UMSQEMRD GROUND FLOOR RCC QUANTITY
S.NO. DESCRIPTION NO'S. REMARKS
A BEAMS
1 GB01 1 1.56 0.3 0.25 0.117
2 GB02 TO GB 05 1 12.155 0.3 0.25 0.912
3 GB06 1 5.85 0.3 0.5 0.878
4 GB07,GB10 1 12.93 0.4 0.5 2.586
5 GB11 1 5.705 0.3 0.5 0.856
6 GB12,GB13 1 11.26 0.3 0.5 1.689
7 GB14,GB15 1 12.03 0.4 0.5 2.406
8 GB16 1 6.11 0.4 0.5 1.222
9 GB17,GB18 1 11.26 0.4 0.5 2.252
10 GB19 1 6.22 0.4 0.5 1.244
11 GB21 1 3.02 0.3 0.35 0.317
12 GB22 1 5.81 0.35 0.5 1.017
13 GB23,GB24 1 11.54 0.3 0.5 1.731
14 GB25,GB26 1 12.93 0.4 0.5 2.586
15 GB27,GB28 1 11.54 0.3 0.5 1.731
16 GB29,GB30 1 12.93 0.4 0.5 2.586
17 GB31 1 2.575 0.3 0.25 0.193
18 GB32,GB33 1 11.54 0.3 0.5 1.731
19 GB34 1 2.73 0.4 0.5 0.546
20 GB35 1 7.92 0.4 0.5 1.584
21 GB36 TO GB38 1 7.92 0.4 0.35 1.109
22 GB39,GB40 1 11.54 0.3 0.5 1.731
23 GB42 1 2.96 0.3 0.25 0.222
24 GB43 1 3.8 0.3 0.25 0.285
25 GB44 TO GB51 1 34.66 0.3 0.25 2.600
26 GB52 TO GB58,GB58A 1 32 0.3 0.25 2.400
27 GB59 TO GB66 1 34.66 0.4 0.35 4.852
28 GB67 TO GB73,GB73A 1 32 0.3 0.25 2.400
29 GB74 TO GB81 1 34.66 0.3 0.25 2.600
30 GB83 1 4.99 0.3 0.25 0.374
31 GB84 TO GB87 1 16.7 0.4 0.35 2.338
32 GB88 1 3.4 0.4 0.5 0.680
33 GB89 1 4.635 0.4 0.35 0.649
34 GB90 TO GB92 1 13.635 0.3 0.25 1.023
35 GB93 1 3.01 0.3 0.25 0.226
36 GB94 TO GB98 1 21.85 0.3 0.25 1.639
37 GB99 1 5.815 0.4 0.5 1.163
38 GB100 1 3.01 0.4 0.35 0.421
39 GB101 TO GB105 1 21.85 0.4 0.35 3.059
40 GB106 TO GB109 1 13.635 0.3 0.25 1.023
41 GB110 TO GB115 1 21.85 0.3 0.25 1.639
42 GB116 1 5.925 0.3 0.5 0.889
43 GB117 1 3.01 0.3 0.35 0.316
44 GB118 1 3.91 0.3 0.25 0.293
MAIN CONTRACTOR: LARSEN & TOUBRO LIMITED ECC DIVISION P.O. BOX 30803, ABU DHABI, U.A.E.
LENGTH (m)
WIDTH (m)
DEPTH (m)
THICKNESS (m)
VOLUME (m3)
45 GB119 1 3.885 0.3 0.25 0.291
46 GB120 1 1.945 0.3 0.25 0.146
47 GB121 1 3.4 0.3 0.25 0.255
48 B01 B02 2 0.6 0.3 0.6 0.216
49 B03 1 0.7 0.3 0.6 0.126
50 B04 1 3.82 0.4 0.4 0.611
51 B05,B06 1 5.86 0.4 0.4 0.938
52 B07,B08 1 5.745 0.4 0.4 0.919
53 B10 1 5.715 0.3 1.6 2.743
54 B11 1 2.75 0.3 1.6 1.320
55 B12 1 3.95 0.3 0.6 0.711
56 B13 1 6.7 0.3 1.6 3.216
57 B14,B15 1 6.7 0.4 0.4 1.072
58 B16 1 2.89 0.3 1.6 1.387
59 B17 1 3.95 0.3 0.6 0.711
60 B18 1 7.14 0.3 1.6 3.427
61 B19,B20 1 7.14 0.4 0.4 1.142
62 B21 1 3.19 0.3 1.6 1.531
63 B22 1 3.95 0.3 0.6 0.711
64 B23 1 5.8 0.3 0.6 1.044
Total 84.631
B SLABS
1 SLAB1 1 22.38 8.24 0.2 36.882
2 SLAB2 1 28.08 31.275 0.25 219.550
3 SLAB3 1 18.935 3.985 0.25 18.864
Total 275.297
359.927
C DEDUCTIONS
1 OPENING FOR STAIR CASE 1 2.8 5.915 0.25 4.140
2 CABLE TRENCH OPENING 6 0.273 0.6 0.25 0.246
3 CABLE TRENCH OPENING 24 0.273 0.45 0.25 0.737
4 CABLE TRENCH OPENING 36 0.273 0.5 0.25 1.229
5 CABLE TRENCH OPENING 42 0.1 0.35 0.25 0.368
6 CABLE TRENCH OPENING 8 0.1 0.48 0.25 0.096
7 CABLE TRENCH OPENING 3 0.115 0.57 0.25 0.049
8 CABLE TRENCH OPENING 2 0.1 0.35 0.25 0.017
9 CABLE TRENCH OPENING 11 0.2 0.35 0.25 0.193
10 CABLE TRENCH OPENING 3 0.613 0.718 0.25 0.330
11 CABLE TRENCH OPENING 4 0.8 0.8 0.25 0.640
12 CABLE TRENCH OPENING 1 0.55 1 0.25 0.138
13 CABLE TRENCH OPENING 5 0.6 1 0.25 0.750
15 CABLE TRENCH OPENING 2 0.6 1.3 0.25 0.390
16 CABLE TRENCH OPENING 1 0.6 1.4 0.25 0.210
17 CABLE TRENCH OPENING 2 1.2 1.7 0.25 1.020
18 CABLE TRENCH OPENING 3 1.2 0.9 0.25 0.810
19 CABLE TRENCH OPENING 4 0.7 0.8 0.25 0.560
20 CABLE TRENCH OPENING 2 0.65 0.8 0.25 0.260
21 CABLE TRENCH OPENING 9 0.15 0.35 0.25 0.118
22 CABLE TRENCH OPENING 1 0.55 1.05 0.25 0.144
23 CABLE TRENCH OPENING 1 0.4 1 0.25 0.100
24 CABLE TRENCH OPENING 1 0.5 1.05 0.25 0.131
25 CABLE TRENCH OPENING 1 0.94 7.05 0.25 1.657
Total 14.333
Total concrete Quantity 345.595