Phase 1C
Phase 2
Phase 3A
Phase 3B
Phase1A
RIVERDALEMARC
SEABROOK MARC
Sources: Esri, HERE, DeLorme, USGS, Intermap, INCREMENT P, NRCan, EsriJapan, METI, Esri China (Hong Kong), Esri Korea, Esri (Thailand), MapmyIndia,NGCC, © OpenStreetMap contributors, and the GIS User Community
User: klukacs Path: H:\5000\5586_S-WallaceMontg_ATHA_BikeShare_Station_PG_S10-029\PRODUCTION\GIS\MXD\2018_9_11_Bikeshare_Station_Study_Area.mxd
Prince George's CountyCapital Bikeshare
LegendPhase 1APhase 1BPhase 1CPhase 2Phase 3APhase 3B
"Metro Stations
I2Purple Line Station!( mBike Stations
Existing Trails
Existing Bikeshare Station
Planned Bikeshare StationFuture Bikeshare StationMunicipal Boundary
2.5Miles
Terry Bellamy Director
Angela D. AlsobrooksCounty Executive
Phase 1BSources: Esri, HERE, DeLorme,USGS, Intermap, INCREMENTP, NRCan, Esri Japan, METI,Esri China (Hong Kong), EsriKorea, Esri (Thailand),
Department of Public Works and Transportation
Terry L. BellamyDPW&T Director
Angela D. AlsobrooksCounty Executive
CONTACT INFORMATION
POINTS OF CONTACTS DURING DESIGN:
Erv Beckert, P.E.Chief, Highway and Bridge Design Division
Mobile: 240.508.9610
Email: [email protected]
Stephanie WalderDesign Project Manager
Phone: 301-883-5131
Email: [email protected]
POINT OF CONTACT DURING CONSTRUCTION:
Dwight JosephChief, Construction Division
Direct: 301. 883. 5633