Project Costing template.xls Project Title: Date Prepared: WBS ID Labor Hours Labor Rates Total Labor Material Supplies Equipment Travel Other Direct Costs Indirect Costs Reserve Estimate From WBS. From duration estimates. By hour, day or fixed rate. Hours x rates. From quotes. From quotes. From quotes. From quotes. As appropriate. Per company policy. As appropriate. Sum of all costs. BOTTOM-UP COST ESTIMATING WORKSHEET This document is part of the iKompass PMP training in SIngapore

BOTTOM-UP COST ESTIMATING WORKSHEET - Courses |PMP… · Hours x rates. From quotes. From quotes. From quotes. From quotes. As appropriate. Per company policy. As appropriate. Sum

  • Upload
    donhan

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BOTTOM-UP COST ESTIMATING WORKSHEET - Courses |PMP… · Hours x rates. From quotes. From quotes. From quotes. From quotes. As appropriate. Per company policy. As appropriate. Sum

Project Costing template.xls

Project Title: Date Prepared:

WBS ID

Labor Hours

Labor Rates Total Labor Material Supplies Equipment Travel

Other Direct Costs

Indirect Costs Reserve Estimate

From WBS.

From duration estimates.

By hour, day or fixed rate.

Hours x rates.

From quotes.

From quotes.

From quotes.

From quotes.

As appropriate.

Per company policy.

As appropriate.

Sum of all costs.

BOTTOM-UP COST ESTIMATING WORKSHEET

This document is part of the iKompass PMP training in SIngapore