HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential Security Level: www.huawei.com Vodafone IP MW Project BNC Panel Test Procedure

BNC Panel Test Procedure

Embed Size (px)

DESCRIPTION

BNC Panel Test Procedure

Citation preview

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    Security Level:

    www.huawei.com

    Vodafone IP MW Project

    BNC Panel Test Procedure

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    BNC Panel Test

    Page 2

    Connectivity is as shown in the figure.

    Test to be done by doing physical loopback on each E1.

    Test on the WebLCT will be as shown in the next slide.

    ALL E1s should be tested , and print screen of a successful result should be taken

    CSH

    IFU2 EM6F

    IFU2

    SP3D

    E1: 1 to 16

    E1: 17 to 32

  • HUAWEI TECHNOLOGIES CO., LTD. Huawei Confidential

    BNC Panel Test

    Page 3

    Tributary Should be 0Should be 100%

    Should be Green (Normal)

    Start Test:-Should be performed for ALL E1s

    Should be 5

    1 1

    2

    3

    3

    3

  • Thank youwww.huawei.com

    Vodafone IP MW ProjectBNC Panel TestBNC Panel TestSlide Number 4