement facility can be provided by RDC. RDC need to seek an ‘agreement in principle’ for the acquisition of this site which is fundamental to the project and masterplan.

Page 18: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

18

Skills Centre King Offa Primary School Nursery Facility

Vacant land next to Leisure Centre. Skate Park and Skills Centre Substation

A259 frontage

Page 19: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

19

Site Analysis and Opportunities1.3The key observations on the site which inform the site masterplan evaluations are as

follows:

• The site offers the potential to create a gateway development to Bexhill with commercial

and leisure facilities having active ‘shop window’ frontages to the SE corner onto the

key junction of the A259 and the BHLR and continuing along the southern edge which is prominent from approach up the A529.

• The masterplan area has a strong relationship to Bexhill Down and currently feels part

of the park. The Primary School and playing ield feel particularly connected to the park space as does the frontage area which contains some signiicant mature tree outside the developable area on the southern frontage.

• The site is served by a single vehicular entrance and road interface off Down Road at the

junction with the A25 which then serves the school, nursery and Skills Centre in addition to the requirements of the new development.

• It is noted that the new BHLR will quickly rise to irst loor level as it leaves the A259 junction to cross the underpass into the site and that the site will generally be viewed obliquely by drivers (opposed to the southern frontage which will be seen from the junction and up London Road)

• To the east side of the BHLR a new bus interchange is being created which will link to the

masterplan site for pedestrians via the underpass.

• The southern frontage orientation lends itself to address the sun path.

• A substation exists to the important SE corner of the site which would need to be

relocated as part of the masterplan development.

• There are four footpath linkages to the site which should remain but could be adjusted by the masterplan - linking to the northern residential district Bancroft Road, east-west across the site between the school/nursery and to the new BHLR underpass, and from the NW

corner site to Bexhill Down.

• The site is generally lat with approximately a 1m fall west to east though no detailed topographic data exists and will need to be carried out to inform any detailed development

of the masterplan.

The masterplan area contains six existing buildings as follows:-

• King Offa Primary School - the school is a feature building which should inform the masterplan solution particularly in regard to the functional requirements of child pedestrian

safety and parent and coach drop-off; and also the axial design of the building with its feature central clock tower entrance.

• The nursery is newly built and its integration and access should be considered by the

masterplan.

• The Skills Centre (shown overleaf) is to be retained with an area north of the centre

allocated by ESCC for future expansion.

• The existing Bexhill Leisure Centre is to be demolished.

• Drill Hall - the masterplan assumes that the MoD facility is demolished and the accommodation reprovided by either a new facility as part of the masterplan development

or elsewhere (see overleaf)

• High School Refectory - the refectory will be demolished though feasibly could be used to provide temporary accommodation for either the MoD or Sports Centre during site

development.

Page 20: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

20

Skills Centre

The newly built Skills Centre will remain on the site and consideration should be given to improving and

integrating the frontage, which includes business spaces currently containing a bistro cafe and hairdressing

salon, which could add to the mix and vibrancy of the masterplan vision.

The building is a basic portal framed structure with a clean industrial look and feel with vehicular service access

space to facilitate the teaching programmes.

The Skills Centre and associated car park is currently fenced off from the masterplan site.

The Council need to explore the potential with ESCC to integrate the Skill Centre more comprehensively into the

masterplan including removing fencing, and amalgamating the car park with the sports centre car park together

with the potential opportunity to extend this car parking northwards into the Skills Centre ‘expansion zone’.

Drill Hall

The Drill Hall forms a joint MoD ACF (Army Cadet Force) and ATC (Air Training Corps) training centre.

The majority of the Drill Hall building is simple brick structures. However, the frontage is quite grand and whilst not of substantial architectural value may have sentimental value particularly for it’s historic links to the war.

The MoD have advised that they would be prepared to give the building and site to RDC in exchange for a new

facility.

The existing Drill Hall building is currently oversized (c.820sqm) for its needs and is in poor condition. The layouts opposite show the existing building and an example layout of a typical benchmark new ACF/ATC combined

facility at Gravesend, provided by the MoD, which is approximately 350sqm.

The MoD have highlighted that a new facility would require to have some visual presence though are happy in

principle for the facility to be part of a new leisure centre with appropriate segregation of use when required

solely by the MoD.

The accommodation required includes meeting and classrooms which could be utilised by the leisure centre

during daytime periods when not required by the MoD. The ‘hall’ space is a modest studio sized space (c.9x7m) used by the MoD for drill marching practice 3 - 4 nights per week and therefore again could be lexibly shared.

The key dedicated areas of the MoD accommodation would be the general stores, band instrument storage,

ofice accommodation, a practice ‘light deck’ and the required iring range and associated ammo stores.

The iring range requires 2-3 lanes which would equate to an overal width of approximately 4m and 20-25m length. This could be provided as an underground pipe system which may allow a more eficient layout and cost effective solution. The armoury would be via a Home Ofice approved ‘arms box’ and small magazine safe.

It is highlighted that whilst the above has been discussed ‘in principle’ a formal agreement should be sought

which also deines the responsibility for ongoing maintenance, sharing of accommodation, a detailed brief of requirements, project costs including FF&E, and temporary accommodation during development.

The presumption of this report is to demolish and replac the Drill Hall. However, should part, or all, of the

Drill Hall be retained then this can can be accommodated in some of the masterplan responses or as part of a

refurbishment and extend approach to the existing dry sports facility. This is shown in appendix 4.

Page 21: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

21

Existing Drill Hall Layout Gravesend Facility

Artist’s impression of how the Drill Hall frontage could look if refurbished.

Page 22: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 23: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

23

• The north west corner site should be provided with a public footpath link through to

Bexhill Down.

Highways

ESCC have advised that consideration is given to a mini roundabout to form access into

the site given the likely increase in trafic entering the site. It would also offer an element of trafic calming which would be beneicial to both school related trafic and school children / visitors walking / cycling to school or proposed leisure centre.

It has also been advised that the proposed development of the site would be unlikely to

create any net impact on the road infrastructure above the previous high school use which

would require any further signiicant improvements or changes necessary.

ESCC have conirmed that the developing proposals would not attract an off-site inancial contribution but rather improvements pedestrian / cycle routes across / within the site

which would be required as part of the masterplan development.

Car Parking

Any detailed development of the masterplan should consider a lexible shared parking use for the school and sports facility given that the peaks (i.e. busiest times) are unlikely

to conlict with one another.

The design of the car park / vehicular access would need to accommodate school drop off

and turning areas for coach parking.

In regard to the proposed development options ESCC have provided the following parking

guidelines:

Swimming Pools and Sports Centres (D2) - 1 space per 10sqm of each usable sport area (e.g. court, hall, pitch etc) as well as spectator spaces and levels of staff. This would

suggest based on the core sports activity areas (c.1750sqm) 175 spaces are required.

Cafe/Restaurants (A3) - 1 space per 5sqm of usable space, plus one per two full time staff working at any one time. This would suggest based on 350-750sqm of public space (60% of GFA) 70-150 spaces are required.

Hotel (C1) - 1 space per bedroom plus 1 space per two full time staff likely to be working at any one time. It is likely that the Leisure and Hotel will have similar peak periods and

therefore the hotel may require 80 - 100 spaces.

Primary School - Existing parking provision should be reprovided though potentially ‘lexible’ with sports parking. RDC need to seek conirmation of staff parking requirements.

Residential - 1 space per small dwelling. 2 spaces per larger dwelling

The above guidelines provide a high level assessment of potential car parking

requirements. However, a green travel plan and transport assessment of the existing

transport and parking infrastructure should be considered which seeks a principle of

minimising the use of cars particularly in respect to the new bus interchange proximity.

It is advised that generally a leisure centre of this type and edge of town centre location

would usually be provided with around 125-150 spaces. Noting the existing dry sports has c.60 spaces.

Based on the above for the purposes of masterplanning we advise that a car park of 150

spaces has been assumed without hotel/restaurants. With a hotel and restaurants the

guidance suggests that a car park of 250+ spaces may be required. All residential has

been considered with a minimum of 1 parking space per apartment / townhouse.

Page 24: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

24

Flood Zone 2 - land assessed as having between a 1 in 100 and 1 in

1,000 annual probability of river

looding (1% – 0.1%), or between a 1 in 200 and 1 in 1,000 annual

probability of sea looding (0.5% – 0.1%) in any year

Flood Zone 3 - land assessed as having a 1 in 100 or greater annual

probability of river looding (>1%), or a 1 in 200 or greater annual

probability of looding from the sea (>0.5%) in any year

Surface Water (30 yr) - land assessed as having 30, 100

and 1000 year risk of surface

water looding based on existing assessment of building and

permeable areas.

Line of Existing Culvert provided by the Environment Agency

Flood Zones as provided by the Environment Agency

Page 25: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

25

Site Issues and Constraints1.5The following site issues and constraints should be explored further as part of any

detailed development of the project and masterplan:

Flood Risk

The maps opposite provided by the Environment Agency highlight that the frontage of the

masterplan site sits beside, and partly within, lood zones from one of the town’s main surface water courses to the sea - Egerton Brook.

To protect the development from risk of looding the buildings and site would need to be raised and mitigations may be required such as sustainable SuDS drainage systems.

In progressing the project a full FRA (lood risk assessment) would be required to inform the masterplan development and the detailed requirements to prevent any lood impact from development on surrounding properties. The FRA may need to take into account the

impact of the new elevated BHLR which presumably may reduce lood spread eastwards and therefore potentially increase risk westwards.

Culvert

The plan opposite provided by the Environment Agency shows the route of the culverted

section of Egerton Brook which passes beneath the Bexhill Leisure Centre site and then

cranks diagonally across the Down Road junction. The route of the culvert effectively cuts the SE corner off the prominent frontage site. As a natural water course the culvert is

owned and maintained by the EA.

The EA recommend that no buildings or structures (including fences) are undertaken

within an 8m easement zone of the culvert line to allow for maintenance and replacement. This would mean either the masterplan has to respect the 8m easement zone, the easement zone is negotiated down, or the culvert would require realigning. Taking into account the stepping route and road junctions any amended route, to avoid the masterplan area, may not be a viable. It is advised that it may be possible to bridge over

the cuvert as long as appriate access is provided to maintain and replace.

The EA have conirmed that a CCTV survey of the culvert was undertaken in 2009 which highlighted the need for repair works between the inlet and the irst manhole adjacent to the dry sports centre. Remedial works were carried out to the failing section in 2010 and

a further survey was completed in 2011 to determine the condition of the repaired section

of the culvert. The survey showed that some sections of the pipe were deformed but the

overall condition is fair. The culvert is programmed to be re-surveyed in 2017.

It is understood from Council Oficers that the culvert route may have hydrostatic storage pumping stations along its route which should also be investigated.

Informal advice from engineers suggests that realiging the culvert may be possible to

the SE corner of the site to open up the potential of this prominent frontage corner. The

size and depth of the culvert is unknown though assuming 1.5m diameter and 1.5m depth a cost in the region of £450-£500/lm plus £15k for forming connections would be an appropriate allowance. The extent of realignment would suggest an overal allowance of

£100k may be appropriate.

It is highlighted whilst the cost of realigning is relatively modest this wuold need to

be agreed with the EA who may use the opportunity to revert back to an open ditch or

improve the route to prevent low restrictions upstream and lood risk. Additionally, as above, the impact of the new BHLR may have not been assessed in regard to lood risk.

It is noted that the negotiations with the EA may be protracted, and if realignment were

acceptable, attaining design approval may take 8-10 weeks, assuming no signiicant legal hurdles.

Page 26: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

26

Water Mains around the site provided by Southern Water

Lines of Existing Gas Mains

Sewer Routes around site as provided by Southern Water

Page 27: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

27

Utilities

• Water - Southern Water have conirmed that the primary water mains and foul drains are routed outside the site to road lines. It is assumed that redundant dead-end spurs may exist from the High School. As part of any pool project the discharge capacity into the foul drain will need to be established to inform costs in regard to pool backwash.

• Electric - No information available. It has been assumed that the existing substation to SE corner can be moved which will require conirmation.

• Gas - RDC have provided the existing gas mains drawings shown opposite which shows a mains routes following the culvert line and a run up the centre of the site to the old High

School site.

It is advised that the Council should carry out a full due diligence review of the site(s)

including seeking and procuring legal searches, surveys (ground investigations,

topographic surveys, asbestos surveys), Services investigations (full statutory services

infrastructure drawing and capacities) and planning (ecology, trafic) of the site.

Page 28: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

28

The aspiration is to create a sports facility which

creates a lexibility and a balance between leisure and formal sport as Horsham Pool by FaulknerBrowns.

Page 29: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

29

Sports Evaluation

Page 30: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

30

Facility Model Basic Core Supplementary

Swimming * **

Dry Sports Hall * *

Fitness Gym (350sqm) Studios (2no) Sauna / Steam Spa Facility Soft Play Creche Squash Climbing Bowling (6-lane) Retail * Larger

** Larger again

Squash and Soft Play are provided in the Core Model

Page 31: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

31

The Facility Models2.1For the purposes of identifying and testing both operational and capital affordability

of the leisure centre a range of facility models have been established, as illustrated

opposite, for three potential scenarios:-

• Firstly a ‘basic’ model which is the absolute minimum that could be provided to create a

traditional wet and dry leisure facility.

• Secondly a ‘core’ model which includes larger activity areas and secondary functions

where there is a proven demand or are activities already provided within the existing

facilities to include soft play, squash and a small retail area.

• Additionally a list of ‘supplementary’ facilities have been identiied which may increase the attraction / draw to the facility and assist in creating a true ‘destination’ to include

a creche, a spa facility, climbing, bowling and increased pool waters. We highlight

that some of these activities could be provided as part of the sports centre operation,

potentially leased to a specialist operator, or alternatively provided separately by the

commercial sector.

Within Appendix 1 we include the ‘operational inancial business report’ compiled by FMG for the sports facility. The irst part of this report evaluates the nature and extent of facilities which should be provided against supply and demand analysis of the Bexhill

catchment area, feedback from Sport England’s facility planning modelling for the area,

and assessment of the operational performance and feedback of the existing wet and dry

facilities.

In summary this analysis concludes with the following guidance which has been

interpreted in the models:-

Swimming

Sport England’s facility planning model suggests c.400sqm water area demand for

Bexhill. The supply and demand assessment of the existing centre usage, including

data from the current operators, suggests 500sqm of water area would be sustainable

and justiiable particularly to satisfy demand for learn-to-swim classes. The basic brief therefore accommodates 400sqm water area and the core 500sqm. The supplementary

increases the area further to 600sqm as detailed overleaf.

Health and Fitness

Using a catchment area of 3 miles the total itness demand is c.1850 users. Using industry standards this establishes a itness gym requirement of c.74 stations. It is highlighted that the current gyms within the existing Bexhill dry sports and swimming facilities provide

90 stations though are not used to capacity. For all models a 350sqm gym has been

used which would provide 70 - 85 itness stations. The supply and demand analysis also suggests 2no studios are provided.

Sports Halls

The existing hall at Bexhill sports Centre is at 100% capacity at peak times. The halls at the High School and College at 55% and 58% respectively. Sport England would expect a sports hall to be provided as part of any new leisure development. For the briefs a 4-court hall has been suggested as there is no justiiable demand for a larger 6-court hall. The exact size of the 4-court sports hall is discussed overleaf.

The checklist opposite summarises the key activities included in each facility model

tested.

Page 32: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

32

Basic Brief

400sqm water area

6-lane 25m pool and 100sqm learner pool

OR

8 lane 25m pool

Core Brief

500sqm water area

6-lane 25m pool and 100sqm learner pool with modest

seperate leisure pool

OR

conjoined to learner poolOR

conjoined to main pool.

Supplementary Brief

600sqm water area

8-lane 25m pool and leisure pool.

OR

Full leisure pool

Existing Bexhill Swimming Pool

(to same scale)

350sqm water area

An example of a potential mix for the core model with 500sqm of water area would be Stockton Pool which

includes an inherent lexibility between leisure and lane swimming through the programming of a leisurised 6-lane pool, separate learner pool with movable loor and a modest freeform area for toddlers, infants and juniors.

Page 33: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

33

Swimming2.2The range of facility models includes increasing the swimming water area incrementally.

For a wet sports facility the support accommodation and building area is generally a

factor of the water area. For the range of briefs from basic to supplementary the water

area has been increased from 400sqm to 500sqm to 600sqm with a proportional increase

in support, changing and plant. This range of water areas has been tested in the business

report in regard to operational performance.

The diagrams opposite illustrate some options for how the varying area of water could

be conigured and we highlight some of the key considerations in determining the water coniguration:-

• The amount of leisure pool to be provided in lieu of ‘traditional’ lane swimming or learn-to-swim pools.

• The amount of ‘leisurisation’ to be included either within the main pool or as part of a

separate leisure waters noting that the existing swimming pool has a wave pool, shallow

beached toddler area and a lume.

• Leisure Variety - providing fun features to cater for the various age groups of toddler wiht parents, infants, juniors and through to teenagers.

• Water conidence - it is good practice to provide a range of water depths from shallow waters for toddlers (300mm), to learn-to-swim / infants (600mm), to swim classes (900mm) through to full depth waters for experienced swimmers generally 1.8m-2.0m for community pools.

• The lexibility of the 25m pool - it is suggested to maximise lexibility that a movable loor could be provided to one end or alternatively along one side to allow variable depths to suit swimming programmes and aid a water conidence transition from shallow to deeper waters. However, it is highlighted that a movable loor would restrict the ability to provide leisure water features.

• Alternatively a traditional ixed 25m pool tank could be provided, with depths ranging from a shallow end c.0.9m then sloping down to a c.2.0m deep end, and a movable loor could be provided to the learner pool.

• It is highlighted that the ASA have advised a preference for the water area to be

conigured as either an 8 lane pool or a 6 lane and learner pool to facilitate learn-to-swim classes.

At feasibility stage the water coniguration does not impact signiicantly on the outline building capital cost assessments. However, we highlight that the outline costs would

require additional budget to cover the cost of a movable loor and lume each of which can cost in the region of £250k.

In discussion with RDC, and to satisfy the supply and demand for swimming classes, it is

suggested that a mix of traditional water and leisure is provided to provide similar mix to

the existing pool offer. It is suggested that a separate learner pool would be operationally

helpful to provide shallow water area for water conidence and learn-to-swim classes and therefore ‘freeing-up’ the main pool for either lane swimming or leisure. A good example of a water coniguration that may be appropriate is Stockton waters as shown opposite.

Page 34: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

34

Page 35: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

35

The existing sports hall within Bexhill Leisure Centre is 32 x 18m which was the previous

Sport England standard size for a 4 badminton court hall. The current Sport England recommended standard size is now a larger 34.5 x 20m.

As per the ‘basic’ diagrams below the existing size will accommodate all the core sports at a recreational club level (badminton, volleyball, netball and basketball). The beneits of the new enlarged and ‘core’ size includes a full size netball court, ability to create two recreational volleyball courts and greater lexibility for providing coach and modest team bench areas to the hall side.

It is advised that the larger hall, as per the core model, should be targeted for inclusion.

The sports hall should be a minimum of 7.5m clear height.

A part of a detailed design process we suggest the design of the sports hall should

consider whether it is a ‘black box’ or whether natural light is to be introduced. As an

extreme it is possible, and common on the continent, to create ground level clerestorey

glazing around the hall to provide openness, visual permeability, and a ‘community’ hall feel oppose to a traditional ‘sports’ hall.

Sports Hall

Basic Core

Extract from Sport England Guidance

Existing Leisure Centre Layout

Page 36: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

36

Basic Core Supplementary Activities

Page 37: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

37

Schedule of Accommodation

The accommodation schedule for the facility models is summarised opposite.

The schedule has been benchmarked against equivalent facilities, compliance with Sport

England guidance and tested with layout plans. Appropriate allowances have been made

of 10% plant, 5% circulation, and 2.5% internal walls together with a modest 2.5% design contingency reserve.

The schedule highlights that for the facility models the GIFA would equate to

approximately:

Basic 4000sqm

Core 5000sqm

An assessment of the schedule, assuming that the facility is over two storeys, and taking

into account double height spaces, suggests footprint requirements of:-

Basic 3250sqm

Core 4000sqm

For the supplementary model total areas are provided for the additional activities which

may be included inclusive of the additional support accommodation allowances required.

In addition to the above area the Drill Hall would require an additional c.350sqm of

accommodation together with the underground iring range.

For the purposes of the feasibility masterplanning assessment a 4000sqm footprint has

been used for the leisure facility.

External Requirements

External to the new leisure facility the following requirements would need to be

accommodated:

• Carparking for the sports centre will require 5% accessible parking allocation in accordance with Sport England guidance.

• Cycle Parking (covered and uncovered)

• Parking and drop-off bays for coaches, school buses and mini-buses.

• Access for maintenance and deliveries including chemical delivery to the pool water

plantroom.

• Fire vehicle access to the building perimeter and ambulance access near to the irst aid point.

• Refuse area with appropriate refuse truck access.

The current site includes a skate / bmx park as part of the dry sports facility. RDC will be

reprovidng this facility but at this stage no decision has been made as to whether this will

be provided as part of the Bexhill Down site development or reprovided elsewhere.

2.3

Page 38: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

39

Operational Cost2.4The operational inancial business report within Appendix 1 establishes the following

operational costs for each facility model and concludes in the net income / loss to the

Council after operational management overheads and proit are taken into account:

• Sales (based on supply and demand analysis and review of current facility

performance)

• Employee Costs (generally 60% of operational cost with an increase of current stafing due to increased services)

• Premises Costs (appropriate allowance for maintenance and replacement costs)

• Marketing

• Other Costs

• Costs of Sales

• Finance, Overheads and Proit• Net Income / loss

The sales income and costs for the basic and core briefs are summarised opposite.

Both facility models are estimated to achieve a net income - for the basic model this is estimated as £144k and the core £226k.

The net income does not take into account the operating deicit of Rye Sports Centre which is currently £154k which would reduce / omit the potential proit. We have been advised that it may be possible to pass Rye Sports Centre into a trust to handover the

operational and deicit responsibility.

It is advised that the business modelling:-

• Is based on industry standard approaches to operation

• Is based on pessimistic assumptions in regard to sales

• Does not include any capital inancing of the building

The schedule opposite summarises the operational costs of the basic and core facility

models and demonstrates that each would provide a net proit to the Council after operational inance, overheads and proit are taken into account. It is highlighted that these igures are based on a fourth year projection which is assumed as a mature year.

Page 39: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

40

Example projects of a good quality benchmark leisure wet and dry community leisure facilities.

Example of the Sport England affordable model.

Page 40: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

41

Quality Benchmark Rates2.5For the purposes of deining a preliminary budget cost for the leisure centre a range of rates has been reviewed from the Sport England ‘affordable’ low-cost model to a high quality benchmark facility cost.

We advise that from midpoint to higher would be deliverable with design development

representing a medium to high quality facility, whereas the low-cost model would not achieve the project vision and would probably not allow a design to be delivered to the speciic site requirements.

Opposite we illustrate the Sport England ‘affordable’ low-cost model and good quality benchmark leisure facilities.

Affordable Models

Sport England ‘affordable’ models are based on basic, generally square, stand-alone facilities on a clean site – a more accurate terminology is low cost or budget models.

The affordable models are based on a basic external appearance and materials and

therefore do not allow for any signiicant architectural quality or bespoke design which in our experience is required to make these facilities a success in regard to creating

attractive buildings.

The vision for the Bexhill facility will be tailored to complement any commercial element;

be attractive, visually and socially engaging; and satisfy the site ‘gateway’ requirements.

We therefore suggest that Sport England’s ‘affordable’ model would not match the

required vision for Bexhill.

Cost Guidance

Sport England’s affordable models suggest the following building cost rates including

preliminaries, overheads and proits which we have rounded with an inlation factor to 2014:-

Swimming facility £1840sqm @ 3Q 2011 + 3.5% c.£1900 @ 2104

(6 lane and learner)

Dry sports facility £1200 @ 2Q 2012 + 3.5% c.£1250 @ 2014

(4 court hall, changing and H&F)

Combined wet and dry facility £1525sqm @ 2Q 2013 +3% c.£1575 @ 2014

(6 lane pool, learner and 4 court hall)

The Bexhill project is a combined wet and dry facility with an extensive health and itness offer we therefore suggest a rate of c.£1575sqm is representative of the low-cost affordable model.

In comparison for a bespoke high quality facility, from benchmarking similar facilities,

more appropriate rates would be in the region of £2600sqm for wet accommodation and £1500sqm for dry accommodation which equates to proportionally £2000sqm for the

facility mix.

For the preliminary cost plans we have taken a midpoint £1750sqm for the building cost

between the low and high rates. We believe this would represent the minimum rate that

would enable a appropriate facility to be delivered.

Summary

Sport England Affordable Mid Quality High Quality

£1575sqm £1750sqm £2000sqm

Page 41: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

42

Facility Model Basic Core Supplementary

(all)

Area 4000sqm 5000sqm 6500sqm

£sqm rate @£1750sqm @£1750sqm @£1750sqm

Building Cost 7.0 8.75 11.4

Car Park 0.4 0.4 0.4

Externals 0.5 0.5 0.5

SUB-TOTAL 7.9 9.65 12.3

Client Contingency 10% 0.8 0.96 1.2

Site Abnormals 0.5 0.5 0.5

CONSTRUCTION COST 9.1 11.0 13.9

Project Fees 12% 1.1 1.3 1.7

FF&E Allowance 0.5 0.5 0.5

PROJECT COST £10.7m £12.8m £16.1m

Say, £11m £13m £16m

Note if £2000sqm is used for the building costs the overall Project Cost would be:

£12m £14.5m

The above costs do not include allowance for the Drill Hall accommodation:

350sqm @ £1500sqm, contingency, fees, FF&E say, £750k

Page 42: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

43

Preliminary Budget Costs2.6The cost plan opposite provides a preliminary assessment of the project cost for the new sports centre models.

The building cost is based upon the £1750sqm rate described in section 2.5. The impact on the overall project cost is shown if a rate of £2000sqm is required.

An allowance for car parking is shown based on a rate of £2500 per space for surface parking x 150 spaces, c.£400k, and external works. Together these represent c.10% of the build cost which is a common allowance for the immediate realm to a sports centre, utility connections

and drainage. We highlight that this allowance may not fully allow for the enhanced public

plaza as part of a larger commercial development.

10% has been allowed as a client contingency. The level of contingency is dependent on

the attitude to risk and can vary from 5% to 15%, or more. We advise that 10% is a modest allowance at feasibility stage which allows for a level for design reserve. As the project design develops it would be usual to review whether the level of contingency can be reduced.

An outline allowance for site abnormals has been included for the known site issues-

• Demolition of Drill Hall and the existing dry sports facility

• Site Clearance and preparation to sports centre site

(excavation, temporary works, removal of obstructions)

• Floodrisk mitigation to sport centre building

• Sub-station relocation • Re-alignment of Culvert (£100k)

We highlight that this allowance should be tested and at this stage and is unlikely to cover the

cost for the greater masterplan area including general site clearance, demolishing the high

school refectory, removal/replacement of fences, etc.

Based upon the building brief and site issues the total construction cost range is shown for the

facility models.

An allowance for design and professional project fees is generally in the region of 12% of construction cost.

An allowance for FF&E is estimated to include for loose client supply pool and sports

equipment, furniture and itness equipment. It is highlighted that some equipment particularly the itness equipment may be leased or inanced as part of the operational costs which may reduce this cost.

The total project cost range is shown noting that the supplementary total of £16m is only if all additional activities are included.

The cost for the Drill Hall accommodation is shown separately which would be an additional

cost to the totals.

We advise that the preliminary budget costs excludes the following which would require

further detailed review:-

• Inlation beyond mid-2014 • VAT (including implications of any commercial development)

• Land acquisition cost

• Utility diversions (including culvert)

• Asbestos removal

• Any off-site works (incl. highways) • Section agreements / contributions

At this early design stage the building cost is preliminary and would vary modestly between

the alternative masterplan arrangements though at this stage this cannot be assessed

accurately and would not signiicantly change the overal inancial picture. In particular we highlight that building to the southeast may have a modest premium due to the lood mitigation and visual prominence though this may be offset by offering a more attractive

facility with increased throughput and the revenue this delivers.

Page 43: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

45

Supplementary Accommodation2.7The schedules opposite summarises the break down of the operational costs (top) and the

additional building and equipment capital costs (as section 2.6) that would be required

individuallly for each of the identiied potential supplementary activities if provided by the Council as part of the sports facility development.

The summary suggests that bowling could potentially ‘wash its own face’ if the proit inanced the capital cost whereas the increase in swimming provision would require a signiicant capital expenditure for no revenue return.

The costs include the following assumptions and as detailed in the business report the

following operational impacts:

Leisure Swimming

To provide an additional 100sqm of water area, a total of 600sqm water area, with a more

‘leisure’ focused offer together with associated changing and support accommodation.

• Capital Cost: +400sqm @ £2600sqm + 10% contingency + 12% fees = say, £1.3m

• Operational Cost: Additional Stafing, premises, utilities and capital cost outweigh the marginal income increase. It may be possible to increase income and £ for £ will reduce the projected deicit but may create additional risk to the Council.

Spa Facility

To provide a modest relaxation area with treatment rooms, spa pool in addition to sauna and

steam room.

• Capital Cost: +100sqm @ £2600sqm + 10% contingency + 12% fees = say, £300k

• Operational Cost: As per spa consultant projection and adjusted for operator proit and premises costs.

Creche

To provide a small creche facility with WC, staff room and store integrated within the overal

sports facility.

• Capital Cost: +100sqm @ £1500sqm + 10% contingency + 12% fees = say, £200k

• Operational: Although limited hours, the cost of stafing will be very likely to exceed users and income projections. This is normal in creche operation.

Climbing

For a climbing / bouldering wall equivalent in size and area to Crawley’s K2 Leisure Centre.

• Capital Cost: +300sqm @ £1500sqm + 10% contingency + 12% fees = say, £600k

• Operational Cost: Assumes 15,000 visits per annum (300 per week) which may be

optimistic given the proile of demographics in the catchment area. The council may be able to negotiate with a specialist provider a rent but this is unlikely to cover the cost of debt

inancing. We would expect the net income £30k to be paid as a fee to the operate the facility (for example Hi Sport).

10-pin Bowling (see also section 3.2)

To provide a 6-lane hall space as part of the leisure centre i.e. controlled from the same reception.

• Capital Cost: +300sqm @ £1500sqm + 10% contingency + 12% fees = say, £600k

• Operational Cost: Uses an average £30k income per lane taken from performance data of similar facilities plus an additional £25k for other associated income. It may be possible to increase catering and party estimates to increase proit but could expose the Council to third party revenue risk. It would be preferential for an independent specialist provider to deliver

and manage the facility.

Page 44: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

46

Consultations2.8As part of this study the following parties have been consulted to inform the proposals

together with RDC Oficers, Planners and ESCC Highways as detailed within the report.

South East Reserve Forces and Cadet Association

SERCA attended a meeting at Bexhill Town Hall on 29th April 2014 to discuss the

principles of the Drill Hall land exchange with the MoD and provided an outline brief for

a replacement accommodation as discussed in Section 1.2. We advise that RDC should

continue this dialogue to create a formal agreement.

Freedom Leisure

As current operators of the existing facilities Freedom Leisure have provided their

operational data for FMG to assess as part of operational business report. Freedom have

also provided operator ‘on the ground’ advice on what they believe would create an

attractive and successful facility for Bexhill.

Sport England

Sport England have provided their facility planning modelling for the Bexhill area which

has been used and interogated as part of the operational business report. The project principles have been discussed with Sport England.

Sport England design and cost guidance notes have been consulted in reviewing the

facility models, costs estimates and outline feasibility design testing including:

• Swimming Pool Design and Guidance 2013

• Sports Hall Design and Layouts 2012

• Accessible Sports Facilities 2010, audits, checklists and standard layouts

• Affordable Swimming Pools 2012, Sports Halls 2012 and Sports Centres 2013

• Fitness and Exercise Spaces

• Car Parking and Landscaping

• Better Places for Sport

We highlight that in some areas Sport England guidance is excessive therefore in deining the schedule of accommodation we have adopted pragmatic assumptions based on

benchmarking Sport England projects and making reductions where, from our experience, this is usually acceptable.

Page 45: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

47

ASA

The ASA have advised that Bexhill has a good network of clubs which are well run and

attended. They advise that a new pool at Bexhill should focus on swimming development

and teaching opposed to competition (Bexhill does not register on the competition

information across Sussex).

However, the ASA have advised that Bexhill also has both a disability user group and a

squad structure with a competition focus who currently do organise their own galas so

it would be beneicial to integrate the ability to host community level competition which would include c.150 spectator seats and c.150 for competitors on poolside. Within

Sussex , Crawley K2, albeit not within close proximity to Bexhill, would continue to provide for higher level regional competitions.

The ASA recommend that a suitable facility for Bexhill would be a 25m 6 or 8 lane pool.

An 8 lane pool with a movable loor would provide great lexibility and an excellent community offer though a 6 lane pool with a large learner pool with movable loor would provide signiicant lexibility including accommodating simultaneous programming.

We advise that RDC should open up a formal dialogue with both Sport England and

the ASA to assist in the detailed development of the project particularly in regard to

establishing the potential and requirements to achieve any funding contribution.

User Groups

Consultations with user groups to assist deining and reining a design is paramount in regard to elements such as accessibility and functionality. For this building mix this

most commonly assists deining the most appropriate pool water coniguration, access requirements to the water, and lexibility of playing surface and heating/ventilation to the sports hall. However, at this early feasibility stage, particularly when the project inances are undeined, we advise full public engagement can undermine the process by setting undeliverable aspirations. Therefore as part of the study RDC have sent out notiications to the core user groups to request their comments on the supply and demand assessments

and proposed facility models. This feedback is included in Appendix 3 and includes some

feedback on key aspects that different groups would like to see.

The feedback supports the proposals with an emphasis on the need for inlusion of lexible studio / treatment spaces and suggests a preference for a vinyl type sports hall loor. The rowing club have suggested an indoor rowing tank is considered for inclusion.

We advise that once the project inances are clearer and the project proceeds to full design then full public engagement should be addressed including a stakeholder group,

user group forum, public displays of developing proposals and website/social media

interfaces.

Environment Agency

As detailed in section 1.5 the Environment Agency have been consulted. Their comments

and advice on the site development is included in appendix 2.

Willmott Dixon Contractors

The SCAPE framework (see section 6.2) includes a single contractor Willmott Dixon who

have contacted FaulknerBrowns to express an interest in delivering the scheme under the

framework. We advise that WDC have a strong track record of delivering local authority

wet and dry sports facilities. In regard to commercial development WDC have advised

that they would be willing to discuss with the Council the contributions they could make

to the project with their regeneration team who can assess development opportunity and their ‘be here’ residential rental division under which they may be able to act as developer

alongside being the building contractor for the sports centre/development.

Page 46: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

48

Jersey Waterfront combines a sports centre with

restaurants and a cinema with a central plaza area.

Page 47: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

49

Commercial Evaluation

Page 48: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

50

3 - 4 Restaurants

80 - 100 bed budget hotel

Boutique Cinema

Boutique Bowling

Page 49: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 50: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

52

Commercial Opportunities3.2For the purpose of reviewing masterplan options for the site the following considerations

and advice has been followed:

Residential

RDC have conirmed that sheltered housing should not to be part of the development.

RDC planners have advised on the likely acceptable type, height and densities for the

allowable residential development as described in section 1.4.

Apartments and townhouses would require dedicated parking of at least 1 space per unit

with consideration for visitor and service vehicles.

Hotel

Whilst there appears to be some demand from budget hotel chains it is highlighted that if

a hotel could not be attracted that an approach should be taken whereby the masterplan

is lexible to be amended for this accommodation to become private apartments or not be included.

It is advised that a budget hotel may not necessarily require a dedicated car park as long

as parking for customers is available. Therefore the management and size of the sports centre car park would require consideration and there is a risk that the size of car park required may exceed the value of providing hotel to the council due to the value of land

used.

A lexible option would be to plan the site to allow either a hotel or apartments. However, in this circumstance the car parking philosophy would need to be carefully considered.

Retail

In discussion with RDC oficers, planners and urban design team it has been advised that the introduction of a mini-supermarket would not be in accordance with the permitted development plan and would not sit comfortably with the leisure ‘destination’ vision and

therefore, despite the value and footfall this could create, is unlikely to be approved.

Restaurants

As with the hotel there appears to be some demand for restaurants though it would

only be attractive if a signiicant footfall can be created by a destination which would probably need to include commercial leisure such as bowling or a cinema. However,

restaurant groups may potentially perceive the site as a drive-by offer opposed to a town centre offer. If so the masterplan needs to address and consider this. For a drive-by offer restaurants would require signiicant parking and open frontage akin to a retail park.

An alternative consideration, and a more pragmatic and achievable vision, would be to

incorporate commercial space within, or amalgamated with, the sports centre building

which could provide food outlets or community space dependant on demand.

It should be noted that the leisure cafe should not compete with the commercial offers as

this would diminish the demand and potentially the leisure cafe should become a leased

outlets to provide for instance a Costa coffee.

It should also be noted that the adjacent Skills Centre already includes a food offer.

Page 51: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

53

Bowling

It is recognised with the loss of Ocean Bowling at Ravenside that there is public demand to

see a new bowling facility as part of the development.

Ocean Bowling was 24 lanes and this was not commercially sustainable. However, a

smaller 6-8 lane ‘boutique’ bowling centre may just be commercially viable but would not create signiicant value to the Council as the bowling proit margins would only just cover the capitalisation of the building cost (as highlighted in 3.1). For bowling this relects the assessment summarised in section 2.8 and detailed in the business case if delivered as

part of the sports centre operation.

Therefore the key decision for the Council would be whether a bowling hall is to be

provided, and if so, whether they would wish this to be operated as part of the leisure

centre or try and to attract a separate operator.

We highlight that if the bowling hall were integrated lexibly if it did not succeed that the space could be turned into another activity - for instance a 6-8 lane bowling hall could accommodate a 5-a-side centre, studio space or a restaurant.

Cinema

Whilst a cinema would act as an additional draw, and would greatly assist creating an

attractive destination which would potentially attract restaurant operators, it is advised

that it is unlikely to be operationally inancially successful. At this stage a cinema has therefore been discounted. If the Council wished to explore this further then an operator

could be asked to provide a business case assessment on the site.

Summary

The commercial assessment suggests there are a range of potential options that would

need to be considered by the masterplan and future detailed assessment from a modest

commercial offer, to mid, and through to a high commercial density.

Modest Commercial Mix

• Leisure Centre

• Leisure Centre Cafe (leased)

• Bowling (either as commercial

or part of sports centre)

• Car Park (c.150 spaces)

• Townhouses and Apartments to

the remainder of the site.

Mid-level Commercial Mix

• Leisure Centre

• Leisure Centre Cafe (leased)

• Hotel or apartments

• 1-2 Restaurants• Bowling (either as commercial

or part of sports centre)

• Car Park (c.150 spaces)

• Townhouses to the remainder of

the site.

High Density Commercial Mix

• Leisure Centre

• Leisure Centre Cafe (leased)

• Hotel

• Apartments

• 2-3 Restaurants• Bowling (commercial)

• Cinema (commercial)

• Large Car Park (c.250 spaces+)

• Townhouses to the NW corner

of the site

Page 52: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

54

Scale Comparison of Jersey Waterfront

and the Bexhill Down Masterplan site.

Page 53: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

55

Site Masterplanning

Page 54: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

56

Option 1 Option 2

Option 3

Approximate front entrance position

Focal plaza

Building zones could be rotated

Leisure Centre Building Zone

Leisure Car Park

Commercial Building Zone

Residential Zone

Page 55: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

57

Masterplan Options4.0Three principle development options have been considered as follows and illustrated

opposite-

Option 1: The frontage zone contains the new leisure centre together with associated car parking with central zone commercial / residential (apartments) development. The coniguration of the leisure centre and car park to the frontage is variable.

Option 2: The leisure centre is located in the central zone with the frontage zone used for car parking and commercial / residential (apartments) to the eastern edge .

Option 3: The frontage zone contains a combined leisure centre and commercial development with the central zone accommodating the associated car parking.

The development options deliver the range of commercial mix summarised in the section

4.4 as follows:-

Option 1 - provides a modest commercial mix

Option 2 - provides a mid-level commercial mix

Option 3 - provides a high-density commercial mix

To all options residential is consistently shown to the NW corner zone as this is the only reasonable use for this area and due to the proximity to neighbouring residential

properties, on Bancroft Road and Newlands Avenue, 3-storey townhouses are deemed an appropriate development.

For the purposes of testing the feasibility masterplan options the approximate 4000sqm

leisure centre footprint (equivalent to the core model facility) has been used together with

350sqm for the Drill Hall and 150 car parking spaces for the sports centre.

The diagrams demonstrate that the frontage site is approximately double the central zone area creating 3 zones of equal size each equivalent in size to the leisure centre or 150 car parking spaces.

Options 1,2 and 3 have been explored and appraised at feasibility level as detailed over

the following pages.

Some of the key determinants of selecting a preferred masterplan are:-

• Creates a leisure destination

• Has a strong urban design relationship to town and park context

• Allows a lagship / iconic leisure provision to be created and have a gateway presence at the road intersection.

• Maximises the potential land use and value including consideration for areas where

additional building height would be acceptable.

• Ability to avoid the culvert route or to create value which exceeds the cost of

realigning.

• Flexibility to accommodate different potential commercial mixes and associated car

parking requirements.

• Ability to allow coach turning within the site for the school and sports centre.

Page 56: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

58

Option 1 Feasibility Scale and

Layout Testing

Page 57: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 58: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

60

Option 1A Option 1B

Page 59: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

61

The sketches opposite indicate a number of alternative

illustrative layout approaches for option 1 and show

that this option could be interpreted in a number of

ways which deliver quite varying masterplan solutions.

Option 1A

Whilst locating the leisure building east-west with the car park to the front would not create signiicant street presence and would conceal the Skills Centre and the

footpath link, from the underpass / bus interchange, it

does allow a good opportunity to locate commercial

elements on the street corner, allows lexibility for the commercial area to be developed seperately and to

suit demand. The commercial area could be reduced

to avoid the culvert or cantilever over it, and could link

to the leisure centre if required. The layout allows the

residential development layout to be rationally laid out

behind the sports centre. The sketch plan shows that

it would be possible to break centrally the building to

create visual links through to the Skills Centre frontage

and a central internal foyer space.

Option 1B

Locating the leisure building to the eastern edge would

create a excellent site response, street presence, form

a strong edge to the park and gateway entrance from

the town centre. However, the culvert would require to

be realigned and the position of the commercial block

may be restricted to restaurants/leisure as it may be

too deep into the site to attract a hotel. In this case the

option would evolve into option 1C.

Option 1C

To avoid the culvert altogether the leisure centre

would need to be located as effectively a large

pavilion building to the centre of the frontage site. The

sketches show this literally as a circular form though

the facility could be shaped differently dependant

on the facilities within. The approach would create a

signiicant architectural statement if handled well and respond well to the park setting, street presence and

gateway building vision. It would be possible to enlarge

the pavilion to amalgamate commercial elements such

as bowling / restaurants as part of the facility off a

shared hub foyer which could run through the centre or

external space.

For option 1 we suggest all options have positive

aspects and could be developed into appropriate

masterplan solutions for the site. The extent of

commercial demand and the potential to move the

culvert will be deining factors in the deliverability of the options. If the culvert cannot be realigned

options 1A (with mid level commercial) and 1C (modest

commercial) are viable. If the culvert can be realigned

cost effectively then 1B becomes a viable masterplan

response.

Option 1C

Page 60: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

62

Option 2 Feasibility Scale and

Layout Testing

Page 61: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 62: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

64

Option 2A Option 2B

Page 63: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

65

The sketches opposite indicate a number of alternative

illustrative layout approaches for option 2. The options

highlight that the leisure centre could be incrementally

moved forward which would start to create a changing

relationship with the frontage buildings particularly if

they had commercial elements within.

Option 2A

Locating the leisure building directly in the central site

with development blocks stepping up to the corner

frontage form a strong legible layout to the overall

site. The sketch 3Ds suggest that the corner block

could warrant being expressed as a linchpin tower

element to the corner. The sketch layout plan suggests

that commercial leisure elements could be created

at ground level N/S suficient in scale to include 2no modest restaurants and a 6-lane ten-pin bowling hall.

Option 2B

The leisure building could be moved forward with a

cranked frontage to create a stronger relationship

to the frontage development, the route up London

Road from the town centre, and the pedestrian link

between the bus interchange/underpass, sports centre

and school. Additionally the corner block could be

expressed more dynamically to ‘contain’ the site and

be cantilevered / staddle over the culvert where the

connecting route beneath is formed. The layout would

still allow commercial leisure elements to be created

at ground level though positively against the cranked

route. The route into the Skill Centre car park would

need to be ammended potentially sweeping all the way

around the commercial or from the north.

Option 2C

The leisure building could be moved further forward to

create a more contained public space with the frontage

development wrapping around. However, this would

create a solid edge to the BHLR, would probably loose

the ability to create commercial leisure elements,

would conceal the skill centre and rely on the skills

centre access from the north of the leisure centre.

This option would reduce the level of apartments, and

value, to the frontage in lieu of additional townhouses

to the north.

For option 2 the recommended response would be

between 2A and 2B.

Option 2C

Page 64: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

66

Option 3 Feasibility Scale and

Layout Testing

Page 65: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 66: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

68

Option 3A Option 3B

Page 67: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

69

The sketches opposite indicate the optional

illustrative rotational and height potential of the

option 3 feasibility masterplan.

Option 3A

The most viable scenario for this development

options is with two storeys of commercial leisure

and the two-storey sports centre sweeping up to the 5-storey hotel at the NW corner. This arrangement would create a dynamic and iconic gateway

development. However, the development is high-density and feels less comfortable against the school

and in the park context.

Option 3B

Shows the alternative of apartments above a single

storey of commercial leisure. A strong dynamic

relationship can be formed with the two-storey sports centre. However, the scale of development

feels too dense for the site and town.

Option 3C

Simply relects option 3B locating the lower sports building to the western school side of the site. The

scale of the development look increasingly too dense

with the high apartment block to the eastern BHLR

side.

For option 3 the recommended response would be

3A. However, we advise that this type, extent and

scale of set-piece development would probably not be achievable.

Option 3C

A higher apartment development as option 3B and 3C is

considered potentially too dense a development for the

site and town.

Page 68: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 69: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

71

Masterplan 1C

Page 70: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 71: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

73

Masterplan 1A

Page 72: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 73: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

75

Masterplan 2C

Page 74: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

76

All the layout proposals allow the creation of a

double-height cafe foyer which addresses the key activities and contains the vertical circulation.

Page 75: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

77

Design Principles

Page 76: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

78

Leisure Centre Layout Principles5.0The feasibility options review suggests alternative positions and layouts for the leisure

facility. In all cases the future detailed development and reinement of the inal selected masterplan will always lead to reinement and changes to the leisure centre design,

footprint and layout from the sketch schemes as the illustrative layouts.

However, with each of the feasibility development options the internal building layout of

the leisure centre has been tested and with each we believe a quality leisure facility and

design can be created. The following principles have been used:

• A double foyer hub with a glazed frontage to an external or internal plaza space has been created with activity spaces directly off.

• Vertical circulation is provided within the foyer hub area to provide movement and

animation to the space.

• The foyer hub exploits visual connections wherever possible into the activity spaces to

animate the space, engage with the street, and act as a shop front to the facilities within.

• The layouts are simple, clear and legible which use the hub for the circulation with

minimal corridor space.

• Coniguring the double height pool hall to the frontage to act as a shop front and the solid sports hall generally to the back of the facility.

• Pool spectator seating is conigured at ground level stepping down to poolside accessible directly from the cafe foyer.

• The sports hall is accessed directly off the foyer hub to allow it to be more accessible

and open as a community hall.

• Squash courts are semi-sunken and accessed by stepping down spectator seats from ground level.

• Positioning the itness suite at an upper level overlooking the external realm, pool hall and to create an upper shop frontage to the facility.

• The two studios are positioned side-by-side allowing the option to provide a sliding acoustic partition to create a large studio space.

• Provide a servicing route to the outside perimeter for pool chemical delivery,

maintenance, and emergency vehicle access.

• The layout principles would allow the MoD accommodation to be separately accessed

or segregated when required with lexibility to marry with any shared facilities.

Page 77: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

79

Option 15.1The option 2 masterplan creates a pavilion building to the centre of the frontage with

a modest commercial element. The building shape could literally be circular with the

commercial elements subsumed or expressed as two separate buildings.

Option 1B creates a shared hub space between a modest commercial element and the

sports centre this space could be internal or external. The commercial space could

accommodate bowling or restaurants at ground level with either a 4-storey hotel above or another restaurant level (alternative shown). The sport centre has a double height foyer

with the pool hall to the frontage, squash and sports hall directly off.

Option 1C creates a single building broken with a street with a wet and dry

accommodation lanking either side. The reception sits at the centre and controls access to the wet and dry changing, the sports hall and circulation upstairs which would allow

the street space to be openly accessible from each end and have a dynamic relationship

to all the activities within. Externally the pool hall and squash area could be glazed and optionally the sports hall could have a clerestrorey glazed base.

With both options an area for the Drill Hall accommodation is allowed and this could be

bowling (as shown)

Option 1B Option 1B

Bowling

alternative

Restaurant

alternative

or Drill Hall

Page 78: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

80

Option 25.2The option 2 masterplan creates a linear leisure centre which, due to the width of the

central zone, would require a linear central spine street with activities lanking either side.

The pool hall would be located at the front, potentially cranked or shaped, to respond to

the urban realm and commercial development. Alongside the pool hall it is suggested the

cafe is created within a double height foyer space with direct access to spectator seating

and a poolside cafe terrace. The reception and cafe servery would then sit at the end of

the double cafe space controlling access deeper into the facility.

Beyond reception the spine route would lead to a central vertical circulation node which

would also highlight the entrance to the dry and wet changing facilities. To the end of

the spine the space opens up again into the squash courts, which are semi sunken with

spectator seats down, and the sports hall creating a waiting and viewing area.

Upstairs the itness suite and studios lank the vertical circulation node with the itness suite overlooking the pool. Meeting spaces are shown set above the reception. The

upstairs layout could be conigured in alternative ways.

To accommodate the Drill Hall and/or bowling the spine corridor could be extended. If

these facilities are not included the sports hall could be rotated to act as a focal endpoint

to the spine.

It is envisaged that the street would be top lit with suficient width, utilising the circulation node void and spectator seats, to not feel like a corridor.

The principles of this building layout could alternatively be lipped vertically to locate the pool and sports hall to the west particularly if the sports hall were to have a clerestorey

Page 79: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

81

Option 35.3The option 3 masterplan would allow the leisure centre double height foyer to become

an internal extension of the external plaza. The foyer would contain the cafe, vertical cirulation and provide direct links to squash viewing and sports hall as option 1B. The pool

hall, with itness overlooking, would create a beacon shop-window to the corner of the site. The pool hall would wrap around the corner to address the BHLR junction and the upper level itness would address the road as it rises to irst loor level.

The commercial development would contain hotel foyer, restaurants and bowling at

ground level with the hotel bedrooms and a cinema above or alternatively apartments

above.

Page 80: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

82

Horsham Pool by FaulknerBrowns

Page 81: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

83

Financial Appraisal and Delivery Options

Page 82: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 83: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 84: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

86

Procurement Options and Recommendations6.2There are four key procurement routes that could be used by the Council for the

development as follows. All options allow the Council to procure via a tendered ixed price contract process based on a set of clearly deined employers requirements / contract proposals. A 10% Client contingency is allowed in the preliminary cost plan for additional

costs to the Client such as changes or unforeseen events.

COUNCIL LED

Process

The Council is responsible for the overall delivery of the leisure centre and retains control

of the process and design. The Council would need to competitively market and sell the

development plots for the highest possible value and then add to this further additional

capital to meet the shortfall. The Council would then separately procure design team,

contractor and operator would then need to follow the OJEU public procurement process

or via an existing public framework.

How

The project would be delivered under a traditional contract or either a single or two stage design and build process. We recommend that the design be developed under a single stage

D&B process where the Client would procure a design team to develop the design and cost planning to RIBA D+ stage at which point the contractor would be procured via another

OJEU process of prequaliication and tender upon this design and the contractor selected on a ixed price. The design team would be novated to the contractor to complete the design. The council would need to seperately tender for an operator for the new facility.

Key Issues and Risks

With this option the Council retains the overall risk for delivery, would fund all stages of the

project, and is also most likely to be the most expensive option.

By directly selling the commercial development sites the process would create the least

value and also, as the Council is directly and transparently selling the development plots,

overage is more likely to be payable to ESCC.

OPERATOR LED

Process

The Council appoints an operator for the leisure centre on the basis of a Design, Build,

Operate and Manage (DBOM) form of procurement. The operator becomes the single entity

with overall responsibility for delivering the new leisure centre who would separately

appoint a design team and seek a development partner to bring forward the enabling

commercial development. The Council would be required to fund the shortfall between the

development value and overall cost of delivering the scheme.

How

The Council appoints the operator via an OJEU public procurement process using either

restricted, negotiated or competitive dialogue routes.

The restricted and negotiated routes are more applicable in circumstances where the

Council is clear on what exactly is being procured as they do not allow a great deal of

interaction with the tenderers. Therefore we believe a competitive dialogue process would

be more applicable for the Council in respect of the leisure centre project as it allows the Council to liaise with the bidders and discuss directly elements such as design, funding and

legals. It should be noted that a competitive dialogue process will take at least 1 year to

complete.

Key Issues and Risks

The overall delivery and funding for the project is reliant on the enabling development and so we believe that it is high risk relying on this element through an operator rather than the

Council having direct control over the appointment of the developer. Additionally, there is a

limited number of commercial leisure operators that would be capable of taking on a DBOM

contract of this nature therefore reducing the overall level of competition.

Page 85: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

87

DEVELOPER LED

Process

As the operator led process with the Council appointing a developer to take overall

responsibility for the whole site including the delivery of the leisure centre from start to

inish. The leisure centre is delivered through proceeds from the enabling development together with a capital contribution from the Council to meet any shortfall.

This option allows the overall site to be brought forward in a cohesive masterplan in which

the site value is deined, maximised with potential amalgamation between the commercial and leisure development. It is important that the developer establishes the potential

commercial value at the outset to allow the leisure centre funding to be conirmed.

How

As outlined in the operator led solution, the developer would be appointed through an OJEU

procurement process and, for the same reasons, we believe that the competitive dialogue

procedure would be most appropriate for the Council. Typically it would be expected that

as part of the competitive dialogue process, the short listed developers would take the

design through to RIBA Stage C before appointment. This allows ample opportunity for

the Council to assess and comment on the quality and suitability of the design solution as

part of the selection dialogue process. The council would need to seperately tender for an

operator for the new facility.

Key Issues and Risks

Developers are well placed to manage design and construction works as well as maximising

the commercial returns from a site. Consideration will need to be given to how any

shortfall in commercial value is funded and therefore as securing early quantiication is fundamental. In order to protect the Council’s requirements either in terms of facilities

or design quality a robust output brief, speciications and design parameters should be provided as part of the procurement process.

ALTERNATIVE FRAMEWORK OPTION (CONTRACTOR LED)

One potential alternative option for the Council to utilise a public sector framework which

is available to all local authorities and based on pre-agreed tendered rates. A common framework used is the national Scape framework where Willmott Dixon are currently the

sole contractor.

How

Under the framework process Willmott Dixon would appoint an appropriate design team

as well as a development partner to develop the design to the approval stages set out in

the framework. Each stage would be developed in close collaboration with the Council in

regard to design and cost.

Key Issues and Risks

The process offers signiicant savings in time and resource from the Council as it greatly reduces the procurement timescale. The process also allows the Council to overview and

comment on the the design evolvement through the close collaborative working process

to assure their quality and speciications requirements are embodied into the contract proposals. The council would need to seperately tender for an operator for the new facility.

However, this option needs to be balanced against the importance and signiicance of the project to the Council and the need to achieve best value in all areas to the highest possible standards.

Recommendation

Ultimately the Council wish to have control of design quality in parallel with maximising

the site value. Therefore we suggest a procurement strategy which has a developer lead,

to maximise value, and design controlled by robust design parameters set by the Council

with formal dialogue as part of the process. Therefore we recommend that a competitive

developer led procedure or a framework process (with the prerequisite that a developer

is formally integrated part of the delivery team) are the relevant options that should be

considered for this development.

Page 86: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

84

Page 87: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

85

Appendix 1

Leisure Centre Operational Financial

Business Report

Page 88: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

NEW LEISURE CENTRE – FINANCIAL AND LEISURE REPORT

ROTHER DISTRICT COUNCIL

A

REPORT

BY

FMG CONSULTING LTD

AUGUST 2014

Page 89: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

TABLE OF CONTENTS

1. Introduction ................................... ................................................... ...... 3

2. Supply and Demand .............................. ................................................... . 12

3. Project Options ................................ ................................................... .... 23

4. Capital Costs .................................. ................................................... ..... 24

5. Business Plans ................................. ................................................... ..... 27

6. Financial Modelling and Affordability .......... ................................................... 38

Appendices

Appendix A - Competition Analysis

Appendix B - Latent Demand Assessment from Leisure Database Company

Appendix C - Business Plan – Basic Scheme

Appendix C - Business Plan – Core Scheme

Appendix D - Marginal Cost of Supplementary Items

Page 90: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

1. Introduction

Introduction

1.1 The Council have engaged Faulkner Brown Architects and FMG Consulting to undertake a feasibility study on the development of a new leisu re centre and enabling development on the site of the existing Bexhill Leisure Centre.

1.2 As part of the feasibility study, FMG Consulting ha ve reviewed the demographics of the catchment area, review the current performance of e ach of the current facilities, establish the projected demand for the different leisure faci lity types, develop new facility mix options, and undertake the financial modelling of e ach option and compare this to the current financial budget of the Council.

Local demographics

1.3 This section reviews the local demographics of the district and the catchment of Bexhill Town:

• Rother District demographics;

• Bexhill-on-Sea town demographics;

• Demographics of a 20 minute catchment of the site.

1.4 The district of Rother has a population of 90,588 (Census 2011), of which circa 76,000 people are over the age of 16 years (84.3%). According to the figures, there are a higher proportion of people when compared to the average for England in Rother in all age groups 45 years and above. The people aged 45 years and over combines t o 57.7% of the total population which is significantly higher than the national average of 4 1.8%. All of the age groups below 45 years old are below the national average including the ke y target ages of 16-44 years for sport and physical exercise. Therefore, the district of Rother has an ageing population.

Obesity across the District

1.5 In terms of obesity, the Sport England Active People Survey data suggests that the number of adults in Rother that are classified as obese is ci rca 50,700 or 63.9% of the adult population. This is slightly above the national average for Eng land where it is estimated that 63.8% of the population are deemed to be obese in addition to al so being above the regional average of 63.1% in the South East.

1.6 In terms of children, the level of child obesity is 18.3%, which is below the national average of 19.2% but above the regional average for the Sou th East of 16.5%.

Life Expectancy

1.7 Life expectancy in Rother is above the national ave rages for both males and females. Adults are expected to live on average of 79.9 years which is slightly below the South East average of 80.0 years but above the national average of 78. 6 years.

Page 91: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 4

Economic Inactivity

1.8 In terms of unemployment as a proportion of the economically active, the district of Rother has 2,019 people (3.2%) unemployed from the 39,859 adults that are economically active, which is lower than both the South East regional (3 .4%) and national (4.4%) averages. This is positive in terms of disposable income available to participate in leisure activities.

Sport England Key Performance Indicators for Rother

1.9 Sport England, the Governments agency for sport measure 5 key areas in relation to sport activity. The table below sets out the performance of the district compared to the South East and England.

Table 1.1 - Comparison with Sport England KPIs

Rother South East England

KPI1 – 1x30 mins Physical Activity per week

30.7% 36.9% 35.7%

KPI2 - Volunteering at least one hour a week

4.9% 7.1% 6.0%

KPI3 - Club Membership in the last 4 weeks

18.4% 24.3% 21.0%

KPI4 – Received tuition / coaching in last 12 months

17.6% 18.1% 15.8%

KPI5 - Took part in organised competition in last 12 months

11.9% 14.2% 11.2%

Above regional and national averages

Above national average but not regional average

Below regional and national averages

1.10 It can be seen by the figures in the table above th at the district is currently underperforming in all of the five KPIs. They are all below the reg ional average with only two of the KPIs above the national average. Consequently, KPI1 (phy sical activity for 1x30 mins participation a week) is significantly below both averages at 30. 7% compared to the South East (36.9%) and England (35.7%). This is concerning for the distric t with sedentary lifestyles potentially leading to health issues and a more obese district.

1.11 The results are also negative in terms of participation in physical activity at any proposed new centre. Alternatively, a new centre may help to attract new users helping to increase participation. The area also has an ageing populati on; therefore it is important that pricing and programming is regularly monitored in order to attract the older populations.

Page 92: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 5

1.12 In terms of trends between 2009 and 2013, the table overleaf shows these for each of the five key performance indicators, the colours (green above and red below) represent the change from the previous year, with green indicatin g a positive increase and red a decrease in performance.

Table 1.2 - Trends for Rother in Sport England KPIs

Indicator 2009/10 2010/11 2011/12 2012/13

KPI1 - 1x30 mins Physical Activity per week observed

31.5% 30.6% 32.0% 30.7%

KPI2 - Volunteering at least one hour a week

1.7% 9.9% N/A* 4.9%

KPI3 – Club Membership in the last 4 weeks

26.1% 23.5% 19.1% 18.4%

KPI4 – Received tuition / coaching in last 12 months

15.5% 14.5% 12.8% 17.6%

KPI5 - Took part in organised competition in last 12 months

14.5% 17.3% 12.1% 11.9%

*indicates that data has been suppressed by Sport E ngland due to the sample size

1.13 It can be seen that in 2012/13 (the last published measured year, Active People Survey 7), all of the KPIs decrease from the previous set of results except KPI4 (receiving tuition and coaching in the last 12 months). These downward tre nds in the results are reflected in the poor comparison to national and the regional averages in the latest 2012/13 results in table 1.1 above.

1.14 Table 1.2 also shows that the KPI1 (1 x 30 minutes participation) figures had initially increased over the previous set of results but then reduced again, moving further away from the regional and national averages.

Demographics of Bexhill-on-Sea

1.15 Bexhill-on-Sea is a coastal town in district of Rother in East Sussex, located to the east of Eastbourne and Brighton and to the west of Hastings . According to the Census 2011, the population of the town of Bexhill-on-Sea is 43,107, an increase of 6.1% in population from 40,495 in the Census 2001.

1.16 Bexhill-on-Sea can be accessed via both road and ra il. It is located on the A259 road which forms the coast road between Folkestone and Brighton, while a new Hastings to Bexhill bypass is currently being built, located next to th e site of the proposed new Bexhill Leisure Centre. Bexhill is served by the coastal railway li ne between Ashford and Brighton and has

Page 93: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 6

three railway stations; Cooden Beach, Collington, and Bexhill. Regular trains run to Brighton, Ashford and London from Bexhill.

20 minute Catchment Analysis around the proposed new site

1.17 The table below shows the population of the 20 minu te drive time catchment surrounding the proposed new Bexhill Leisure Centre site.

Table 1.3 - 20 Minute drive time catchment around the new Bexhill Leisure Centre site

Age 0-2.5 2.5-5 5-10 10-15 15-20 Total

0-14 years 2,997 2,603 3,495 10,498 13,325 32,918

15-24 years 2,117 1,724 2,658 7,714 8,629 22,842

25-39 years 2,988 2,168 3,879 11,098 12,038 32,171

40-59 years 5,212 4,502 6,358 17,597 20,298 53,967

60-79 years 5,216 5,828 4,916 12,668 16,646 45,274

80+ years 2,327 2,560 1,761 3,438 4,594 14,680

Total 20,857 19,385 23,067 63,013 75,530 201,852

1.18 As the table above shows, there is circa 202,000 pe ople within a 20 minute drive time of the new site without taking into account the new bypass . The catchment expands into the whole of Hastings and Battle as well as a large proportion of Eastbourne. The largest population group is the 40-59 years where there 54,000 people (26.7% of the population). Some of this population group will have propensity to participate, however, the ideal age groups for participation are the 15-24 and 25-39 years age gro ups. In combination, there is circa 55,000 people (27.3%) in these age groups.

1.19 The majority of the population in the catchment liv e over 10 minutes away from the site with circa 139,000 of the 202,000 above the 10 minu te threshold (68.6%). This is due, as previously mentioned, to the catchment reaching the Eastbourne, Hastings and Battle. There are only circa 40,000 people within 5 minutes of th e site.

Page 94: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 7

Market Segmentation

1.20 Sport England market segmentation data models parti cular groups and provides information on sporting behaviours and attitudes as well as mot ivations for and barriers to taking part in sport. This research builds upon the Active People Survey, the Department for Culture Media and Sport's Taking Part Survey and the Mosaic tool from Experian.

1.21 There are 19 market segments have been created from an analysis of the English population (18+ years). Each segment exhibits distinct charact eristics, with information covering specific sports that people take part in and reason s why people do sport, together with the level of interest in and barriers to doing more sport.

1.22 By applying this information to demographic and soc io-economic data for the district, the model is able to estimate the likely behaviour and activity patterns of residents within the catchment. In addition to being used to determine w hich types of facilities are most appropriate to meet resident's needs, the model can also be used as a prerequisite to any intervention programmes to facilitate greater activ ity levels.

1.23 The table below illustrates the market segmentation for a 12km as the crow flies catchment (equating to 20 minutes’ drive time) and compares t he results to the national average. The following colour codes have been used in the table:

% of the population is higher than the national av erage for that group

Top 5 groups that have the highest proportion of the population within the catchment area

Page 95: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Table 1.4 - Market Segmentation Analysis for 12km catchment

Segment Name Age band

Catchment Catchment

% England % Preferred Activities

1 – Competitive Male (Urban) Ben 18 – 26 5,323 4.1% 4.9% High intensity activities, weight lifting, competitive court games and technical sports

2 – Team Drinker Jamie 18 –25 5,982 4.5% 5.5% Team sports (e.g. football), combat sports and weight training

3 – Fitness Class Friend Chloe 18 – 25 4,796 3.6% 4 .7% Exercise classes, individual activities, team games, swimming and gym

4 – Supportive Single Leanne 18 –25 4,758 3.6% 4.3% Social activities, swimming and keep fit classes

5 – Career Focused Female Helena 26 – 35 5,830 4.4% 4.5% Very active, keep fit and gym related activities, winter sports and swimming and likely to have private gym membership

6 – Settling Down Male Tim 26 – 35 9,436 7.2% 8.8%

Very active, technical sports, skiing, water sports, team games, individual activities, personal fitness and likely to have private gym membership

7 – Stay at Home Mums Alison 36 – 45 4,863 3.7% 4.4 % Keep fit classes, racquet sports, swimming and likely to have private gym membership

8 – Middle England Mum Jackie 36 -45 6,305 4.8% 4.9 % Visiting leisure facilities for swimming and may take children bowling or ice skating

9 – Pub League Kev 36 -45 5,145 3.9% 5.9% Team sports, football, combat sports, low intensity social activities (e.g. darts)

Page 96: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 9

Segment Name Age band

Catchment Catchment

% England % Preferred Activities

10 – Stretched Single Mum Paula 26 -35 3,655 2.8% 3 .7% Social activities, 10 pin bowling and low intensity

11 – Comfortable Mid Life Male

Philip 46 – 55 11,523 8.8% 8.6% Team sports, racquet sports, technical sports, fitness club member and competitive sports

12 – Empty Nest Career Ladies Elaine 46 – 55 8,973 6.8% 6.1% Swimming, exercise classes, gym and walking

13 – Early Retirement Couples Roger &

Joy 56 – 65 12,841 9.8% 6.8%

Walking, swimming, table tennis, golf and keep fit classes.

14 – Older Working Female Brenda 46 -65 5,289 4.0% 4.9% Swimming, walking, keep fit and cycling

15 – Local Old Boy Terry 56 -65 4,581 3.5% 3.7% Low intensity, walking, fishing, darts and pool

16 – Later life Woman Norma 56 -65 2,541 1.9% 2.1% Walking and low intensity activities

17 – Comfortable Retired Couples

Ralph & Phyllis

65+ 7,873 6.0% 4.2% Swimming, fishing, golf, lower intensity and bowls

18 – Twilight Year Man Frank* 66+ 7,643 5.8% 4.0% Individual and peer activities, walking, bowls, golf, darts, pool, swimming

19 – Retirement Home Single Elsie & Arnold*

66+ 14,138 10.8% 8.0% Low intensity, bowls, walking and dancing

Page 97: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

1.24 It can be seen that the prevalent segments in the c atchment district are 6, 11, 12, 13, and 19. These groups preferred activities include; team sports, health and fitness, low intensity activities, swimming and walking. Out of the key se gments 1 to 6 who have a higher propensity to participate in physical activity, onl y Tim (segment 6) is included in the top 5 prevalent segments.

1.25 One of the key issues in this segmentation analysis is that the main income drivers for sport and leisure facilities are health and fitness membe rships and swimming. Segments 3, 4, 5, 6, 7, 12 and possibly 14 are more likely to utilise gy m and exercise facilities. As can be seen in Table 1.4, Tim (segment 6) and Elaine (segment 12) are prevalent segments in the catchment for health and fitness, however, none of the other segments that are ideal for health and fitness are above the national average. Therefore, this is challenging in terms of health and fitness participation. Programming and p ricing will be vital to attracting additional users to the new centre, especially thos e in older generations.

1.26 When analysing propensity for swimming, segments 3, 4, 5, 7, 8, 12, 13, 14, 17 and 18 states that swimming is a preferred activity but segments 3, 4, 5, 7, 8, 12, are more likely to use the pools as a secondary facility alongside their gym membership or exercise classes. Therefore 13, 14, 17 and 18 are likely to use the p ools as a primary visit with Roger and Joy (segment 13) the only prevalent segment in the catc hment. However, segment 17 (Ralph & Phyllis) and segment 18 (Frank) are not prevalent s egments but they above the national average and they both enjoy swimming participation. Therefore, there is good propensity for swimming in the catchment.

1.27 The largest segment in the catchment is Elsie and A rnold (segment 19) who are mainly aged 66 years and above and are retired and widowed. The y live on their own in warden controlled sheltered accommodation. Due to their ag e, they cannot drive but will walk to the post office to collect their pension. They are much less active than the adult population. When they participation, they enjoy keep fit/gym, s wimming, bowls and golf.

1.28 Roger & Joy (segment 13) are generally aged 56-65 y ears, married and either in full time employment or retired. They are slightly less active than the national average, with keep fit/gym, swimming, cycling and golf as the most expected activities that Roger and Joy will participate in.

1.29 Comfortable mid-life male, Phillip, segment 11 is aged 46-55 years. He is interested in a variety of sports including team, racquet, technica l and competitive sports. Philip wants to stay healthy for later in life, and despite his age he can be classed as a ‘sporty segment’. His activity levels are above average and Philip enjoys participating in cycling, keep fit/gym, swimming and football.

1.30 Tim, segment 6, a 'settling down male' who is mainl y aged 26-45 years, married or single and may have children. Tim is a busy professional but i s an active person who enjoys exercise on a regular basis such as cycling, gym/keep fit, swimming and football.

1.31 Finally, Elaine (segment 12) is mid-life professional who has more time since her children left home. She is married and mainly aged 46-55 years ol d. Elaine’s sporting activity levels are consistent with the national average, and slightly above average for some indicators. She also eats healthy meals but also enjoys a glass of red wine in the evening after work. Elaine’s preferable activities include keep fit/gym, swimmin g, cycling and athletics.

Page 98: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 11

Summary

• The district of Rother has a population of 90,588 (Census 2011), of which circa 76,000 people are over the age of 16 years (84.3%). All age groups under 45 years old are below the national average so Rother has an ageing population.

• Unemployment is lower than national and regional av erage. Life expectancy is above the national average but below the South East avera ge while obesity in adults is higher than the averages.

• Comparison with Sport England Key Performance Indicators across sport and participation shows Rother scores lower than all national averages and these have generally decreased from previous years.

• The catchment population within 20 minute drive tim e from the new site is circa 202,000 of which 55,000 are between 15 and 39 years of age (our target market) with 33,000 under 15 years of age.

• The majority of the population is located after 10 minutes with 139,000 of the 202,000 located in this bracket. This is due to the drive time catchment reaching Eastbourne, Battle and Hastings.

• Market segmentation suggests that the largest group s within the District are Tim (26 – 35 years), Philip (46 – 55 years), Elaine (empty nest, age 46-55), Roger & Joy (early retirement couples, 56 – 65 years) and Elsie & Arno ld (retired couples and singles, 65 years old plus).

Page 99: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

2. Supply and Demand

Introduction

2.1 In order to access the viability of the different f acility types, we have sought to establish the supply and demand within the catchment linked to th e scale and uniqueness of the offer under the different facility packages. A summary of the market supply is included in Appendix A to this report.

2.2 The facilities covered include:

• Health and fitness

• Swimming pool water and Leisure water

• Sports halls

• Soft play

• Squash

• Ten pin bowling

• Climbing and bouldering

• Spa

Health and Fitness

2.3 The proposed new facility will have plans for a new health and fitness suite and studio(s). Currently, both of the facilities have gyms; Bexhil l Leisure Centre has 75 stations and Bexhill Leisure Pool has 20 stations combining to a total o f 95 stations. The total membership across the board is 1,666 which equates to 18 members per station, which is below the industry average of 25 members per station.

2.4 This is reflected in the financial performances of both sites in comparison to our FMG benchmark. Our FMG benchmark figure comes from our internal database of hundreds of pieces of information from across the UK which we can filter to show a variety of variables such as management operator type (trust, private co ntractor, in house).

2.5 In the last financial figures 2012/13, Bexhill Leis ure Centre produced £[REMOVED] per station in

income while Bexhill Leisure Pool generated only £[REMOVED]. These are both [REMOVED] our benchmark for trusts of £7,900 per station. Therefo re, this suggests that the gym at the new centre needs to be smaller than the current 95 stat ions. In order to identify the required size of the gym at the facility, The Leisure Database Co mpany (TLDC) provided a report on the projected demand for fitness within the catchment a rea.

Page 100: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 13

Latent Demand

2.6 Demand for health and fitness has been determined f rom information provided by TLDC. For the purposes of health and fitness, the TLDC have u tilised a 3 mile drive time. The catchment area for the site was determined based on a number of factors which include a map review, where competitors are located, where cl usters of population live and where TLDC think people would realistically travel to whi lst also trying to limit too much overlap with similar facilities.

2.7 Health and fitness uses catchment areas to establis h the likely potential users of a particular site. This can also depend upon the quality and the pricing of the facilities. TLDC have used a 3 mile catchment to establish the likely user pen etration (or propensity to participate) for health and fitness using Mosaic, which is the world 's most widely used geo-demographic population segmentation system.

2.8 Mosaic UK classifies the population, using very small geographical areas such as a single postcode, into 61 different types, which are in tur n aggregated into 11 broader groups. Over 400 different data variables have been used in its creation, making it the most accurate and up to date way of identifying and describing popula tion trends within the UK population. It is sourced both from the regular Census and also from other dynamic sources such as the Electoral Roll, consumer credit activity, the Post Office Address File, house prices and council tax information, all updated annually.

2.9 TLDC has combined the Mosaic System with the postco des of millions of health & fitness members to build up the largest ever profile of what sort of people are - and are not - participating in fitness. This helps to demonstrate where there has been a relatively high take up for fitness (i.e. a high proportion of a particular Mosaic group or type) or where only a small proportion of inhabitants of a particular k ind have participated, usually for social or economic reasons. These are the penetration rates f or the various Mosaic groups / types.

2.10 TLDC proceeds to use these current levels of partic ipation across the various Mosaic groups and types - 'penetration rates' - to make accurate assessments of the unmet ('latent') demand for health & fitness in a given catchment area, bui lding in allowance for current and future competition, and, where relevant, new housing devel opment. Those Mosaic types with the highest penetration rates are said to be the kind o f people with the 'highest propensity' to participate.

Demographics and the Catchment Area

2.11 At the moment (due to the building of the bypass), a 10 minute drive around the new site fans out predominantly along the A259, from Hooe in the west to Bulverhythe, 3 miles away at the gateway to St Leonards on Sea, in the east. It also heads North West up the A269 to Ninfield and Lower Street. There is very little coverage to the North East, towards Crowhurst and Green Street.

2.12 Using a 3 mile radius around the new centre anticip ates the better access of which the new link road will eventually give in that direction, w hile excluding some of those living just over 3 miles to the East, who may realistically be more in the orbit of providers in the St Leonards and Hastings area. Within this 3 mile radius there are 47,593 people.

2.13 According to TLDC, Bexhill has a reputation as a re tirement centre and a large proportion of the catchment population falls into two segments, w hich will create particular challenges in terms of programming and equipment mix. There are more than 29% of the population that fall into Mosaic group E (Active Retirement). These are mostly older people who enjoy

Page 101: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 14

sufficient pensions and savings to choose pleasant locations for their retirement with many of these people will be in their 60s and 70s.

2.14 The other Mosaic group which is prevalent in large numbers is D (Small Town Diversity) which accounts for over a quarter of the total. This contains many people whose study, work or weekly lifestyle doesn’t tend to take them far from their home town. The younger contingent of this group (D16 Side Street Singles) tend to be living in rented flats towards the town centre and have modest incomes and low levels of car ownership.

2.15 In additional to this information, It should be not ed when calculating the demand that there are a large number of people in Bexhill who do not have a particularly high propensity to use fitness gyms and this excludes a greater proportion of the population from enjoying a new facility than might be the case in a non-seaside.

Competition

2.16 The potential amalgamation of the swimming pool und er the same roof as the leisure centre reduces the number of fitness providers in the town. There are two small independent gyms in the town (Physiques Gym, 7 stations and TL Leisu re Club, 30 stations) and a hotel based leisure club at The Cooden Beach Hotel (Poolside Le isure Club, 7 stations). Meanwhile, Hastings is circa 4 to 5 miles away which has 3 or 4 fitness options. Therefore, the current Council run facilities are the main contributors to health and fitness in the area.

2.17 The table below summarises the projected latent dem and for health and fitness within the 3 mile catchment area of the new Bexhill Leisure Cent re site.

Table 2.1 – Latent Demand for the proposed Bexhill Leisure Centre

Population Projection

Total Demand in Catchment 1,483

Consideration for 20% of potential members who currently live outside the core catchment area

371

Estimate of Total Demand for Health & Fitness 1,854

Minus current membership 1,666

Estimate of Latent Demand for Health & Fitness 188

2.18 The table shows that TLDC have estimated the latent demand for a new wet and dry leisure centre in Bexhill to be 1,854 members as the total number of members they feel could be achieved. This is a latent demand of 188 members.

2.19 When looking at the demand for 1,854 members and us ing an industry average of circa 25 members per station, we calculate a requirement for a 74 station gym. However, a health and fitness suite should be able to accommodate abo ve 30 members per station before becoming too busy and adversely impacting on retent ion rates, so a 70 station would be adequate to still provide room to increase the memb ership above the identified latent

Page 102: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 15

demand. Gyms are able to accommodate over 30 people per station due to classes becoming increasing popular with users buying memberships for the use of classes only.

2.20 This figure is also presuming that all 100% of the latent demand is to be met by the centre; therefore it is prudent to assume 70 stations will be adequate for the health and fitness suite.

2.21 A 70 station gym would require 5m2 per station to m eet IFI standards, therefore a gross internal floor area of 350m2. We would also recommend that the facility has 2 studios with a moveable wall. Classes such as spinning are increas ingly popular and require their own space which could be utilised in one of the studios.

2.22 In summary, we recommend that it is essential to re provide health and fitness at the new site. The gym should be no larger than a 70 station gym with 2 studios with a moveable floor to create flexibility with classes.

Swimming Pools

2.23 The Council has undertaken Facility Planning Model (FPM) for swimming pool water in the district of Rother in 2014. The report analysed tha t Rother has 4 swimming pools across 4 sites (Bexhill Swimming Pool, Crowhurst Park, Rye Sports Centre and St Marys School) totalling 974m2 of which 824m2 is publically availa ble (scaled with hours available in peak periods). There is a potential for 7,142 Visits per Week in the Peak Period (VPWPP) and this equates to 10.46m2 per 1000 people which is lower t han the national average (12.68m2) and the South East (14.01m2).

2.24 The FPM calculates that there is demand for 5,498 V PWPP, equivalent to 906m2 of pool water (including a comfort factor). In addition, th e population without access to a car is 17.8% which is lower than the national average and similar to the regional average. This suggests that the demand created is relatively mobi le. Therefore, the simplistic view of the supply and demand balance is -82m2, suggesting the current supply of water space is not sufficient to meet the demand across Rother.

2.25 In terms of satisfied demand (demand from Rother residents currently being met by supply), 81.6% of total demand is satisfied of which 88% tra vel by car. Not all of the demand that is created by Rother’s population will be met by swimm ing pools within Rother. The model shows that 30.4% of the demand that is currently sa tisfied is exported from Rother into other authority areas. This is significantly higher than all of the neighbouring authority areas, with the exception of Wealden.

2.26 Rother has 1,012 visits in peaks periods are not me t which equates to unmet demand as a percentage of 18.4% or 167m2 which is slightly high er than the South East and England. The data shows that circa 77% of this unmet demand is c aused by people living outside of the catchment of a swimming pool facility.

2.27 The FPM has calculated that the swimming pools in R other are being used at circa 63% capacity during the peak periods each week. This is generally in line with the national figure (64.7%) and slightly higher than the regional figur e (60.5%). This suggests that the facilities are below Sport England’s used capacity threshold o f 70% and above when pools are considered to be busy.

2.28 Those that have a used capacity of 100% are conside red to be theoretically totally full all the time in the peak periods. When we analyse individua l pools, Bexhill Leisure Pool is at 100% capacity and therefore significantly above the thre shold benchmark.

Page 103: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 16

2.29 In summary of the FPM, the model suggests that desp ite Rother being under capacity in terms of swimming pool water by circa 82m2, the sat isfied demand figures are lower than the regional and national averages and Rother also has an unmet demand of 18.4%. Therefore, it proposes that despite being a lack of pool water, the facilities across the district are not being utilised to their full poten tial. However despite this, Bexhill Leisure Pool has a 100% used capacity in peak times and is a very important asset to Rother.

2.30 This theoretical demand is supported by the financi al performance of the pool. In 2012/13,

the pool generated £[REMOVED] per m2 of pool water whic h is higher than our FMG benchmark for trusts of £778. Therefore, despite the age of the c urrent pool, the facility is performing excellently.

2.31 As a result of the evidence from the benchmarking a nd FPM, it indicates that additional pool water is required across Rother, especially in Bexh ill. However, to determine how much pool water is required, we have used the Sport England S ports Facilities Calculator (SFC). This tool analyses how much pool water is required for a new facility. While the calculation is crude, we can use it as a guide for the new pool.

2.32 There are currently circa 43,000 people in the town of Bexhill-on-Sea and the SFC equates this population to a requirement of 450m2 of pool water. Therefore, in order to be prudent, we believe there is potential to increase the amoun t of pool water at Bexhill to a minimum of circa 400m2, the equivalent of at least a 6 lane x 25m pool and 13m x 7m learner pool.

2.33 However, there is potential to move away from the o rthodox pool water and towards supplying large amounts of leisure water at the fac ility. Given the nature of the town and its location with the sea, consideration may be given t o create leisure water as the main focus, providing a facility for young people and families during inclement weather and providing another reason to come to the town.

2.34 Leisure water can be expensive to operate in terms of staffing, as it normally attracts young people, the water surface area (especially with wav e machines, water sprays etc.) can be difficult to allow the lifeguard to see down into the pool tank but this is normally down to scale and design but overall leisure water is a ver y popular facility type.

2.35 In terms of leisure water facilities in the local a rea, there is a limited amount available (see appendix A). The closest facility is The Sovereign Centre in Eastbourne (20 minutes’ drive time) which includes a fun pool, flumes and wave ma chine along with a traditional 6 lane pool, learner pool and diving pool.

2.36 Lewes Leisure Centre (37 minutes’ drive time) only has a flume while the next large leisure water is at Tenterden Leisure Centre in Kent (47 mi nutes’ drive time). This facility has a 25m swimming pool, wave machine, flume, bubble pool, pi rate slide, tipping buckets, spray rails and treasure chests. Therefore, there is a lack of competition in the immediate vicinity of Bexhill.

2.37 Overall, we suggest that it is essential that swimm ing pool water is resupplied at the new facility and increased to a minimum of at least 400 m2 of pool water, beginning with a standard lane pool and learner pool and then moving towards providing leisure water at the new centre depending on the affordability of the sc heme.

Page 104: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 17

Sports Halls

2.38 The Council have also undertaken the FPM model for sports halls in Rother. In the district, there are 7 halls across 6 sites; Battle Area Sport s Centre, Bexhill College Sports Centre, Bexhill High School, Bexhill Leisure Centre (2 hall s), Claremont Preparatory and Nursery School and Rye Sports Centre. These sites provide a supply of 24.1 courts of which 20.64 courts are publically available. It is calculated t hat Rother has 2.59 courts per 10,000 of the population which is lower than England (3.91 courts ), South East (4.14 courts) and the neighbouring authorities.

2.39 In terms of demand for sports halls, this equates to 3,676 VPWPP and the model analyses that 22.69 courts are required (including a comfort factor). It should be noted that the percentage of Rother’s population without access to a car is 17.8% which is lower than the national average and similar to the regional averag e. This also suggests that the demand created is relatively mobile. Therefore, in basic terms this creates a supply and demand balance of a requirement for 2.05 courts.

2.40 When the FPM model analyses deeper into the Satisfi ed Demand of Rother’s sports halls, it calculates that 91.8% of total Satisfied Demand is met. This is similar to the national figure (91.2%) but is lower than the figure for the south east region (94.5%). Of this Satisfied Demand, 85.1% is by those travelling by car which i s above the national figure (77.0%) and the regional figure (81.7%). However, the model sho ws that 30.7% of the demand that is currently satisfied is exported from Rother into other authority areas. This is significantly higher than all of the neighbouring authority areas , with the exception of Wealden.

2.41 Unmet Demand has been calculated at circa 303 visit s per week or 8.2% which is higher than the South East (5.5%) but lower than England (8.8%) . This equates to 1.88 courts and the FPM shows that 97.1% of this Unmet Demand is due to the population living outside the catchment area.

2.42 In terms of understanding the Used Capacity of the halls, the FPM has calculated that the overall capacity of halls used is 65.1% (South East 66.5% and England 68.5%). The FPM identifies that sports halls with a used capacity o f 80% and above are considered to be busy, therefore, the halls across Rother are currently under-utilised.

2.43 When looking on a site by site basis, the FPM shows that Bexhill Leisure Centre is at 100% Used Capacity, whereas Bexhill College (55%) and Be xhill High School (58%) are underutilised. Therefore, there is potential to increase community use at these two sites in order to reduce the burden on Bexhill Leisure Centre. Furthermore, due to its maximum capacity, Sport England identifies Bexhill Leisure Centre’s importance as a community facility and therefore it needs to be resupplied at the new centre.

2.44 In addition, our benchmarking analysis has also shown that the Bexhill Leisure Centre sports

hall is very well utilised. In 2012/13, the income per court was £[REMOVED] which is circa £[REMOVED] per court higher than our FMG benchmark figure for trusts of £15,834. Therefore, similarly to the pool, despite the age of the facility, the spor ts hall is performing excellently.

2.45 Overall, the evidence from the FPM and benchmarking has shown the need for a sports hall at the new Bexhill Leisure Centre. Currently, Bexhi ll Leisure Centre is operating at 100% used capacity and the benchmarks show it is currently pe rforming very well. Therefore, we would advise that a sports hall must be retained at the n ew Bexhill Leisure Centre.

2.46 The information would suggest there is potential to increase the size of the sports hall due to its high utilisation. However, we would advise that the hall remains as a 4 court hall and the

Page 105: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 18

Bexhill College and Bexhill High School halls should increase their community use to help reduce the strain on the leisure centre. There is n ot enough evidence to suggest that the additional 2 courts across Rother should be supplied in Bexhill only in order to create a 6 court hall at the site.

2.47 Furthermore, the SFC calculates that circa 12 court s are required for a population of Bexhill, therefore falling in line with the current supply ( Bexhill College, Bexhill High School and Bexhill Leisure Centre all have 4 courts each). The refore, we recommend that a 4 court sports hall is included in the facility options.

Soft Play

2.48 A soft play area is designed to encourage health an d fitness in children, and promote physical activity. Every soft adventure play area i s used to accommodate the natural development of children through play incorporating running, bouncing, rolling, climbing, interactivity, special awareness, scrambling, swing ing, sliding crawling etc. These facilities can be used by toddlers to young children, dependin g upon the design of the facility and equipment.

2.49 There is currently the Jumbos Soft Play Centre at Bexhill Leisure Centre which targets ages 2-8 years and it offers all of the classic soft play features including slides, bridges, balls etc. There is also the opportunity to hold a birthday parties or for children to attend the after school activity club or holiday club.

2.50 In terms of competing facilities to Bexhill Leisure Centre within 20 minutes’ drive time, the full supply of soft play facilities can be found in Appendix A. The closest facility is Clambers Indoor Soft Play Centre (11 minutes’ drive time) wh ich has a multi-level climbing frame with slides, ropes, ball pits etc. There is also a garden (weather permitting) which has a climbing frame, paddling pool, large sand pit, play houses, slides and other activities. The analysis also showed that there are 3 facilities in nearby E astbourne; Treasure Island, Leo’s Play Den and The Play Station.

2.51 When analysing demand, we have looked at the curren t performance of the soft play facility.

In 2012/13, children’s activities generated circa £[REMOVED] at Bexhill Leisure Centre (£[REMOVED] when including activities at Bexhill Leisure Pool). Therefore, currently the facility does not make significant income to suggest soft play should be included in the proposed facility mix.

2.52 Generally in soft play ‘the bigger the site the bet ter’, however, due to the ageing population in Bexhill, there is only circa 5,600 children aged 0-14 years within 5 minutes of the site and a further 3,500 within 10 minutes (9,100 in total) and this is probably reflected by the income levels above in 2012/13. Therefore, it appea rs there is not great demand for soft play in the area.

2.53 However, there is currently no competition within 1 0 minutes of the facility and we believe that there is potential for the provision of soft p lay at the new site of a larger size to what is currently available at Bexhill Leisure Centre. This will cater for the local children and provide a facility on their doorstep.

Squash

2.54 Bexhill Leisure Centre currently has 3 squash court s including 1 glassed backed court. Including the centre, there are 13 courts within a 20 minute drive time of the new site (see Appendix A). However of the 13 courts, 9 of the squash courts are part of private clubs; Bexhill Squash and Social Club, Cooden Beach and Sp orts Club and David Lloyd Eastbourne,

Page 106: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 19

therefore, private membership is required to access the courts. The only other public squash facility within 20 minutes’ drive time is at Summer field Leisure Centre (12 minutes’ drive time) where there is currently one court.

2.55 Unfortunately, we did not receive a breakdown of sq uash income for 2012/13, therefore we cannot fully analyse the current performance. Howev er, the ‘dry activities’ line of the profit

and loss account states that circa £[REMOVED] was gene rated at the centre, with a high proportionate most likely from squash income. This suggests that the 3 courts create circa

£[REMOVED] each per year, which is in line with industr y averages.

2.56 This information would propose that 3 courts should be retained in the new facility. We believe that due to the lack of publically accessib le squash courts in the area, there is adequate evidence to include all three as part of a larger leisure scheme but we would class them as a ‘non-core’ option.

Ten Pin Bowling

2.57 Ten Pin Bowling facilities are found across the country from small boutique offerings (i.e. 6-8 lanes) through to large multi-lane facilities (i.e. 30 lanes). They are often supported by ancillary services such as arcade machines, cafes, bars and pool tables to create a leisure experience for the user.

2.58 The activity generally targets those aged 5-34 year s old. The main target group is people up to the age of 44 years, with 0-15 years mainly aime d at party income and the 15-34 years for general pay play. The demand catchment is regarded as 120,000 people within a 20 minute drive time and this can create net bowling revenue of at least £30,000 per lane.

2.59 There is currently one facility within 20 minutes a t Lloyds Lanes, Eastbourne (20 minutes’ drive time). The facility is a large scale ten pin bowling facility which has 20 lanes, laser quest, pool, arcade and sports bar and grill. It should also be noted (see Appendix A) that there is also a 24 lane facility at Hailsham Leisur e 24 minutes’ drive time from the new site.

2.60 On average there is a population of circa 10,000 fo r each lane in the UK. In terms of demand, there are circa 202,000 people within a 20 minute c atchment area around the new site. This suggests there should be 20 lanes in the 20 minute catchment which is currently covered by Lloyds Lanes in Eastbourne. However of this catchment, 139,000 people are in the 10-20 minute catchment section, suggesting they come from the outskirts of Eastbourne, Hastings and Battle. As a result, those who live close to Eastbourne are likely to travel to Lloyds Lanes making it highly likely that they will travel to a facility in Bexhill which restricts the available catchment area.

2.61 Therefore, if we were to analyse the 0-10 minutes’ drive time only from the new site, there are 63,000 people and this would equate to a maximu m of 6 lanes. There is also potential for people from Hastings to travel to Bexhill as there is currently not a facility in Hastings. The new bypass will enable increased access for the Has tings residents, making the new centre an attractive proposition.

2.62 Overall, we believe that a large ten pin bowling fa cility (i.e. 20 lanes or above) would not work in Bexhill due to the competition in Eastbourne with a large proportion of the catchment likely to go to Lloyds Lanes. However, th ere is potential to include a 6 lane facility for the close population of Bexhill (circa 63,000 plus potentially Hastings residents) but we believe that this would only work as part of a broader offer and could not be a standalone facility.

Page 107: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 20

Climbing and Bouldering

2.63 Indoor climbing walls provide a range of climbing adventures for those of all abilities throughout the year. Climbing activities can be use d by all age groups but generally are more attractive to the younger market, and possibly stud ents, with younger people supporting the party income. Indoor bouldering involves climbing on a wall undertaken without a rope and is generally limited to small climbs with a safety mat below the participant to prevent injury.

2.64 There is currently no demand model for climbing wal ls and bouldering. However, by understanding the demographics of the local catchme nt and applying some historical user data it is possible to make an assessment for the l evel of demand.

2.65 Climbing attracts a wide variety of ages including children for parties etc. with young people starting at 4 years old and older climbers of 60 years old. The main demographic population groups are between 4 and 39 years of age. The prope nsity to participate from the age group 40 plus starts to see decay in demand which increas es with age.

2.66 A smaller type local facility would need to attract circa 18,000 users per annum which would require a total population catchment of over 106,00 0 within the immediate catchment and assuming that no other climbing walls were in the s ame catchment. For a larger facility the target sales is between 25,000 and 40,000 users but needs a catchment of between 150,000 and 250,000 within a circa 20 minute drive time

2.67 The supply of climbing walls within a 45 minute cat chment can be seen in Appendix WHAT. However, if we focus on a 20 minute drive time, it can be seen that there are currently two walls. There is a wall at Bexhill College (3 minute s’ drive time) which can cater for a maximum of 12 people at £4 a group. The wall is 8m high and 40m2. There is also a climbing facility in Hastings called the Robsack Centre (12 minutes’ drive time) where there is a 20ft wall as part of a sports hall. It costs £55 per hour (maximum of 9 people) and this includes hire of the climbing wall, tuition from a qualified instructor and hire of the equipment. It appears that pay and play is not available at eithe r centre and this could potentially be a market to penetrate.

2.68 When analysing the demand, we estimate that within 20 minutes of the site there are circa 202,000 people but this does not reflect the pull f actors of the walls in Eastbourne, Hastings and even Brighton. Due to the majority of the popul ation (circa 139,000) being located in the 10-20 minute band of the catchment, this means they any potential users are likely to travel to Eastbourne or Hastings.

2.69 In terms of catering for this immediate catchment 1 0 minute catchment of 63,000, the wall at Bexhill College is group hire only, leaving the pay and play market is open for a climbing wall at the new centre. As previously mentioned, it is estimated that an immediate catchment of 106,000 is required for a small wall, indicating that a wall in Bexhill is not viable. However, due to the Robsack Centre also bei ng group hire only and part of a sports hall (not a dedicated facility), a climbing wall at Bexhill potentially will be able to attract the population to the East from Hastings, especiall y with the opening of the new bypass.

2.70 Therefore, we believe that a dedicated climbing wal l (i.e. not part of a sports hall) could potentially be viable at the new Bexhill Leisure Ce ntre as part of an ‘core’ scheme. For it to work, the new facility will have to have scale, a r ange of different but complimentary facilities and have a destination feel to the site to draw people across from Hastings. There are a number of specialist providers that can be us ed to operate the facility for a rental stream, to de-risk this facility type for the Counc il.

Page 108: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 21

Spa Facilities and Health Suite

2.71 A spa facility is different from a health suite. A spa is defined as having a water based therapy, such as a hydro pool, Jacuzzi etc. and normally has a range of treatment rooms and a range of heat and ice treatments. A health suite consists of a sauna and steam room plus other heat experiences. It should be noted that hot els and beauty salons often use the word “Spa” in their name but are not necessarily spa fac ilities.

2.72 The local authority market has entered this market, providing beauty treatments and Spa facilities at a lower cost than some hotels and spa resorts. It should be recognised that they do not tend to cater for the spa day as such, with robes, lunch and expensive surroundings that you would find in a hotel spa.

2.73 Income can be high with most income coming from treatments and product sales, but also members bolting on the spa to their monthly members hips (where there is a gym) and casual users. Specialist qualified staff is required to operate the facility, and the key is to find an experienced spa manager in order to make the facili ty profitable.

2.74 A Spa does provide an element of sophistication and difference to a leisure site, providing something more up market, and this would be very su itable for the area of Bexhill. They are mainly used by women of all ages, but also men, it could provide a positive image of the town and cater for the older and ‘well off’ demographic in the town. There is also potential for sights looking over the sea would provide a very calming and relaxing offer.

2.75 We would expect any facility in Bexhill to include as a minimum (to be compliant as a spa rather than a health suite):

• 3 or 4 treatment rooms

• 4 x heat and ice experiences

• Sauna and steam rooms

• Plunge pool/Hydrotherapy pool

2.76 We have undertaken an audit of these facilities (se e Appendix A) and this also includes the locations and services (i.e. ice shower, ice founta in etc.) provided. The nearest spas to the new Bexhill Leisure Centre site are in Eastbourne ( The Grand Hotel, 20 minutes’ drive time) and Uckfield (East Sussex National De Vere, 36 minu tes’ drive time). There are also a range of spas in Brighton at a circa 45 minute drive time .

2.77 Therefore, due to the lack of similar facilities to the proposed Spa in the area, we believe that a Spa should be considered in any potential la rge scale scheme in Bexhill. It will create a different option to the surrounding competition which are generally hotel spas and will provide an affordable day facility for all ages of the community, providing a valuable asset to a large scale leisure option.

Page 109: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 22

What does this mean for the Council?

Broxtowe

• Health and Fitness Suite – There is latent demand o f a further 188 members, totally 1,854 members. This leaves a requirement of a 70 st ation gym, 25 stations less than the combined two facilities.

• Swimming Water – it is essential that swimming pool water is resupplied at the new site. The amount of water should be increase above to cur rent levels to a minimum of 400m2 with the potential to provide large scale leisure w ater if affordable.

• Sports Hall – A 4 court sports hall should be re-provided. There is not sufficient evidence to increase the size to a 6 court hall.

• Soft play – There is currently no competition within 10 minutes of the facility and we believe that there is potential for the provision o f soft play at the new site of a larger size to what is currently available at Bexhill Leis ure Centre.

• Squash – Within a 20 minute drive time, there are o nly 4 public squash courts, of which 3 are supplied at Bexhill Leisure Centre. Therefore, they should be resupplied but as a ‘non-core option’.

• Ten Pin Bowling - Bexhill appears to have a catchme nt population of circa 63,000 within a 10 minute catchment which suggests a 6 lane bespo ke facility may be achievable at the site but we believe that this would only work as pa rt of a broader offer and could not be standalone facility.

• Climbing Wall - in terms of catering for the immediate catchment, we believe that climbing and bouldering could potentially be viable due to the walls at Bexhill College and Robsack Centre being groups only.

• Spa Facility - due to the lack of similar facilitie s in the area, we believe that a Spa should be considered in any potential new centre in Bexhill.

Page 110: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

03

3. Project Options

Facility Mix

3.1 The table below sets out the facilities to be inclu ded in the new sport and leisure facility based upon the results in Section 2.

Table 3.1 – Facility Mix

Facilities Basic Core

Main Pool 313 313 Learner Pool 91 91 Leisure Water - 75 Balance of Pool Hall 322 397 Total Pool Hall 725 875 Viewing Area 100 150 Wet Changing 300 400 Wet Support 100 100 Sports Hall 576 690 Hall Storage 75 85 Dry Changing 125 175 Dry Changing 125 125 Health and Fitness Gym 350 350 Studio (incl. Stores) 216 216 Treatment Rooms 50 50 Health Suite 100 100 Soft Play 100 Squash Courts (3) 185 Viewing Area 50 Café/Foyer/Kitchen/Vending 200 300 Admin and Reception 100 125 Meeting Rooms (2) 75 75 Main Drill Hall (2 courts) 350 350 Total for Facilities 3,567 4,501

Add Provisions for:Plant 357 450 Circulation 268 338 Internal Walls 89 113 Total 4,280 5,401

Page 111: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

04

4. Capital Costs

Introduction

4.1 This section provides details of the construction costs, capital payments and equipment costs for each of the project options. These have been prepared from information provided by the design team Faulkner Brown.

Capital Payments

4.2 The table below sets out the capital payments which have been provided by Faulkner Brown.

Table 4.1 – Details of Capital Payments

All £ Basic Core

Main Construction Contract 12,000 13,500

Equipment Costs 214 245

Inflation to Construction Outturn 488 548

Capitalised Interest 745 893

Capital Receipts -8,000 -8,000

Total Capital Payments 5,447 7,186

Key Assumptions

4.3 The following assumptions have been used in prepari ng these costs:

• Gross Internal Floor Areas as set out in Section 3 above

• Price base 1Q-2014

• Professional fees included in the above figures

• Infrastructure works and contingency provisions inc luded

• Inflation at 3% per annum compounded

• Interest on construction drawdown charged to projec t and financed by debt

• Details of capital funding are set out in the table 4.3 below.

Page 112: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 25

Land Acquisition Costs

4.4 It is assumed that there are no land acquisition co sts to be included in the capital costs.

Decommissioning Costs

4.5 No provision has been made to the decommissioning costs of the swimming pool or the current leisure centre.

Capital Equipment

4.6 The project options models include some initial new equipment which will need to be financed and included in the overall capital paymen t cashflow within each of the Project Options Models. Detail of the equipment is shown in the table below.

Table 4.2 – Operator Equipment

All £ Basic Core

Swimming 31,743 31,743

CV Equipment 0 0

Resistance Equipment 0 0

Fitness General 42,474 42,474

Dance Studio 7,700 7,700

Sports Hall 24,500 47,400

Café 52,000 52,000

Administration 17,875 17,875

General 11,000 8,500

Other 0 10,000

ICT 26,850 26,850

Totals 214,142 244,542

4.7 Some of the equipment required will be financed thr ough leasing and will impact on the profit and loss account of the leisure operator.

Capital Funding

4.8 Details of the capital funding to support the capit al payments above are set out in the table below.

Page 113: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 26

All £’000 Basic* Core*

Sale of the Commercial Site Land 2,000 2,000

North Bexhill Housing Land 500 500

Surrender of the Swimming Pool Lease 2,000 2,000

Planning Gain from the Ravenside Developer 1,000 1,000

Capital Receipt from Marks and Spencer 500 500

Sport England Grant 1,500 1,500

Other Grants – (to be identified) 500 500

Totals 8,000 8,000

*these have been provided to us by the Council/Faul kner Brown.

Disposal of Old Equipment

4.9 We anticipate that the new facility will have all n ew equipment which the exclusion of some office equipment that may transfer. It is difficult to value the inventory of current equipment, but as a prudent approach we have not in cluded any value in the financial model for the proceeds of any disposal.

Page 114: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 115: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 116: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 29

New Business Plans

5.7 We have prepared a business plan for each of the pr oject options and we have highlighted the assumptions and outputs from the business plann ing undertaken and where appropriate compared this to the actual performance.

Key assumptions applied to Business Plan

5.8 The following assumptions have been used :

• Charitable trust operates the facility

• New facility opens April 2017

• VAT applied to catering and retail income only all other income exempt

• Recovery of VAT at 10%

• Operator directly manages retail and catering servi ces

• No corporation tax or capital allowances applied

• NNDR costs met by Council

• Building lifecycle costs are met by the Council

• Day to day maintenance, service contracts and preve ntative planned maintenance are the responsibility of the operator

Project Option – Basic Scheme

5.9 We have prepared a 5 year business plan for the bas ic scheme using the facility mix as shown in Section 3 and the current pricing. We have applied indicative programmes and made a comparison with the current performance as a sense check.

5.10 The table overleaf sets out a summary of the 5 year income and expenditure for the Basic project option.

Page 117: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 118: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 119: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 120: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 33

Supplies and Services

5.26 The current cost is circa £[REMOVED] and we have estim ated that the cost for the new facility

within the increased number of users is marginally more at £[REMOVED] per annum and covers postage, stationary, licences, consumables and professional services (cash collection, banking charges etc.).

Profit, Central Costs and Overheads

5.27 We have included within this heading, irrecoverable VAT, leasing costs, profit and overhead

recovery by an operator of the facilities totalling £[REMOVED] in Year 1 and circa £[REMOVED] by

Year 5. This compares to the actual cost in 2012/13 of £[REMOVED]. However we are not clear on whether the profit and overhead recovery is in the actual costs.

Project Option – Core Scheme

5.28 We have also prepared a 5 year business plan for the Core scheme using the facility mix as shown in Section 3 and the current pricing. We have applied indicative programmes and made a comparison with the current performance and that of the basic project option as a sense check.

5.29 The table overleaf sets out a summary of the 5 year income and expenditure for the Basic project option.

Page 121: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 122: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 35

5.30 It can be seen that the turnover of the business is £1.575 million (which compares £1.4 million for Basic scheme) rising to £1.67 million plus by Year 3 onwards (£1.5 million plus in Basic scheme).

5.31 The main changes between the Scheme and this Core s cheme are the provision of squash courts and also soft play.

Sports Hall

5.32 There is no change in the sports hall income at £71 ,000 in Year 1 and future years.

Health and Fitness

5.33 The table below sets out a summary of the income fo r fitness over gym membership, casual gym use and classes and is the same as the Basic sc heme.

Table 5.7 – Summary of Fitness Income

All £ Year 1 Year 2 Year 3 Year 4 Year 5

Membership Income

647,089 664,461 683,696 687,417 687,417

Casual Gym Income

34,624 25,279 12,639 12,639 12,639

Casual Class Income

31,738 28,564 25,707 23,137 23,137

Total 713,451 718,303 722,043 723,193 723,193

Swimming

5.34 Swimming income has increased from the Basic scheme to reflect the marginal impact of the leisure water of £13,000 in Year 1 and the comp ounding impact of this over the 5 years.

5.35 The table below sets out a summary of the swimming income over the first five years of operation.

Table 5.8 – Summary of Swimming Income

All £ Year 1 Year 2 Year 3 Year 4 Year 5

Casual Swimming

272,404 286,024 300,325 315,341 331,109

Swimming Lessons

164,206 172,416 181,037 190,089 199,593

Pool Hire 49,275 51,739 54,326 57,042 59,894

Totals 485,885 510,179 535,688 562,472 590,596

Page 123: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 36

Meeting rooms

5.36 We have included a marginal increase in income for meeting room hire compared to the Basic option of circa £1.5k per annum.

Soft Play

5.37 Under this option we have included provision of soft play which is parentally supervised and generates revenues from casual use and party hire o f circa £90,000 per annum and rising to £110,000 by Year 5.

Squash

5.38 The inclusion of squash courts has resulted in additional income of circa £18,000 per annum rising to circa £23,000 by Year 5.

Café and Retail

5.39 Under this option, the increased projected usage wi ll increase café and retail sales by circa £23,000 before cost of goods sold but excluding VAT.

Employee Costs

5.40 We have calculated the level of staffing required, included employer on-costs for national insurance and pensions, plus holiday cover and training at £754,000 per annum which is higher than the Basic scheme of £739,000 and repres ents the cost of additional lifeguarding for the leisure water.

Premises Costs

5.41 Premises costs are linked to the gross internal floor area of the building. Under the Core scheme this is increased by 1.121m2 as shown in Sec tion 3 above.

5.42 However the main increase relates to utility costs which have increased by circa £30,000 and equipment lifecycle provision (from the margina l increase in equipment provision).

Supplies and Services

5.43 We have not increased the costs associated with pos tage, stationary, licences, consumables and professional services (cash collection, banking charges etc.) when compared to the Basic scheme.

Profit, Central Costs and Overheads

5.44 These costs are linked to income and with the incre ase in income we have seen a £15,000 increase in these costs compared to the Basic schem e.

Page 124: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 37

Marginal Impact of Supplementary Facilities

5.45 As part of our assessment of the facilities to be included in the business plans, we were asked to include the net marginal income or costs, after debt of a number of supplementary items and these are included in Appen dix D to this report but cover the following areas:

• Ten Pin Bowling (6 lanes)

• Small climbing wall

• Full Spa offer

• Crèche facility

• Replace formal water space with free form leisure water

5.46 Details of the financial implications are shown in the table below.

Table 5.9 – Marginal Impact of Supplementary Facilities

Marginal Impact*

Direct Operation of Ten Pin Bowling -£16,346.24

Direct Operation of Climbing (Small) -£56,596.24

Provision of full Spa Facility -£31,940.10

Replace Standard 6 lane pool + learner pool with le isure water configuration

-£165,400.20

Provision of a Crèche -£41,216.21

*negative is a cost.

5.47 Further details on the calculations, caveats etc. a re included in Appendix D to this report.

Page 125: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

06

6. Financial Modelling and Affordability

Introduction

6.1 This section brings together the Net Present Value and affordability of each of the project options set out in Section 3. In particular this section covers the following:

• Key modelling assumptions

• Capital payments

• Capital receipts

• Debt costs

• Interest on temporary cashflows

• Net facility operating costs

• Lifecycle costs

• Cashflow Projections

• Affordability.

Key Assumptions for each Financial Model

9.1 The following assumptions have been used in project ing the forward costs of each of the options:

• Construction works will take circa 18 months to be completed

• Net Present Discount Rate is 3.5% (HM Treasury Gree n Book)

• Interest rates on temporary cashflow borrowing is 3% per annum

• Interest on temporary cashflow is capitalised and charged back to the scheme which is then financed from debt

• Investment interest on Capital Receipts received is 1.5%

• No inflation has been used in the models, other tha n 3% for capital inflation

• VAT is assumed to be fully recoverable by Council on its capital costs

• The net direct operating surplus budget for the two sites being considered as part of this report is £192,070 (made up of the manageme nt fee paid by the Council less the net direct operating cost of Rye £346,367 less £154,297) at 2012-13 prices and is used for affordability comparison purposes.

Page 126: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 39

Capital Payments

9.2 The main construction contract capital costs and ca pital funding have been provided by the design team. The equipment costs, inflation and capitalised interest have been calculated by the financial model and are shown in the table below.

Table 9.1 - Summary of Capital Payments

All £ Basic Aspiration

Main Construction Contract 12,000 13,500

Equipment Costs 214 245

Inflation to Construction Outturn 488 548

Capitalised Interest 745 893

Total Capital Payments 13,447 15,186

Net Capital Payments funded by Debt

9.3 The table below sets out the options and their resp ective capital payments, adjusted for internal capital funding, capital receipts and grants that will be financed from debt. The debt servicing costs will be charged to the on-going revenue costs of the project over the following 25 years.

Table 9.2 - Summary of Net Capital Payments to Finance from Debt

All £’000 Basic Core

Capital Payments 13,447 15,186

Less: Capital Funding -8,000 -8,000

Long Term Debt 5,447 7,186

Lifecycle Costs

9.4 We have calculated a broad estimate of building lif ecycle costs based upon 20% of the capital costs and divided over 25 years to obtain an annual contribution which is standard practice at this stage of the project. It should be noted that this provision does not include inflation and assumes full recovery of VAT attributable to lifecycle expenditure.

9.5 The table below sets out the total value of the lif ecycle fund and the annual contribution included within the financial model fo r each option.

Page 127: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 40

Table 9.3 - Lifecycle Funds and Annual Contribution

All £’000 Total Building Provision

Annual Building Contribution

Total FF&E Provision

Annual FF&E Contribution

Basic 2,400 96 925 37

Core 2,700 108 1,050 42

9.6 The building lifecycle fund sets aside money to rep lace key elements of the building over its lifetime. The annual provision for FF&E is to meet the replacement of the original capital cost of FF&E provision acquired at the end of the build programme.

Net Operating Surpluses

9.7 A summary of the net operating surpluses for the two project options is shown in the table below. Detailed business plans are provided f or each option in Appendix B and C.

Table 9.4 - Summary of Net Operating Surpluses

All £ March 2018 March 2019 March 2020 March 2021

Basic 102,092 114,113 111,992 144,257

Core 163,573 182,605 187,008 226,132

Affordability

9.8 A key part of the equation is the annual cost of ea ch option compared to the budgetary provision that the Council will have to m eet the overall cost each year of the facility when the services are operational.

Affordability during Operation

9.9 The tables below sets out a summary of the first 4 years of revenue costs against the current budget provision. For the purposes of these tables any negative numbers are income.

Table 9.5 – Affordability Basic Scheme

All £ March 2018 March 2019 March 2020 March 2021

Net Operating Position Surplus 102,092 114,113 111,992 144,257

Building Lifecycle Costs -96,000 -96,000 -96,000 -96,000

Debt Costs -330,529 -330,529 -330,529 -330,529

Page 128: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

New Bexhill Leisure Centre 41

All £ March 2018 March 2019 March 2020 March 2021

Total -324,437 -312,416 -314,537 -282,272

Current Budget (excl. Rye Cost) 191,000 191,000 191,000 191,000

Net Saving/(Additional Cost) -133,437 -121,416 -123,537 -91,272

Table 9.6 – Affordability Core Scheme

All £ March 2018 March 2019 March 2020 March 2021

Net Operating Position Surplus 163,573 182,605 187,008 226,132

Building Lifecycle Costs -108,000 -108,000 -108,000 -108,000

Debt Costs -436,003 -436,003 -436,003 -436,003

Total -380,430 -361,398 -356,995 -317,871

Current Budget (excl. Rye Cost) 191,000 191,000 191,000 191,000

Net Saving/(Additional Cost) -189,430 -170,398 -165,995 -126,871

Summary

9.10 In summary, both options produce an operational surplus.

9.11 However, after taking into account the capital cost s, funding and associated debt costs together with building lifecycle costs that a re probably not allowed for in the Council’s budget, both options will require additional support if they are too be affordable.

9.12 Taking into account the impact of any of the supple mentary schemes, these would increase the potential net deficit of each of the o ptions.

Contact

9.13 Please contract Kevin Godden, Director, FMG Consult ing on 07710710847 or [email protected]

Page 129: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

88

Page 130: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

86

Page 131: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

87

Appendix 2

Environmental Agency Site Advice

Page 132: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Environment Agency

Orchard House (Endeavour Park) London Road, Addington, West Malling, ME19 5SH. Customer services line: 03708 506 506 www.gov.uk/environment-agency

Cont/d..

Mr Nigel Tye Faulkner Browns Architects Dobson House Northumbrian Way Newcastle upon Tyne Tyne and Wear NE12 6QW

Our ref: KT/2014/118350/01-L02 Your ref: Bexhill Leisure Centre Date: 18 June 2014

Dear Mr Tye Preliminary Opinion - Feasibility study for new leisure centre (including swimming pools) and commercial / residential / car parking development to the site of the existing leisure centre and drill hall (to be demolished) and the previous high school site (already demolished). Bexhill Leisure Centre/ Bexhill Down/ High School Site (now demolished), TN39 4HS. Thank you for consulting us on the pre-application enquiry regarding the above proposed development. We have reviewed the information submitted and have identified some areas that we feel need to be addressed as part of the planning application and these are set in our Preliminary Opinion below: Flood Risk Part of the site lies within Flood Zone's 3 and 2 and a main river (culvert) crosses the site or adjoins the eastern boundary. Please refer to the attached OS map extract. Flood Risk Assessment The application site lies within Flood Zone 3/2 defined by the Environment Agency Flood Map as having a high/medium probability of flooding. Paragraph 103, footnote 20 of the National Planning Policy Framework (NPPF) requires applicants for planning permission to submit an Flood Risk Assessment (FRA) FRA when development is proposed in such locations. For further guidance on assessing flood risk for planning applications and how to undertake a Flood Risk Assessment (FRA) please refer to our website (link below):- https://www.gov.uk/planning-applications-assessing-flood-risk In particular, for this type of site, attention is drawn to "Flood Risk Assessment (FRA) Guidance Note 3". Your FRA should make reference to modelled flood levels (where available). Finished floor levels should be set accordingly. The construction of the new BHLR road should have no effect on local flood risk. Prior to investing resources in completing a FRA, applicants are advised to contact the Local Planning Authority (LPA) and discuss how the flood risk Sequential Test as set

Page 133: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Cont/d..

2

out in the National Planning Policy Framework (NPPF) will affect the proposed development. Proximity to Main River The line, dimensions and level of the Egerton Park Stream culvert (Classified Main River) should be identified and confirmed on site. Restrictions may apply to any works within 8 metres on either side of the culvert. It is recommended that no new buildings, structures (including gates, walls and fences) or raised ground levels are undertaken within 8 metres of the outside edge of the existing culvert. This provides for access for future watercourse maintenance or improvement and also safe floodwater conveyance and storage. Flood Defence Consent The site incorporates/is bounded by the Egerton Park stream, a main river under the jurisdiction of the Environment Agency. Any works whatsoever in, over, or under the channel of this watercourse on its banks within 8 metres from the top of the channel, would require the prior consent of the Agency under Section 109 of the Water Resources Act 1991 and/or Byelaws (known as Flood Defence Consent). For further information on how to apply for Flood Defence Consent please refer to our website (link below): https://www.gov.uk/flood-defence-consent-england-wales Activities controlled by flood defence consent The flood defence consent will control works in, over, under or adjacent to main rivers (including any culverting). Your consent application must demonstrate that: there is no increase in flood risk either upstream or downstream; access to the main river network and sea/tidal defences for maintenance and

improvement is not prejudiced. works are carried out in such a way as to avoid unnecessary environmental damage.

Mitigation is likely to be required to control: Off site flood risk We will not be able to issue our consent until this has been demonstrated. Contamination Site investigations to determine the extent of any contamination on-site need to be addressed and then preparation of a remediation strategy that will ensure that both during and after the construction phase there will be no adverse impacts on the environment will also be required. These reports should be included with any planning applications. Where these reports are missing, or where they do not demonstrate that the development of the site can go ahead without environmental damage, we will likely raise objection to the planning application.

Page 134: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Cont/d..

3

We also need to see information regarding the proposed surface water drainage arrangements for the site. Drainage schemes may need to be cross-referenced with the results of the preliminary risk assessment in order to avoid creating pathways for any contamination present. National Planning Policy Framework paragraph 109 states that the planning system should contribute to and enhance the natural and local environment by preventing both new and existing development from contributing to or being put at unacceptable risk from, or being adversely affected by unacceptable levels water pollution. Paragraph 120 states that local policies and decisions should ensure that new development is appropriate for its location, having regard to the effects of pollution on health or the natural environment, taking account of the potential sensitivity of the area or proposed development to adverse effects from pollution. Government policy also states that planning policies and decisions should also ensure that adequate site investigation information, prepared by a competent person, is presented (NPPF, paragraph 121). We recommend that developers should: Follow the risk management framework provided in CLR11, Model Procedures

for the Management of Land Contamination, when dealing with land affected by contamination. Refer to the Environment Agency Guidance on Requirements for Land Contamination Reports for the type of information that we require in order to assess risks to controlled waters from the site. Refer to our Guide for Developers which is designed to give practical advice on the environmental issues that may affect the site and provides some examples of sites where good practice has already been applied. Some of the topics covered in the guide include, managing the risk of flooding, wildlife & green space, managing waste and land affected by contamination. You can find this guide and links to further information at https://www.gov.uk/government/publications/planning-a-guide-for-developers .

Sustainable Drainage Surface water run-off should be controlled as near to its source as possible through a sustainable drainage approach to surface water management. SuDS seek to mimic natural drainage systems and retain water on or near to the site, when rain falls, in contrast to traditional drainage approaches, which tend to pipe water off site as quickly as possible. SuDS therefore offer significant advantages over conventional piped drainage systems and will be applicable to most sites. Government policy set out in paragraph 103 of the NPPF expects Local Planning Authorities (LPAs) to give priority to the use of SuDS in determining planning applications. Whilst we generally welcome the inclusion of any SuDS features, they should always be appropriate for the conditions encountered where development is proposed. We would encourage developers to use 'open' features (swales, attenuation basins, wetland areas, etc) rather than subterranean storage tanks or over-sized pipes. Pumped solutions should be avoided (unless it can be clearly demonstrated that there is no viable alternative), and it must be ensured that the receiving network is of sufficient capacity to accommodate any proposed off-site discharge. The continued efficacy of any SuDS scheme is dependent on a robust and pre-determined maintenance regime, the details of which should be agreed with the LPA

Page 135: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Cont/d..

4

prior to the commencement of any development on site. Additionally, any excess surface water generated by an event which exceeds the design parameters should be retained on site in pre-determined areas which are well away from any vulnerable property and where the off-site flood risk will not be exacerbated by its presence. SuDs Guidance Guidance and references on SuDS can be found in Paragraph: 051 of the National Planning Policy Guidance, Reducing the causes and impacts of flooding. The Interim Code of Practice for Sustainable Drainage Systems provides advice on design, adoption and maintenance issues and a full overview of other technical guidance on SuDS. The Interim Code of Practice is available electronically on CIRIA's web site at: http://www.ciria.com/suds/interim_code.htm. Approved Document Part H of the Building Regulations 2010 also establishes a hierarchy for surface water disposal, which encourages a SuDS approach beginning with infiltration where possible e.g. soakaways or infiltration trenches. Where SuDS are used, it must be established that these options are feasible, can be adopted and properly maintained and would not lead to any other environmental problems. Where the intention is to dispose to soakaway, these should be shown to work through an appropriate assessment carried out under Building Research Establishment Digest 365. For further information on SuDS, ‘dry islands’ and situations where disposal to a public sewer is proposed, please refer to the Environment Agency Flood Risk Standing Advice at: https://www.gov.uk/flood-risk-standing-advice-frsa-for-local-planning-authorities . Helpful sources of information on SuDS include: the CIRIA C697 document SuDS manual HR Wallingford SR 666 Use of SuDS in high density developments CIRIA C635 Designing for exceedance in urban drainage – good practice the Interim Code of Practice for Sustainable Drainage Systems. The Interim

Code of Practice provides advice on design, adoption and maintenance issues and a full overview of other technical guidance on SuDS.

The Interim Code of Practice is available on our website at: https://www.gov.uk/government/organisations/environment-agency and CIRIA's website at www.ciria.org.uk Under the terms of the Flood & Water Management Act 2010, each Lead Local Flood Authority will set up a Sustainable Drainage Advisory Body (SAB). Kent County Council (KCC) have been identified as the lead Flood Local Authority for this area and will be responsible for approval of surface water drainage infrastructure for new development. SAB approval will be required in addition to planning consent. We therefore recommend the applicant makes contact with the SAB at KCC to discuss details of the proposed surface drainage infrastructure. Enquiries should be made KCC via email at [email protected] . Swimming Pool Drainage Swimming pool effluent discharges result from the cleaning of filters (filter backwash) and the emptying of pool water (drain-down water).

Page 136: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Cont/d..

5

Filter backwash is the water used to clean accumulated pool dirt and debris off pool filters by reversing the flow across the filter. Cleaning of the filters is a regular exercise (weekly, monthly) and the backwash may contain a mixture of salts, acids, chlorine/bromine derivatives (or other disinfectants), particles of filtration medium and, potentially, accumulated cosmetic oils. Drain-down water arises from emptying the swimming pool. This may be done every three months or even yearly, depending on maintenance and level of use. The volume discharged will be high. The principal contaminant of concern is likely to be the disinfectant and its by-products. This is normally chlorine or bromine based, but hydrogen peroxide or ozone can also used, along with algicides, chlorine stabilizers and other water treatment chemicals. It is imperative that both drain-down water and filter backwash are left to stand (passive venting-off) before being discharged. This can be either within the pool or in a holding tank and its aim is to allow disinfectant concentrations to reduce. The period required for natural venting-off is between two and five days, depending on the nature of product and initial concentrations (chlorine/ bromine disinfectants require longer than ozone/peroxide products). Alternatively, de-chlorination tablets (e.g. sodium thiosulphate) can be used although adding chemicals is not encouraged. If a holding tank is used it will require periodic de-sludging, owing to settlement, with the silt needing to be removed and disposed of appropriately. Hot tubs must also need to be allowed to cool to ambient temperature. Discharge of filter backwash Note! The discharge of filter back-wash direct to surface water is not permissible. Although of small volume, this effluent has the potential to be highly toxic. If disposal to foul sewer is not available, disposal to groundwater via an infiltration system (soakaway), can then be considered. If a groundwater assessment (see Section Discharge to Groundwater: Discharge of Filter Backwash) concludes this disposal route is not permissible, filter backwash may be disposed to surface water via a domestic package treatment plant in some situations. This is potentially acceptable under the following conditions if; it can be passed through the treatment plant without adversely impacting on the

treatment facility and effluent discharge quality; the backwash forms a small proportion of the discharge (a high dilution ratio of backwash : domestic sewage effluent) so reducing the risk; the sewage treatment plant manufacturer confirms that the plant can effectively treat the proposed backwash; the operator monitors the discharge to ensure plant performance is not compromised (as detailed in the permit).

Evidence of the above must be provided in support of an application for a new permit or to vary an existing permit, to surface or groundwater. In addition the applicant must submit details of the potential substances and concentrations present (available from supplier / manufacturer of the filters) to enable the Environment Agency to accurately determine the application and acceptability of the discharge. Discharge of drain-down water Discharge of drain-down water requires an assessment on a case-by-case basis at a pre-application stage to consider the variables of volume, effluent content and receiving water. The applicant must prove that the discharge will not:

Page 137: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Cont/d..

6

have an impact on the receiving surface water environment; contain solid, polluting, offensive or injurious substances; contain any substances prejudicial to fish or spawn, or to spawning beds or food of fish; have an adverse environmental impact; and, because of the potentially high volumes, the applicant must show that: the rate of discharge will be controlled to prevent any significant scouring of the bed or bankside of the receiving water; the discharge will not cause or significantly contribute to flooding downstream.

If our initial assessment concludes potential impact to the receiving watercourse, then we would require the operator to apply for an environmental permit so a more thorough assessment can be made. This application may, or may not, result in the issue of a permit. Note! Small, low volume discharges such as hydrotherapy pools may be disposed of via a domestic sewage treatment facility. De-chlorination via a holding tank is still an essential requirement, and the conditions of disposal listed above still apply. Discharge to Ground / Groundwater Discharge of filter backwash If an operator proposes a discharge to ground that contains filter backwash (either alone or in combination with other effluent sources) an environmental permit will be required. The permit application must include a risk assessment of the proposed effluent disposal and the discharge site for its suitability. Issues that need to be considered include; information on the suitability of the site – height of the water table, percolation (Vp)

results, soil conditions, vulnerability of the underlying ground waters to pollution, the proximity of other abstractions and whether the site is located in a groundwater Source Protection Zone (SPZ) demonstration that there is no risk of run-off to surface waters preferably a properly constructed infiltration system (soakaway) / reed bed. The use of geotextile membranes can aid retention time of effluent

As the discharge is considered a trade effluent (see ‘Charging for Discharges’), it is appropriate to refer the application to Groundwater & Contaminated Land team to assess the risk posed, regardless of discharge volume. Discharge of drain-down water If the operator proposes a discharge to ground that contains drain-down water only and is 5m3/day or less, it may be a de minimis activity, which does not require a permit as long as: the drain-down water is of drinking water quality standard, with no discernible

hazardous substances the discharge has been left to de-chlorinate for at least 2-5 days and does not contain concentrations of chlorine above 0.2 mg/l.

Not withstanding the above, whether a discharge is via a soakaway or directly onto land via irrigation (e.g. plant watering), the discharger still has a duty of care to the environment. They must ensure, for example, that the land area is not waterlogged, and that the ground is not frozen.

Page 138: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

End

7

A discharge of drain-down water/effluent over 5 m3/day is not automatically defined as de minimis and would require an application and subsequent assessment by the Environment Agency. Depending on the specifics of the discharge and the site, the GWCLT will decide whether the discharge is de minimum or that a permit is required. Developers Guide Our Guide for Developers is designed to give practical advice on the environmental issues that may affect sites and provides some examples of sites where good practice has already been applied. Some of the topics covered in the guide include, Green Roofs, using water wisely, wildlife & green space, managing waste and land affected by contamination. You can find this guide and links to further information at: https://www.gov.uk/government/publications/planning-a-guide-for-developers. Review of documentation and Further Work We have not undertaken a detailed review of the pre-application enquiry. We cannot confirm at this stage whether the proposed development is acceptable to us. We do have a voluntary charged-for service where we can provide more detailed pre-application advice to the applicant. As part of this service, we can provide a dedicated project manager to act as a single point of contact to coordinate any problems, data requests or review technical documents. Should the applicant wish us to undertake a detailed review of the proposal (or any subsequent documentation) or want further advice to address the land contamination issues, we can do this as part of our charged service. We can also provide advice on what would be required to secure a Flood Defence Consent for works within 8 meters of a main river. Whilst we have identified some potential issues with this proposed development, we are keen to work with the applicant in resolving these so that we do not have to raise objection at the formal planning stage. Please note that the view expressed in this letter by us is a response to a pre application enquiry only and does not represent our final view in relation to any future planning application made in relation to this site. We reserve the right to change our position in relation to any such application. You should seek your own expert advice in relation to technical matters relevant to any planning application before submission. Yours sincerely Pp Jennifer Wilson Miss Kerry Hesmer Planning Advisor Direct dial 01732 223272 Direct e-mail [email protected]

Page 139: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

88

Page 140: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

84

Page 141: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

89

Appendix 3

Feedback from User Groups

Page 142: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

1

Nigel Tye

From: Laura Leslie <[email protected]>

Sent: 04 July 2014 18:58

To: Nigel Tye

Subject: Let us know your views on the potential facility mix for a new leisure centre in Bexhil

Dear Nigel,

I was sent an email by Scott Lavocah at Rother District Council and he indicated we should contact you

direct, with reference to our ideas for the proposed Leisure Centre.

As a local Yoga Teacher, of course, my thoughts are that there should be a room for group exercise. There

is a definite need in the area for specialist classes for key groups -

Mental Health - Stress, addictions etc. Possibly linked to the association Mind. I can put you in touch with

them.

Senior Citizens - special classes, eg. chair exercises.

Young Mothers

Pregnant Ladies

Arthritis

Obesity to tie in with the "Keep Rother Active Campaign"

Thank you for considering some of the options and do please contact me if you would like clarification.

--

Laura Leslie

Always Yoga

[email protected]

07580 984539 01797 227564

Page 143: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 144: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 145: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

FAO Nigel Tye Faulkner Brown Architects

[email protected]

15th July 2014

Dear Mr Tye,

At the invitation of Scott Lavocah I write to provide an input into the considerations for the new Rother Leisure Centre study.

Having read the summary of the proposed provision of facilities, I am confident that good provision is being

considered for all user groups. The mix would seem both adequate and sensible.

We at Silverdale are of course are only qualified to speak apropos our specialist sport – SWIMMING. To that

end may I enlighten you as to who we are.

Silverdale Swim Schools (SSS) is a Registered ASA SWIMMING SCHOOL operated by joint partners - Trevor and Susan Spinks.

SSS has been regularly hiring the Bexhill Leisure Pool (BLP) for c.10 years. We teach and coach children from the age of rising 4 years up until the age of about 17 years. Since operating at Rother’s BLP, our pupil

numbers have steadily risen year after year; despite the recession. We currently provide swimming lessons in Bexhill for 700+ children and young persons per week. We also have a significant waiting list.

Our USP is clearly our ratio of staff to pupils, which we are confident cannot be surpassed. Testimonies to

our exceptional high quality, yet very reasonably priced lessons, can be read by studying the many reviews

formally accredited to us. Our website currently features a staggering 339 FIVE STAR REVIEWS from highly satisfied parents and carers. All the ratings & comments can of course be validated as they are

submitted via a quality control agency. Our quality of service is such that we are currently rated 1st out of 48 UK Swimming Schools

We are in the happy position of having a dedicated and well trained workforce of over 50 persons which is highly acclaimed for its professionalism and efficiency by the public and indeed within the sport per se;

Unfortunately, the demand for our teaching service greatly outweighs the water resources at our disposal;

hence the massive waiting list.

The spectrum ages of our clientele being what it is, we can only provide our much sought-after lessons, after

the end of the school day. It necessarily follows that we cannot commence our lessons until 4pm on a weekday at the earliest.

When deliberating upon the provision of resources for water based activities, we urge you to take our

requirements and the fact that we are forever expanding into due consideration.

You may be interested in viewing our website - www.silverdaleswimschools.co.uk

It will give you the flavour of what we do, how we do it, and more importantly, who we do it for.

Please do not hesitate to contact me if i can assist you further.

Yours sincerely,

Trevor Spinks

Page 146: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

1

Nigel Tye

From: Warren Trunchion <[email protected]>

Sent: 15 July 2014 09:51

To: Nigel Tye

Subject: Fwd: New leisure centre for Bexhill

Dear Sirs I am writing in response to the potential new leisure facility in Bexhill and to ask you to include

our clubs/sports needs within your considerations.

I run South Coast Inline, we are a sports for development in Line Hockey club and currently use the Bexhill

leisure centre for 2 regular weekly training sessions.

We play in Line Hockey and have been training there for approaching 3 years. In total we run 4 weekly

sessions at different venues (in Hastings, Bexhill and battle) and are ideally looking for a permanent venue

to accommodate all our teams trainings and games.

As well as running this local club I am also chairman of the south east skater hockey association (SESHA)

which has members throughout the south east. Previously we have used the Summerfield’s leisure centre

(also freedom leisure) as our home venue and played league games and hosted national tournaments there.

Unfortunately this year the floor was replaced (funded by the badminton association) with a soft floor that

we are unable to skate on. Subsequently we have several different training/games venues and after losing

Summerfields had to merge leagues and now require our players/teams to travel to the London and eastern

league to play league games in London and Essex.

The currently sports hall in Bexhill is of adequate size for us train on but lacks the additional space for

spectators and match day officials for games. As a club/association we continue to look at the feasibility of

having a bespoke roller rink and feel that there is a viable business opportunity to sustain this.

A normal sports hall may not be able to support our sport where as roller rink could still be multi purpose

and accommodate other sports such as 5 a side football, badminton and basketball for instance? The specific

venue would attract not only roller sports but other associations/sports. As well as my our club using such a

facility there are also teams in Eastbourne, Lewes, Brighton and Tunbridge, whom would be willing to

travel to Bexhill for games and trainings if the venue/facilities where appropriate. In addition to hockey

there are then other sports/activities, including Roller discos which we could host, plus these have been held

at both Bexhill and Summerfield’s by the SK8 school. Hockey Training camps (during half terms). 1066

roller dance now also use Bexhill following the floor change at Summerfield’s; again they have regular

weekly sessions plus events and competitions. There is also roller derby which again has previously been

held at Summerfield’s plus of roller sports disciplines.

The number of hours/different uses would ultimately depend on what facilities where available but could be

anything from our local teams training there to hosting our league (approx 20 -30 Sundays over the year 10

– 6pm) local, national and international tournaments. Multiple roller sports disciplines own trainings,

games and tournaments.

I have listed below the details of our requirements in different tofms and hpw that should a new venue be

built then we would still be accommodated in some way.

Minimum Requirements

• Similar size hall to the present sports centre

• Changing facilities

• Hard floor

• Room to store our goals

Page 147: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

2

Subject to availability we could hold all 4 training session in one venue approx 6 – 8 hours per week all year

round

More useable space

• Hall similar size to Summerfields leisure centre

• Spectator viewing

• Barriers to separate the playing surface/match day officials area

• Changing facilities

• Hard floor

• Room for goals/match day equipment

Subject to availability we could hold all 4 training session in one venue approx 6 – 8 hours per week all year

round

Regular games and exhibitions

League venue for SESHA (approx 20-30 Sundays over the year 10 – 6pm)

Annual tournaments (local/national – possibly international?)

Could attract other roller sports

Ideal requirements

• 40m x20m enclosed Playing area with rounded corners

• Spectator viewing area

• Match day officials players substitution area.

• Sports court multi purpose hard floor.

• Storage for goals and match day equipment

Subject to availability we could hold all 4 training session in one venue approx 6 – 8 hours per week all year

round. This would increase due to expected demand

Regular games and exhibitions (feature semi professional games)

League venue for SESHA (approx 20-30 Sundays over the year 10 – 6pm)

Annual tournaments (local/national/international)

Would attract other roller sports

• different forms of roller hockey (there is a distinct lack of purpose built facilities in the UK, and

various forms of roller hockey)

• Roller derby (currently the fastest growing roller sport in the country)

• Roller discos (Multiple throughout the week; including public and private parties)

• Sledge hockey (for disabled)

• Roller Dance

• Speed/slalom skating

I appreciate that you would not be able to accommodate all thoughts/request and suggestions but if new

leisure facility was to go ahead would welcome the opportunity of having further input so that our sport

is not again forced to find a even less suitable venue. Though part of my request comes from our own

need there is also a genuine need for a recreational activity locally and I feel that roller rink which others

such variety in a seaside town would prove popular with both residents and tourist.

I thank you for the time in reading this and would be happy to answer any questions you have

Kind Regards

Warren

South Coast In-Line

SESHA Chair

Page 148: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother
Page 149: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

1

Nigel Tye

To: Scott Lavocah

Subject: RE: Bexhill Rowing Club

From: Phil McCorry

Sent: 17 September 2014 19:35 To: Scott Lavocah

Subject: Bexhill Rowing Club

Hi Scott,

A while ago i emailed you about the Rother feasibility study for the possible new leisure centre and asked

if an indoor rowing tank could be considered, i am just wondering if you have an update on this or not?

Also are their any community grant schemes that the Rowing Club can apply for for new equipment or

coaching hours?

Regards

Phil McCorry

Follow all news stories on Twitter

Visit our Website

********************************************************************** This email and any files transmitted with it are confidential and intended solely for the use of the individual or entity to whom they are addressed. If you have received this email in error please email us.

Any views expressed are not necessarily the views of Rother District Council unless stated.

This email message has been checked for the presence of computer viruses and malware, however we accept no liability for any unknown virus contained in the message or any attachments. **********************************************************************

Page 150: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

90

Page 151: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

95

Appendix 4

Retaining the Drill Hall in the Masterplan

Page 152: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

96

Further to discussion on the Drill Hall there is a possibility, for its sentimental value, that

retaining the frontage, or frontage / main hall, may be required. If the Drill Hall was to be

retained this could be accommodated quite easily and embraced successfully in many of

the masterplan options. Historically the Drill Hall has sat quite autonomously in the site

and could continue to ‘sit in its own space’ or be conjoined with commercial development

or the leisure centre. The Drill Hall could be converted to a community hall, facilities as

part of the leisure centre or a pub / restaurant.

Option 1

Similar to Option 1B of the feasibility study with a new build leisure centre to the east

of the frontage site with residential to the north and retaining the Drill Hall either the

frontage or including the main hall space with later lean-to additions removed. The option retains positive connectivity to the Skills Centre and across the site. The link

between the Drill Hall and leisure centre could be a physical building element such as

a cafe foyer or alternatively could be an external plaza space potentially with a roof canopy.

Page 153: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

97

Option 2

Similar to Option 2 of the feasibility study with a new build leisure centre to the centre of

the site and commercial / residential to the east of frontage retaining the Drill Hall. There

are several ways the accommodation and car parking to the frontage could be laid out

including the potential to integrate a hotel / restaurants alongside the Drill Hall.

Page 154: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

98

As stated in the feasibility report retaining and extending the existing Bexhill Leisure

Centre will require signiicant demolition and remodelling to conjoin new wet facilities and may not be a cost effective solution. The options shown are purely to test the

potential layout/it on the site particularly if the Drill Hall is retained.

Retain / Extend Option 1

Retaining the existing Bexhill Leisure Centre and extending to create a wet sports to the

east side would require a connection to be driven through the centre from a new entrance

on the western edge. This would require signiicant remodelling and demolition which, together with the tightness to the eastern boundary, suggests this option would be

unfeasible and ineficient. If the culvert cannot be realigned this option is not possible.

Page 155: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

99

Retain / Extend Option 2

With the wet facilities to the west side you could retain the majority of the existing Bexhill Leisure Centre though a route will still require to be driven through to tie the facilities

together. This option would retain the entrance in approximately its existing position

though may require extending (as shown) to provide dry changing / hall storage which

would be lost by creating the central connection. The car park is shown maximised around

the entrance (c.100 spaces) with additional spaces to the west of the facility. The centre

of the site would be residential.

Page 156: Bexhill Down Leisure Hub Masterplan Feasibility ... - Rother

Dobson House

Northumbrian Way

KillingworthNewcastle Upon Tyne

NE12 6QW

Tel. +44 (0)191 268 3007

Fax. +44 (0)191 247 8132

[email protected]