    BINANI CEMENT LIMITED

    Unit Profile

    Binani Cement was launched under the brand name BINANI in the year 1997. In the

    beginning the capacity of kiln was 4750 TPD and with in-house effort of plant personnel,

    the clinker production was raised to 5950 TPD in the year 2002-03. We have our own

    captive Thermal Power Plant and 90% of the total power requirement is met from it. In

    the financial year 2003-04, total 2.15

    million tons cement was produced with a

    capacity utilization of 102%.

    Binani Cement has adopted the most

    modern and latest dry-process pre-

    calcination technology with sophisticated

    control instruments ensuring uniform and

    top quality cement. We have also attached utmost importance to the conservation of

    environment in and around our unit by installing efficient dust collection equipment in

    consonance with the international standards.

    An Overview of Binani Cement Limited

    The plant produces three types of cement viz. OPC-43 grade, OPC-53 grade & Portland

    Pozzolona Cement. Company's product has the premium image in the market due to its

    superior quality. The annual turn over of our company is Rs. 46267.5 Lacs for the year

    2003-04. The Herculean task of selling the high quality cement at a competitive price

    put the BCL at their toes to control the cost right from day one.

    Energy Consumption

    18.16 19.1819.97

    0

    5

    10

    15

    20

    25

    2001-02 2002-03 2003-04

    19.2121.12 22.02

    0

    5

    10

    15

    20

    25

    2001-02 2002-03 2003-04

  • 8/4/2019 Bin Ani Cement

    2/7

    In times of increasing cost and decreasing cement prices, optimization of plant

    operation plays a major role.The cost of production should be brought down to the least

    possible level without compromising on quality. All the employees of Binani Cement

    are very energy conscious and they do not leave any stone unturned to reduce the

    electrical as well as thermal energy consumption. Our Management provides free

    hand, full cooperation and moral support in this regard and everyone is being motivated

    to do so. Our percentage of energy cost comes out to 39.87 % of the total cost of

    cement production in the year 2003-04. The electrical & thermal energy consumption

    figures of last three years are shown below: -

    Proportion of Energy Cost Vis--vis Production Cost

    79.6378.00

    76.83

    65

    70

    75

    80

    85

    2001-02 2002-03 2003-04

    701 692 681

    300

    400

    500

    600

    700

    2001-02 2002-03 2003-04

    Fuel

    22.98%

    Raw

    Materials

    Dep. & Int.30.07%

    Sal &

    Wages

    2.86%

    Others

    13.76%

    Electricity16.89%

    13.45%

  • 8/4/2019 Bin Ani Cement

    3/7

    Energy Conservation Commitment, Policy & Setup

    Energy conservation receives top priority at Binani Cement. In view of fast depleting

    natural resources of energy and galloping prices of energy, the commitment of the

    management towards energy conservation measures is high. As we are an ISO-14001

    certified company, we have well defined Environmental policy in which due emphasis is

    given to conservation of raw materials, fossil fuels & electrical energy.

    For the whole plant, Seven Sectional teams are formed from Mines Dept. to Packing

    Plant including Power Plant also. These groups have been given free hand working to

    identify problems, reason of break-down in their sections and coming forward with

    techno-economic feasible solutions and implementing them in a scheduled time frame.

    Monthly performance of their respective section is being apprised to the President

    regularly.

    The Daily Production report, Stoppage Report and Power Report is analysed by all the

    responsible persons at different forum as given below.

    Daily review of stoppage & power report by all team members for improving the

    plant performance.

    Daily Plant performance is reviewed in technical meeting by the top executives of

    the plant. The meeting is chaired by the President.

    Monthly Review Meeting is being held in the Conference Room, which is attendedby all the concerned persons of the plant. Monthly Production and Power targets

    are being set in this meeting.

    Yearly Plant Performance Review for setting up new benchmark for electrical and

    thermal energy consumption.

    Optimisation is an on-going process in all the industries. At BCL, people with innovative

    ideas are nurtured and motivated; their ideas are given due respect and discussed at

    various levels.

    We have Energy Conservation Cell and Quality Cell, which is headed by Senior Vice

    President (Operations). The activities of this cell are being carried out by all the

    executives jointly. Based on the recommendation made by the Energy Conservation

    Cell and reviewed by various level committees, the decisions are taken for

  • 8/4/2019 Bin Ani Cement

    4/7

    implementation of energy conservation programme in short, medium and long term

    basis.

    The Energy Audit is being done on yearly basis either by an outside agency or by our

    in-house team, which helps in identifying the energy saving potentials in different

    sections of the plant. The internal energy audit team at BCL is also well equipped with

    latest monitoring equipment & several competitive in-house developed softwares.

    Binani Cement believes in all modern techniques like Quality Circle, Statistical Process

    Control, Statistical Quality Control, 5-S Techniques etc. and is striving to become a

    world class unit in all its operations.

    Energy Conservation Achievement

    Droplets Make Ocean, as rather big volume of production was involved, even a small

    step taken in the direction turned out to be a great gain. With the sincere efforts of plant

    personnel and motivation given by top management, the energy consumption of plant

    has declined drastically.

    Specific Electrical and Thermal Energy Consumption of the plant in the year 2001-02

    was 79.63 kWh/ton of cement & 701 Kcal/kg clinker respectively. In the year 2003-

    2004, specific Energy consumption reached to 76.83 kWh/ton of cement & 681 Kcal/kg

    clinker. Hence, specific electrical energy consumption lowered by 3.52% & thermalenergy consumption by 7.06%.

    In order to achieve the best energy level, Brain Storming Sessions are conducted for

    getting innovative ideas. Hence, the different ideas are nurtured and motivated and the

    resultant benefits are fruitful modification.

    Few of such modification are enlisted below:-

    1. Energy saving bricks(ACC-Refratherm) installed in the safety zones of kiln

    2. Inlet boxes of Kiln & Calciner fans have been enlarged

    3. Inlet boxes of Raw Mill Fan enlarged

    4. EVASE angle of Sepax fan of both Cement Mills has been reduced from 30 to

    19.5 degree

    5. Speed reduction of Limestone hopper top JPF fan & removal of fan inlet damper

    6. Power distribution system has been optimised to reduce the distribution losses

  • 8/4/2019 Bin Ani Cement

    5/7

    7. Speed reduction of Surge Bin top JPF fan(211FN1) & removal of fan inlet

    damper

    8. Sand Sealing provided in the divertors of Preheater Cyclone's below K-6 & C-5

    9. Shifted PH Fan 1 feeder from incomer 2 to incomer 1in LC3 HT board

    10. Speed reduction of Limestone hopper top JPF fan 311FN2 & removal of fan inlet

    damper

    11. Speed reduction of Baghouse Transport JPF fan 391FN8 & removal of fan inlet

    damper

    Energy Conservation Plans & Targets

    Our new benchmark for electrical energy consumption is 78.5 kWh/ton of cement

    (Target revised due to pet-coke consumption) and for thermal energy consumption is688 Kcal/kg clinker. The following energy conservation related projects have been

    identified for implementation in the plant.

    Modification to be done in the preheater cyclones

    Calciner string downcomer duct dia to be increased from 3 to 3.5 mtr.

    Quantity of energy saving bricks to be extended from 10 mtr. to 30 mtr. length in

    the kiln

    Optimisation packages to be installed in Raw Mill, Kiln & Cement Mills

    Environment and Safety

    Utmost priority is always given on Industrial safety, occupational health and

    environment protection in our unit. We have an effective Environment Management

    system conforming to ISO 14001:1996 and Occupational Health & Safety Management

    System conforming to OHSAS: 18001. The company has distinct and well-defined

    safety, health and environment policy to provide a framework for further developing

    system and procedure to achieve objectives/goals.

    Environment

    As of our prime concern, the technology and equipment selection was so keeping

    environmental consideration as topmost priority. The various environmental aspects/

    impacts were considered/envisaged and accordingly mitigatory measures were

    adopted. Following are the few measures taken for environmental protection: -

  • 8/4/2019 Bin Ani Cement

    6/7

    All the major venting points are provided with pollution control equipment like Bag

    House (L.S. Crusher, Raw Mill/Kiln Section) and 4 Nos. of Electro Static Precipitator

    ESP (Coal Mill, Clinker Cooler, and Cement Mills). The air is emitted out through a

    stack, the stacks are regularly monitored for its emission of Particulate Matter and

    found to be less to the norms of 150 mg/N-m3.

    All the transfer points are provided with Jet Pulse Filter (JPF) so that no emission

    occurs during transportation of material.

    Dust suppression system has been installed at Coal & Limestone unloading points.

    Provision of water sprinkling on the belt carrying raw material is made.

    Provision of water injection in drilling machine to reduce the dust emission.

    We maintain a status of Zero Discharge unit. The cement plant consumes water in

    cooling the machines & for temperature control in process, hence no waste water

    gets generated which is to be disposed off.

    Our Domestic Waste-water is treated in a Sewage Treatment Plant and then reused

    for Plantation.

    The operators of HEMM are provided with Air Conditioned cabin to prevent them

    from dust exposure and for improved efficiency.

    The noise making machines like Compressors, Blower etc are provided with an

    enclosure.

    Regular monitoring of noise levels and initiation of corrective action if any for

    increased noise levels.

    We have already kept more than 47% of the land in our possession reserved for

    plantation. Till date 83,000 numbers of saplings have been planted.

    Safety

    We have defined our own On-Site Emergency plan for handling any type of

    emergency/eventuality. For handling emergencies & its speedy execution, we have

    made a Central Safety Committee. The safety committee makes aware the plant

    personnel about the hazards involved in their tasks through training, developing

    procedures, investigation of accidents, maintaining statistics, active participation &

    organizing safety meetings.

    Our company is always one step ahead in taking care of employees health/ safety and

    their well being. We have gone for OHSAS 18001 (Occupational Health & Assessment

  • 8/4/2019 Bin Ani Cement

    7/7

    Series) just because to provide safe working place / environment to every employees.

    We have identified all unsafe areas and where there is a chance of exposure to hazard,

    accident and incident. Regularly our sectional teams are taking rounds and further

    identifying the unsafe working place and person, and reviewing the same in OHS cell

    meeting. As a part of welfare and well being of our employees, various improvements

    have been carried out in the canteen for keeping raw material in hygienic condition,

    dishwashing system for proper cleaning and manifold system to provide safety to our

    employees in canteen. To timely check and maintain hygiene condition in canteen, a

    committee has been framed with equal participation of workmen & Executive staff.

    We are having our well-quipped, diagnostic and health center with qualified doctor and

    para-medical staff in our residential area round the clock employees and the villagers

    can get free medical aid. The company has also taken very good insurance policy for

    their employees, which covers the employees security for twenty-four hours i.e. GPA,

    Janta Policy & Mediclaim, which brings sense of security among the employees.