BOARD OF EDUCATION OF CALVERT COUNTY PLANNING & CONSTRUCTION REPORT November 7, 2019 WORK IN PROGRESS Project Design Construction Northern High School Replacement GWWO Architects Administration Building o Roofing complete o Window frame installation complete o HVAC equipment installed o Interior insulation and drywall work ongoing Mary Harrison Center o Floor slab complete o Exterior brick complete o Interior block walls complete Bus loop base paving ongoing Bio-pond work ongoing Landscaping around Classroom building complete Site concrete in plaza and front of administration building ongoing J.A. Scheibel Misc. Security Projects Smolen Emr Ilkovitch Architects Guided Vestibule Projects at 6 schools complete Final round of security projects currently being surveyed J.A. Scheibel FHP Tectonics Beach Elementary School Final feasibility study submitted to State Planning request submitted in FY 2021 CIP Design Services solicitation in development

BOARD OF EDUCATION OF CALVERT COUNTY...BOARD OF EDUCATION OF CALVERT COUNTY PLANNING & CONSTRUCTION REPORT November 7, 2019 . Huntingtown High School Front Entrance & Gymnasium Entrance

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

  • BOARD OF EDUCATION OF CALVERT COUNTY PLANNING & CONSTRUCTION REPORT

    November 7, 2019

    WORK IN PROGRESS

    Project Design Construction Northern High School Replacement

    GWWO Architects • Administration Building

    o Roofing complete o Window frame installation complete o HVAC equipment installed o Interior insulation and drywall work

    ongoing • Mary Harrison Center

    o Floor slab complete o Exterior brick complete o Interior block walls complete

    • Bus loop base paving ongoing • Bio-pond work ongoing • Landscaping around Classroom building

    complete • Site concrete in plaza and front of

    administration building ongoing

    J.A. Scheibel

    Misc. Security Projects Smolen Emr Ilkovitch Architects • Guided Vestibule Projects at 6 schools

    complete • Final round of security projects currently

    being surveyed

    J.A. Scheibel FHP Tectonics

    Beach Elementary School

    • Final feasibility study submitted to State • Planning request submitted in FY 2021 CIP • Design Services solicitation in development

  • BOARD OF EDUCATION OF CALVERT COUNTY PLANNING & CONSTRUCTION REPORT

    November 7, 2019

    Huntingtown High School Front Entrance & Gymnasium Entrance Arches

    CRA Associates • Punch list work ongoing

    Colossal Contractors

    Aging School Projects (ASP) – Partial Intercom Replacement at Plum Point Middle School & Mt. Harmony Elementary School

    In House Design • Work Complete

    Commercial Cabling & Sound

    Patuxent High School HVAC Replacement – Phase 2

    James Posey Associates • Phase 2 construction complete

    W.L. Gary Company

    Calvert Country School Systemic Renovation

    Alban Engineering • Project complete

    W.L. Gary Company

    Southern Middle School HVAC Equipment Replacement

    Alban Engineering • Previous Building Automation Controls

    Project scope combined into overall project scope.

    • Project phasing over 2 summers (2021/2022) • Design related work to begin in November

    TBD

    Mt. Harmony Elementary School Partial HVAC Replacement

    James Posey Associates • Design 95% complete

    TBD

    Northern High School/Northern Middle School Wastewater Treatment Plant

    Whitman Requardt & Associates • Design 95% complete

    TBD

    Video Surveillance Project - IDIQ Marathon Technology Solutions • Elementary School camera installation-100%

    Marathon Technology Solutions

  • BOARD OF EDUCATION OF CALVERT COUNTY PLANNING & CONSTRUCTION REPORT

    November 7, 2019

    School Security Grant Program -Round 2

    • Round 2 application-State review complete • CCPS awarded $175,000 in grant funding • Project surveys ongoing

    Misc. Existing Contracts

    Northern Middle School • Educational Specifications (Ed Specs) to be developed in 2020

    TBD

  • Northern High School Replacement

    June 2019

    October 2019

  • Northern High School Replacement

    Micro Bioretention Pond – June 2019 Micro Bioretention Pond – October 2019

  • Northern High School Replacement